Paint Booth SOW - Appendix A1 - Hangar 253 Building Plans (Supplemental Drawings for Addendum)_JUN_26_2020.pdf
PDF 2 MB Posted
- Attached to
- Paint Booth- W508S8A -20-Q-0005
- Solicitation number
- W508SA
About this file
This solicitation is for a paint booth and installation services. The New Hampshire Army National Guard requires a paint booth and installation as a single line item for quantity one. Quotes are due by June 5, 2020 and the site visit will be the week of June 8, 2020. The requirement is set aside 100% for small business. The solicitation includes evaluation criteria of past performance, technical approach, and price. The selected vendor must comply with Defense Federal Acquisition Regulation Supplement clauses and provisions on such areas as certification of no forced or indentured child labor for listed products and prohibition of contracting with entities engaging in certain Iran-related activities.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by No. Date
Sheet
C :\D fil e\
4.
-C
-1
.D
W G
Stamp
PEASE AIR NATIONAL
GUARD BASE
NEW HAMPSHIRE
www.oakpoint.com 85 Middle Street, Portsmouth, NH 03801 (T) 603.431.4849 (F) 603.431.1870
KC-46A ADAL FUEL CELL, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SZCQ139901
SJT
WAL
JRK
SJT
9 APRIL 2015
C-105
SITE UTILITY PLAN
AS SHOWN
1ST STAGE 1 MICRON FILTER
2ND STAGE .01 MICRON FILTER
REGULATOR WITH PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 150 PSIG RANGE.
4 OUTLET MANIFOLD W/QUICK
DISCONNECTS
1 2 3
FLOW GAUGE (SCFM)
NOTE: QUICK DISCONNECT FITTINGS FOR TOOL AIR OUTLETS SHALL NOT BE
COMPATIBLE WITH QUICK DISCONNECT FITTINGS FOR BREATHING AIR
OUTLETS.
BALL VALVE, TYP.
6" MIN.
DIRT LEG
FULL PORT
BALL VALVE
GENERAL PURPOSE
LUBRICATOR
HOSE QUICK
DISCONNECT FITTING
GENERAL PURPOSE FILTER WITH
REGULATOR AND PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 150 PSIG RANGE.
NOTE: ARRANGEMENT MAY MIRROR IN SOME LOCATIONS.
6" MIN. DIRT
LEG
SIDE VIEW END VIEW
ADAPTER
BALL VALVE / INLET TAP
DRIP LEG/
SEDIMENT TRAP
2" MAX DISPLACEMENT12"
HEATER
MOVEMENT
FLEXIBLE GAS CONNECTOR
ADAPTER
BURNER CONTROL BOX
FLEXIBLE GAS CONNECTOR
BALL VALVE / INLET TAP
45°
45°
HORIZONTAL
REMOVE CAP TO CLEAN
SEDIMENT TRAPBURNER CONTROL BOX
NOTE: DO NOT EXCEED 14 INCHES W.C. TO THE APPLIANCE.
BURNER BOX
MOUNTING
BRACKET
BURNER TUBE IS IN STRAIGHT
ALIGNMENT WITH 10' PRIMARY
COMBUSTION CHAMBER.
BURNER SIGHT GLASS
(BOTTOM SIDE OF THE TUBE)
SIDE VIEW
6" MIN.
DIRT LEG
GAS PIPE
THREADED CAP FITTING
UNION
GAS COCK.
PROVIDE "LOCKOUT" ON
VALVE.
NOTE:
REFER TO DRAWINGS FOR INLET AND OUTLET LINE SIZES.
ALL GAS FUELED EQUIPMENT SHALL BE PROVIDED WITH A PRESSURE
REGULATOR UNLESS IT IS PROVIDED INTEGRAL TO THE EQUIPMENT.
MEDIUM PRESSURE GAS
SUPPLIED AT 2 PSI
MAXITROL GAS
PRESSURE
REGULATOR
LOW PRESSURE GAS
SUPPLIED AT 0.5 PSI
TO EQUIPMENT
VENT LIMITER
BALL VALVE, TYP.
1ST STAGE 1 MICRON FILTER
2ND STAGE .01 MICRON FILTER
REGULATOR WITH PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 40 PSIG RANGE.
FLOW GAUGE (SCFM)
STEEL BRAIDED HOSE
QUICK DISCONNECT FITTING
MOTORIZED HOSE REEL WITH
300' 1/2" HOSE (MOUNTED TO
STRUCTURE ABOVE). PROVIDE
HOSE REEL IN HANGAR BAY
ONLY. COXREEL 1125
NOTE: QUICK DISCONNECT FITTINGS FOR TOOL AIR OUTLETS SHALL NOT BE
COMPATIBLE WITH QUICK DISCONNECT FITTINGS FOR BREATHING AIR
OUTLETS.
6" MIN.
DIRT LEG
BALL VALVE, TYP.
6" MIN.
DIRT LEG
FILTER WITH REGULATOR AND
PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 150
PSIG RANGE.
STEEL BRAIDED HOSE
QUICK DISCONNECT FITTING
MOTORIZED HOSE REEL WITH
300' 1/2" HOSE (MOUNTED TO
STRUCTURE ABOVE). PROVIDE
HOSE REEL IN HANGAR BAY
ONLY. COXREEL 1125
QUICK DISCONNECT FITTING
GENERAL PURPOSE LUBRICATOR
FILTER WITH REGULATOR
AND PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 150
PSIG RANGE.
QUICK DISCONNECT FITTING
FILTER WITH REGULATOR
AND PRESSURE GAUGE.
UNIT TO PROVIDE 5 TO 150
PSIG RANGE.
NOTE: QUICK DISCONNECT FITTINGS FOR TOOL AIR OUTLETS SHALL NOT BE
COMPATIBLE WITH QUICK DISCONNECT FITTINGS FOR BREATHING AIR
OUTLETS.
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-502
PLUMBING DETAILS
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE: N.T.S.
5 BREATHING AIR DROP DETAIL
SCALE: N.T.S.
3 COMPRESSED AIR DROP (TOOL AIR) DETAIL
SCALE: N.T.S.
6 FLEXIBLE GAS CONNECTION DETAIL
SCALE: N.T.S.
4 GAS CONNECTION TO EQUIPMENT
SCALE: N.T.S.
1 HANGAR BAY BREATHING AIR DROP DETAIL
SCALE: N.T.S.
HANGAR BAY COMPRESSED AIR DROP (TOOL
AIR) DETAIL
W
W
IWH-1
P11
IWH-2
FPH
P7
IWH-2
P11
IWH-3
P10
FPH
FPH
IWH-3
P10
HB
IWH-1
IWH-2
P11
FPH
RPBP
GWH-1
CP-1
1" CW
1-1/4" CW
3/4" CW
3/4" CW
1-1/4" CW
1-1/4" CW
1-1/4" CW
1-1/4" CW
1" CW
3/4" CW 3/4" CW
1-1/4" CW
1-1/4" CW
3" CW
2-1/2" CW
1-1/4" CW
2-1/2" CW
3/4"
2-1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
3" CW
'A'
'B'
1" CW
TYPE K COPPER ROUTED
BELOW SLAB TO TRENCH DRAIN
FOR WASH OUT
1" CW
1" CW
TYPE K COPPER ROUTED
BELOW SLAB TO TRENCH DRAIN
FOR WASH OUT
1" CW
TYPE K COPPER ROUTED
BELOW SLAB TO TRENCH DRAIN
FOR WASH OUT
1-1/4" CW
1-1/4" CW
1" CW
TYPE K COPPER ROUTED
BELOW SLAB TO TRENCH DRAIN
FOR WASH OUT
2-1/2" CW
3/4 HWR"
1-1/2 HW"
1-1/2" CW
2-1/2" CW
2-1/2" CW
1-1/2" HW
1-1/2" HW
3/4" HWR
3/4" HWR
3/4"
3/4"
1-1/2"
HW @ 120°
1-1/2"
HW @ 140°
TO EXISTING SOLAR
SUPPLY FEED
TO EXISTING FEED TO
RESTROOMS
3/4" HWR
1-1/2" CW
FIELD VERIFY SIZE
1-1/4" CW
3/4" CW
3/4" CW TO HUMIDIFIER
WITH RPBP
P4
P4
P4
P4
P4
P4
P1
P2
P3
P1
P2
P1
FPH
P5
P1
P10
P6
P6 P5
HB
2-1/2" CW
1-1/4" CW
2" CW
1/2"
1/2"
1/2"
1/2"
1/2"
1/2"
1"
1"
3/4" 3/4"
1"
1/2"
1/2" 1" CW
3/4"
3/4"
1"
1"
1/2" CW
1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
2-1/2" CW
2" CW
1-1/2" CW1-1/2" CW
2" CW
1-1/2" CW
1-1/2" CW
1-1/4" CW 1/2" HW
3/4" HW
1-1/4" CW
1-1/4"
CW
1/2" CW
1/2" CW 1" CW
3/4" CW
'A'
'B'
TO PWP-1 PUMP
SYSTEM
ON MECHANICAL
MEZZANINE
3/4"
3/4" HWR
1-1/2" HW
1/2" HW
1" HW
1-1/4" HW
3/4" HWR
3/4" HW
1" HW
1-1/4" HW
1" HW
3/4" HWR
#200
#100
#200
BALANCING VALVE
#100
#100
3/4" CW TO
HUMIDIFIER
WITH RPBP
SYMBOL LEGEND
SYMBOL ABRV. DESCRIPTION
WATER DROP
COMPRESSED AIR DROP
W
CA
BREATHING AIR DROPBA
1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN
WASH OUT
WD
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-901
DOMESTIC WATER RISER DIAGRAM
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE:NTS
DOMESTIC WATER RISER DIAGRAM - OVERALL
SCALE:NTS
DOMESTIC WATER RISER DIAGRAM - RESTROOMS
P-503
P-503
P-503
P-503
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
CA
AC-1
2-1/2" CA
2-1/2" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA2-1/2" CA
2-1/2" CA
2-1/2" CA
1-1/4" CA
1-1/4" CA
1" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA
1-1/4" CA
1-1/4" CA
2-1/2" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
1-1/4" CA
2-1/2" CA
1-1/4" CA
1-1/4" CA
1" CA
1" CA
1" CA
1" CA
1" CA
1" CA
1-1/4" CA
2-1/2" CA
2" CA
2" CA
1-1/4" CA
1-1/4" CA
2-1/2" CA
2-1/2" CA
2-1/2" CA
1" CA
2-1/2" CA
1" CA
1" CA
1" CA
1" CA
1" CA
1-1/2" CA
1-1/4" CA
1-1/4" CA
2-1/2" CA
2-1/2" CA
1/2" CA
1/2" CA DOWN TO PNEUMATIC
FLOW CONTROL VALVE MANIFOLD
SYMBOL LEGEND
SYMBOL ABRV. DESCRIPTION
WATER DROP
COMPRESSED AIR DROP
W
CA
BREATHING AIR DROPBA
1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN
WASH OUT
WD
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-903
COMPRESSED AIR RISER DIAGRAM
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE:NTS
COMPRESSED AIR RISER DIAGRAM
P-502
P-502
P-502
P-502
P-502
NOTE:
REFER TO DETAIL 3 ON P-502 FOR TYPICAL COMPRESSED AIR
DROPS.
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
BA
AC-2
1" BA
1" BA
2" BA
2" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
1" BA
2" BA
2" BA
1" BA
1" BA
1" BA
1" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
2" BA
1-1/2" BA 1" BA
1" BA
1-1/4" BA
1" BA
1" BA
SYMBOL LEGEND
SYMBOL ABRV. DESCRIPTION
WATER DROP
COMPRESSED AIR DROP
W
CA
BREATHING AIR DROPBA
1" WATER DROP WITH MANUALVALVE FOR TRENCH DRAIN
WASH OUT
WD
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-904
BREATHING AIR RISER DIAGRAM
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE:NTS
BREATHING AIR RISER DIAGRAM
P-502
P-502
P-502
P-502
P-502
NOTE:
REFER TO DETAIL 5 ON P-502 FOR TYPICAL BREATHING AIR
DROP.
P5
FD1
P1
P2
P1
FD1
P4
P1
P2
P3
FD1
P4
P5 FD1
P1
P6
P6
P10
P4
P4
P4
P4
WCO
WCO
WCO
WCO
YCO
P10
FCO
WCO FD2
FD2
P10
FD1
FD1
FD2
4" SS
6" SS
6" SS
6" SS
TRANSITION TO 6" BEFORE
EXITING BUILDING
4" SS
4" SS
4" SS
4" SS
4" SS
2" SS
2" SS
2" SS
2" SS
4" SS
4" SS
4" SS
4" SS
4" SS
4" SS
4" SS
2" SS
2" SS
2" SS
4" SS
4" SS
4" SS
4" SS
4" SS4" SS
4" SS
3" SS
3" SS
4" SS
3" SS
3" SS
3" SS
3" SS
1-1/2"
1-1/2"
1-1/2"1-1/2"
1-1/2"
2"
1-1/2"
1-1/2"
2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
2"
2"
4"
4"
1-1/2"
4" SS
4" SS
4" SS
4" SS
4" SS
4" SS
1-1/2"
1-1/2"
2"
2"
2"
2-1/2"
2-1/2" 3"
1-1/2"
2"
2"
1-1/2"
2"
1-1/2"
2"
3"
3"
3" VTR
1-1/2"
2"
2"
3" SS 3" SS
3" SS
3"
3" SS
3"
3"
1-1/2"
2"
2"
3" VTR
2"
2"
3" SS
3" SS
2" VTR
3" SS
3" SS
3"
3" SS
4" SS
3" SS
1-1/2"
1-1/2"
INVERT @ 87.5' REFER TO
CIVIL SHEETS FOR
CONTINUATION
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-905
SANITARY SEWER RISER DIAGRAM
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE:NTS
SANITARY SEWER RISER DIAGRAM
NEW GAS
METER
16,655 CFH
TOTAL
RH-10
90 CFH
RH-9
90 CFH
RH-5
90 CFH
RH-7
90 CFH
RH-4
155 CFH
RH-3
155 CFH
RH-2
155 CFH
RH-1
155 CFH
IWH-1
200 CFH
IWH-1
200 CFH
IWH-1
200 CFH
IWH-2
125 CFH
IWH-2
200 CFH
IWH-1
200 CFH
IWH-2
125 CFH
IWH-1
200 CFH
IWH-1
200 CFH
RH-6
90 CFH
RH-8
90 CFH
GRIEVE
750 CFHB-3
3,000 CFH
B-2
3,000 CFH
B-1
3,000 CFH
RH-11
90 CFH
RH-12
60 CFH
IWH-1
200 CFH
IWH-2
125 CFH
GWH-1
120 CFH
PAINT BOOT
MAKE-UP AIR UNIT
2,000 CFH
EXISTING
GRIEVE
500 CFH
4" G @ 5 PSI
SHUNT TRIP VALVE
LINKED TO FOAM FIRE
SYSTEM
4" G @ 5 PSI
4" G @ 5 PSI
6" G @ 2 PSI
1-1/4" G
1" G @ 2 PSI
1-1/4" G @ 2 PSI
1-1/4" G @ 2 PSI
1" G
1" G
2" G
2" G @ 2 PSI
1-1/2" G @ 2 PSI
1-1/4" G @ 2 PSI
1-1/2" G3" G @ 2 PSI
3-1/2" G @ 2 PSI
4" G @ 2 PSI
1-1/4" G @ 2 PSI
1-1/2" G @ 2 PSI
1" G
1" G
1" G
1" G
1" G
1-1/4" G @ 2 PSI
1-1/4" G @ 2 PSI
1" G @ 2 PSI
1" G @ 2 PSI
1-1/4" G
1" G
1" G
1" G @ 2 PSI
1" G @ 2 PSI
1" G @ 2 PSI
1" G @ 2 PSI
2" G @ 2 PSI
1-1/4" G @ 2 PSI
6" G @ 2 PSI
1" G @ 2 PSI1" G
1" G @ 2 PSI
6" G @ 2 PSI
6" G @ 2 PSI
1" G
1" G @ 2 PSI
1" G @ 2 PSI
1" G
1" G
6" G @ 2 PSI
6" G @ 2 PSI
1" G
2-1/2" G @ 2 PSI
2-1/2" G @ 2 PSI
2-1/2" G @ 2 PSI
1-1/4" G @ 2 PSI
2-1/2" G @ 2 PSI
5 PSI TO 2 PSI
REGULATOR
1" G @ 2 PSI
1" G @ 2 PSI
1" G @ 2 PSI
1" G
2-1/2" G @ 2 PSI
6" G @ 2 PSI
1" G @ 5 PSI
4" G @ 5 PSI
4" G @ 5 PSI
1" G @ 5 PSI
PEASE AIR BASE
NEW HAMPSHIRE
NATIONAL GUARD Project
Client
Drawing
NEW HAMPSHIRE AIR NATIONAL GUARD
REVISIONS
Description
Drawn by
Designed by
Scale
Date
Project No.
Approved by
Checked by Date
Sheet
N :\P ro je ct s\
A ut oc ad
P ro je ct s\ P e as e A
F B
H a ng ar s\ D ra w in gs
\A ut oC A
D R ef er en ce
S
Z C
Q
-G -B
S A
R C
1.
dw g g ue ck er
AS SHOWN
Stamp
P-906
GAS PIPING RISER DIAGRAM
09 APRIL 2015
JWM
JWM
DSB
DSB
SZCQ139901
KC-46A ADAL FUEL CELL HANGAR, BUILDING 253
PEASE AIR NATIONAL GUARD BASE, NEW HAMPSHIRE
SCALE:NTS
GAS PIPING RISER DIAGRAM
P-504
NOTE:
REFER TO DETAIL 4 ON P-502 FOR TYPICAL GAS CONNECTION TO
EQUIPMENT.
| B253_C-105_NEW |
| B253_P-502_NEW |
| B253_P-901_NEW |
| B253_P-903_NEW |
| B253_P-904_NEW |
| B253_P-905_NEW |
| B253_P-906_NEW |
File details come from the government source that posted it. Updated .