TE 3.9 Athletic Field Maint Requirements_Rev1.doc

DOC document 52 KB Posted

Attached to
Picatinny Arsenal Base Operations (BASOPS) Federal contract opportunity
Solicitation number
W15QKN-21-R-5005
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This technical exhibit outlines athletic field maintenance requirements for a federal contract opportunity. The contractor shall perform maintenance on multiple athletic fields and recreational areas at Fort Belvoir, including mowing grass, trimming weeds, lining fields for various sports, and applying fertilizers, lime, seed and topsoil in accordance with soil test results. Additional requirements specified for football fields include weekly topsoil application and turf repair. The contractor must coordinate all maintenance schedules with the Directorate of Family, Morale, and Welfare & Recreation and is responsible for repairing and maintaining various athletic equipment but not asphalt or hard surfaces. The related federal contract opportunity is solicitation number W15QKN-21-R-5005 for Picatinny Arsenal Base Operations services with a closing date of February 2, 2021.

View the file

Other files for this federal contract opportunity

Other files attached to Picatinny Arsenal Base Operations (BASOPS), newest first.
File Type Posted
07 - Price Matrix (Sanitized)-REVISION 01.xlsx XLSX spreadsheet
06-PRICING Matrix-REVISION 01_20210310.xlsx XLSX spreadsheet
9.3-Picatinny Staffing Matrix-REVISION 01.XLSX XLSX spreadsheet
011-DD Form 254-NEW.pdf PDF
7.7-Preventative Maintenance Checks and Services_AR 58-1-NEW.pdf PDF
DD Form 1423-1-A038 (Daily Log of Chiller Inspection)-NEW.pdf PDF
DD Form 1423-1-A037 (Lab Water Analysis Report)-NEW.pdf PDF
DD Form 1423-1-A033 (Storm Water Mgmt System Maint Insp Form)-NEW.pdf PDF
DD Form 1423-1-A032 (Storm Water Mgmt System Maint Plan (SWMSMP))-NEW.pdf PDF
DD Form 1423-1-A028 (Key Control-Inventory)-NEW.pdf PDF
DD Form 1423-1-A027 (Utilization of GFF Plan)-NEW.pdf PDF
DD Form 1423-1-A023 (Daily Log of CAD Support Requests)-NEW.pdf PDF
DD Form 1423-1-A021 (PWO (IJO) Annual Work Plan (AWP)-NEW.pdf PDF
DD Form 1423-1-A020 (Preventative Maintenance (PM) Schedule)-NEW.pdf PDF
DD Form 1423-1-A017 (Dispute Contingency Plan)-REVISED.pdf PDF
DD Form 1423-1-A009 (Safety Plan)-REVISION 01.pdf PDF
DD Form 1423-1-A006 (Physical Security-GFP)-REVISION 01.pdf PDF
DD Form 1423-1-A005 (Key Personnel)-REVISION 01.pdf PDF
TE 3.14 Gate Locations_Rev1.docx DOCX document
TE 2.2.1 Attachment A.1 Boilers 2020_NEW.pdf PDF
W15QKN21R5005_Amendment 0004.docx DOCX document
W15QKN21R5005_Amendment 0003.docx DOCX document
Picatinny Basops Site Visit Announcement-28 Jan 21.docx DOCX document
W15QKN21R5005_Amendment 0002.docx DOCX document
W15QKN21R5005_Amendment 0001.docx DOCX document
02 - Past Performance Questionaire_Rev1.docx DOCX document
W15QKN21R5005_Released_20201202.pdf PDF
0001.2 - CLS 411-Facility Maintenance Vertical.docx DOCX document
0001.3 - CLS 420-Facilities Maintenance-Horizontal.docx DOCX document
0001.4 - CLS 501-Heating and Cooling Services.docx DOCX document
0001.5 - CLS 510-Pest Management Services.docx DOCX document
0003.6 - Technical Exhibit 34 - List of Approved Hands Free Devices (new).pdf PDF
0006.8 - Technical Exhibit - 6.43 - Picatinny Guidance and Implementation-NEPA.PDF PDF
0009 - Technical Exhibits 9.1-9.9 (9 each) - GFEBS Historical Workload Data.zip ZIP file
0010 - Technical Exhibit - Resource Efficiency Management_Summary_SOW.pdf PDF
0012 - Technical Exhibit - Picatinny Integrated Pest Mgmt Plan 2019.pdf PDF
0016 - Contract Data Requirements List (CDRL) - 17 each.zip ZIP file
0017 - Technical Exhibit Master List-BaseOps_FINAL_20201022.xlsx XLSX spreadsheet
0000 - General SOLICITATION Exhibits (10 each).zip ZIP file
0001.1 - CLS-408-Pavement Clearance.docx DOCX document
0003.2 - Technical Exhibits 3.16-3.19; 6.2 (5 each) - Storm Prep and Snow Removal.zip ZIP file
0003.4 - Technical Exhibits 3.30-3.32 (3 each) - GFEBS References.zip ZIP file
0003.5 - Technical Exhibit 33 - Picatinny Wellhead Protection Plan (Partial).pdf PDF
0006.5 - Technical Exhibits 6.17-6.18 (2 each) - Petroleum Fuel Activities & Internal Comb Engines.zip ZIP file
0006.6 - Technical Exhibits 6.19-6.34 (16 each) - Environmental #2.zip ZIP file
0006.7 - Technical Exhibits 6.35-6.42 (8 each) - Cultural & Historic Resource Management.zip ZIP file
0007 - Technical Exhibits 7.1-7.4 (4 each) - Safety PM (Fire-411-UPS-Elevators).zip ZIP file
0008 - Technical Exhibit - LIST OF GENERATORS FOR FUELING.XLS XLS spreadsheet
0013 - Technical Exhibit - Picatinny Integrated Nat Resource Mgmt Plan.pdf PDF
0015 - Technical Exhibit - Picatinny Arsenal Visitors Map.pdf PDF
Show all 50

Picatinny Arsenal Base Operations (BASOPS) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 3.9

ATHLETIC FIELD MAINTENANCE REQUIREMENTS

1.0 Athletic Fields to Be Maintained:

Ball Fields:

· Main Gate Field 1 ( Softball/Football)

· Main Gate Field 2 (Softball/Soccer)

· Main Gate Field 3 New Soccer Field

· LL Field (Schrader Road) Courts:

· Teen Center Basketball Court

· Street Hockey Court (Farley Avenue)

· Tennis Court (Farley Avenue)

· Volleyball Court ( Near Chapel)

· Small Blacktop Basketball Area ( Main Gate)

· Playground (Main Gate Field)

1.1 The Contractor shall perform maintenance on of the athletic fields. All work shall be performed by qualified and licensed Contractor personnel and shall conform to current Amateur Softball Association and Little League Baseball Association rules and standards where applicable. The Contractor shall provide all labor, materials and equipment to complete the following athletic field maintenance: All work to be completed between 1 April and 30 November on an annual basis except where otherwise noted.

1.1.1. Ball fields 1&2:

1.1.2. Grass maintenance 01-April to 30-November:

1.1.2.1. To be mowed no less than once a week between 2 ½” to 3”.

1.1.2.2. To be weed trimmed every other week.

1.1.3. The lines and field will be drug for preseason last week February to mid-March.

1.1.4. The infield maintenance will start 01 Mar. and end the 2nd week of Sep.

1.1.5. During season fields will be drug and lined Monday, Wednesday, and Thursday.

1.1.5.1. All infield lines to include batter’s box will be done in lime.

1.1.5.2. All other field lines will be done in field paint and be 3”.

1.1.6. New soccer field:

1.1.7. Grass maintenance 01-April to 30 November:

1.1.7.1. To be mowed no less than once a week between 2 ½” to 3”.

1.1.7.2. To be weed trimmed every other week.

1.1.8. Small sided 5V5 filed lines will be struck for preseason the last week of Feb.

1.1.9. Soccer field maintenance to start 01 March to the 2nd week of September.

1.1.10. Small sided 5V5 field lines will be maintained once a week on every Monday.

1.1.11. All field lines on grass will be done in field paint and be 3”.

1.1.12. Flag football field (Ball field 1):

1.1.13. Grass maintenance 01-April to 30-November:

1.1.13.1. To be mowed no less than once a week between 2 ½” to 3”.

1.1.13.2. To be weed trimmed every other week.

1.1.14. 01 Aug lines will be over laid on field 1 for flag football preseason. Season to start third week in August and end the first week in November.

1.1.15. Lines for flag football will be maintained once a week on every Monday.

1.1.16. All field lines will be done in field paint and be 3”.

1.1.17. Little League baseball field (near CYS/SAS):

1.1.18. Grass maintenance 01-April to 30-November:

1.1.18.1. To be mowed no less than once a week between 2 ½” to 3”.

1.1.18.2. To be weed trimmed every other week.

1.1.18.3. No field lines required.

Note: All the fields/courts needs tick control, spraying for poison ivy, and routine pest control for nuisance animals and mice in storage sheds.

Recreational Areas:

Lake Denmark Picnic Area:

· Covered Pavilions

· Picnic Table Areas

· Bathroom winterization and seasonal opening maintenance for leafs, grass cutting, and recreational space (horseshoes/badminton)

Boating Areas:

· Picatinny Lake

· Lake Denmark (North/South Basin)

The maintenance of the recreational areas are mostly for weed/brush control, spraying for ticks, maintenance of the pathway between the north/south basin.

1.1 The Contractor shall perform maintenance on of the athletic fields. All work shall be performed by qualified and licensed Contractor personnel and shall conform to current Amateur Softball Association and Little League Baseball Association rules and standards where applicable. The Contractor shall provide all labor, materials and equipment to complete the following athletic field maintenance: All work is to be completed between 1 March and 1 April on an annual basis except where otherwise noted.

1.2 Complete soil tests annually for turf areas at two locations in each of the athletic fields. Fertilizer and lime applications are to be regulated in accordance with soil test results, which must be performed in accordance with state nutrient management guidelines. A copy of the test results is to be provided to the Government.

1.2..1 Apply a slow release fertilizer (50% percent or more of the nitrogen is in a water insoluble form) at rates dictated by the results of the soil test. The fertilizer is to be applied to turf areas two times a year, 1 March – 1 April and again 15 September – 31 October.

1.2.2 Apply agricultural limestone up to two times a year (1 March – 1 April and 15 September – 31 October) to maintain a soil pH of 5.5 – 6.8 at rates dictated by the results of the soil test.

1.2.3 Core aerate turf areas a minimum depth of 3-4 inches in two directions two times a year (1 March – 1 April and 15 September – 31 October).

1.2.4 Level and rake all baseball/softball infield soil areas. Add approximately 5 tons of ball diamond mix per field. Grade, rake (York rake) and prepare surface as required to ensure a safe and acceptable playing surface. Add approximately 3 tons of surface material (Turface) per field to help stabilize and improve the infield's water retention properties. Cultivate, roll, and drag the infield. Mix until smooth and level in accordance with the following specification. Difference in elevation of infield and transition to outfield grass on any two points will not exceed one tenth of one foot. This must take into consideration a two to three percent grade increase from the infield edges towards the pitcher's area for proper drainage.

1.2.5 All turf areas are to be overseeded (drill or verticut) in two directions. A total of six pounds per 1000 square feet is to be implanted ¼ to ½ inch. A certified seed mixture containing at least three varieties (approved by the Fort Belvoir DPW) of Improved Tall Fescues (80%-90%) and Perennial Ryegrass (10%-20%) is to be applied

1.2.6 All infield baselines are to be edged annually. On an annual basis (every April), all of the baseball and softball fields need an edged about 20 feet to level out transition area from infield to outfield and make the area a safe playing field.

The Directorate of Family, Morale, and Welfare & Recreation (DFMWR) is responsible for marking all baselines prior to edging.

1.2.7 Top-dressing is to be completed annually between 15 February and 15 March . Approximately 18 cubic yards of top-dressing per acre are to be applied to all turf areas as required to ensure adequate compaction resistance, water holding capacity, seed germination, and level ground for a safe and acceptable playing surface. The top-dressing is to consist of a homogeneous mixture of topsoil, leaf compost/peat humus and course sand.

1.2.8 All athletic fields are to receive adequate moisture for a minimum of four weeks following overseeding. Pullen Football field is to receive additional water during dry periods (less than 1 inch of rain over a 10 day period) from 1 June through 30 September to maintain turf vigor. If watering is required during the playing season, limit watering to ensure that the field is not too wet for good playing conditions or that the turf is not subject to excessive devoting or tearing.

2.1 Pullen Football Field. In addition to annual maintenance, Pullen Football Field is to receive weekly maintenance during the football playing season. Topsoil is to be applied as required to repair rough areas and divots once a week. Rebel tall fescue is to be applied at the rate of 6 pounds per 1000 square feet with the topsoil. The areas are to be raked to smooth the playing surface and eliminate standing water. Work schedulers are to be coordinated with DFMWR to permit recovery of areas after treatment.

3.0 The Contractor is to coordinate all maintenance schedules with the DFMWR Outdoor Recreation Office to identify field use, rotations and maintenance activities.

4.0 The contractor will repair and maintain real property associated with tennis courts, outdoor basketball courts (#2125, etc), football fields, track, and obstacle course (#1171) in referenced in the map of athletic fields and courts (TE GR7A). These include but not limited to: football goal posts, basketball pole, basketball headboard, basketball backboard, basketball rim, back stops, fences, obstacle course rubber pellets, tennis court poles and fencing.

5.0 The Contractor is not responsible for the asphalt or hand surfaces at the tennis courts, basketball courts and all-weather track.

6.0 There are nine tennis courts, five basketball courts, one skate park, five playgrounds and one obstacle course.

�Only baseball fields

�Added as per Sheila Edwards, MWR Sports and fitness director .

�On the major and minor league fields- hardball fields

�Pullen field need specific things

�Softball fields

File details come from the government source that posted it. Updated .