W15QKN-17-R-0214 - SECTION F
View the file
Other files for this federal contract opportunity
Show all 50
PRODUCTION OF IMPROVED ARMOR CAB (IAC) MODIFICATION KITS FOR THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F.1 METHOD AND PLACE OF DELIVERY
F.1.1 NOTE TO OFFERORS. This Delivery Schedule and Address pertain to the Base quantity plus any modification made after contract award to increase quantity.
F.2 Period of Performance. The solicitation includes a base plus four (4) option periods as follows:
Base: 12 Months After Contract Award Option Period 1: 12 Months After Base Option Period 2: 12 Months After Option Period 1 Option Period 3: 12 Months After Option Period 2 Option Period 4: 12 Months After Option Period 3 F.3 Production Verification Unit Delivery. After Production Verification Inspection is approved by the Government, the samples shall be delivered to the address specified below:
(W56DVN) SR W6DV FIELD LOG READ CTR MODS
FIELD LOG READINESS CENTER MOD
HIMARS MOD FACILITY BLDG 312
NEW BOSTON,TX,75570-5000
F.3.1 Production Verification Unit Samples are due per the following delivery schedule. Production Verification Inspection Report is due 395 days after contract award. The Production Verification Unit Samples shall not be shipped until all the requirements set forth in Section C Statement of Work(SOW)and Section J Attachment 0001 Technical Data Package (TDP) have been met.
Delivery Schedule for Production Verification Unit Samples (Section B CLIN 0001):
(270) days after contract award 1 unit
(300) days after contract award 1 unit
(330) days after contract award 1 unit
(360) days after contract award 1 unit
(390) days after contract award 1 unit
(420) days after contract award 1 unit F.4 Required Production Ramp-Up and Delivery.
Production Ramp-Up after Production Verification Inspection Report Approval:
a.) IAC Kits Production Delivery Schedule (Section B CLIN 0002) 1 each 450 days after award 1 each 480 days after award 1 each 510 days after award 2 each 540 days after award 2 each 570 days after award 2 each 600 days after award 3 each 630 days after award 3 each 660 days after award 3 each 690 days after award 4 each 720 days after award 4 each 750 days after award 4 each 780 days after award 4 each 810 days after award Every 30 days thereafter 4 units until end of contract.
b.) IAC Integration Spares Delivery Schedule (Section B CLIN 0004) 1 each 270 days after award 1 each 600 days after award c.) IAC Cab Lifting Eyes Delivery Schedule (Section B CLIN 0003) 52 103
W15QKN-15-R-0240
REPRINT
CONTINUATION SHEET
Reference No. of Document Being Continued Page of Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
12 each 270 days after award F.5 Early deliveries are acceptable provided they are at no cost to the Government.
F.6 IAC Kits Production, IAC Integration Spares and IAC Cab Lifting Eyes shall be delivered to the address specified below:
(W56DVN) SR W6DV FIELD LOG READ CTR MODS
FIELD LOG READINESS CENTER MOD
HIMARS MOD FACILITY BLDG 312
NEW BOSTON,TX,75570-5000
F.7 The Government reserves the right to not exercise the PVU CLINS in options years without impacting the Government's right to exercise the production CLINS in Option Years.