QA_007-_Complete_RFP_W15QKN-15-R-0017_r1.docx

DOCX document 13 KB Posted

Attached to
Part 3 of 3- Complete RFP (Sections A through M) for Mortar Weapon System: W15QKN-15-R-0017
Solicitation number
W15QKN15R0017
Issued by

About this file

Q A's 007 - 17JUN2015

View the file

Other files

File Type Posted
Attachment_0002-_Latest_Drawing_Revisions-16JULY2015.docx DOCX document
QA_009-_Complete_RFP_W15QKN-15-R-0017.docx DOCX document
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions_with_correction.docx DOCX document
Attachment_0017_Scheduled_Government_Furnished_Property.PDF PDF
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
QA_006-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_005-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_0004-_Part_3_(Sections_A_through_M)_RFP_W15QKN-15-R-0017.docx DOCX document
Q A_003-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
Q A_002-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
CDRL_A021_SAR.docx DOCX document
CDRL_A010_Integrated_Program_Mgmt_Report_(IMPR).docx DOCX document
Attachment_0012-_Live-Fire_Acceptance_Testing_Requirements.docx DOCX document
CDRL_A011_Production_Status_Report.docx DOCX document
CDRL_A023_Opec_Plan.docx DOCX document
CDRL_A002_Status_of_GFP_Report.docx DOCX document
RFP_W15QKN-15-R-0017.pdf PDF
Attachment_0004_Non-Disclosure_Agreement_W15QKN-15-R-0017.doc DOC document
CDRL_A006_ECP.docx DOCX document
CDRL_A017_MSE.docx DOCX document
Attachment_0016-_Warranty_Repair_Source_Instructions.xlsx XLSX spreadsheet
CDRL_A012_Integrated_Master_Schedule_(IMS).docx DOCX document
CDRL_A018_Certification_Data.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions.docx DOCX document
Attachment_0007_-_FORM_3002.pdf PDF
CDRL_A022_Post_Award_Conference_(PAC).docx DOCX document
Attachment_0010-_Hazardous_Component_Safety_Data_Statement_(HCSDS).pdf PDF
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
CDRL_A004_Report _Production_or_delivery_Problem(s).docx DOCX document
Attachment_0008_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
CDRL_A007_NOR.docx DOCX document
Attachment_0014-_Past_Performance_Questionnaire.docx DOCX document
CDRL_A019_Accident_Incident_Report.docx DOCX document
CDRL_A015__Product_Acceptance.docx DOCX document
CDRL_A001_QDR.doc DOC document
Attachment_0015-_Warranty_Tracking_Information.xlsx XLSX spreadsheet
Attachment_0009_-_SF_LLL.pdf PDF
CDRL_A009_RFV.docx DOCX document
Attachment_0005_DD2345_Form.pdf PDF
CDRL_A008_SCN.docx DOCX document
CDRL_A013_QMS_Audits..docx DOCX document
Attachment_0013_-_Demilitarized_Items.docx DOCX document
CDRL_A024_Marking.docx DOCX document
Attachment_0006_AMSTA-AR_1350_Form.pdf PDF
CDRL_A003_Physical_Inventories_Report.docx DOCX document
Attachment_0011-_Live_Fire_Testing_Government_Furnished_Property_(GFP)_List.docx DOCX document
CDRL_A014__Rework_Procedures.docx DOCX document
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
CDRL_A005_Contractors_CM_Plan.docx DOCX document
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers_007:

Complete RFP W15QKN-15-R-0017 (Mortar Weapon Systems)

Question 1: The current Parts list shows 1010‐01‐020‐5626 (Cannon, 60mm Mortar: M225), CLIN’s 100‐110. Our information shows this part to be obsolete and replaced by 1010‐01‐586‐2874. Is the intent for Bidders to find the obsolete part or to quote the replacement?

RESPONSE: NSN 1010-01-020-5626 is not the Cannon, it is the M224 60mm Combinations of Adopted Items (COAI), which is the legacy 60mm Mortar Weapon System that we may buy for FMS sales, it is also not obsolete.

NSN 1010-01-586-2874 is the M224A1 60mm Mortar General Drawing, which is the Light Weight 60mm Mortar Weapon System

Question 2: Section C.4.14 states "The contractor shall manage live-fire acceptance testing of both the bipods and baseplates in accordance with the TDPs that is deemed acceptable by the USG. This will include proposed location for testing, pre and post-fire inspections, ammunition storage/conditioning if utilizing non-USG test facilities, and personnel responsible for conducting the testing." Question: Are there contractor live fire first article testing required for any item other than baseplates and bipods?

RESPONSE: Yes the Cannon, 81mm, M253A1 PN 11581921 NSN 1015-01-620-0110

File details come from the government source that posted it. Updated .