Exhibit_U_-_DD1423_-_CDRL_A019_-_Critical_Safety_Item_Characteristic_&_Critical_Defect_Report.pdf

PDF 53 KB Posted

Attached to
M793A1 Point Detonating/Delay (PD/DLY) Fuze
Solicitation number
W15QKN17R0051
Issued by

About this file

Exhibit U - CDRL A019 - Critical Safety Item Characteristic & Critical Defect Report

View the file

Other files

File Type Posted
Questions_and_Answers_Set__2_-_Q&A's_6-17_-_M739A1_Fuze_W15QKN-17-R-0051.pdf PDF
W15QKN-17-R-0051_-_Amendment_0002.pdf PDF
Questions_and_Answers_Set__1_-_Q&A's_1-5_-_M739A1_Fuze_W15QKN-17-R-0051.pdf PDF
W15QKN-17-R-0051_-_Amendment_0001.pdf PDF
Exhibit_D_-_DD1423_-_CDRL_A004_-_Measurement_System_Evaluation_(MSE).pdf PDF
Exhibit_M_-_DD1423_-_CDRL_A012_-_Acceptance_Description_Sheets.pdf PDF
Exhibit_V_-_DD1423_-_CDRL_A020_-_Performance_Oriented_Packaging_(POP)_Test_Report2.pdf PDF
Attachment_0003-_Hazardous_Component_Safety_Data_Statement_(HCSDS)_Index.docx DOCX document
Attachment_0010_-_Past_Performance_Letter_and_Questionnaire.docx DOCX document
Exhibit_F_-_DD1423_-_CDRL_A006_-_Test-Inspection_Report_-_FAT.pdf PDF
Exhibit_K_-_DD1423_-_CDRL_A010_-_Critical_Characteristics_Control_(CCC)_Plan.pdf PDF
Exhibit_L_-_DD1423_-_CDRL_A011_-_Critical_Plan_of_Action_(CPOA).pdf PDF
Attachment_0002_-_Data_Item_Description_Index.docx DOCX document
Exhibit_J_-_DD1423_-_CDRL_A009_-_Management_Plan.pdf PDF
Attachment_0001-_Pricing_Matrix_Excel_Spreadsheet.xlsx XLSX spreadsheet
Exhibit_A_-_DD1423_-_CDRL_A001_-_Quality_Assurance_Program_Plan.pdf PDF
Exhibit_B_-_DD1423_-_CDRL_A002_-_Certifications-Data_Report.pdf PDF
Attachment_0007_-_AMSTA-AR_FORM_3002_-_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
Attachment_0005_-_DD_2345_-_MILITARY_CRITICAL_TECHNICAL_DATA_AGREEMENT.pdf PDF
Attachment_0004_-_Technical_Data_Package_Info_for_M739A1_PD-DLY_Fuze.docx DOCX document
Attachment_0008_-_AMSTA-AR_Form_1350_-_Technical_Data_Request_Questionnaire.pdf PDF
Exhibit_T_-_DD1423_-_CDRL_A018_-_Technical_Report_-_Study-Services.pdf PDF
Exhibit_R_-_DD1423_-_CDRL_A016_-_Notice_of_Revisions_(NORs).pdf PDF
Exhibit_Q_-_DD1423_-_CDRL_A015_-_Request_for_Variance_(RFV).pdf PDF
Exhibit_C_-_DD1423_-_CDRL_A003_-_Ammunition_Data_Cards.pdf PDF
Exhibit_N_-_DD1423_-_CDRL_A013_-_Operations_Security_(OPSEC)_Plan.pdf PDF
Exhibit_P_-_DD1423_-_CDRL_A014_-_Engineering_Change_Proposals_(ECPs).pdf PDF
Attachment_0006_-_NonDisclosure&NonUseAgreement.docx DOCX document
Exhibit_W_-_DD1423_-_CDRL_A021_-_Report,_Record_of_Meeting-Minutes.pdf PDF
Exhibit_H_-_DD1423_-_CDRL_A008_-_Supplier's_Configuration_Management_Plan.pdf PDF
Exhibit_G_-_DD1423_-_CDRL_A007_-_Test-Inspection_Report_-_LAT.pdf PDF
Exhibit_S_-_DD1423_-_CDRL_A017_-_Accident-Incident_Report.pdf PDF
Exhibit_E_-_DD1423_-_CDRL_A005_-_Failure_Summary_&_Analysis_Report.pdf PDF
W15QKN17R0051_-_Released_30_June_2017.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

A

C. CATEGORY:

TDP TM OTHER

D.SYSTEM/ITEM

M739A1 PD/DLY Fuze

E. CONTRACT/PR

F. CONTRACTOR

17.PRICE

GROUP

1. DATA ITEM NO.

A019

2. TITLE OF DATA ITEM

Critical Safety Item Characteristic & Critical Defect Report

3. SUBTITLE

CICL, Notification, Investigation, Segregated, Material Use and Restart Request

18.ESTIMATED

TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80970A

5. CONTRACT REFERENCE

M739A1 Fuze SOW: C.6

6. REQUIRING OFFICE

RDAR-EIQ-MA

7. DD 250 REQ

LT

9.DIST STATEMENT

REQUIRED

10. FREQUENCY

AS REQ

12. DATE OF FIRST

SUBMISSION

SEE BLK 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. ADP CODE

A

11. AS OF DATE

AS REQ

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final Reg Repro

16. REMARKS

Critical Item Characteristics List (CICL) (DID paragraph 3.3)

BLK 12 and 13: If applicable, contractor shall submit 60 days prior to First Article or Production if FA is not applicable.

Government will respond within 45 days of receipt of original and any required revisions. Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of Government response.

Notification of a critical defect (DID paragraph 4.1)

BLK 12 and 13: Unless otherwise approved by the PCO, notification of the occurrence of any critical defects shall be made to the government, see distribution list, within 24 hours of event, by the most expeditious means available.

Root Cause Investigation and Corrective Action (DID paragraph 4.2)

BLK 12 and 13: Contractor shall submit to the Government, see list, for approval. Government will respond within 45 days of receipt of original and any required revisions. Unless otherwise stated, contractor shall submit revisions within 10 days of receipt of Government response.

Segregated Suspect Material Use (DID paragraph 4.3)

BLK 12 and 13: Contractor shall submit to the Government, see list, for approval. Government will respond within 45 days of receipt of original and any required revisions. Unless other stated, contractor shall submit revisions within 10 days of receipt of government response

RDAR-EIQ-MA 1

RDAR-MEF-F 1

Local DCMA 1

RDAR-EIQ-PE 1

ACC-NJ-CA 1

MCSC-PM-AMMO 1

G. PREPARED BY

Jason Menegus

H. DATE

11/15/16

I. APPROVED BY

*See Page 2

J. DATE

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXH/ATCH NO.

A

C. CATEGORY:

TDP TM OTHER

D.SYSTEM/ITEM

M739A1 PD/DLY Fuze

E. CONTRACT/PR

F. CONTRACTOR

17.PRICE

GROUP

1. DATA ITEM NO.

A019

2. TITLE OF DATA ITEM

Critical Safety Item Characteristic & Critical Defect Report

3. SUBTITLE

CICL, Notification, Investigation, Segregated, Material Use and Restart Request

18.ESTIMATED

TOTAL PRICE

4. AUTHORITY (Data Acquisition Document No.)

DI-SAFT-80970A

5. CONTRACT REFERENCE

SOW C.3.6

6. REQUIRING OFFICE

RDAR-EIQ-MA

7. DD 250 REQ

LT

9.DIST STATEMENT

REQUIRED

10. FREQUENCY

AS REQ

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. ADP CODE

A

11. AS OF DATE

AS REQ

13. DATE OF SUBSEQUENT

SUBMISSION

Draft

Final Reg Repro

16. REMARKS

Request to Restart Operations (DID paragraph 4.3)

BLK 12 and 13: Contractor shall submit to Government, see list, for approval. Government will respond within 10 days of receipt

BLK 14: It is preferred that the data be submitted using electronic media with email as the preferred format. Contact information will be provided as an attachment in Section J after contract award.

G. PREPARED BY

Jason Menegus

H. DATE

11/15/16

I. APPROVED BY

4/17/2017

X Jeremy S. Heiskanen Jeremy S. Heiskanen Product Quality Manager Signed by: HEISKANEN.JEREMY.S.1367473408

J. DATE

12/22/2016

File details come from the government source that posted it. Updated .