This document contains a standing operating procedure for the Logistics Readiness Center Maintenance Division at Picatinny Arsenal. Key details include:

  • The SOP provides guidance for obtaining maintenance support from the LRC Maintenance Division for active Army, reserve, Air Force, Navy, Marine Corps, and Coast Guard units stationed at or supported by Picatinny Arsenal. Support includes field and limited sustainment maintenance.

  • Request procedures, acceptance criteria, delivery points, levels of support, on-site repairs, status requests, and completion notifications are outlined. Inspection and classification services, technical assistance programs, and historical records access through GCSS-A are also addressed.

  • Emergency services are available by contacting shop offices or on-call numbers provided. Standard deadlines for vehicles are included in an annex.

  • The related federal contract opportunity notice alerts interested offerors that solicitation W15QKN-21-R-5005 for Picatinny Arsenal base operations was released, with a closing date of February 2, 2021 at 2:00 PM EST. The contracting agency is the Department of the Army Materiel Command Contracting Command Picatinny Arsenal.

View the file

Other files

File Type Posted
Recommended Sol Closing Instruction_PicaBASOPS_20210507.doc DOC document
W15QKN21R5005_Amendment 0006.docx DOCX document
DD Form 1423-1-A018 (Tree Srvc-Maint PMP)-REVISED.pdf PDF
Consolidated List of Questions (for publication) AMD 0006.xlsx XLSX spreadsheet
DD Form 1423-1-A041 (Scheduled Pest Inspections-Work)-NEW.pdf PDF
Consolidated List of Questions (for publication) post 20210303 thru 20210319.xlsx XLSX spreadsheet
DD Form 1423-1-A003 (QCP)-REVISION 01.pdf PDF
DD Form 1423-1-A022 (Real Property Records Updates)-NEW.pdf PDF
012.1-CBA-Picatinny_ 2018_2021.pdf PDF
TE 3.9 Athletic Field Maint Requirements_Rev1.doc DOC document
W15QKN21R5005_Amendment 0005.docx DOCX document
DD Form 1423-1-A013 (Damage Report)-REVISION 01.pdf PDF
TE 3.5 Picatinny Owned Lights on Base as July 22nd_Rev1.xlsx XLSX spreadsheet
DD Form 1423-1-A028 (Key Control-Inventory)-NEW.pdf PDF
DD Form 1423-1-A038 (Daily Log of Chiller Inspection)-NEW.pdf PDF
011-DD Form 254-NEW.pdf PDF
7.7-Preventative Maintenance Checks and Services_AR 58-1-NEW.pdf PDF
TE 2.5 IDS Zones by Bldg_Rev1.docx DOCX document
08.1-Davis Bacon Wage Determination-Building-REVISION 01 (NJ20210038-1 Jan 21).pdf PDF
DD Form 1423-1-A017 (Dispute Contingency Plan)-REVISED.pdf PDF
DD Form 1423-1-A037 (Lab Water Analysis Report)-NEW.pdf PDF
DD Form 1423-1-A019 (Records-All Monthly Maint Activity)-NEW.pdf PDF
TE 7.3 LIST OF UPS SYSTEMS FOR PREVENTIVE MAINTENANCE_Rev1.XLS XLS spreadsheet
TE 2.7 Kitchen Equipment 20200610_Rev1.xlsx XLSX spreadsheet
DD Form 1423-1-A014 (Spill Plan)-REVISION 01.pdf PDF
DD Form 1423-1-A018 (Tree Srvc-Maint PMP)-NEW.pdf PDF
09-Service Contract Act (SCA) Wage Determination-REVISION 01_20201221.pdf PDF
DD Form 1423-1-A012 (Affirmative Procurement)-REVISION 01.pdf PDF
7.5-Dispatching Procedures-NEW.pdf PDF
012-CBA Wage Determination-DOL Cover Letter.pdf PDF
0004 Technical Exhibit List of Picatinny Historic Buildings Use and Distribution_Rev1.pdf PDF
DD Form 1423-1-A009 (Safety Plan)-REVISION 01.pdf PDF
9.3-Picatinny Staffing Matrix-REVISION 01.XLSX XLSX spreadsheet
DD Form 1423-1-A006 (Physical Security-GFP)-REVISION 01.pdf PDF
DD Form 1423-1-A005 (Key Personnel)-REVISION 01.pdf PDF
DD Form 1423-1-A027 (Utilization of GFF Plan)-NEW.pdf PDF
07 - Price Matrix (Sanitized)-REVISION 01.xlsx XLSX spreadsheet
DD Form 1423-1-A032 (Storm Water Mgmt System Maint Plan (SWMSMP))-NEW.pdf PDF
DD Form 1423-1-A026 (Quality Control Report)-NEW.pdf PDF
06-PRICING Matrix-REVISION 01_20210310.xlsx XLSX spreadsheet
TE 3.14 Gate Locations_Rev1.docx DOCX document
DD Form 1423-1-A031 (Storm Water Collection System Maint Work Plan)-NEW.pdf PDF
DD Form 1423-1-A007 (Key Control)-REVISION 01.pdf PDF
TE 2.2 Attachment A Equipment List_2020_Rev1.pdf PDF
DD Form 1423-1-A036 (Quarterly Visual Insp Report)-NEW.pdf PDF
011.1-USAG Picatinny VGSA-DD 254 Continuation Sheet.docx DOCX document
DD Form 1423-1-A042 (Pest Management License and Certifications)-NEW.pdf PDF
DD Form 1423-1-A024 (Disaster Contingency Plan)-NEW.pdf PDF
DD Form 1423-1-A035 (Wastewater and Storm Water Systems Safeguarding Plan)-NEW.pdf PDF
DD Form 1423-1-A004 (Accident Reporting)-REVISION 01.pdf PDF
Show 40 more

Latest 50 of 121 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASPA-LPI

SUBJECT: Logistics Readiness Center (LRC) Picatinny, Maintenance Division, External Standing Operating Procedure (SOP)

This SOP will be reviewed annually by the IMO and approved by the LRC Director. Initial review for this SOP was conducted during the month of Aug 2018 with comments and suggestions due NLT 1 Aug 2019. Supplemental reviews will be conducted on an annual basis NLT the month of August. This review/approval page will be retained with the SOP and presented for inspection upon request.

Initial Review & Approval

Reviewed By: Robert Sestan, Director LRC (Printed Name) (Signature) (Date)

Approved By: Woytowich, Adam LTC Commanding (Printed Name) (Signature) (Date)

2020 Review (Due Aug 2020)

Reviewed By:

(Printed Name) (Signature) (Date)

Approved By:

(Printed Name (Signature) (Date)

2021Annual Update (Due Aug 2021)

Reviewed By:

(Printed Name) (Signature) (Date)

Approved By:

(Printed Name) (Signature) (Date)

2022 Review (Due Aug 2022)

Reviewed By:

(Printed Name) (Signature) (Date)

Approved By:

(Printed Name) (Signature) (Date)

Standing Operating Procedure (SOP)

LOGISTICS READINESS CENTER

MAINTENANCE DIVISION EXTERNAL STANDING OPERATING PROCEDURE

Summary. This Standing Operating Procedure (SOP) provides instructions for obtaining maintenance support by all customers or potential customers of the Logistics Readiness Center (LRC) Picatinny Arsenal, New Jersey.

Applicability. This SOP applies to all Active Army, Reserve Component, USAF, USN, USMC, USCG units and activities stationed at Picatinny Arsenal or supported by LRC in accordance with area support requirements identified in AR 5-9, units and activities provided maintenance support by LRC under the provisions of an Inter-service Support Agreement (ISSA), Memorandum Of Agreement (MOA), Memorandum Of Understanding (MOU), or any other such method that may be directed by proper authority.

Suggested improvements. The proponent agency of this SOP is the Logistics Readiness Center Picatinny, Maintenance Division. Users are invited to send comments and suggestions on DA Form 2028 (Recommended Changes to Publications and Blank Forms) to DIRECTOR, Logistics Readiness Center-Picatinny, ATTN: ASCE-LPI, Picatinny Arsenal, NJ 07806-5000

Standing Operating Procedure (SOP)

CONTENTS PARAGRAPH PAGE

CHAPTER 1 INTRODUCTION

Purpose 1-1 4 Scope 1-2 4 Applicability 1-3 4 References 1-4 4 Mission 1-5 5

CHAPTER 2 PROCEDURES

SECTION I ADMINISTRATIVE

Location 2-1 6 Telephone Communications 2-2 6 Incoming Written Communications 2-3 6 Email Communications 2-4 6 Normal Hours of Operation 2-5 7

SECTION II MAINTENANCE OPERATIONS

Request for Maintenance Support 2-6 7 Emergency Services 2-7 7 Acceptance Criteria 2-8 8 Delivery Points 2-9 9 Levels of Support 2-10 9 On-site Repairs 2-11 9 Requests for Status 2-12 9 Notification of Completed Maintenance Requests 2-13 9 Commercial Material Handling Equipment (MHE) 2-14 9 Fire Fighting Equipment & Emergency 10 2-15 9 Demilitarization of Equipment Weapons

2-16 2-17

Load Testing 2-18 10 Equipment Below 10 Horsepower 2-19 10 Damaged Vehicles 2-20 10

SECTION III INSPECTION AND CLASSIFICATION

Inspection and Classification Services 2-21 10 Classification Inspection 2-22 10 On-site Inspection/Repair 2-23 11 Standard Deadline List 2-24 12

CHAPTER 3 TECHNICAL ASSISTANCE

Coordination of Program 3-1 12

Standing Operating Procedure (SOP)

Informal Liaison Visits 3-2 12 Drivers Training 3-3 12

Warranty Claims Actions 3-4 12 Army Oil Analysis Program 3-5 12 Calibration Program 3-6 13 Maintenance Meetings 3-7 13 Maintenance Advisory/Technical Information 3-8 13 GCSS-A Historical Records 3-9 13

ANNEXES

ANNEX A – Maintenance Flow Chart A-1 ANNEX B – Sample WBS Form B-1 ANNEX C – ECOD Release Statement C-1 ANNEX D – Standard Deadline List D-1

ASCE-LPI

Standing Operating Procedure (SOP)

CHAPTER 1

INTRODUCTION

1-1. Purpose. The purpose of this Standing Operating Procedure (SOP) is to provide information and guidance to all customers supported by the Logistics Readiness Center (LRC), Maintenance Division concerning methods of obtaining Field and limited Sustainment maintenance. It is designed as a convenient reference to promote understanding and teamwork between the maintenance facility and supported units.

1-2. Scope. This SOP encompasses the mission and capabilities of the maintenance facility, and procedures employed in accomplishing the support mission. Units and activities utilizing the services of the Maintenance Division must comply with procedures outlined in this SOP. Unique requests not covered by this SOP should be coordinated with the Division Chief.

1-3. Applicability. This SOP applies to all Active Army, Reserve Component, USAF, USN, USMC, USCG units and activities stationed at the Logistics Readiness Center or supported by LRC in accordance with area support requirements identified in AR 5-9, units and activities provided maintenance support by LRC under the provisions of an Inter-service Support Agreement (ISSA), Memorandum Of Agreement (MOA), Memorandum Of Understanding (MOU), or any other such method that may be directed by proper authority.

1-4. References. The following are basic Department of the Army (DA), Army Sustainment Command (ASC), Training and Doctrine Command (TRADOC), and other headquarters directives governing Table of Distribution and Allowances (TDA) material maintenance activities and do not include all of the numerous directives that apply.

Other references to directives having an impact on the total mission of the Maintenance Division, may be considered.

a. AR 220-1, Unit Status Reporting

c. AR 700-4, Logistics Assistance Program

d. AR 700-138, Army Logistics Readiness and Sustainability

e. AR 700-139, Army Warranty Program IMNE-LNW-LGM 02 February 2015

f. AR 710-2, Supply Policy Below the National Level

ASCE-LPI

Standing Operating Procedure (SOP)

g. AR 725-50, Requisitioning, Receipt, and Issue System

h. AR 750-1, Army Material Maintenance Concepts and Policies

i. AR 750-10, Army Modification Program

j. AR 750-43, Army Test, Measurement and Diagnostic Equipment

k. DA Pam 710-2-1, Using Unit Supply System (Manual Procedures)

l. DA Pam 710-2-2, Supply Support Activity Supply System (Manual Procedures)

m. DA Pam 750-8, The Army Maintenance Management System (TAMMS)

n. DA Pam 750-13, Maintenance of Supplies and Equipment

o. TB 43-180, Calibration and Repair Requirements for the Maintenance of Army Material

r. GCSS-A End User Manual (EUM+)

s. Various Command Policy Memorandums

1-5. Mission. The primary mission of Maintenance Division is to coordinate, control, and perform Field and limited Sustainment material maintenance for ASC, IMCOM, ARDEC, and Joint Services units and activities stationed at Picatinny Arsenal, reserve component units in AR 5-9 support area, and other activities with current Inter-service Support Agreements. The secondary mission is to provide Field maintenance to supported units and activities with no organic Field maintenance capability.

Maintenance Division's mission is accomplished through the following functions:

a. Perform maintenance support on the following equipment categories:

emergency vehicles, combat vehicles, tactical vehicles, construction equipment, material handling equipment, industrial plant equipment.

b. Perform technical inspections for classification of equipment returned to the wholesale level and lateral transfer to other activities. Estimate Cost of Damage (ECOD) to government equipment is initiated when equipment is found to have damage through abuse, neglect, and/or “other than fair wear and tear”.

c. Operate an internal maintenance Shop Supply to support the shop in completion of work orders.

Standing Operating Procedure (SOP)

d. Provide a Maintenance Assistance to coordinate the Army Oil Analysis Program (AOAP) and Test, Measurement and Diagnostic Equipment (TMDE) program for the installation.

e. Manage and coordinate the installation Warranty Control (WARCO) program, Combat Vehicle Evaluation (CVE) program and the Modification Work Order (MWO) program.

f. Provide production, planning and control for maintenance requests submitted to the division from supported customer units and activities. Operate the GCSS-A System used to record, track, store, and report all maintenance actions, internal supply actions, and manpower utilization within the Division.

CHAPTER 2

PROCEDURES

SECTION I ADMINISTRATIVE

2-1. Location. The Maintenance Division is located in building 30-North, Picatinny Arsenal, New Jersey. The Maintenance Facility is located at building 33, Picatinny Arsenal, New Jersey.

2-2. Telephone Communications. Customers can reach Maintenance Division shops by calling the extension number listed at Annex A. Commercial long distance calls can be made by dialing Area Code (973) then 724 and extensions listed at Annex A.

Customers are encouraged to contact the Shop Office for work order status or the Division Chief about issues and concerns.

2-3. Incoming Written Communications. Written communications shall be addressed to:

Director Logistics Readiness Center

ATTN: ASCE-LPI

Building 30-N Picatinny Arsenal, New Jersey 07806-5000

2-4. Email Communications. The LRC email is usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil.

2-5. Normal Hours of Operation. The normal hours of operation are 0700-1130 and 1200-1530 Monday through Friday, excluding federal holidays. For non-emergency routine maintenance support during non-duty hours, a request must be submitted to the Chief of Maintenance Division for consideration. For emergency services, see paragraph 2-7.

mailto:usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil

Standing Operating Procedure (SOP)

SECTION II

MAINTENANCE OPERATIONS

2-6. Request for Maintenance Support. Maintenance and inspection services are initiated through the Transportation Motor-pool office (TMP) building 240, for all units that do not have internal maintenance support teams. Units with maintenance support teams are required to initiate all requests through their support team. Annex A Depicts the maintenance initiation flow.

a. For new accounts: An account must be established with the LRC in order for services to be performed. To create an account, a WBS must be funded and provided to the LRC maintenance office bldg. 30-N or email: usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil. A prefilled sample WBS form can be found in Annex B. A blank WBS form may be requested through the email in this paragraph.

b. Submission of Maintenance Requests must be completed in accordance with instructions found in DA Pam 750-8, GCSS-A End User Manuals and this SOP.

Maintenance Requests must have the proper Priority Designator (PD) code and high priority authentication signature. A current DA Form 1687 (Signature Card) must be on file along with an Assumption of Command letter for the Commander or Appointment letter for the hand receipt holder who authorizes the signature card for all supported customers. A Point of Contact (POC) and phone number must be annotated on maintenance request to ensure proper notification when repairs are completed.

c. Equipment maintenance owned by Army units located on Picatinny Arsenal are required to be on the unit property record in GCSS-A. Equipment not on the record are unable to have work orders created and will be rejected until the unit property records are corrected. To request corrections to the unit property record, contact: 4- 2125.

d. Equipment on loan for research and development purposes requiring maintenance will be evaluated on a case by case basis. To get approval for equipment on loan contact the LRC maintenance office bldg. 30-N, DSN 4-7403, commercial (973)724-7403 or email: usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil

e. Units with maintenance roles in GCSS-A will create notifications and evacuate work orders in the system to the maintenance facility after requirements of 2-6a-c have been met. Instructions on forwarding a work order can be found in the GCSS-A End User Manual (EUM+) titled: Change PM Notification - Create Order and Forward

(/ISDFPS/DISP_EQU_SIT).

2-7. Emergency Services.

mailto:usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil

Standing Operating Procedure (SOP)

a. Requests for emergency service during normal duty hours can be coordinated through Shop Service Office building 33, telephone: DSN 4-4487, commercial 973-724- 4487.

b. Requests for emergency service during non-duty hours can be coordinated through the on call phone numbers: commercial 973-479-1566 or 973-513-3259.

c. To ensure timely and appropriate response to emergency requests, the following information should be included:

1. Name, location and telephone number of reporting individual.

2. Nature of emergency in as much detail as possible.

3. Nomenclature and type of item.

4. Nature of deficiency or malfunction.

5. Exact location of item.

2-8. Acceptance Criteria.

a. All equipment submitted for inspection or repair will be required to meet the following criteria as applicable:

1. Properly completed DA Form 2404/5988-E (Equipment Inspection and Maintenance Worksheet) will accompany the item. The DA Form 2404/5988-E will be acquired through the TMP office or the unit maintenance support team

2. All field level (operator/crew/organizational) level faults listed in the "equipment is not ready/available if" column of the applicable equipment Technical Manual, Preventive Maintenance Checks and Services section, will be corrected or have corrective action indicated on DA Form 2404/5988-E.

3. Equipment must be reasonably clean with particular attention given to areas that are being submitted for repair, i.e., differential, engine, transmission, etc.

(Allowances will be made for weather and road conditions.)

4. Equipment with liquid cooling systems must be protected in accordance with TB 750-651. Antifreeze protection will be maintained between -20 and -55 degrees Fahrenheit year round.

5. Powered equipment must have fuel tanks a minimum of 3/4 full and serviceable batteries installed.

Standing Operating Procedure (SOP)

6. All components and sub-assemblies must be present and properly installed. If sub-assemblies are removed for transport to LRC, sub-assemblies must be reinstalled prior acceptance Tools, Basic Issue Items (BII), Additional Authorization List (AAL) items, spare parts, running spares, etc., will be removed from equipment and retained at the owning unit prior to being accepted.

7. Equipment damaged by other than fair wear and tear will require an ECOD. A release statement from a surveying officer or a damage statement signed by the Commander will be required prior to initiating repairs. Sample damage statement memorandum is at Annex C. Once the ECOD is completed, the Work Request will be closed, and owning unit will submit a new Work Request with the appropriate Priority Designator for repair.

b. Equipment failing to meet the above criteria will be rejected back to the customer for corrective action. A copy of the DA Form 2404/5988-E, Acceptance Inspection, will be provided showing the reason for rejection.

c. After acceptance, equipment will receive an initial inspection to determine all faults, shortcomings, deficiencies, and missing or removed items. This inspection will be recorded on DA Form 2404/5988-E.

2-9. Delivery Points. Items submitted for repair should be delivered prior to 1500 hours to the maintenance building 33.

2-10. Levels of Support. The Maintenance Division provides Field and limited Sustainment maintenance. Shops will perform Field Level Maintenance for units that do not have Field Maintenance capability upon request.

2-11. On-Site Repairs. The Maintenance Division will perform repairs and inspections on-site when equipment cannot be delivered to the facility, or when the inspection and repair will minimize the resources and time expended. On-site repair will be approved and scheduled based upon the availability of manpower, tools, repair parts, and the estimated time for repair.

2-12. Requests for Status. Inquiries concerning the status of items submitted to the maintenance facility shall be addressed to Shop Office at 4-4487. Automated listings are available that will provide status for all unit maintenance requests.

2-13. Notification of Completed Maintenance Requests. Upon completion of all repairs and final inspection, Shop Office will notify the customer by telephone or official correspondence that the item is ready for pick-up. Units will ensure items are picked up within 48 hours of notification.

ASP-LPI

Standing Operating Procedure (SOP)

2-14. Commercial Material Handling Equipment (MHE). On-site maintenance support is available for commercial MHE. Units are responsible for preparing a Maintenance Request and submitting it to the shop. For units without organic maintenance see paragraph 2-6.

2-15. Fire Fighting Equipment Maintenance support is provided for TDA fire-fighting equipment. Firefighting equipment is normally submitted by the user when maintenance is required. Unscheduled maintenance and special requirements are obtained by coordination with the Shop Office 4-4487. Refer to paragraph 2-7 for emergency services during non-duty hours.

2-16. Demilitarization of Equipment. Demilitarization is performed by Defense Logistics Agency (DLA) Disposition Services. The DLA Disposition website is:

http://www.dla.mil/DispositionServices.aspx

2-17. Weapons. Customers requiring above operator services including applications of Maintenance Advisory Messgaes, Safety of Use Messages and all support level gauging and tests will submit a DA 2404 to the shop office. Work above field level will be evacuated to the Logistics Readiness Center Joint Base MDL small arms repair facility.

2-18. Load Testing. Load testing is performed by the ARDEC IPE Team who can be reached at 4-1638, commercial (973) 724-1638. Maintenance work orders opened by external customers that require load testing are reimbursable to ARDEC.

a. Material Handling Equipment (MHE) supporting energetics will comply with TB 43-180 chapter 4(b)(2)(d): Periodic inspections of lifting devices for handling hazardous materials such as ammunition and explosives, molten metals, acids, strong caustics, and flammable and toxic materials shall include a functional test.

b. When MHE supporting energetics is identified, a full load test will be scheduled annually to ensure equipment meets the highest standards of support and safety.

c. It is a unit responsibility to identify to the LRC, MHE that supports energetic functions.

2-19. Equipment below 10 Horsepower. Equipment below 10 horsepower are not authorized for service by the LRC maintenance facility, included but not limited to;

lawnmowers, grass trimmers, small snow blowers. Units are responsible for repair or replacement of 10hp and below equipment through micro-purchase methods designated at each unit.

2-20. Damaged Vehicles. Repairs for damages to any vehicle or supported equipment will be reported to the Transportation Motor-pool office (TMP) building 240 or call 4-http://www.dla.mil/DispositionServices.aspx

Standing Operating Procedure (SOP)

4-2049, (973)724-2049 to schedule repair. Vehicle repairs due to damage require an ECOD Release Statement (Annex C) signed by the organization commander or civilian equivalent and an SF-91 Motor Vehicle Accident form. The SF-91 is located in the dispatch binder or https://app_gsagov_prod_rdcgwaajp7wr.s3.amazonaws.com/SF91- 04.pdf.

SECTION III

INSPECTION AND CLASSIFICATION

2-21. Inspection and Classification Services. The Maintenance Division provides inspection and classification services for equipment items being transferred or turned in.

Classification inspections, Estimated Cost of Damage (ECOD), Actual Cost of Damages (ACOD), verification inspections, and other miscellaneous inspections are performed as requested by supported customers.

a. One time exception will be granted for technical inspections of new equipment to be performed prior to acceptance in GCSS-A. This enables units to identify equipment conditions prior to accepting equipment onto the unit equipment record.

2-22. Classification Inspection. Excess or uneconomically repairable end items, major assemblies, supplies, and equipment with AMDF recoverability codes of "F, D, or H" will be classified by an authorized Maintenance Division inspector and a condition code assigned IAW AR 710-2, AR 725-50 and AR 750-1.

a. End items and major assemblies:

1. Units having excess or uneconomically repairable end items or major assemblies will submit properly completed Maintenance Request, and DA Form 2404/5988-E showing organization inspection and repairs, to the Maintenance Division, building 33, requesting Technical Inspection (TI) for turn in. The DA Form 2404/5988-E will indicate component and Basic Issue Items (BII) shortages.

2. Technical inspectors will inspect the equipment and record the results on DA Form 2404 listing all faults, deficiencies and shortages IAW appropriate TM 10/20 PMCS checks. Condition code of equipment will be annotated on the Maintenance Request, DA Form 3590 and/or DA Form 461-5 classification forms indicating condition of the item, estimated cost of repairs, and assigned condition code.

Classification will only be prepared for items being turned in as is, or for items that are in “TM 10/20” condition i.e. condition codes “A” or “B”.

3. After classification has been completed, the equipment will be returned to the customer for turn-in IAW AR 710-2 and LRC Reg 710-2.

https://app_gsagov_prod_rdcgwaajp7wr.s3.amazonaws.com/SF91-04.pdf https://app_gsagov_prod_rdcgwaajp7wr.s3.amazonaws.com/SF91-04.pdf

Standing Operating Procedure (SOP)

b. Supplies and Equipment (other than major end items). Units having unserviceable recoverable items will submit a Maintenance Request, requesting “TI for turn-in”. Items going to Central Turn-in may be classified while the customer waits if shop workload allows. IMNE-LNW-LGM 10 October 2010 SUBJECT: Logistics Readiness Center (LRC), Maintenance Division, External Standing Operating Procedure (SOP) 18 Warning: Verify revision is current prior to use. The information contained in this document is controlled. Only current controlled versions are complete and have the most up to date information. Users are responsible to properly dispose of obsolete copies. Inspection and classification of items with a maintenance repair code of “F”, "O" or "Z" is the unit’s responsibility, based on the unit’s maintenance capabilities.

2-23. On-Site Inspection/Repair Support. On-site inspection and repair service for equipment requiring maintenance or classification may be provided upon request when determined to be the best means of providing this support. On-site inspection and repairs will be requested, coordinated and conducted using the following guidelines:

a. Supported units can request an on-site inspection/repair by submitting a Maintenance Request to the Shop Service Office building 33, or call telephone: DSN 4- 4487, commercial 973-724-4487.

b. Decision to perform on-site inspection and repair will be made by the shop supervisor or inspector at the time of acceptance of the Maintenance Request. The unit will be notified immediately when the inspection cannot be performed on-site. Decision to perform on-site inspections will be based on availability of inspection personnel, time required and type of equipment to be inspected.

d. The customer will be informed of action(s) necessary for items that cannot be repaired on-site by contact maintenance support. Normally these items are delivered to the applicable delivery point (paragraph 2-9). If the items cannot be repaired on-site, the Maintenance Request for on-site inspection will be closed out and the new one opened when the item is delivered to the shop.

2-24. Standard Deadlines. Due to the variety of standard and commercial equipment on Picatinny Arsenal, a standard deadline list is compiled for customer use in ANNEX D. This list is designed for use on cars and trucks. The standard deadline list is used to help users identify deficiencies that would cause a vehicle to be inoperable when an operator manual is not present. Any deficiency that meets dead-lining criteria will require notification to Transportation Motor-pool office (TMP) building 240 or call 4- 2049, (973)724-2049.

CHAPTER 3

TECHNICAL ASSISTANCE

GENERAL

Standing Operating Procedure (SOP)

3-1. Coordination of Programs. The Maintenance Division Chief or a designated representative will coordinate with the appropriate section to provide maintenance technical assistance as required.

3-2. Informal Liaison Visits. Maintenance Division personnel are available to assist supported units in establishing new procedures, identifying equipment requirements and other matters associated with equipment maintenance.

3-3. Drivers Training. Drivers training, testing and licensing will be conducted in accordance with IMCOM USAG SOP.

3-4. Warranty Claims Actions. Warranty claims actions are initiated at all levels of maintenance as appropriate. DA Pam 750-8 provides instructions for initiation of such claims. All maintenance supported equipment requiring repairs under warranty provisions will be processed by bringing a Maintenance Request to the Maintenance Division coordinated through Shop Service Office building 33, telephone: DSN 4-4487, commercial 973-724-4487. The maintenance facility will provide technical assistance to supported customers in the preparation of documentation and selection of exhibits.

3-5. Modification Work Orders (MWO). The MWO Coordinator is the Maintenance Division Chief for Department of the Army Modification Work Orders. Fielding plans and application of MWOs are coordinated through the Installation MWO Coordinator for all supported customers.

a. The MWO Coordinator will advise supported customers of pending MWOs, schedules for application, and procedures that will be followed before, during, and after application.

b. Owning units are responsible for preparation of Maintenance Requests to document MWO application.

3-6. Army Oil Analysis Program (AOAP). AR 750-1 Requires units that have equipment listed in TB 43-0211 to have an oil-sampling program for their equipment.

Information, instructions and procedures for managing the Department of the Army Oil Analysis Program for non-aeronautical equipment and components are contained in TB 43-0211. The Maintenance Division Chief serves as the Installation AOAP Monitor.

Units will ensure that all items of non-aeronautical equipment subject to the AOAP are enrolled in the program through the maintenance facility. The maintenance facility provides oil sample extraction for supported units to be shipped to the lab. Within the first two weeks of the month due, equipment will be delivered to drop off point: Shop Service Office building 33, telephone: DSN 4-4487, commercial 973-724-4487.

All levels of command can view and print lab reports for their UIC and view training and other AOAP related documents thru AESIP (https://idmng.armyrep.army.mil).

Standing Operating Procedure (SOP)

3-7. Calibration Program. Test, Measurement, and Diagnostic Equipment (TMDE) assigned to LRC supported units are required to be enrolled in the Calibration Program.

The program is managed by the U.S. Army Material Command (AMC) in accordance with guidance contained in AR 750-43, TB 750-25, TB 43-180, and DA Pam 750-8. The calibration lab that supports Picatinny Arsenal is located at Tobyhanna Army Depot. The TMDE drop off point is located in Building 91, telephone: DSN 4-6476, commercial 973- 724-6476.

a. Commanders of LRC supported units with assigned TMDE are responsible for:

Ensuring that all assigned TMDE is identified, reported and delivered in accordance with current publications governing the calibration and maintenance to TMDE Support Center Tobyhanna Army Depot.

3-8. Maintenance Meetings. Maintenance meetings conducted at various levels of maintenance and command at Picatinny Arsenal are the primary vehicles for surfacing maintenance related areas in need of management emphasis. Supported units desiring the Maintenance Division's participation at unit maintenance meetings should contact the Maintenance Division Chief bldg. 30N, phone: 4-7403 commercial: (973) 724-7403 or email: usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil.

3-9. Maintenance Advisory/Technical Information. Maintenance related information received through official channels, i.e., SOUM, GPM, MAM, letters, messages, safety recalls, etc., are disseminated to supported units through maintenance meetings or normal distribution.

3-10. GCSS-A Historical Records. The Global Combat Support System-Army (GCSS- A) database is capable of providing numerous and varied maintenance reports from both active and historical files. Customers requiring maintenance management data and reports should contact the Maintenance Division Chief Bldg. 33, phone: 4-7403 commercial: (973) 724-7403 or email: usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil.

mailto:usarmy.pica.406-afsb-lrc.mbx.lrc-picatinny-arsenal@mail.mil

Standing Operating Procedure (SOP)

ANNEX A

Standing Operating Procedure (SOP)

ANNEX B

EXAMPLE WBS Form

Standing Operating Procedure (SOP)

ANNEX C

EXAMPLE ECOD RELEASE STATEMENT MEMORANDUM

Office Symbol Date MEMORANDUM FOR Chief Maintenance Division, LRC SUBJECT: ECOD Release statement This is to certify that damage done to

NSN: _________________________, Serial Number: __________________________ has been investigated IAW current regulations. This equipment/item is no longer required for investigation or exhibit. Request repair/disposition.

(Signed by)

COMMANDER

UNIT

Appointing Authority: (Concur / Nonconcur)

Standing Operating Procedure (SOP)

ANNEX C

STANDARD DEADLINE LIST

Improper functioning of:

� Steering � Lights � Windshield wiper � Horn � Warning signals � Side or rearview mirrors � Occupant restraint devices � Other safety devices.

Improper condition of:

� Windshield � Windows � Mirrors � Lights � Reflectors � Other safety devices that are broken, cracked, discolored, or covered with frost, ice, snow, dirt, mud, or grime.

� Note: Glass will not have posters, placards, stickers, or nontransparent materials that impair the operator’s vision or create a hazard.

Defective, inoperable, or out-of-adjustment service or parking brakes.

Fluid leaks. Vehicles with any:

� Gasoline leak � Class III diesel, oil, or water/coolant leak � Note: Class III is defined as leakage of fluid great enough to form drops that fall from item being checked/inspected.

Tires

� Excessively worn � Deeply cut � Exposed cords

Any condition likely to cause injury to personnel or failure of a component. Examples are cracked wheel hubs, worn or frayed tiedown straps, torn sheet metal with exposed sharp edges, damaged or missing exhaust pipe shields, and leaks from exhaust systems.

NOTE: This list is compiled from AR 750-1, AR 385-10 para. 11-3 and TM 9-2320-280-10 ch. 4.