PDF 32 KB Posted

Attached to
M793A1 Point Detonating/Delay (PD/DLY) Fuze Federal contract opportunity
Solicitation number
W15QKN17R0051
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

About this file

Amendment 0002 under Solicitation W15QKN-17-R-0051

View the file

Other files for this federal contract opportunity

Other files attached to M793A1 Point Detonating/Delay (PD/DLY) Fuze, newest first.
File Type Posted
Questions_and_Answers_Set__2_-_Q&A's_6-17_-_M739A1_Fuze_W15QKN-17-R-0051.pdf PDF
W15QKN-17-R-0051_-_Amendment_0001.pdf PDF
Questions_and_Answers_Set__1_-_Q&A's_1-5_-_M739A1_Fuze_W15QKN-17-R-0051.pdf PDF
Exhibit_J_-_DD1423_-_CDRL_A009_-_Management_Plan.pdf PDF
Exhibit_A_-_DD1423_-_CDRL_A001_-_Quality_Assurance_Program_Plan.pdf PDF
Exhibit_U_-_DD1423_-_CDRL_A019_-_Critical_Safety_Item_Characteristic_&_Critical_Defect_Report.pdf PDF
Exhibit_P_-_DD1423_-_CDRL_A014_-_Engineering_Change_Proposals_(ECPs).pdf PDF
Exhibit_F_-_DD1423_-_CDRL_A006_-_Test-Inspection_Report_-_FAT.pdf PDF
Attachment_0010_-_Past_Performance_Letter_and_Questionnaire.docx DOCX document
Exhibit_D_-_DD1423_-_CDRL_A004_-_Measurement_System_Evaluation_(MSE).pdf PDF
Attachment_0002_-_Data_Item_Description_Index.docx DOCX document
Attachment_0001-_Pricing_Matrix_Excel_Spreadsheet.xlsx XLSX spreadsheet
Exhibit_B_-_DD1423_-_CDRL_A002_-_Certifications-Data_Report.pdf PDF
Attachment_0007_-_AMSTA-AR_FORM_3002_-_CLEARANCE_OF_TECHNICAL_INFORMATION_FOR_PUBLIC_RELEASE.pdf PDF
Attachment_0005_-_DD_2345_-_MILITARY_CRITICAL_TECHNICAL_DATA_AGREEMENT.pdf PDF
Attachment_0004_-_Technical_Data_Package_Info_for_M739A1_PD-DLY_Fuze.docx DOCX document
Exhibit_N_-_DD1423_-_CDRL_A013_-_Operations_Security_(OPSEC)_Plan.pdf PDF
Attachment_0006_-_NonDisclosure&NonUseAgreement.docx DOCX document
Exhibit_G_-_DD1423_-_CDRL_A007_-_Test-Inspection_Report_-_LAT.pdf PDF
Exhibit_E_-_DD1423_-_CDRL_A005_-_Failure_Summary_&_Analysis_Report.pdf PDF
Exhibit_H_-_DD1423_-_CDRL_A008_-_Supplier's_Configuration_Management_Plan.pdf PDF
Exhibit_S_-_DD1423_-_CDRL_A017_-_Accident-Incident_Report.pdf PDF
Exhibit_M_-_DD1423_-_CDRL_A012_-_Acceptance_Description_Sheets.pdf PDF
Exhibit_V_-_DD1423_-_CDRL_A020_-_Performance_Oriented_Packaging_(POP)_Test_Report2.pdf PDF
Exhibit_L_-_DD1423_-_CDRL_A011_-_Critical_Plan_of_Action_(CPOA).pdf PDF
Attachment_0008_-_AMSTA-AR_Form_1350_-_Technical_Data_Request_Questionnaire.pdf PDF
Exhibit_T_-_DD1423_-_CDRL_A018_-_Technical_Report_-_Study-Services.pdf PDF
Exhibit_R_-_DD1423_-_CDRL_A016_-_Notice_of_Revisions_(NORs).pdf PDF
Exhibit_C_-_DD1423_-_CDRL_A003_-_Ammunition_Data_Cards.pdf PDF
Exhibit_Q_-_DD1423_-_CDRL_A015_-_Request_for_Variance_(RFV).pdf PDF
Exhibit_W_-_DD1423_-_CDRL_A021_-_Report,_Record_of_Meeting-Minutes.pdf PDF
Attachment_0003-_Hazardous_Component_Safety_Data_Statement_(HCSDS)_Index.docx DOCX document
Exhibit_K_-_DD1423_-_CDRL_A010_-_Critical_Characteristics_Control_(CCC)_Plan.pdf PDF
W15QKN17R0051_-_Released_30_June_2017.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

0002 2017AUG09

W15QKN

ARMY CONTRACTING COMMAND - NJ

PICATINNY ARSENAL, NJ 07806-5000

JENNIFER MEL HUGHES

EMAIL: JENNIFER.M.HUGHES56.CIV@MAIL.MIL

W15QKN-17-R-0051

2017JUN30

X

X 2017SEP06 04:00pm

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 11

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: JENNIFER MEL HUGHES

Buyer Office Symbol/Telephone Number: ACC-NJ-CA/(973)724-4856

Type of Contract 1: Firm Fixed Price

Kind of Contract: Supply Contracts and Priced Orders

*** End of Narrative A0000 ***

The purpose of Amendment 0002 under Solicitation W15QKN-17-R-0051 is as follows:

1. To modify the response date for Solicitation W15QKN-17-R-0051, as reflected within the SF33 of this Amendment. The response date for all proposals has been extended as follows:

FROM: 16 August 2017 at 4:00pm(EST) TO: 6 September 2017 at 4:00pm(EST).

2. To modify Section C, Statement of Work (SOW) by deleting Paragraph C.12 in its entirety as all requirements regarding safeguarding

AA&E are cited in Clause I-123, DFARS 252.223-7007 entitled Safeguarding Sensitive Conventional Arms, Ammunition, and Explosives.

3. To modify Section E, by updating Clause E-11, 52.246-4015 entitled Ammunition Data Cards to ensure that listed components are within the paragraph (c) in lieu of paragraph (d). See Section E for updated Ammunition Data Cards clause.

4. To modify Section J, Attachment 0001 entitled Pricing Matrix by updating the CLIN marking to match the CLIN structure within Section

B. See updated Attachment 0001 dated August 2017.

*** END OF NARRATIVE A0003 ***

2 11

W15QKN-17-R-0051 0002

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

STATEMENT OF WORK FOR PRODUCTION OF M739A1 POINT DETONATING/DELAY (PD/DLY) FUZES FOR ARTILLERY

C.1. SCOPE: This Statement of Work (SOW) defines the contract requirements for the manufacturing, inspection, testing and delivery of

M739A1 (PD/DLY) Fuzes.

C.1.1 The contractor shall provide the necessary personnel, facilities and equipment to perform the requirements specified below.

C.1.2. BACKGROUND:

C.1.2.1 The M739A1 PD/DLY Fuze is the primary fuze for 105mm and 155mm bursting projectiles for point detonating or delay fuze functions. The M739A1 is composed of a one-piece solid aluminum body with a standard 2-inch threaded base. Five modular subassemblies are incorporated as the functional fuze components. The M739A1 PD/DLY fuze contains an Impact Delay Module (IDM) assembly that provides fuze initiation delay based upon the completion of mechanical actions caused by projectile deceleration. In the delay mode, the fuze will function 3 6 milliseconds after target impact. There are no explosive components contained within the IDM. The outer surface of the M739A1 PD/DLY fuze is anodized green to distinguish it from other fuzes in the inventory for Explosive Ordnance Disposal (EOD) purposes.

C.2. APPLICABLE DOCUMENTS:

C.2.1. DETAIL SPECIFICATION

MIL-DTL-32267A Detail Specification Fuze, Point

Detonating, M739A1 07 Oct 16

C.2.2 DRAWINGS

Drawing 13039093 Combination of Adopted Items for Fuze, PD, M739A1(Mal-assembly feature, pallet change/arm time increase feature, PBXN-5 Lead & Booster) 23 Apr 12

C.2.3. MILITARY STANDARDS

MIL-STD-1168C Ammunition Lot Numbering and Ammunition

Data Card 11 Mar 14

MIL-STD-1171B Acceptance and Description Sheets

(For Propellants and Explosives) 31 May 16

C.2.4 DATA ITEM DESCRIPTIONS (DIDs)

DI-ADMN-81505 Report, Record of Meeting/Minutes 20 Nov 95

DI-MGMT-80004A Management Plan 30 Oct 06

DI-MISC-80678 Certification/Data Report 12 Sep 88

DI-MISC-80043B Ammunition Data Card 23 Jun 09

DI-SESS-80255A Failure Summary & Analysis Report 19 Dec 14

DI-NDTI-80809B Test/Inspection Report 24 Jan 97

DI-SESS-80639D Engineering Change Proposal 07 Apr 15

DI-SESS-80640D Request For Variance (RFV) 07 Apr 15

DI-SESS-80642D Notice Of Revision 07 Apr 15

DI-SESS-80858C Suppliers Configuration Management

Plan 07 Apr 15

3 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

DI-SAFT-81563 Accident/Incident Report 02 Jun 98

DI-SAFT-80970A Critical Safety Item, Characteristic and Critical Defect Report 02 Jun 98

DI-PACK-81059A Performance Oriented Packaging

Test Report 25 Mar 11

DI-MISC-80508B Technical Report Study/Services 14 Nov 06

DI-QCIC-81794 Quality Assurance Program Plan 08 Dec 09

DI-QCIC-81960 Measurement System Evaluation (MSE) 25 Feb 14

DI-MGMT-80934C Operations Security (OPSEC) Plan 13 Dec 10

DI-MGMT-81978 Acceptance Description Sheets (ADS) 14 Jul 15

DI-MGMT-81986 Critical Characteristic Control

Plan (CCCP) 14 Jul 15

DI-MGMT-81996 Critical Plan of Action (CPOA) 08 Sep 15

C.2.5. OTHER DOCUMENTS

MIL- HDBK-781A Reliability Test Methods, Plans and

(Guidance Only) Environments for Engineering Development

Notice 1 Qualification and Production, Handbook for 30 Jan 15

MIL-STD-785B Reliability Program for Systems and

(Guidance Only) Equipment Development and Production 30 Jul 98

MIL-STD-3046 Configuration Management 06 Mar 13

(Guidance Only)

DOD 5100.76M Physical Security of Sensitive

Conventional Arms, Ammunition and Explosives 17 Apr 12

DOD 4145.26M DOD Contractor's Safety Requirements for Ammunition and Explosives 03 Mar 08

DoD DLAH 4105.4 & Defense Traffic Management Regulation Jul 92

DA 55-355/DLAR 4500.3

DA 385-64 Safety, Ammunition and Explosives

Safety Program 24 Mar 11

4500.9-R Defense Traffic Management 28 Jun 16

ISO 9001 Model for quality Assurance in

Production, Installation and Servicing 17 Apr 01

CFR-29 Code of Federal Regulations - Labor 01 Jul 08

CFR-49 Code of Federal Regulations 19 Jul 16

SAE EIA-649-1 Configuration Management Requirements

(Guidance Only) For Defense Contracts 20 Nov 14

C.3 BASIC REQUIREMENTS:

C.3.1 The Contractor shall fabricate M739A1 PD/DLY Fuzes IAW Drawing 13039093 and MIL-DTL-32267A, inclusive of all approved Engineering

Change Proposals (ECPs)\~and deliver in accordance with the delivery schedule in Section F. The Contractor shall set up the necessary

4 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

facilities and provide Production, Engineering, and Quality Assurance/Reliability personnel to actively participate in the facility/production plan. These efforts shall include, but not be limited to, identifying quality control points, inspection stations, process control or statistical process control, special screening or test required.

C.3.1.1 The contractor shall adhere to concurrent engineering practices and hence, partake in a Government chaired Integrated Product

Team (IPT). The IPT shall monitor the progress of the program, evaluate all data required to be submitted by the contractor, approve all

TDP changes, and provide recommendations to reach consensus solutions to issues as they arise to encourage efficiency towards meeting the programs objectives. The contractor remains responsible for the M739A1 production in accordance with the requirements of the contract.

C.3.2 Delivery requirements for the fuzes produced will be detailed in Section F of this contract.

C.3.3 The Contractor shall establish a supplier network that will ensure timely delivery of material and parts throughout production to meet the M739A1 PD/DLY Fuze requirements. The contractor shall maintain control of the quality of all suppliers throughout production.

The control techniques shall be defined but not limited to, incoming inspection, source inspection, and monitoring vendor selection, evaluation, and rating techniques. The contractor must inform potential suppliers that the Government reserves the right to inspect their facilities and processes.

C.3.4 The M739A1 PD/DLY Fuze shall be in accordance with the requirements specified in MIL-DTL-32267A inclusive of all approved

Engineering Changes (ECPs).

C.3.5 The Contractor shall have the following components manufactured within the United States and Canada: the Fuze Body assembly, Safe and Arm (S&A) Device, Booster for the M739A1, M99 Stab Detonator, M55 Stab Detonator, Explosive Lead, Lead Azide, Polymer-Bonded

Explosive (PBXN-5) and High Melting Explosive (HMX) Grade B explosive. The Contractor is required to deliver to the Government completed fuze assemblies (boostered).

C.3.6 The contractor shall provide a detailed Quality Management System (QMS), as delineated in DI-QCIC-81794, Data Item Number A001, which meets or exceeds ISO 9001-2008.

C.3.6.1 The QMS shall encompass the following requirements as a minimum:

1) The plan shall identify all quality assurance tasks required for production.

2) The plan shall detail by specific task, the organization performing quality functions and interface with other organizations.

3) A brief description of each task shall be included in the plan and if it is not solely a quality function, the quality organizations participating in the control over the task shall be delineated.

4) The plan shall identify appropriate actions to be taken or data to be generated as a result of quality task milestone completion.

5) The plan shall include as a minimum all tasks specifically identified in this statement of work.

6) The plan shall specify specific samples and intervals for verifying processes for the fabrication of components, sub-assemblies, and assemblies.

C.3.7 All materials that are specified in MIL-DTL-32267A shall be certified by the supplier. The certifications shall be submitted in the report (DI-MISC-80678, Data Item Number A002, as tailored).

C.3.8 Government Furnished Equipment/Material (GFE/GFM): GFM will not be supplied for use on this contract.

C.3.9 Ammunition Data Cards shall be prepared for all production items IAW MIL-STD-1168C and DI-MISC-80043B (Data Item Number A003, as tailored) and shall follow the format required by the worldwide web application identified as WARP or Worldwide Ammunition-data

Repository Program athttp://aeps.ria.army.mil/aepspublic.cfm Prior to gaining access to WARP, contractor/facility personnel involved in the preparation of ammunition data cards shall obtain a users name and password for the Army Electronic Production Support (AEPS) network. Detailed requirements for obtaining and using a manufacturers identification symbol, which is an integral component of the ammunition lot number, can be found in MIL-HDBK-1461A. Lot numbering shall be IAW MIL-STD-1168C.

C.3.10 Measurement System Evaluation (MSE): The contractor shall establish and maintain a documented measurement evaluation system for the identification and approval of Acceptance Inspection Equipment (AIE) / Automated Acceptance Inspection Equipment (AAIE) to include the calibration and verification of inspection equipment (i.e., calibration, validation, non-destructive testing, and standards) as necessary to meet contract requirements. Approved AIE / AAIE, in accordance with this requirement, shall be utilized for all hardware inspection and acceptance. The Government reserves the right to disapprove, at any time during the performance of this requirement, the use of any AIE / AAIE that is not meeting the requirements of the approved documentation (i.e., calibration, validation, non-destructive testing, standards) (DI-QCIC-81960, Data Item Number A004 and Section E 52.246-4018).

5 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.3.11 Failure Summary and Analysis Report. Contractor shall submit a Failure Summary and Analysis Report (DI-SESS-80255A Data Item

Number A005, as tailored) that is acceptable to the government (see MIL-HDBK-781A, Para 4.6 and MIL-STD-785B (Task 104) for additional guidance.

C.3.12 First Article Acceptance Testing. The Contractor is responsible for conducting First Article Acceptance Test on subassemblies and critical components (MIL-DTL-32267A, Para 3.1) including Environmental Testing (MIL-DTL-32267A Para. 4.2), except for Ballistic Lot

Acceptance gun firings (MIL-DTL-32267A, Table II,) which will be conducted by the Government at a Government Facility in accordance with

MIL-DTL-32267A. Contractor shall submit to the Government Test and Inspection Report (FAT) (DI-NDTI-80809B, Data Item Number A006, as tailored).

C.3.13 Lot Acceptance Test (LAT). The Contractor is responsible for conducting Lot Acceptance Testing (MIL-DTL-32267A Para. 3.2), including Environmental Testing (MIL-DTL-32267A, Para. 4.3), except for Ballistic Lot Acceptance gun firings (MIL-DTL-32267A, Table II and Table III), which will be conducted by the Government at a Government Facility in accordance with (MIL-DTL-32267A). The contractor shall submit to the Government Test and Inspection Report (LAT) (DI-NDTI-80809B) Data Item number A007) prior to final shipment of the

Lot.

C.3.14 Configuration Management Plan. The contractor shall submit a Configuration Management Plan per DI-SESS-80858C (Data Item Number

A008). For additional guidance see MIL-STD-3046.

C.3.15 Statistical Process Control (SPC): The contractor shall submit a General and Detailed Statistical Process Control Plan in accordance with the characteristics listed below (DI-MGMT-80004A, Data Item Number A009, as tailored. See Section E, 52.246.4014). The contractor may propose alternate characteristics to conduct SPC on.

SPC Characteristic List

Drawing

Number Title Spec Characteristic Characteristic Description______ _____ ___________________ ___________________________

12973181 Spinlock 4.4.1.33 Major 101 Weight

9258634 Setback Pin 4.4.1.44 Major 102 Weight

9258620 S&A Retainer 4.4.1.46 Major 103 Height of spinlock slots

9258655 Escape Wheel and 4.4.1.37 Major 106 Thickness of escape wheel pinion assembly

11720309 Pallet 4.4.1.39 Major 101 Profile of engagement surface (2 places)

3258636 Setback pin Spring 4.4.1.43 Major 101 Spring Rate

C.3.16 Critical Characteristic Control Plan The contractor shall submit a CCCP in accordance with DI-MGMT-81986 (Data Item Number A010).

C.3.17 Critical Plan of Action The contractor shall submit a CPOA in accordance with DI-MGMT-81996 (Data Item Number A011, as tailored).

C.3.18 Acceptance and Description Sheets (For Propellants and Explosives) - The contractor shall submit an acceptance and description sheet per MIL-STD-1171B in accordance with DI-MGMT-81978 (Data Item Number A012. See Section E, 52.246-4016)

C.3.19. OPERATIONS SECURITY (OPSEC) STANDARD OPERATING PROCEDURE PLAN. The contractor shall develop an OPSEC Standard Operating

Procedure (SOP)/Plan within 90 days of contract award, to be reviewed and approved by the responsible Government OPSEC officer, per Army

Regulation 530-1, Operations Security. This SOP/Plan will include the governments critical information, why it needs to be protected, where it is located, who is responsible, and how to protect it. In addition, the contractor shall identify an individual who will be an

OPSEC Coordinator. The contractor will ensure that this individual becomes OPSEC Level II certified per Army Regulation 530-1. Per AR

530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of their reporting for duty. All contractor employees must complete annual OPSEC awareness training. (DI-MGMT-80934C, Data Item Number A013).

C.4 CONFIGURATION MANAGEMENT

C.4.1 The contractor shall work with the IPT in updating designs within TDP P16C39 to include all changes under this contract. The IPT shall monitor the progress of the program, evaluate all data required to be submitted by the contractor, approve all TDP changes, and provide recommendations to encourage efficiency towards meeting the programs objectives.

C.4.1.1 The contractor shall maintain a Configuration Management (CM) Program and refer to respective appendices of SAE EIA-649-1 which may be used as guidance. The contractor shall obtain concurrence from the IPT on the methodology and strategy for conducting the CM

Program. The CM Program shall address all aspects of the contract effort, which ultimately lead to establishment, deviation or modification of any item of the Technical Data Packages.

C.4.1.2 Once the IPT has formally approved the changes to the TDP, the contractor shall prepare and submit change documentation, i.e., Engineering Change Proposals (ECPs), (DI-SESS-80639D, Data Item Number A014) Request for Variance (RFVs), (DI-SESS-80640D) Data Item

Number A015, and Notice of Revision (NORs) (DI-SESS-80642D Data Item Number A016). The contracting officer will provide disposition of all such submissions. The contractor shall provide a record by drawing and revision level, specification and revision level of each

6 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

component, subassembly and assembly used in any hardware builds. The record shall include, with each applicable item, any nonconformance to drawing or specification requirements; ISO 9001-2008 may be used as reference. Waivers and Variance for non-conforming material shall include the revision level of the document in effect.

C.5 SAFETY

C.5.1 U.S. Army Accident/Incident Report. The Contractor shall report immediately any major accident/incident (including fire) resulting in anyone or more of the following; causing one or more fatalities, one or more disabling injuries, damage to government property exceeding $10,000; affecting program planning or production schedules; degrading the safety of the equipment under contract such that personnel injury or property damage may be involved; identifying a potential hazard requiring corrective action. The

Contractor shall prepare the report. (DI-SAFT-81563, Data Item Number A017).

C.5.2 Hazardous Component Safety Data Statements (HCSDS) are applicable to this SOW and are provided in Section J.

C.5.3 All activities must be in compliance with Federal, State, local and Army Environmental laws and regulations.

C.5.4 HAZARD CLASSIFICATION. The contractor shall obtain a hazard classification from the Department of Transportation prior to shipment of any energetic material ammunition and explosives. The contractor shall provide hazard classification test data report when applicable. (DI-MISC-80508B, Data Item Number A018).

C.6 CRITICAL CHARACTERISTICS. The contractor shall follow the critical characteristic clauses of this contract, and in accordance with the Critical Safety Item, Characteristic and Critical Defect Report (DI-SAFT-80970A, Data Item A019).

C.7. PERFORMANCE ORIENTED PACKAGING (POP). The contractor shall provide POP information for the M739A1 PD/DLY Fuze (DI-PACK-81059A).

Prior to shipment, the contractor shall make sure the container has been tested by a Government approved Performance Oriented Packaging

(POP) Test Laboratory for compliance with POP requirements in accordance with Title 49 Code of Federal Regulations. POP marking shall not be applied to the container until verified by the Government. The contractor shall submit a POP test report (DI-PACK-81059A, Data

Item Number A020) following the test.

C.8 PRODUCTION OF LOT ACCEPTANCE TESTING (Government Facility)

C.8.1 A Production lot acceptance test is required to be submitted by the contractor from each production lot tendered to the government for acceptance per MIL-DTL-32267A.

C.8.2 The production lot acceptance test sample shall consist of (see SOW C.3.13).

C.8.3 The production lot acceptance test sample units shall be randomly selected from the entire lot by in the presence of the

Government Quality Assurance Representative (QAR). Prior to selection of the production lot acceptance test sample units, the lot shall have been inspected to, and shall meet all requirements of the contract. Unless authorized by the Contracting Officer, a test sample shall not be submitted from a lot, which is or has been rejected for nonconformance to the detailed requirements of the contract, the specification(s) and/or the drawing(s).

C.8.4 The Production lot acceptance test sample (including, if applicable, basic issue items and/or repair parts) shall be packaged and packed in accordance with the contract; if packaging and packing requirements are not specified in the contract, the production lot acceptance test sample shall be packaged and packed in accordance with best commercial practices. The production lot acceptance test sample shall be appropriately marked, to include the drawing/part number, the contract number, the name of the contractor and FOR

PRODUCTION LOT ACCEPTANCE TESTING. The production lot acceptance test sample-shall be accompanied by a DD Form 1222, Request For and

Results of Test, appropriately completed by the Government QAR. A copy of the results of the contractor's examination and/or test shall be attached to the DD form 1222. Simultaneous with shipment of the production lot acceptance test samples, a copy of the DD Form 1222

(including attached documentation) shall be submitted to RDAR-EIQ-MA, Attn: Jason Menegus.

C.8.5 The ballistic lot acceptance test sample shall be shipped Free On Board (FOB) Origin on a Transportation Account Code (TAC) to the location designated below unless transportation protective service and/or transportation protective service and/or transportation security is required; the ballistic lot acceptance test sample shall be shipped FOB Origin on a Government Bill of Landing (GBL).

Shipping Destination: YUMA PROVING GROUNDS (See Section F for Details)

C.8.5.1 The production lot acceptance test sample shall be examined and tested by the Government for and/or in accordance with (see SOW

C.3.13).

C.8.6 Within 45 days after receipt of the production lot acceptance test sample at the government facility, the Contracting Officer shall provide written notification to the Contractor as to the approval, disapproval or conditional approval of the production lot acceptance test sample. Unless Authorized by the Contracting Officer, the lot from which the production lot acceptance test sample is drawn shall not be shipped from the Contractor's facility, nor shall final acceptance of the lot to be made until such time as notification has been provided by the Contracting Officer that the production lot acceptance test samples have been approved or conditionally approved.

7 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

C.8.7 If the production lot acceptance test sample fails to meet any applicable contractual requirement, the lot from which the test sample was drawn shall be considered rejected. The contractor shall take immediate corrective action, both to correct the deficiency/nonconformance (if applicable) and to prevent recurrence of such deficiency/nonconformance and shall submit an additional production lot acceptance test sample (from the reworked lot or from a new lot as applicable). Such corrective action shall be taken by the contractor at no increase in contract price and shall apply to all items (including, if applicable, basic items and/or repair parts) either in process or final assembly which have been produced (or are in production) since the last successful production lot acceptance test. Any and all costs associated with testing the additional production lot acceptance test sample shall be borne by the contractor.

C.8.8 The Contractor is responsible for conducting Contractor Laboratory Lot Acceptance Testing on subassemblies and critical components with the exception of Government Conducted Ballistic Lot Acceptance Tests outlined in MIL-DTL-32267A.

C.9 ENVIRONMENTAL COMPLIANCE All activities must comply with Federal, State, and Local Environmental Laws and Regulations, Executive

Orders, Treaties and Agreements.

C.10 The contractor shall host quarterly Program Management Review (PMR): starting six months after contract award. This meeting shall include a discussion of the Integrated Master Schedule (IMS) and Integrated Master Program Plan (IMPP). The contractor and the government shall mutually derive review agenda provided by the contractor no later than 5 working days prior to each review. The contractor is responsible for providing PMR meeting minutes in accordance with DI-ADMN-81505 (Data Item Number A021, as tailored). The contractor will provide meeting minutes from the post award meeting in accordance with DI-ADMN-81505 (Data Item Number A021, as tailored).

C.11 Demilitarization: At the conclusion of this contract, all excess or unaccepted fuzes shall be destroyed, such that they are no longer usable or reclaimable for their original purposes. Once material is destroyed, it will be disposed of only as scrap.

*** END OF NARRATIVE C0003 ***

8 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION E - INSPECTION AND ACCEPTANCE

Status Regulatory Cite Title Date Status Regulatory Cite Title Date _______ _______________ ______________________________________________________________________ ____________ _______ _______________ ______________________________________________________________________ ____________

E-1 CHANGED 52.246-4015 AMMUNITION DATA CARDS (ES6922) JUN/2014

Detailed requirements and guidance for the preparation of Ammunition Data Cards (ADCs) and Ammunition Lot Numbers are contained in MIL-

STD-1168, DI-MISC-80043 and the Worldwide Ammunition-data Repository Program (WARP) online user's manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in

MIL-STD-1168 and the WARP users manual. Information provided in paragraphs 6.7 through 6.16 of MIL-STD-1168 shall be considered mandatory requirements where all instances of the term "should" are considered to be replaced with the word "shall."

(a) The contractor shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user's manual located on the WARP database. The WARP application is accessed through the Munitions History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(b) The contractor shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.

(c) Unless otherwise authorized by the Procuring Contracting Officer, the contractor shall include, in the components sections on the

ADC representing the deliverable item, as a minimum; all assemblies, sub-assemblies, components, explosives, and propellants listed below for the item being procured.

End Item Component Listing:

M739 PD/DLY Fuze:

Drawing Number Nomenclature______________ ____________

879331 Detonator, Stab, M55

9255165 Lead, Explosive PA508

9255168 Pellet, Booster

9258611 Screw, Closing

9258613 Firing Pin, Housing and Detonator Assembly

9258622 Crossbar and Holder Assembly

9258630 Safe and Arming Module Assembly

9272235 Detonator, Stab, M99

9294595 Fuze Body and Setting Sleeve Assembly

9298909 Cap, Nose

11836270 Delay Module, Impact

Safe and Arm (S&A):

Drawing Number Nomenclature______________ ____________

12992295 Lead, Explosive

8798331 Detonator

(d) The component items identified below are from paragraph (c) above and will require their own component ADC in addition to being listed on the end item ADC. The component ADCs shall also comply with MIL-STD-1168 and WARP requirements.

Drawing Number from paragraph (c) above M739A1 Fuze, components as follows:

Component Drawing Number Nomenclature ________________________ ____________

N/A N/A

(e) Lot numbers shall be in accordance with MIL-STD-1168 lot number convention and the technical data package requirements. Lot numbers shall be used for all ammunition end items and their major components, including inert, dummy, or non-energetic items and components. When not required by technical data package and not considered an end item or major component, the component lot number may be constructed through contractor lot number convention.

(f) The flowdown of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.

(g) All component RFD/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user's manual provides information on the level of detail required.

9 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

(h) A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.

(End of clause)

10 11

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION J - LIST OF ATTACHMENTS

List of Number List of Number

Addenda Title Date of Pages Transmitted By Addenda Title Date of Pages Transmitted By________________ ____________________________________________________________ _______________ ____________ _______________________________ ____________________________________________________________ _______________ ____________ _______________

Attachment 0001 PRICING MATRIX EXCEL SPREADSHEET M739A1 PD/DLY FUZE 08-AUG-2017 001 EMAIL

11 11

SECTION A
SECTION C
SECTION E
SECTION J