Exhibit_A_-_M270A1_IAC_Production_W15QKN-17-R-0214_CDRLS.PDF

PDF 242 KB Posted

Attached to
PRODUCTION OF IMPROVED ARMOR CAB (IAC) MODIFICATION KITS FOR THE MULTIPLE LAUNCH ROCKET SYSTEM (MLRS)
Solicitation number
W15QKN-17-R-0214
Issued by

About this file

Exhibit A - M270A1 IAC PRODUCTION CDRLS A001 - A032

View the file

Other files

File Type Posted
W15QKN-17-R-0214_0004.pdf PDF
Attachment_0028_W15QKN-17-R-0214_Question_Set_4.pdf PDF
W15QKN-17-R-0214_0003.pdf PDF
Atttachment_0027_W15QKN-17-R-0214_QUESTION_SET_3.pdf PDF
Attachment_0026_W15QKN-17-R-0214_QUESTION_SET_2.pdf PDF
W15QKN-17-R-0214_0002.pdf PDF
QUESTION_SET_1_-_W15QKN-17-R-0214.docx DOCX document
W15QKN-17-R-0214_0001.pdf PDF
W15QKN-17-R-0214_.pdf PDF
Attachment_0017_--_Past_Performance_Questionnaire_(2).pdf PDF
W15QKN-17-R-0214_SECTION_L.docx DOCX document
Attachment_0020_--_IAC_Fielding_Spares_20_July_2016_(2).pdf PDF
Attachment_0015__IAC_Integration_Spares_Version_07__with_12620750_and_57K6653_Part_Numbers.pdf PDF
Attachment_0022_--_Government_Furnished_Property_List_Updated_29_August_2016.pdf PDF
Attachment_0013--_Requisitioned_Government_Furnished_Property_2_May_2016_(2).pdf PDF
W15QKN-17-R-0214_-_DRAFT.pdf PDF
Attachment_0021_--_Cost_and_Software_Data_Reporting_Plan_-_IAC.pdf PDF
Attachment_0016_--_MOD_KIT_MLRS_ARMORED_CAB_(IAC)_COMPONENT_TESTING_2_MAY_2016_(2)_Rev_05132016_(2).pdf PDF
Attachment_0006_--_SAFE_Site_Limited_Distribution_Document_Request_Form_(2).pdf PDF
Attachment_0004_--_NDA_for_IAC_Modification_Kit_(2).pdf PDF
Attachment_0012_OMB_SF_LLL_Disclosure_of_Lobbying_Activities_Version_07_97_(2).pdf PDF
W15QKN-17-R-0214_SECTION_D.docx DOCX document
Attachment_0014--_Scheduled_Government_Furnished_Property_2_May_2016_(2).pdf PDF
W15QKN-17-R-0214_-_SECTION_C.docx DOCX document
W15QKN-17-R-0214_SECTION_H.docx DOCX document
Attachment_0019_--_Clearance_of_Technical_Information_for_Public_Release_Version_1_Mar_2011_(2).pdf PDF
W15QKN-17-R-0214_SECTION_M.docx DOCX document
Attachment_0009--_M270A1_IAC_Kit_Packaging_Instructions_04-21-2016_(2).pdf PDF
Attachment_0002_--_AMSTA-AR_Form_1350_Technical_Data_Request_Questionnaire_(2).pdf PDF
Attachment_0007_--_M270A1_IAC_Production_DSL_17_August_2015_(2).pdf PDF
Attachment_0008_--_IAC_Legacy_TACOM_Drawing_List_04-21-2016_(2).pdf PDF
W15QKN-17-R-0214_SECTION_F.docx DOCX document
Attachment_0003_--_Military_Critical_Tech_Data_Agrmnt_DD2345_Form_Expiration_Date_31_Mar_2019_(2).pdf PDF
Attachment_0005_--_Limited_Distribution_Documents_Certificate_of_Destruction_(2).pdf PDF
Attachment_0024_--_Confirmation_Certificate_for_Limited_Distribution_Documents_Request.pdf PDF
Attachment_0017_--_Past_Performance_Questionnaire_(2).pdf PDF
Attachment_0021_--_Cost_and_Software_Data_Reporting_Plan_-_IAC.pdf PDF
Attachment_0022_--_Government_Furnished_Property_List_Updated_29_August_2016.docx DOCX document
Attachment_0007_--_M270A1_IAC_Production_DSL_17_August_2015_(2).pdf PDF
Attachment_0006_--_SAFE_Site_Limited_Distribution_Document_Request_Form_(2).pdf PDF
Attachment_0004_--_NDA_for_IAC_Modification_Kit_(2).pdf PDF
Attachment_0002_--_AMSTA-AR_Form_1350_Technical_Data_Request_Questionnaire_(2).pdf PDF
Attachment_0024_--_Confirmation_Certificate_for_Limited_Distribution_Documents_Request.docx DOCX document
Attachment_0008_--_IAC_Legacy_TACOM_Drawing_List_04-21-2016_(2).pdf PDF
Attachment_0013--_Requisitioned_Government_Furnished_Property_2_May_2016_(2).pdf PDF
Attachment_0009--_M270A1_IAC_Kit_Packaging_Instructions_04-21-2016_(2).pdf PDF
Attachment_0016_--_MOD_KIT_MLRS_ARMORED_CAB_(IAC)_COMPONENT_TESTING_2_MAY_2016_(2)_Rev_05132016_(2).pdf PDF
Attachment_0005_--_Limited_Distribution_Documents_Certificate_of_Destruction_(2).pdf PDF
Attachment_0015_IAC_Integration_Spares_Version_24_Mar_2016_(2).xlsx XLSX spreadsheet
Attachment_0020_--_IAC_Fielding_Spares_20_July_2016_(2).pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A. Contract Line Item No. B. Exhibit C. Category A Other

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A001 Technical Report - Study/Services Pilot Line Validation Report

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 3.3.3

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

OTIME

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12, and 13: Submit draft report 30 days after completion of Pilot Line Validation. Government comments will be provided within 30 days. Contractor incorporation of comments shall be submitted within 15 days. Government approval/disapproval of final provided within 10 days.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office document or searchable PDF formats.

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A002 Technical Report - Study/Services First Article Inspection Report

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 4.6

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12, and 13: Submit draft report 30 days after completion of First Article Inspection. Government comments will be provided within 15 days. Contractor incorporation of comments will be submitted within 5 days. Government approval/disapproval of final provided within 5 days. Contractor format is acceptable.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A003 Technical Report - Study/Services Physical Configuration Audit (PCA)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 5.2.2

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A ASREQ

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: The contractor shall submit 30 days after completion of the PCA. The government will provide approval/disapproval 30 days after receipt of report. If disapproved, the contractor shall resubmit 15 days after receipt of government disapproval.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A004 Technical Report - Study/Services Data Accessions List Supporting Documentation

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 6.2

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

NA N/A ASREQ

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

ASREQ

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A005 Technical Report - Study/Services Data Item IMS

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 6.4

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

MTHLY

8. APP Code 11. As of Date 13. Subsequent Submission Date

NA 0 MTHLY

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

30DAC

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 14: Electronic delivery of this data item shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in searchable PDF formats.

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A006 Technical Report - Study/Services Welder Qualification Records (WQR)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80508B SOW Para 3.6.3

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 8: Government approval/disapproval within 15 days of submission. If disapproved, resubmit within 15 days.

Blocks 10, 12, & 13: Welder Qualification Records shall be delivered 30 days prior to start of production of first IAC Welded Cab Assembly. Updates are required upon re-qualification of WQR or qualification of new processes.

Block 14: Electronic delivery of the data item shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office document or searchable PDF formats.

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A007 Test Plan Qualification Test Plan

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-NDTI-80566A SOW Para 4.9

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: Submit draft 60 days prior to start of qualification testing. Government comments provided within 30 days of receipt. Final to be submitted NLT 20 days after receipt of Government comments.

The Government will approve/disapprove 5 days after receipt of final. The test plan shall include test procedures.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A008 Test Procedure Acceptance Test Procedure

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-NDTI-80603A SOW Para 4.4

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: Submit draft 30 days prior to start of testing. Government comments provided within 15 days of receipt. Final to be submitted NLT 5 days after receipt of Government comments. Government will approve/disapprove 5 days after receipt of final.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A009 Engineering Change Proposals (ECP)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-CMAN-80639C SOW Paras 5.3.1

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12, and 13: Submit ECPs for changes to the Government as controlled documents when directed by the Government. The Government will provide ECP approval/disapproval 30 days after receipt. If disapproved by the Government, the contractor shall resubmit ECP 30 days after receipt of Government comments. ECP shall be incorporated and changed.

Block 14: Electronic delivery of the data item shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The document organization shall be in accordance with the most recent version of the MEARS. The contractor shall submit the ECP accompanied with a Metadata Record IAW MIS-

STD-52406B-IS.

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A010 Request for Deviation (RFD) Product Baseline Updates

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-CMAN-80640C SOW Para 5.3.2

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A ASREQ

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: RFD shall be submitted as generated for approval. The Government shall provide approval/disapproval 30 days after receipt of the RFD. If disapproved, the contractor shall resubmit 15 days after receipt of Government comments.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A011 Notice of Revision (NOR)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-CMAN-80642C SOW Para 5.3.1

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A ASREQ

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: Submit with Engineering Change Proposal (ECP), DI-CMAN-80639 as part of the ECP package. The Government will provide ECP approval/disapproval 60 days after receipt. If disapproved by the Government, the contractor shall resubmit ECP 30 days after receipt of Government comments. The contractor shall submit NORs for changes to Government controlled documentation IAW SOW.

Block 14: Copies of the NOR shall be delivered to the Government in searchable PDF format. Submit through PF Nets, https://mis.msl.army.mil/pfnets/.

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A012 Contractor Validation Plan STE/SIE Validation

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80759A SOW Paras 4.4.1

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: Submit draft 45 days prior to start of validation effort. Government comments provided within 15 days of receipt. Final to be submitted NLT 15 days after receipt of Government comments.

Government will approve/disapprove 5 days after receipt of final.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A013 Test/Inspection Report See 16

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-NDTI-80809B SOW Para 3.2.2

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 3: Armor Lot Heat Treatment and Ballistic Data

Blocks 8, 10, 12, and 13: Test report due 30 days prior to start of production of first article cab structure. The Government will provide approval/disapproval 10 working days after receipt of document. Contractor shall resubmit 5 working days after Government disapproval.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A014 Test/Inspection Report Qualification Test Report

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-NDTI-80809B SOW Para 4.9

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 1

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 3: Armor Lot Heat Treatment and Ballistic Data

Blocks 8, 10, 12, and 13: Submit draft 30 days after receipt of all test data. Government comments provided within 15 days of receipt. Final to be submitted NLT 5 days after receipt of Government comments.

Government will approve/disapprove 5 days after receipt of final.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A015 Contractor's Configuration Management Plan Contractor CM Plan (CMP)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-CMAN-80858C SOW Para 5.1

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

ASREQ

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A ASREQ

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Blocks 8, 10, 12 and 13: First submission shall be 60 days after contract award. Government will provide approval/disapproval of the first submission within 30 days. If disapproved, the contractor shall resubmit 15 days after receipt of Government comments.

Block 14: Electronic delivery of the data item is required IAW the SOW and shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A016 Welding Procedures See 16

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80875 SOW Para 3.6.3, 3.6.5

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C., Sec 2751, et seq.) or the Export Administration Act of 1979 (Title 50, U.S.C., App. 2401 et seq.), as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.

(C) The contractor shall mark all technical data with Distribution Statement B IAW DODI 5230.24 dated 23 Aug 2012 for Technical Data delivered to the government with other than Unlimited Rights.

Block 3: Welding Repair Procedures and Welding Procedure Specifications

Block 8: Government approval/disapproval within 30 days of submission. If disapproved, resubmit within 15 days.

Blocks 10, 12, & 13: Welding Procedures shall be delivered 60 days prior to start of production of first IAC Welded Cab Assembly. Updates provided to Government as they occur.

Welding Procedure format and content shall be IAW the applicable welding standard in Table 1 of SOW, in lieu of 4.2.1 of MIL-STD-248 (cancelled).

Block 14: Electronic delivery of the data item shall be submitted through PF Nets, https://mis.msl.army.mil/pfnets/. The data item shall be delivered in one or more of the MS Office document

D. System/Item E. Contract/PR No. F. Contractor M270A1 IAC Production

1. Data Item No. 2. Title of Data Item 3. Subtitle A017 Welding Procedure Qualification Test Report PROCEDURE QUALIFICATION RECORDS (PQRs)

4. Authority (DID) 5. Contract Reference 6. Requiring Office DI-MISC-80876 SOW Para 3.6.3

7. dd250 Req.

9. Dist

10. Frequency 12. First Submission Date 14. Distribution

LT

D

See 16

8. APP Code 11. As of Date 13. Subsequent Submission Date

A N/A See 16

SFAE-MSL-PFE

16. Remarks

G. Prepared By H. Date I. Approved By J. Date

DD Form 1423-1 (Computer Generated) Previous Versions are obsolete

CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approved OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden, estimate or any other aspect of this collection of information including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR NO listed in Block E.

W15QKN-17-R-0214

See 16

a. Addressee

b. Copies Final

Draft Reg Repo

SFAE-MSL-PFE 0

15. Total

Block 9: (A) DISTRIBUTION STATEMENT D. Distribution authorized to the Department of Defense and U.S.

DoD contractors only; Reason: Administrative or Operational use; Date of determination: 1 June 2015. Other requests shall be referred to the PFRMS Project Office, ATTN: SFAE-MSL-PFE, Redstone Arsenal, AL 35898- 8000.

(B) Export-Control Act Warning - This…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .