Attachment_0012-_Live-Fire_Acceptance_Testing_Requirements.docx

DOCX document 16 KB Posted

Attached to
Part 3 of 3- Complete RFP (Sections A through M) for Mortar Weapon System: W15QKN-15-R-0017
Solicitation number
W15QKN15R0017
Issued by

About this file

Attachment 0012

View the file

Other files

File Type Posted
Attachment_0002-_Latest_Drawing_Revisions-16JULY2015.docx DOCX document
QA_009-_Complete_RFP_W15QKN-15-R-0017.docx DOCX document
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions_with_correction.docx DOCX document
Attachment_0017_Scheduled_Government_Furnished_Property.PDF PDF
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
QA_007-_Complete_RFP_W15QKN-15-R-0017_r1.docx DOCX document
QA_006-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_005-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_0004-_Part_3_(Sections_A_through_M)_RFP_W15QKN-15-R-0017.docx DOCX document
Q A_003-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
Q A_002-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
CDRL_A021_SAR.docx DOCX document
CDRL_A010_Integrated_Program_Mgmt_Report_(IMPR).docx DOCX document
CDRL_A011_Production_Status_Report.docx DOCX document
CDRL_A023_Opec_Plan.docx DOCX document
CDRL_A002_Status_of_GFP_Report.docx DOCX document
RFP_W15QKN-15-R-0017.pdf PDF
Attachment_0004_Non-Disclosure_Agreement_W15QKN-15-R-0017.doc DOC document
CDRL_A006_ECP.docx DOCX document
CDRL_A017_MSE.docx DOCX document
Attachment_0016-_Warranty_Repair_Source_Instructions.xlsx XLSX spreadsheet
CDRL_A012_Integrated_Master_Schedule_(IMS).docx DOCX document
CDRL_A018_Certification_Data.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions.docx DOCX document
Attachment_0007_-_FORM_3002.pdf PDF
CDRL_A022_Post_Award_Conference_(PAC).docx DOCX document
Attachment_0010-_Hazardous_Component_Safety_Data_Statement_(HCSDS).pdf PDF
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
CDRL_A004_Report _Production_or_delivery_Problem(s).docx DOCX document
Attachment_0008_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
CDRL_A007_NOR.docx DOCX document
Attachment_0014-_Past_Performance_Questionnaire.docx DOCX document
CDRL_A019_Accident_Incident_Report.docx DOCX document
CDRL_A015__Product_Acceptance.docx DOCX document
CDRL_A001_QDR.doc DOC document
Attachment_0015-_Warranty_Tracking_Information.xlsx XLSX spreadsheet
Attachment_0009_-_SF_LLL.pdf PDF
CDRL_A009_RFV.docx DOCX document
Attachment_0005_DD2345_Form.pdf PDF
CDRL_A008_SCN.docx DOCX document
CDRL_A013_QMS_Audits..docx DOCX document
Attachment_0013_-_Demilitarized_Items.docx DOCX document
CDRL_A024_Marking.docx DOCX document
Attachment_0006_AMSTA-AR_1350_Form.pdf PDF
CDRL_A003_Physical_Inventories_Report.docx DOCX document
Attachment_0011-_Live_Fire_Testing_Government_Furnished_Property_(GFP)_List.docx DOCX document
CDRL_A014__Rework_Procedures.docx DOCX document
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
CDRL_A005_Contractors_CM_Plan.docx DOCX document
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Live-Fire Acceptance Testing Requirements

The contractor shall implement and maintain a contractor/sub-contractor training and certification program for all personnel involved in the live-fire testing of mortar weapon systems, subsystems, assemblies, sub-assemblies and components in accordance with the applicable Technical Data Packages (TDPs), Technical Manuals (TMs) and associated contract requirements for contract deliverables of mortar system materiel. The training program shall encompass contract and sub-contract personnel designated to perform live-fire testing of mortar system products to be supplied within the terms and conditions of the contract. The contractor’s program shall facilitate the proper training and certification necessary to ensure that only fully trained and qualified personnel are assigned to conduct live-fire test operations performed by the contractor. This requirement does not apply for the sub-contract test services performed by a US Government Proving Ground Test Center previously established and utilized by the Government for the testing of mortars.

The following areas of test discipline are recommended for consideration and inclusion to the contractor’s live-fire testing training program as determined applicable to the contract and deliverable items:

1. Firing Crew requirements including Test Director

a. Training, successful completion of

i. Gunners Exam or equivalent

ii. Ammunition Handling and Operation

iii. Preventative Maintenance Checks and Services (PMCS)

iv. Misfire Procedures

v. Boresighting Procedures

b. Personnel requirements – minimum of three (Gunner, Assistant Gunner, Ammo Bearer)

c. Prior experience in Mortar Systems operation – 1 year minimum or trained equivalent.

d. Method to be used in charge weight establishment and pressure measurement

i. Validated methods to determine excess charge necessary to meet proof pressure requirements for all caliber mortars and mortar components.

ii. Validated method to measure and determine the breech pressures.

2. Ancillary Crew requirements

a. Training/Qualification/Certification

i. Pre-Fire and Post Fire Inspections – Qualification/Certification of personnel, equipment and procedures used to perform pre and post fire inspections of mortar systems and components.

ii. Geodetics – Qualification/Certification with equipment required (if/as required by contract deliverables).

iii. Radar operator – Qualification/Certification with equipment required (if/as required by contract deliverables).

iv. Explosive Handler – Qualification/Certification with safe handling procedures of ammunition and explosives.

b. Equipment and Ammunition

i. Equipment – Maintain required calibration certification for equipment used in the acceptance test of mortar system materiel.

ii. Unexploded Ammunition – Qualification/Certification of Explosive Ordnance Disposal (EOD) personnel.

3. Range Requirements

a. Ammunition Storage, Transportation and Handling of mortar ammunition.

b. Mortar Systems / Components Storage of mortar weapon systems and associated components, including items containing tritium.

c. Environmental/Radiological. Must comply with all local, state and federal regulation requirements for firing mortar weapons and ammunition.

d. Disposal methods for unexploded ordnance must comply with all local, state, and federal regulation requirement for the proper disposal of unexploded ordnance.

4. Classification Requirements of Test Data: Validated methods of processing and transmitting Classified and Non-classified test data of information.

File details come from the government source that posted it. Updated .