TE 3.13 Wash Rack Preventative Maintenance Checklist_Rev1.docx

DOCX document 13 KB Posted

Attached to
Picatinny Arsenal Base Operations (BASOPS) Federal contract opportunity
Solicitation number
W15QKN-21-R-5005
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This document contains a technical exhibit outlining preventative maintenance requirements for vehicle wash facilities and a related federal contract solicitation notice. The technical exhibit specifies quarterly inspection and maintenance requirements for oil/water separators, including completion of inspection checklists and submission of maintenance records biannually. It also requires minimum quarterly and biannual inspections of wash racks and basins to check for leaks, proper pump operation, sediment removal, and repairs. The related solicitation is for base operations services at Picatinny Arsenal and will close on February 2, 2021 at 2:00 PM EST, issued by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to Picatinny Arsenal Base Operations (BASOPS), newest first.
File Type Posted
W15QKN21R5005_Amendment 0006.docx DOCX document
W15QKN21R5005_Amendment 0005.docx DOCX document
011.1-USAG Picatinny VGSA-DD 254 Continuation Sheet.docx DOCX document
08.1-Davis Bacon Wage Determination-Building-REVISION 01 (NJ20210038-1 Jan 21).pdf PDF
7.6-LRC Picatinny Maintenance SOP 2020-NEW.pdf PDF
DD Form 1423-1-A041 (Scheduled Pest Inspections-Work)-NEW.pdf PDF
DD Form 1423-1-A039 (HVAC Emergency Personnel Roster)-NEW.pdf PDF
DD Form 1423-1-A036 (Quarterly Visual Insp Report)-NEW.pdf PDF
DD Form 1423-1-A026 (Quality Control Report)-NEW.pdf PDF
DD Form 1423-1-A013 (Damage Report)-REVISION 01.pdf PDF
DD Form 1423-1-A007 (Key Control)-REVISION 01.pdf PDF
DD Form 1423-1-A004 (Accident Reporting)-REVISION 01.pdf PDF
TE 2.5 IDS Zones by Bldg_Rev1.docx DOCX document
TE 2.2 Attachment A Equipment List_2020_Rev1.pdf PDF
07 - Price Matrix (Sanitized)-REVISION 01.xlsx XLSX spreadsheet
06-PRICING Matrix-REVISION 01_20210310.xlsx XLSX spreadsheet
9.3-Picatinny Staffing Matrix-REVISION 01.XLSX XLSX spreadsheet
011-DD Form 254-NEW.pdf PDF
7.7-Preventative Maintenance Checks and Services_AR 58-1-NEW.pdf PDF
DD Form 1423-1-A038 (Daily Log of Chiller Inspection)-NEW.pdf PDF
DD Form 1423-1-A037 (Lab Water Analysis Report)-NEW.pdf PDF
DD Form 1423-1-A033 (Storm Water Mgmt System Maint Insp Form)-NEW.pdf PDF
DD Form 1423-1-A032 (Storm Water Mgmt System Maint Plan (SWMSMP))-NEW.pdf PDF
DD Form 1423-1-A028 (Key Control-Inventory)-NEW.pdf PDF
DD Form 1423-1-A027 (Utilization of GFF Plan)-NEW.pdf PDF
DD Form 1423-1-A023 (Daily Log of CAD Support Requests)-NEW.pdf PDF
W15QKN21R5005_Amendment 0004.docx DOCX document
21R5005 BASOPS Consolidated QAs-20210315 (pricing) published.xls XLS spreadsheet
W15QKN21R5005_Amendment 0003.docx DOCX document
Picatinny Basops Site Visit Announcement-28 Jan 21.docx DOCX document
W15QKN21R5005_Amendment 0002.docx DOCX document
W15QKN21R5005_Amendment 0001.docx DOCX document
0002 - Technical Exhibits 2.1-2.9 (9 each) - GFP-GFE-GFM.zip ZIP file
0003.1 - Technical Exhibits 3.1-3.15 (15 each) - FMI w-Facilities & Structures.zip ZIP file
0004 - Technical Exhibit - List of Picatinny Historic Buildings-Use and Distribution.pdf PDF
0006.1 - Technical Exhibits 6.1-6.4 (3 each) - Facilities Management & Real Property Pubs.zip ZIP file
0006.2 - Technical Exhibits 6.5-6.11 (7 each) - Environmental #1.zip ZIP file
0006.3 - Technical Exhibits 6.12-6.15 (4 each) - HAZMAT & Solid Waste.zip ZIP file
W15QKN21R5005_Released_20201202.pdf PDF
0001.2 - CLS 411-Facility Maintenance Vertical.docx DOCX document
0001.3 - CLS 420-Facilities Maintenance-Horizontal.docx DOCX document
0001.4 - CLS 501-Heating and Cooling Services.docx DOCX document
0001.5 - CLS 510-Pest Management Services.docx DOCX document
0003.6 - Technical Exhibit 34 - List of Approved Hands Free Devices (new).pdf PDF
0006.8 - Technical Exhibit - 6.43 - Picatinny Guidance and Implementation-NEPA.PDF PDF
0009 - Technical Exhibits 9.1-9.9 (9 each) - GFEBS Historical Workload Data.zip ZIP file
0010 - Technical Exhibit - Resource Efficiency Management_Summary_SOW.pdf PDF
0012 - Technical Exhibit - Picatinny Integrated Pest Mgmt Plan 2019.pdf PDF
0016 - Contract Data Requirements List (CDRL) - 17 each.zip ZIP file
0017 - Technical Exhibit Master List-BaseOps_FINAL_20201022.xlsx XLSX spreadsheet
Show all 50

Picatinny Arsenal Base Operations (BASOPS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 3.13:

Preventative Maintenance Checklist for Vehicle Wash Facility:

1. Quarterly inspection and any maintenance per manufacturer direction is required for Oil/Water Separators at Bldgs. 242. A quarterly inspection checklist must be completed and any deficiencies listed that were observed during the inspection and submitted to the COR.

2. Maintenance records for the Oil/Water Separators shall include at a minimum the date of inspection, the date of maintenance carried out, the type of maintenance performed, and type of replacements/repairs performed/equipment/parts installed. Copies of these maintenance records shall be submitted to the COR and to the DPW-ENRD at least bi-annually (January 1 and July 1) for permit compliance.

3. The basins and wash racks shall be inspected at a minimum quarterly for proper operation, for leaks at connections, proper operation of pumps and operating mechanisms, wet storage capacity, settling chamber baffles, damaged components, and condition of the wash rack surface for cracks and other damage that allows wash water not be properly contained and drain to the proper inlets. The trench drains and associated water conveyances must be kept free of sediment and debris to allow for proper functioning of the system. The facilities shall be policed at least weekly for trash and debris litter which must be removed and properly disposed of.

The sedimentation basins must be cleaned out when one-half of the wet storage has been reached or earlier if the basin does not operate or drain properly. The basins and wash racks shall be inspected at a minimum bi-annually for proper operation, for leaks at connection, proper operation of pumps and operating mechanisms, wet storage capacity, and associated infrastructure.

4. Any damage and leaks must be repaired immediately, or the contractor shall notify the COR and DPW that the system must be temporarily taken out of service until the repairs can be completed. Repairs shall be completed and adjustments to connections made to maintain proper function. Clean drains, water collection systems, settling basins, and all associated infrastructure to maintain proper function of the systems. For settling basins to properly function and meet regulatory requirements the sludge/sediment/debris must be removed no later than one-half of the storage capacity or earlier if the basin that does not drain or operate properly. Maintenance activities and cleaning activities must be documented through detailed reports that include detailed inspection checklists and reporting of all maintenance records must be submitted to the COR and to the DPW-ENRD at least bi-annually (January 1 and July 1) for permit compliance. All work shall be in compliance with the Facility Stormwater Pollution Prevention Plan that is available at the Operations and Maintenance Division.

File details come from the government source that posted it. Updated .