Exhibit_D_-_DD1423_-_CDRL_A004_-_Measurement_System_Evaluation_(MSE).pdf
PDF 48 KB Posted
- Attached to
- M793A1 Point Detonating/Delay (PD/DLY) Fuze Federal contract opportunity
- Solicitation number
- W15QKN17R0051
About this file
Exhibit D - CDRL A004 - Measurement System Evaluation (MSE)
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved
OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXH/ATCH NO. C. CATEGORY:
TDP TM OTHER
D.SYSTEM/ITEM
M739A1 PD/DLY Fuze
E. CONTRACT/PR
F. CONTRACTOR
17.PRICE
GROUP
1. DATA ITEM NO.
A004
2. TITLE OF DATA ITEM
Measurement System Evaluation (MSE)
3. SUBTITLE
18.ESTIMATED
TOTAL PRICE
4. AUTHORITY (Data Acquisition Document No.)
DI-QCIC-81960
5. CONTRACT REFERENCE
M739A1 Fuze SOW:C.3.10 Section E. 52.246-4018
6. REQUIRING OFFICE
RDAR-EIQ-MA
7. DD 250 REQ
LT
9.DIST STATEMENT
REQUIRED
D
10. FREQUENCY
One/R
12. DATE OF FIRST
SUBMISSION
See BLK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. ADP CODE
A
11. AS OF DATE
13. DATE OF SUBSEQUENT
See BLK 16 Draft
Final Reg Repro
16. REMARKS
The measurement and Inspection equipment system design documentation for acceptance of product describes the Acceptance Inspection Equipment (AIE), Automated Acceptance Inspection Equipment (AAIE) and calibration procedures to be submitted.
BLK 12: Submit 90 days prior to First Article Delivery or production if the First Article is waived. The USG will respond within 60 days of receipt.
Revisions, when applicable, are to be submitted within ten (10) calendar days of receipt of USG response. If documentation was approved on a prior contract with this contract activity and no changes were made, submit revised design for approval.
Final approval: Final approval, through verification, will be performed on-site at the contractor location NLT 30 days prior to First Article Test (FAT) or start of production if FAT is waived.
THE DATA WILL OUTLINE THE OPERATION, INSPECTION PROCEDURES TO BE
EMPLOYED TO CONDUCT QUALITY CONFORMANCE TESTS BY THE CONTRACTOR
which includes qualification, AIE, AAIE, NDT, and calibration.
See Clause paragraphs a1, a2, a5, c, d, d2, d3, e, f1, g l, m, and n for more detailed information on submittal requirements.
BLK 13: If any AIE/AAIE changes occur after initial approval, submit revised design for approval.
BLK 14: Submit electronically. Contact information will be provided in Section J after contract award.
RDAR-EIQ-MA 1 1
RDAR-MEF-F 1
Local DCMA 1
ESED: Code
JXPMN
ACC-NJ-CA 1
RDAR-EIQ-PE 1
G. PREPARED BY
Jason Menegus
H. DATE
11/15/16
I. APPROVED BY
12/22/2016
X Jeremy S. Heiskanen Jeremy S. Heiskanen Product Quality Manager Signed by: HEISKANEN.JEREMY.S.1367473408
J. DATE
12/22/2016
File details come from the government source that posted it. Updated .