Attachment_13_-_Annex_L_-_Wastewater_Services_Revised.pdf

PDF 135 KB Posted

Attached to
Base Operations Support Services Federal contract opportunity
Solicitation number
W15QKN-19-R-1004
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

This attachment provides details on wastewater services required at Fort Hamilton in New York. The contractor will be responsible for operating and maintaining the wastewater collection system and one lift station that transports approximately 40,000 gallons of sewage per day to the Owls Head Sewage Treatment Plant. Key requirements include daily operational checks and tours, submitting monthly operating logs to the Contracting Officer's Representative, and ensuring personnel are certified in accordance with federal and state regulations. The related federal contract opportunity is solicitation number W15QKN-19-R-1004 for base operations support services at Fort Hamilton. Proposals are due by February 13, 2019 to the Department of the Army Materiel Command Contracting Command at Picatinny Arsenal. A site visit is scheduled for January 24, 2019 and all questions must be received in writing by January 30, 2019.

Revised Attachment 13 - Wastewater Services

View the file

Other files for this federal contract opportunity

Other files attached to Base Operations Support Services, newest first.
File Type Posted
W5QKN-19-R-1004-0008.pdf PDF
Q&A__W15QKN-19-R-1004.pdf PDF
Attachment_1_-_Overarching_Standardized_PWS_Revised.pdf PDF
Tech_Exhibit_Index.docx DOCX document
Attachment_8_-_Annex_F_-_Grounds_Maintenance_Revised.pdf PDF
Attachment_14_-_Annex_M_-_Pest_Management_Services_Revised.pdf PDF
Tech_Exhibit_0006_Base_Ops_Office_and_Shop_Locations.pdf PDF
Tech_Exhibit_0003_RCI_Housing_Locations.pdf PDF
Tech_Exhibit_0302_Snow_and_Ice_Removal_Plan.docx DOCX document
Tech_Exhibit_0507_List_of_Portable_Generators.xlsx XLSX spreadsheet
Tech_Exhibit_0508_Fire_Hydrant_Map.pdf PDF
Tech_Exhibit_0420_Swimming_and_wading_pools.docx DOCX document
Tech_Exhibit_0005_JOC_Workload_Requirements.docx DOCX document
Tech_Exhibit_0701_Sample_Maintenance_Cycle_Checklists.pdf PDF
Tech_Exhibit_0412_Auxiliary_Generators.xlsx XLSX spreadsheet
Tech_Exhibit_0404_Overhead_Doors.docx DOCX document
Tech_Exhibit_0303_Priority_Pavement_Clearing.docx DOCX document
BASOPS_CDRLs_A041_A044.pdf PDF
Tech_Exhibit_0002_-_Facilities_Maintenance_Instruction.docx DOCX document
Tech_Exhibit_0501_Utilities_Not_Included_-_Copy.docx DOCX document
BASOPS_CDRLs_A017_A020.pdf PDF
Tech_Exhibit_0418_Barracks.docx DOCX document
Tech_Exhibit_0203_Parade_Area_Taylor_Field.pdf PDF
Tech_Exhibit_0409_Grease_Traps.docx DOCX document
Tech_Exhibit_0204_Tree_&_Shrub_Locations.pdf PDF
BASOPS_CDRLs_A009_A012.pdf PDF
Tech_Exhibit_0408_Hot_Water_Tanks.docx DOCX document
BASOPS_CDRLs_A013_A016.pdf PDF
Tech_Exhibit_0603_lead_lag_procedures_in_the_buildings.docx DOCX document
Tech_Exhibit_0301_Sweeping_and_Snow_Removal_Areas.docx DOCX document
Tech_Exhibit_0801_Food_handling_establishments.docx DOCX document
Tech_Exhibit_0406_Air_Compressor.docx DOCX document
Tech_Exhibit_0001_Performance_Locations.docx DOCX document
Tech_Exhibit_0410_Gas_and_Oil_fired_boilers.docx DOCX document
Tech_Exhibit_0416_Hood_Systems.docx DOCX document
Tech_Exhibit_0102_Map_of_Current_Dumpster_Location.docx DOCX document
Tech_Exhibit_0402_Eye_Washes_and_Safety_Showers.docx DOCX document
Tech_Exhibit_0202_Histroical_Grass_Cutting.docx DOCX document
Attachment_26_GFP-11.xlsx XLSX spreadsheet
Attachment_4_-_Pricing_Matrix.xlsx XLSX spreadsheet
Attachment_6_-__Annex_B_-_Facilities_Maintenance_Instruction.pdf PDF
Attachment_23_GFP-8.xlsx XLSX spreadsheet
Attachment_27_-_Standard_Form_LLL.pdf PDF
Attachment_8_-_Annex_F_-_Grounds_Maintenance.pdf PDF
Attachment_13_-_Annex_L_-_Wastewater_Services.pdf PDF
Attachment_21_GFP-6.xlsx XLSX spreadsheet
Attachment_19_GFP-4.xlsx XLSX spreadsheet
Attachment_24_GFP-9.xlsx XLSX spreadsheet
Attachment_25_GFP-10.xlsx XLSX spreadsheet
Attachment_5_-_Personnel_Licensing_and_Certs.pdf PDF
Show all 50

Base Operations Support Services has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wastewater Services

06 March 2019

Table of Contents

1.0 GENERAL INFORMATION

1.1 Overview

1.2 Components

1.3 Work Management and Control

1.3.1 Reporting Requirements

1.3.2 Certification

2.0 DESCRIPTION OF SERVICES

2.1 STP Operation

2.2 Laboratory Testing

3.0 WASTEWATER TREATMENT PLANT

3.1 Scope

3.1.1 Industrial Wastewater Treatment Plant (IWPT)

3.1.2 Lift Stations

3.1.3 Equalization Basins

3.1.4 Biological Ponds

3.1.5 Free Oil Separator (FOS) Facility

3.2 Components

3.3 Work Management and Control

3.3.1 Reporting Requirements

3.4 Services

3.4.1 IWTP Operation

3.4.2 Samples

3.4.3 Systems and Components Operation

3.4.4 On-Site Operator

3.4.5 Operational Tours

1.0 General Information.

1.1 Overview. The Fort Hamilton wastewater collection system collects and delivers wastewater to the City “Owls Head” Sewage Treatment Plant (STP) by means of collection lines, sewer mains, and lift stations. The collection system consists of industrial water, wastewater, storm water and combination lines with manholes, some of which are buried. There is one lift station located in building 231. There are approximately (89,607.66) linear feet (LF) of sewer mains ranging from (3) inches to (48) inches in diameter, and approximately (299) manholes.

1.2 Components. Sanitary wastewater collection system components include, but are not limited to, electrical, electronic, and digital systems and controls; level controls, control panels, phone dialers, switches, metering devices, sewage basins, alarms, lift stations, wet wells, dry wells, pumps, motors, air compressors, filters, piping, indicator lights, mounting hardware, meters, valves, and fittings, and laboratory equipment and components.

Domestic sewage from Fort Hamilton is approximately (40,000) gallons per day (gpd).

The Contractor's maintenance responsibility encompasses all of Fort Hamilton. The maintenance boundary begins where the line exits the building. The Contractor’s responsibility in the housing areas shall be limited to main lines and manholes.

1.3 Work Management and Control.

1.3.1 Reporting Requirements.

1.3.1.1 The Contractor shall submit to the Contracting Officer’s Representative (COR) or Alternate Contracting Officer’s Representative (ACOR) for approval, a plan for accomplishing the Wastewater Treatment and Collection System operation described in this Performance Work Statement (PWS).

1.3.1.2 The Contractor shall prepare and submit to the COR or ACOR by the tenth (10th) day of each month a copy of DA Form 4247, Facilities Engineering Operating Log (Sewage General)), and DA Form 4178, Facilities Engineering Operating Log (Sewage Supplementary) (Deliverable A021). The Contractor shall also maintain a daily operator's log notebook that includes routine operational duties, unusual conditions, accidents, and complaints.

1.3.2 Certification. The Contractor shall provide certified personnel in compliance with Federal, New York Department of Public Health, and Environment Regulations.

2.0 Description of Services.

The Contractor shall operate the wastewater collection system and components in accordance with (IAW) AR 420-1, TM 5-814-1 (Sanitary and Industrial Waste Water Collection - Gravity Sewers and Appurtenances), TM 5-814-2 (Sanitary and Industrial

Wastewater Collection - Pumping Stations and Force Mains), Operations & Maintenance (O&M) manuals, and manufacturer’s specifications. Sample maintenance cycles checklists in TE 0701.

2.1 STP Operation. N/A

2.2 Laboratory Testing. N/A

3.0 Wastewater Treatment Plants (WTP).

3.1 Scope. There are no sewage or industrial wastewater treatment plants.

3.1.1 Industrial waste consists of collection lines from facilities such as the motor pool wash racks.

3.1.2 Lift Stations. There is one lift station located in building 231 which delivers combined sewage (sanitary sewage and storm water) to “Owls Head Treatment Plant” which is operated by NYC.

3.1.3 Equalization Basins. N/A

3.1.4 Biological Ponds. N/A

3.1.5 Free Oil Separator (FOS) Facility. Rags, suspended solids, and oil are removed prior to discharge, under dry weather conditions.

3.2 Components. Reference the utility maps for the collection systems for wastewater and storm water.

3.3 Work Management and Control.

3.3.1 Reporting Requirements. N/A

3.4 Services.

3.4.1 IWTP Operation. There is no IWTP.

3.4.1.1 Operation includes, but is not limited to, the following: operational checks of lift stations, and coordination with the STP for transferring excess water.

3.4.2 Samples. N/A

3.4.3 Systems and Components Operation. The Contractor shall operate systems and components IAW O&M manuals, manufacturer’s specifications, and TM 5-814-3, Domestic Wastewater Treatment Plant Laboratory Guidance. The Contractor shall notify the COR/ACOR of system bypasses and again after the system is returned to normal operation.

3.4.4 On-Site Operator. N/A.

3.4.5 Operational Tours. The Contractor shall perform operational tours to evaluate operations, collections and lift stations.