This document is a request for proposal for the manufacture of M2, M48, and M2A1 .50 caliber machine guns and associated support packages. The U.S. Army Contracting Command - New Jersey is seeking proposals for the production of machine guns, spare barrels, enhanced barrels, spare parts packages, special tools and gauges, maintenance support items, and operator and field maintenance training. This procurement is set aside for small businesses. Proposals will be due 30 days from the release of the solicitation. Offerors must submit documentation to obtain copies of the technical data packages, including a technical data request questionnaire, non-disclosure agreement, and military critical technical data agreement along with verification of company legitimacy. The points of contact for this solicitation are provided.
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Firm Fixed Price
W15QKN
ARMY CONTRACTING COMMAND - NJ
PICATINNY ARSENAL, NJ 07806-5000
MICHAEL GRACE
EMAIL: MICHAEL.F.GRACE4.CIV@ARMY.MIL
W15QKN-24-R-0005
2023OCT04
X
X 2024JAN10
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 28
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MICHAEL GRACE
Buyer Office Symbol/Telephone Number: CCNJ-SL/(973)724-5855
Type of Contract 1: Firm Fixed Price
Kind of Contract: Supply Contracts and Priced Orders
*** End of Narrative A0000 ***
The purpose of this amendment is to:
1) Update Attachment 0016 addressing questions asked since the last amendment.
2) Updating the SOW with the answer to one of the questions that was addressed.
3) Updating Sections L and M in the Solicitation.
4) Updating Attachment 0005 of the Pricing Matrix with the OCONUS OPNET.
5) Extending the closing date for proposals to 10 January 2024.
All other aspects of the solicitation and previous amendments remain unchanged and in full effect.
*** END OF NARRATIVE A0005 ***
2 28
W15QKN-24-R-0005
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
STATEMENT OF WORK
M2, M48, AND M2A1 CALIBER .50 MACHINE GUNS AND SUPPORT PACKAGES
C.1.0 SCOPE. This is an Unclassified Procurement, and the objective of this Statement of Work (SOW) is to manufacture, package, and deliver machine guns and spare part packages for the M2 family of caliber .50 machine guns; including the M2, M48, and M2A1.
Support packages include spare barrels, special tools and gauges, maintenance support items, and operator and field maintenance training for each of the machine guns as specified for each delivery order.
C.2.0 BACKGROUND. The M2 family of machine guns are automatic, recoil-operated, link-belt-fed, air-cooled, caliber .50 crew-served weapons: capable of right and left-hand feed. The M2 is capable of firing single-shot and automatic and includes a backplate small-arms safety. It is used as a ground gun mounted on an M205 (or legacy M3) tripod mount, MK93 mount, or is installed on the M66 ring mount of several types of combat vehicles. The M48 is capable of firing automatic only and is mounted on the M1, M1A1, or M1A2 Abrams main battle tank commanders station. The M2A1 provides system upgrades to the M2 making it easier and safer to employ. The M2A1 includes new features and design improvements consisting of a modified barrel, barrel extension, barrel support, barrel handle, flash suppressor, and a fixed headspace and timing configuration. General Dynamics
Ordnance and Tactical Systems (GDOTS) developed the Technical Data Package (TDP) and has a licensing agreement with the US
Government that permits the use of the contractors proprietary TDP to acquire further M2A1s from any source, provided the
Government satisfies the General Purpose License Rights (GPLR) agreement requirements. The US Government has fulfilled its legal obligations and has the rights to utilize GDOTSs proprietary TDP from any source via contractual vehicle.
C.3.0 APPLICABLE DOCUMENTS. The following documents are applicable to this SOW and attached appendices to the extent specified herein. The following links may assist vendors with accessing the documents found in section 3.1:
http://www.apd.army.mil/default.aspx http://quicksearch.dla.mil/qsSearch.aspx http://www.esd.whs.mil/DD/
C.3.1 Government Documents:
22 CFR Parts 120-130 International Traffic in Arms Regulations (ITAR)
22 USC 2778-2780 Arms Export Control Act (AECA)
AR 25-1 Army Information Technology
AR 190-11 Physical Security of Arms, Ammunition, and
Explosives
AR 525-13 Antiterrorism
AR 530-1 Operations Security
AR 710-3 Asset Tracking Reporting System
DA PAM 385-64 Ammunition and Explosives Safety Standards
DoD 4000.25-2-M Military Standard Transaction Reporting and Accounting Procedures
DoD 4145.26M DoD Contractors Safety Manual for Ammunition and Explosives
DoD 4160.21-M-1 Defense Demilitarization Manual
DoD 5100.76-M Physical Security of Sensitive Conventional Arms Ammunition, and Explosives (AA&E)
DoD 5230.25 Withholding of Unclassified Technical Data from Public Disclosure
DoD Instruction 2040.02 International Transfers of Technology, Articles, and Services
DoDM 5205.02-M DoD Operations Security (OPSEC) Program
FIPS 140-2 Security Requirements for Cryptographic Modules
ISO 9001:2015 Quality Management Systems
MIL-DTL-1298 Gun, Machine; Caliber .50, Browning, M2, Heavy Barrel
3 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
MIL-STD-130 Identification Marking of U.S. Military Property
MIL-STD-882 Standard Practice for System Safety
MIL-STD-1916 DoD Preferred Methods for Acceptance of Product
MIL-STD-2073-1 Standard Practice for Military Packaging
NIST SP 800-171 Protecting Controlled Unclassified Information (CUI) in Non-Federal Systems and Organizations
Public Law 90-629 The Foreign Military Sales Act
GOVERNMENT DRAWINGS
Part No./Drawing Nomenclature
5910630 Machine Gun, Caliber .50: Browning, M2, HB, Turret Type M48 & M48C Series
7266131 Barrel Assembly
8401485 Machine Gun, Caliber .50: Browning, M2, Heavy Barrel, Flexible
13027965 Barrel Assy, Machine Gun (M2A1)
13028723 Machine Gun, Cal .50: M2A1 Quick Change Barrel
AM5910630 Special Packaging Instructions for:
Machine Gun, Caliber .50:Browning, M2, HB, Turret Type
M48 & M48C Series
AM8401485 Special Packaging Instructions for:
Machine Gun, Caliber .50: Browning, M2, Heavy Barrel, Flexible
AM13028723 Special Packaging Instructions for:
Machine Gun, Cal .50: M2A1 Quick Change Barrel
Unless otherwise indicated, copies of the above specifications, standards, handbooks, manuals, or publications are available from the
Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094 or Army Publishing Directorate Home
Page (://www.apd.army.mil). Any documents required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity as directed by the Procurement Contracting Officer (PCO).
C.4.0 DELIVERABLES. The contractor shall provide all materials, equipment, tooling, personnel and facilities necessary to manufacture, test, and deliver the quantities of M2, M48, and M2A1 machine guns and support packages as specified by the contract. The contractor shall be responsible for the testing and delivery of the production units and the required packaging as specified by the contract. Each order may include weapons, spare barrels, spare parts, special tools and gauges, maintenance support items (MSI), and training individually or in combinations as described in the delivery order. The components will be produced from a TDP under a build to print strategy and must meet the performance criteria required within the TDPs.
C.4.1 Weapons. The contractor shall fabricate and deliver the M2, M48, and M2A1 to meet the requirements of the TDP, MIL-DTL-1298, and this SOW. The TDP information for each weapon variant is listed in Table 1.
Table 1. M2 Family of Weapons:
Nomenclature National Stock Number Part No./Drawing CAGE Code
Machine Gun, Cal .50: 1005-00-657-3893 5910630 19204
HB, Turret Type M48 & M48C Series
Machine Gun, Cal .50: 1005-00-322-9715 8401485 19204
Browning, M2,Heavy Barrel Flexible
Machine Gun, Cal .50: 1005-01-511-1250 13028723 19200
4 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
M2A1 Quick Change Barrel
C.4.1.1 Weapon Serialization
C.4.1.1.1 Serial Numbers to Logistics Support Activity (LOGSA). For every weapon delivered under this contract, the contractor shall provide the following information to the PCO and LOGSA
a. Small Arms Serialization Program: Tracking small arms by serial control transactions is required by AR 710-3, Chapter 4, section 1
(Inventory Management Asset and Transaction Reporting System) and DoD 4000.25-2-M (Military Standard Transaction Reporting and
Accounting Procedures), This reporting shall be accomplished in accordance with Small Arms Serialization Program (SASP) Transaction (DI-
MISC-80914B, CDRL A001).
b. Weapon Serial Number (WSN) control transactions will be furnished for each small arm shipped under DOD contracts in accordance with the following:
One serial number control transaction (80 column format), as applicable, shall be furnished for each weapon shipped and forwarded with the shipment.
c. One set of serial number control transactions will be forwarded to each of the appropriate addressee(s) cited in the contract data requirements list (CDRL, DD Form 1423) (DI-MISC80914B A001), block 14, within the time frames established by the CDRL, block 16. Media is described below.
WSN control transactions required for the DOD Central Registry shall be forwarded by registered mail to:
U.S. Army Materiel Command
Logistics Support Activity (LOGSA)
Major Item Center (MIC)
ATTN: AMXLS-MD (UIT)
Redstone Arsenal, Alabama 35898-7466
Shipment of Serial Numbered Small Arms:
For each small arms asset being shipped, a transaction card shall be prepared (DI-MISC-80914B A001):
Document Identifier Code (cc 1-3): DSM
Routing Identifier Code (cc 4-6): AGT
Transaction Code (cc 7) Specified in the contract
National Stock Number (NSN) (cc 8-22): Specified in the contract
(cc 23-29): Leave Blank
Document Number (cc 30-43): Specified in the contract
(cc 44): Leave Blank
DOD Activity Address Code (DODAAC) (CC 45-50): Ship to DODAAC
Reporting DODAAC (CC 51-56): Contractors DODAAC
Weapon Serial Number (cc 57-67): Self Explanatory
(cc 68): Leave Blank
Owning DODAAC (CC 69-74): Leave Blank
(cc 75): Leave Blank
Transaction Date (cc 76-80): Last 2 digits of calendar year and Julian day
C.4.2 Spare Barrels. Spare barrels shall be provided separately from the spare parts package due to the special handling and storage required by their Controlled Inventory Item Codes (CIIC) and security classifications. Spare barrels shall be manufactured, inspected, tested, and packaged to meet the requirements of the barrel assembly TDP. The quantities and configuration of spare barrels will be specified by each delivery order. The spare barrel TDP information for each weapon variant is listed in Table 2.
Table 2. M2 Spare Barrel TDP:
Nomenclature National Stock Number Part No./Drawing CAGE Code
M2/M48 1005-00-726-6131 7266131 19205
M2A1 1005-01-541-2478 13027965 19200
Enhanced M2A1 TBD TBD 19200
5 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
4.2.1 Enhanced M2A1 Barrel. Enhanced M2A1 barrels are variants of the standard M2A1 barrel incorporating modifications intended to improve performance, decrease weight, and/or decrease the cost of production. The details of any enhanced barrel configuration will be provided by the PCO and included in the specific delivery order.
4.3 Spare Parts (SP). SP are parts manufactured using the material, finishes, manufacturing processes, inspections, and tests of the components used in the creation of complete weapons and drawn from weapon production lots to the greatest extent possible. Each variant of the M2 Machine Gun (M2 in Exhibit A, M48 in Exhibit B, and M2A1 in Exhibit C) shall have SP packages dedicated for its use.
4.3.1 Individual Spare Parts (ISP). Spare parts shall be available individually (listed in Exhibit D) as a supplement to the dedicated
SP packages, the items and quantity to be defined in each delivery order.
4.4 Special Tools and Gauges (STG). STG shall be available, with a list for the M2 and M48 in Exhibit E and a separate list for the M2A1 in Exhibit F.
4.5 Maintenance Support Items (MSI). MSI shall be available independent of variant and listed in Exhibit G.
4.6 Packaging and Marking. Preservation, packing, and packaging shall be in accordance with this contract.
4.6.1 Packaging. Packaging shall be in accordance with MIL-STD-2073-1 unless other packaging directions are stated in the M2 Series
Special Packaging Instructions (SPI): AM8401485 (M2), AM5910630 (M48), and AM13028723 (M2A1). The packaging for the spare barrels, STG, and SP items shall conform to the individual SPI requirements. The packaging for the M2A1 Enhanced Barrels shall conform to the SPI for the M2A1 Barrel. The packaging for the sets of STG, SP, and MSI shall utilized best commercial packaging practices.
4.6.2 Markings. The markings shall be in accordance with MIL-STD-130. The identification markings of the external components shall not be marked utilizing white or brightly colored markings.
4.6.2.1 UID Requirements. UID markings shall be applied to each delivered weapon in the location specified on the TDP. UID application method shall be approved by the Government prior to start of production. UID markings shall be in accordance with MIL-STD-130 and shall not negatively affect the protective finish and must withstand all requirements. The details of the markings and method of application shall be approved to the PCO prior to use (DI-MGMT-81803A, CDRL A002).
4.7 Training:
4.7.1 Operator Course (OPNET), CONUS and OCONUS: The contractor shall develop and submit training material and provide training for foreign soldiers/personnel (DI-MISC-80914B, CDRL A003). Sixty days prior to the training event, the contractor shall submit the
Training Course Program of Instruction (POI) (DI-MGMG-81803A, CDRL A004) to the USG for approval. Training shall be taught utilizing training materials, manuals and training aids/student handouts provided by the contractor. An electronic version of the training materials shall also be delivered to the USG at least thirty days prior to the start of each class using the latest version of Microsoft
Products. The Government shall determine the dates of training. For OCONUS training events, planned training locations will be provided by the USG. For CONUS training events, the contractor is responsible for providing both live fire instruction/observation at their facility. The contractor is responsible for providing DODIC: A557, live .50 caliber cartridges of M33 ball and M17 tracer linked (4:1)
(or commercial equivalent) in the necessary quantities to support awarded CONUS OPNET training events. To support OCONUS OPNET training events, the host country shall provide the necessary quantities of DODIC: A557 (or commercial equivalent).
For both OCONUS and CONUS OPNET training events, each CLIN quantity of 1 ea. supports up to 10 students. To support a single training event, up to a quantity of 5 ea. CLINs may be ordered (this would be a 50 student class size).
The operator course shall provide students with the knowledge and understanding of the system's capabilities, limitations, interfaces, and operations. It shall include, at a minimum, Preventive Maintenance Checks and Services (PMCS), capabilities and function of the system, and operations/operator maintenance. The course shall allow the student to become proficient with the required operator tasks.
The course shall be of sufficient depth to ensure that students are qualified to properly operate the system. The course SHALL NOT discuss any Tactics, Techniques, and Procedures of the U.S. Armed Forces. Operator instruction and lesson plans shall include, but not be limited to the following, as appropriate:
System characteristics and capabilities
Safety procedures
Loading and Unloading Procedures
Firing (including battle zero procedures and cycle of operations)
Zero and Sight Adjustment
Immediate and Remedial Action for Malfunctions or Stoppages/Operator
Repair
General Disassembly/Field Stripping
Assembly
Preventative Maintenance Checks and Services
Cleaning and Maintenance (includes clearing procedure)
6 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Compatible Ammunition
Certificates of completion shall be provided to the soldiers/personnel upon successful completion of the training course.
4.7.2 Maintainer Course (MNET), CONUS and OCONUS: The contractor shall develop and submit training material and provide training for foreign soldiers/personnel. (CDRL A003). Sixty days prior to the training event, the contractor shall submit the Training Course
Program of Instruction (POI) (CDRL A004) to the USG for approval. Training shall be taught utilizing training materials, manuals and training aids/student handouts provided by the contractor. An electronic version of the training materials shall also be delivered prior to the start of each class using the latest version of Microsoft Products. For OCONUS training events, planned training locations will be provided by the USG. The contractor is responsible for providing instruction facilities for CONUS events. The contractor is responsible for providing all necessary training equipment (to include dummy ammunition, DODIC: AB36 or commercial equivalent) to support awarded CONUS MNET training events. To support OCONUS MNET training events, the host country shall provide all the necessary training equipment (to include dummy ammunition, DODIC: AB36 or commercial equivalent).
For both OCONUS and CONUS MNET training events, each CLIN quantity of 1 ea. supports up to 10 students. To support a single training event, up to a quantity of 5 ea. CLINs may be ordered (this would be a 50 student class size).
The maintenance course shall be of sufficient depth to ensure that students are qualified to maintain the system to the appropriate level using the technical manuals, general-purpose test equipment, and all available diagnostics. This course shall provide students with the knowledge and understanding of the system capabilities, limitations, interfacing, operations, maintenance tasks, and required skill sets.
Maintainer instruction and lesson plans shall include, but not be limited to the following, as appropriate:
System characteristics and capabilities
Safety procedures
Preventative Maintenance Checks and Services
Repair parts, Special Tools, and Support Equipment
Clearing Procedure
Detailed Assembly/Disassembly
Troubleshooting
Inspection of subassemblies and components
Corrective Maintenance (remove and replace repairable components)
Functional Checks
Gauging
Certificates of completion shall be provided to the soldiers/personnel upon successful completion of the training course.
4.7.3 Translators
The contractor may be requested to provide a translator (at additional cost) for FMS training courses, fluent in the customers native language (TBD) to support CONUS training events.
5.0 QUALITY ASSURANCE
5.1 Quality Management System (QMS). The contractor shall maintain a QMS in accordance with ISO 9001:2015 (no tailoring permitted), or equivalent, and the supplemental requirements contained herein. Subcontractors with production responsibility, shall maintain a QMS in accordance with ISO 9001:2015, or equivalent, and the supplemental requirements contained herein. If the contractor desires to utilize an alternate QMS, a request shall be submitted to the PCO for approval.
5.1.1 Calibration. The contractor shall implement a system for the calibration and control of all measuring and testing equipment used for the performance of this contract. The calibration system shall, as a minimum, comply with the requirements of ANSI/NCSL Z540-1 or an industry equivalent system approved by the Government.
5.1.2 Product Traceability and Lot Control. Product traceability and lot control are requirements on all components and assemblies produced under this contract. Product identification and evidence of the acceptance status of all material shall be maintained throughout the entire manufacturing and assembly process to ensure traceability to original material identification and quality status.
This requirement applies to both prime and subcontractors. Evidence of product traceability and lot control documentation shall be available for Government review upon request.
5.1.3 Quality Program Plan. The contractor shall maintain a documented quality program plan in accordance with the contractors QMS.
The plan shall include the quality system compliance/certification status and a description of the current or planned programs that will be in place for the production of the M2, M2A1, and/or the M48, to include lot traceability and vendor/subcontractor oversight. The plan shall include sections covering Inspection/Test Plan (to include, but not limited to incoming inspections; in-process inspections and controls; and final inspections), Critical Defect Program, Acceptance Inspection Equipment (AIE), Process Control Documentation, a system to address non-conforming materials and corrective actions in the event of a non-conformance, and rework. The contractor shall
7 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
submit an update to the Quality Program Plan, including both prime and subcontractor(s) (if applicable) in accordance with DI-QCIC-81722
(CDRL A005) for Government review and approval. A new Quality Program shall be submitted within thirty days if there is any change for both prime and subcontractor(s) and shall be subject to Government approval.
5.1.3.1 The contractor shall provide a review and update schedule for this plan in accordance with the QMS. This document shall be available for Government review upon request. The contractor shall have a Material Review Board (MRB) that will be controlled in accordance with the Contractors quality procedures. The Government, including Defense Contract Management Agency (DCMA) Quality
Assurance Representatives (QARs), shall have advisory roles throughout this contract.
5.1.3.2 To verify compliance with contract requirements, the contractor shall provide a plan for quality system and statistical process control audits of suppliers in accordance with ISO 9001:2015 or an equivalent system. The plan shall include a schedule for conducting the audits. This plan and associated reports shall be made available to the Government upon request.
5.1.4 Drawing 12993884 Quality Assurance Provisions (QAPs). The contractor is responsible for creating and maintaining quality assurance provision documents per Drawing 12993884 for parts that require inspection and testing. The contractor shall require subcontractors to develop QAPs where necessary to inspect parts they will be manufacturing. QAPs shall be available for review by the
Government.
5.1.5 Responsibility for Inspection. The contractor is responsible for the performance of all inspection requirements as specified herein. The contractor may use its own facilities or any other facilities suitable for the performance of the inspection requirements specified herein, subject to approval by the Government. The contractor will be notified of inspection facility approval by Government through a PCO letter. The contractor is responsible for furnishing all test and inspection equipment, unless otherwise noted. The contractor shall notify the Government 90 calendar days in advance of inspections through the US Government PCO. The Government reserves the right to witness and/or independently perform any of the inspections/tests deemed necessary to ensure that supplies and services conform to prescribed requirements on a non-interference basis.
5.1.6 Phosphate Coating. Chrome Plating, Magnetic Particle Inspection (MPI), and Welding procedures. Prior to production, approval through the PCO of the phosphate coating and chrome plating (CDRL A006), magnetic particle inspection (MPI) (CDRL A007), and welding procedure (CDRL A008) is required in accordance with DI-NDTI-80603A.
5.1.7 Responsibility for Conformance. All items shall meet all the requirements as specified [i.e., Purchase Descriptions, Specifications, QAPs, applicable Government drawings, TDP, approved Engineering Change Proposals (ECP), approved Requests for Variance
(RFV), Special Package Instruction (SPI), etc.]. The inspection set forth in this document shall become a part of the contractor's overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract.
5.1.7.1 Prior to implementation of any anticipated or actual changes to the TDP which would affect dimensions, tolerances, materials, finishes, heat treatments, marking, packaging, etc., the contractor shall notify the PCO. The contractor may not change the TDP requirements without the written approval of the PCO.
5.1.8 Inspection and Test Records. Inspection and test records shall, as a minimum, indicate the nature of the observations made and the number and type of deficiencies found. Data included in inspection and test records shall be complete and accurate and shall be used for trend analysis and to assess corrective action effectiveness.
5.1.9 Measurement System Evaluation (MSE). MSE includes but is not limited to, AIE, gages, instruments, tools, standards, operations, methods, fixtures, software, personnel, environment, assumptions used, and any other piece of equipment used to ensure conformance of components and end-items to contract requirements, TDP (e.g., drawings, specifications), and Drawing 12993884 QAPs (see 5.1.4). To support the MSE, the contractor shall demonstrate the established requirements for the design, supply, performance, and maintenance of
AIE used for product inspection and acceptance. The AIE package shall be submitted for approval and made available to the Government in accordance with DI-QCIC-81960 (CDRL A009) 90 days prior to IPI.
5.1.9.1 The contractor shall furnish detailed descriptions (i.e., part numbers, manufacturer, model, calibration records, and accuracy) of all acceptance and inspection equipment used for inspections and tests of all Critical, Major, and Special QAP characteristics.
5.2 Testing and Inspection
5.2.1 Acceptance Inspection/Test Documentation. The contractors quality program or detailed inspection system shall be retained for the duration of the contract to include documented and validated evidence of compliance with all specified requirements in accordance with the applicable requirements specified in the contract. The contractor shall document the results of any receiving, in-process, and final inspection(s)/test(s) performed on components, subassemblies, the final assembly, and any items delivered as spares or repaired components in accordance with DI-NDTI-80809B (CDRL A010). This documentation shall be available for Government review upon request.
5.2.1.1 Classification of Inspections. Inspection requirements specified herein are classified as follows:
8 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. Initial Production Inspection (see 5.2.2)
b. Conformance Inspection (see 5.2.3.1)
5.2.2 Initial Product Inspection.
5.2.2.1 Initial Production Inspection (IPI).
a. M2 Fixed Barrel - The contractor shall perform an IPI to supersede a First Article Test (FAT), consisting of ten M2 Machine Guns.
These ten weapons shall be representative of items to be manufactured using the same processes and procedures. The IPI shall be inspected and tested to all requirements of the drawings, FAT section of MIL-DTL-1298E, and any additional requirements herein.
Verification of critical characteristics (Critical Control Characteristics (CCC) Plan, Attachment 0015,CDRL A011), major and minor characteristics, Certificates of Conformance (COCs), Certified Test Reports (CTRs), test methods, and procedures are required as specified. The weapons shall be selected from the initial production lot by the Production Quality Manager (PQM). The contractor shall notify the PCO and the PQM at least 15 days in advance of conducting any IPI as described in this section, in order to ensure the PQM witnesses the inspection.
b. M2A1 - The contractor shall perform an IPI to supersede a FAT, consisting of ten M2A1 Machine Guns. These ten weapons shall be representative of items to be manufactured using the same processes and procedures. The IPI shall be inspected and tested to all requirements of the drawings, FAT section of MIL-DTL-1298E, and any additional requirements herein. Verification of critical characteristics (CCC Plan, Attachment 0015, CDRL A011), major and minor characteristics, COCs, CTRs, test methods, and procedures are required as specified. The weapons shall be selected from the initial production lot by the PQM. The contractor shall notify the PCO and the PQM at least 15 days in advance of conducting any IPI as described in this section, in order to ensure the PQM witnesses the inspection.
c. M48 - The contractor shall perform an (IPI to supersede a FAT, consisting of ten M48 Machine Guns. These ten weapons shall be representative of items to be manufactured using the same processes and procedures. The IPI shall be inspected and tested to all requirements of the drawings, FAT section of MIL-DTL-1298E, and any additional requirements herein. Verification of critical characteristics (CCC Plan, Attachment 0015, CDRL A011), major and minor characteristics, COCs, CTRs, test methods, and procedures are required as specified. The weapons shall be selected from the initial production lot by the PQM. The contractor shall notify the PCO and the PQM at least 15 days in advance of conducting any IPI as described in this section, in order to ensure the PQM witnesses the inspection.
d. An IPI sample or portion thereof, may be ordered by the PCO in writing when (i) a major change is made to the technical data, (ii) whenever there is a lapse in production for a period in excess of 90 calendar days, or (iii) whenever a change occurs to performance, manufacturing process, material used, drawing, specification or source of supply. When conditions (i), (ii), or (iii) above occurs, the contractor shall notify the PCO so that a determination can be made concerning the need for an additional IPI sample or portion thereof, and instructions concerning the submission, inspection, and notification of results. Costs of the additional Initial Product Inspection resulting from any of the causes listed herein that were instituted by the contractor and not due to changes directed by the Government shall be borne by the contractor. The contractor shall be responsible for the planning, management, and execution of the IPI.
e. All accepted endurance tested IPI hardware shall remain at the contractors facility until the Government issues instructions for disposition. This hardware shall not be counted as part of the contract quantity. Accepted non-endurance tested IPI hardware may be part of the quantity.
f. The contractor shall maintain a copy of all IPI data for three years following the inspection unless the parties otherwise agree.
5.2.2.2 IPI Report. The contractor shall prepare and submit an IPI Report in accordance with DI-NDTI80809B, (CDRL A012) to include
Certification/Data Reports in accordance with DI-MISC-82386, (CDRL A013). The report shall be submitted within thirty calendar days from the completion of the IPI for Government approval. Within forty five calendar days after receiving the test report, the Government PCO shall notify the contractor in writing of the conditional approval, approval, or disapproval of the IPI. The notice of conditional approval or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
5.2.2.3 IPI Acceptance Criteria. Any nonconformity shall be cause for rejection of the IPI. If any assembly, component, or weapon fails to comply with any of the applicable requirements, the IPI sample shall be rejected and constitutes failure of the IPI. The contractor shall submit a corrective action plan in the event of failure of the IPI.
5.2.2.4 IPI Failure. Upon failure of the IPI, the contractor, upon Government request, shall repeat any or all IPI. After each request for additional tests, the contractor shall make any necessary changes, modifications, or repairs/reworks after approval from the
Government. All costs related to these tests are to be borne by the contractor, including any and all costs for additional tests following a failure. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests. The evaluation process shall be repeated if additional samples are required.
9 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5.2.2.5 Failure data. If test requirements cited herein are not met, acceptance should be deferred pending the acceptance of a failure analysis in accordance with DI-SESS-80255B (CDRL A014) by the PCO. The contractors report shall include, but not be limited to, the following:
a. A failure analysis study performing a dimensional, physical, and visual examination of the components which are suspected to be the cause of failure or malfunction.
b. An evaluation with corrections to the applicable production processes and procedures to prevent recurrence of the same defect(s) in future production.
c. An examination of components (including components and subassemblies at in process or final assembly) to ensure that material containing the same defect is purged from the inventory and not presented to the Government for acceptance.
5.2.3 Conformance Inspection / Lot Acceptance
5.2.3.1 Conformance Inspection. Since the IPI sample is part of the initial lot, any additional testing required for conformance inspection must also be conducted for the initial production lots. The contractor shall perform conformance inspection on every lot of production. Acceptance shall be in accordance with all drawing requirements, specifications, QAPs, and any additional requirements herein. Verification of critical, major and minor characteristics, COCs, CTRs, test methods, and procedures are required as specified on each applicable drawing.
5.2.3.2 Conformance Inspection Report. The contractor shall prepare and submit a conformance inspection report in accordance with DI-
NDTI-80809B, (CDRL A015) to include Certification/Data Reports in accordance with DI-MISC-82386, (CDRL A016). The report shall be submitted within 15 calendar days from the completion of the conformance inspection for Government approval. Within thirty calendar days after receiving the test report, the Government PCO shall notify the contractor in writing of the conditional approval, approval, or disapproval of the conformance inspection. The notice of conditional approval or disapproval shall not relieve the contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the contractor. A notice of disapproval shall cite reasons for the disapproval.
6.0 Configuration Management. The Government is responsible for configuration management. Any proposed changes must be submitted to the
Government for review/approval prior to implementation. The contractor shall submit, in their own format, an Engineering Change Proposal
(ECP) (DI-SESS-80639E, CDRL A017) with a Notice of Revision (NOR) (DI-SESS-80642E, CDRL A018) or Request for Variance (DI-SESS-80640E, CDRL A019), which details the exact change being proposed for the documents in the TDP. This shall include rationale for the change as well as effects on other components/assemblies, schedule, logistical impacts (fielded weapons and spare parts), corrective actions
(RFV), duration/length of effectivity (RFV), and cost.
7.0 Government Furnished Material (GFM). All GFM will be managed by the Government through the use of the contractor provided GFM
Consumption Report (DI-MGMT-80438B, CDRL A020). The contractor shall report any defective GFM (DI-QCIC-80736, CDRL A021). The following documents apply to GFM: DoD Manual 5100.76-M, Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives; and Army
Regulation (AR) 190-11, Physical Security of Arms, Ammunition, and Explosives.
7.1 Request for Government Furnished Material (GFM). To receive GFM, the contractor shall submit a request to the contract PCO (DI-MGMT-
80408C, CDRL A022).
7.2 Reporting of receipts. The contractor shall receive assets from the Government and shall perform an inspection and inventory within the time specified by the CDRL. Assets received shall be reported by NSN, quantity, condition code, document number and serial number of receipt (DI-MGMT-80389C, CDRL A023). Reporting data may be obtained from DD Form 1348-1A accompanying the receipt, from other documentation provided, or from the following POC:
Director
TACOM-RI
ATTN: AMSRD-LC-NCPD
Rock Island, IL 61299-7630
Commercial Phone: 309-782-6396
7.3 GFM Discrepancies
7.3.1 Transportation Discrepancy. A transportation report (DI-MGMT-80554, CDRL A024) shall be filed when material is received at the contractors facility upon discovery of a transportation discrepancy.
7.3.2 Shipping and Packaging Discrepancy. A shipping and packaging discrepancy report (DI-MGMT-80503, CDRL A025) shall be filed when material is received at the contractors facility upon discovery of a shipping and packaging discrepancy.
7.4. Ammunition:
7.4.1 The Government will provide Ammunition to the contractor(s) to support contractual test requirements as follows:
10 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
DODIC: A575 M1 High Pressure Test Cartridge, NSN 1305-01-557-2988.
DODIC: A555 M33 Ball Cartridge w/ Link M9, NSN: 1305-01-658-2714.
DODIC: AB36 M2A1 Dummy Cartridge w/ Link M9, NSN: 1305-01-676-3628.
7.4.2 Requests for all ammunition (DI-MGMT-80408C, CDRL A022) shall be submitted electronically to the PCO no later than 90 days prior to desired delivery dates.
7.4.3 No later than thirty days after completion of the contract, the contractor shall report to the PCO on the remaining ammunition.
The contractor shall indicate the quantity, type, and National Stock Number (NSN) of unused ammunition remaining at the manufacturing/test facility and request disposition instructions.
7.4.4 The contractor shall furnish a copy of the above ammunition and disposition requests to the cognizant Defense Contract Management
Agency Quality Assurance Representative.
8.0 Security
8.1 Weapons and ammunition security.
8.1.1 Hazardous Material. FAR Clause 52.223-3, Hazardous Material Identification and Material Safety Data applies to this contract.
8.1.2 SRC I-IV or CAT-U AA or E. Defense Federal Acquisition Regulation Supplement (DFARS) Clause 252.223-7007, Safeguarding Sensitive
Conventional Arms, Ammunition, and Explosives applies to this effort.
8.1.2.1 Domestic Violence Amendment to the Gun Control Act of 1968. Contractor must ensure compliance with the Domestic Violence
Amendment to the Gun Control Act of 1968. Nothing in this clause shall relieve the contractor of its responsibility for complying with other applicable federal, state, and local laws, ordinances, codes, and regulations (including requirements for obtaining licenses and permits) in connection with the performance of this contract.
8.1.3 Security Storage. The contractor shall be capable of providing storage in accordance with DoD
5100.76-M, which outlines physical security guidance for the protection of Sensitive Conventional Arms, Ammunition, and Explosives. The
M2 Series Machine Guns are CAT II, and the test ammunition is CAT IV.
8.1.4 Demilitarization. At the conclusion of this contract, all excess or unaccepted weapons, components, or sub-components shall be demilitarized in accordance with Appendix 4, Category I Small Arms Weapons, Parts, and Accessories of DoD 4160.21-M-1, Defense
Demilitarization Manual.
8.2 Operations security (OPSEC).
8.2.1 OPSEC Standard Operating Procedure/Plan. The contractor shall develop an OPSEC Standard Operating Procedure (SOP)/Plan, in accordance with DI-MGMT-80934C (CDRL A026), within 90 calendar days of contract award, to be reviewed and approved by the responsible
Government OPSEC officer, per AR 530-1, Operations Security. This SOP/Plan will specify the projects critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator. The contractor will ensure that this individual becomes OPSEC Level II certified per AR
530-1. CCDC Armaments Center OPSEC POC e-mail: usarmy.pica.ccdc-ac.mbx.ardec-opsec@mail.mil.
8.2.1.1 Employee verification. The contractor will implement an employee verification process, to include subcontractors, whether through background checks or other similar processes and provide a written response explaining how the verification process was completed and attest to the trustworthiness of the workforce, within forty five days of contract award (CDRL A027).
8.2.2 OPSEC training. Per AR 530-1 (or DoDM 5205.02-M), new contractor employees, including subcontractor employees, must complete initial (Level I) OPSEC training within thirty calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC Level II trained OPSEC Officer/Coordinator. The Contracting Officer
Representative (COR) or Agreements Officer Representative (AOR) can request CCDC Armaments Center OPSEC training from CCDC Armaments
Center OPSEC POC e-mail:
usarmy.pica.ccdcac.mbx.ardec-opsec@mail.mil.
8.2.3 OPSEC information review for public release. Per AR 530-1 (or DoDM 5205.02-M), an OPSEC review is required prior to all public releases. All Government information intended for public release by a contractor will undergo a Government OPSEC review prior to release.
8.3 Contractor personnel in OCONUS location.
8.3.1 Anti-Terrorism (AT) awareness training. Anti-Terrorism (AT) awareness training as directed by AR525-13. This standard language requires U.S. based contractor employees and associated subcontractor employees to make available and to receive Government-provided area of responsibility (AOR)-specific AT awareness training within 3 months prior to OCONUS travel as directed by AR 52513. Government
11 28
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
provided awareness training specific to an AOR traveled is provided to contract personnel upon request be contacting the CCDC Armaments
Center AT Officer at usarmy.pica.ccdcac.mbx.pica-ardec-at-training@mail.mil or 973-724-3005.
8.3.2 Contractor personnel performance in a foreign country. DFARS Clause 252.225-7043, AT/Force Protection (FP) Policy for Defense
Contractors Outside of the US applies to this contract.
8.4 Information Management Army Information Technology/IA. The contractor shall be capable of assessing, handling, receiving, and storing UNCLASSIFIED documents, equipment, hardware, and test items, using the applicable standards of FOUO information. Controlled
Unclassified Information (Documents designated as FOR OFFICIAL USE ONLY and/or LIMITED DISTRIBUTION.) shall be submitted by a controlled means using USPS mail, Safe Access File Exchange (SAFE) website and/or DoD Army approved encryption software as per AR 25-1.
8.4.1 Export Control Laws/International Traffic in Arms Regulation. DFARS Clause 252.225-7048, Export-Controlled Items applies to this effort. All documents determined to contain export controlled technical data will be marked with the following notice WARNING: - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., App. 2401 et seq.)
Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive
5230.25.
8.5 Controlled Unclassified Information (CUI) or Critical Program Information (CPI)
8.5.1 System Security Plan and Plans of Action and Milestones (SSP/POAM) reviews:
(a) Within thirty days of contract award, unless otherwise notified by the Government, the contractor shall make its System Security
Plan(s) (SSP(s)) for its covered contractor information system(s) available for review by the Government at the contractors facility.
The SSP(s) shall describe how the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 security requirements are implemented as required by Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.204-7012, which is included in this contract, and identify all applicable Commercial and Government Entity Code codes affected. The contractor shall fully cooperate in the Governments review of the SSP(s) at the contractors facility.
(b) If the Government determines that the SSP(s) does not adequately describe how the NIST SP 800-171 security requirements are implemented, then the Government shall notify the contractor of each identified deficiency. The contractor shall correct any identified deficiencies within thirty days of notification be the Government. The Contracting Officer may provide for a correction period longer than thirty days and, in such a case, may require the contractor to submit a Plan of Action and Milestones (POAM) for the correction of the identified deficiencies. The contractor shall immediately notify the Contracting Officer of any failure or anticipated failure to meet a milestone in such a POAM.
(c) Upon conclusion of the correction period, the Government may conduct a follow-on review of the SSP(s) at the contractors facilities. The Government may continue to conduct follow-on reviews until the Government determines that the contractor has corrected all identified deficiencies in the SSP(s).
(d) The Government may, in its sole discretion or in a response to a cyber incident, conduct subsequent reviews at the contractors site to verify the information in the SSP(s). The Government may conduct reviews at any time upon thirty days notice to the contractor.
Compliance to NIST SP 800-171:
a. The contractor shall fully implement the Controlled Unclassified Information (CUI) Security Requirements in NIST SP 800-171 in effect at the time the solicitation is issued or as authorized by the Contracting Officer or establish an SSP(s) and POAM(s) that varies from
NIST SP 800-171 only in accordance with DFARS clause 252.204-7012(b)(2), for all covered contractor information systems affecting this contract.
b. Notwithstanding the allowance for such variation, the contractor shall identify in any SSP and POAM their plans to implement the following, at a minimum:
(1)Implement Requirement 3.5.3 (Multi-factor authentication). This means that multi-factor authentication is required for all users, privileged and unprivileged accounts that log into a network. In other words, any system that is not a standalone should be required to utilize acceptable multi-factor authentication. For legacy systems and systems that cannot support this requirement, a combination of physical and logical protections acceptable to the Government may be substituted;
(2)Implement Requirement 3.1.5 (least privilege) and associated Requirements, and identify practices that the contractor implements to restrict the unnecessary sharing with, or flow of,…