TE 3.13 Wash Rack Preventative Maintenance Checklist_Rev1.docx

DOCX document 13 KB Posted

Attached to
Picatinny Arsenal Base Operations (BASOPS)
Solicitation number
W15QKN-21-R-5005
Issued by

About this file

This document contains a technical exhibit outlining preventative maintenance requirements for vehicle wash facilities and a related federal contract solicitation notice. The technical exhibit specifies quarterly inspection and maintenance requirements for oil/water separators, including completion of inspection checklists and submission of maintenance records biannually. It also requires minimum quarterly and biannual inspections of wash racks and basins to check for leaks, proper pump operation, sediment removal, and repairs. The related solicitation is for base operations services at Picatinny Arsenal and will close on February 2, 2021 at 2:00 PM EST, issued by the Department of the Army Materiel Command Contracting Command Picatinny Arsenal.

View the file

Other files

File Type Posted
Recommended Sol Closing Instruction_PicaBASOPS_20210507.doc DOC document
W15QKN21R5005_Amendment 0006.docx DOCX document
DD Form 1423-1-A018 (Tree Srvc-Maint PMP)-REVISED.pdf PDF
Consolidated List of Questions (for publication) AMD 0006.xlsx XLSX spreadsheet
DD Form 1423-1-A041 (Scheduled Pest Inspections-Work)-NEW.pdf PDF
Consolidated List of Questions (for publication) post 20210303 thru 20210319.xlsx XLSX spreadsheet
DD Form 1423-1-A003 (QCP)-REVISION 01.pdf PDF
DD Form 1423-1-A022 (Real Property Records Updates)-NEW.pdf PDF
012.1-CBA-Picatinny_ 2018_2021.pdf PDF
TE 3.9 Athletic Field Maint Requirements_Rev1.doc DOC document
W15QKN21R5005_Amendment 0005.docx DOCX document
DD Form 1423-1-A013 (Damage Report)-REVISION 01.pdf PDF
TE 3.5 Picatinny Owned Lights on Base as July 22nd_Rev1.xlsx XLSX spreadsheet
DD Form 1423-1-A028 (Key Control-Inventory)-NEW.pdf PDF
DD Form 1423-1-A038 (Daily Log of Chiller Inspection)-NEW.pdf PDF
011-DD Form 254-NEW.pdf PDF
7.7-Preventative Maintenance Checks and Services_AR 58-1-NEW.pdf PDF
7.6-LRC Picatinny Maintenance SOP 2020-NEW.pdf PDF
TE 2.5 IDS Zones by Bldg_Rev1.docx DOCX document
08.1-Davis Bacon Wage Determination-Building-REVISION 01 (NJ20210038-1 Jan 21).pdf PDF
DD Form 1423-1-A017 (Dispute Contingency Plan)-REVISED.pdf PDF
DD Form 1423-1-A037 (Lab Water Analysis Report)-NEW.pdf PDF
DD Form 1423-1-A019 (Records-All Monthly Maint Activity)-NEW.pdf PDF
TE 7.3 LIST OF UPS SYSTEMS FOR PREVENTIVE MAINTENANCE_Rev1.XLS XLS spreadsheet
TE 2.7 Kitchen Equipment 20200610_Rev1.xlsx XLSX spreadsheet
DD Form 1423-1-A014 (Spill Plan)-REVISION 01.pdf PDF
DD Form 1423-1-A018 (Tree Srvc-Maint PMP)-NEW.pdf PDF
09-Service Contract Act (SCA) Wage Determination-REVISION 01_20201221.pdf PDF
DD Form 1423-1-A012 (Affirmative Procurement)-REVISION 01.pdf PDF
7.5-Dispatching Procedures-NEW.pdf PDF
012-CBA Wage Determination-DOL Cover Letter.pdf PDF
0004 Technical Exhibit List of Picatinny Historic Buildings Use and Distribution_Rev1.pdf PDF
DD Form 1423-1-A009 (Safety Plan)-REVISION 01.pdf PDF
9.3-Picatinny Staffing Matrix-REVISION 01.XLSX XLSX spreadsheet
DD Form 1423-1-A006 (Physical Security-GFP)-REVISION 01.pdf PDF
DD Form 1423-1-A005 (Key Personnel)-REVISION 01.pdf PDF
DD Form 1423-1-A027 (Utilization of GFF Plan)-NEW.pdf PDF
07 - Price Matrix (Sanitized)-REVISION 01.xlsx XLSX spreadsheet
DD Form 1423-1-A032 (Storm Water Mgmt System Maint Plan (SWMSMP))-NEW.pdf PDF
DD Form 1423-1-A026 (Quality Control Report)-NEW.pdf PDF
06-PRICING Matrix-REVISION 01_20210310.xlsx XLSX spreadsheet
TE 3.14 Gate Locations_Rev1.docx DOCX document
DD Form 1423-1-A031 (Storm Water Collection System Maint Work Plan)-NEW.pdf PDF
DD Form 1423-1-A007 (Key Control)-REVISION 01.pdf PDF
TE 2.2 Attachment A Equipment List_2020_Rev1.pdf PDF
DD Form 1423-1-A036 (Quarterly Visual Insp Report)-NEW.pdf PDF
011.1-USAG Picatinny VGSA-DD 254 Continuation Sheet.docx DOCX document
DD Form 1423-1-A042 (Pest Management License and Certifications)-NEW.pdf PDF
DD Form 1423-1-A024 (Disaster Contingency Plan)-NEW.pdf PDF
DD Form 1423-1-A035 (Wastewater and Storm Water Systems Safeguarding Plan)-NEW.pdf PDF
Show 40 more

Latest 50 of 121 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 3.13:

Preventative Maintenance Checklist for Vehicle Wash Facility:

1. Quarterly inspection and any maintenance per manufacturer direction is required for Oil/Water Separators at Bldgs. 242. A quarterly inspection checklist must be completed and any deficiencies listed that were observed during the inspection and submitted to the COR.

2. Maintenance records for the Oil/Water Separators shall include at a minimum the date of inspection, the date of maintenance carried out, the type of maintenance performed, and type of replacements/repairs performed/equipment/parts installed. Copies of these maintenance records shall be submitted to the COR and to the DPW-ENRD at least bi-annually (January 1 and July 1) for permit compliance.

3. The basins and wash racks shall be inspected at a minimum quarterly for proper operation, for leaks at connections, proper operation of pumps and operating mechanisms, wet storage capacity, settling chamber baffles, damaged components, and condition of the wash rack surface for cracks and other damage that allows wash water not be properly contained and drain to the proper inlets. The trench drains and associated water conveyances must be kept free of sediment and debris to allow for proper functioning of the system. The facilities shall be policed at least weekly for trash and debris litter which must be removed and properly disposed of.

The sedimentation basins must be cleaned out when one-half of the wet storage has been reached or earlier if the basin does not operate or drain properly. The basins and wash racks shall be inspected at a minimum bi-annually for proper operation, for leaks at connection, proper operation of pumps and operating mechanisms, wet storage capacity, and associated infrastructure.

4. Any damage and leaks must be repaired immediately, or the contractor shall notify the COR and DPW that the system must be temporarily taken out of service until the repairs can be completed. Repairs shall be completed and adjustments to connections made to maintain proper function. Clean drains, water collection systems, settling basins, and all associated infrastructure to maintain proper function of the systems. For settling basins to properly function and meet regulatory requirements the sludge/sediment/debris must be removed no later than one-half of the storage capacity or earlier if the basin that does not drain or operate properly. Maintenance activities and cleaning activities must be documented through detailed reports that include detailed inspection checklists and reporting of all maintenance records must be submitted to the COR and to the DPW-ENRD at least bi-annually (January 1 and July 1) for permit compliance. All work shall be in compliance with the Facility Stormwater Pollution Prevention Plan that is available at the Operations and Maintenance Division.

File details come from the government source that posted it. Updated .