CDRL_A015__Product_Acceptance.docx

DOCX document 18 KB Posted

Attached to
Part 3 of 3- Complete RFP (Sections A through M) for Mortar Weapon System: W15QKN-15-R-0017
Solicitation number
W15QKN15R0017
Issued by

About this file

CDRL A015

View the file

Other files

File Type Posted
Attachment_0002-_Latest_Drawing_Revisions-16JULY2015.docx DOCX document
QA_009-_Complete_RFP_W15QKN-15-R-0017.docx DOCX document
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions_with_correction.docx DOCX document
Attachment_0017_Scheduled_Government_Furnished_Property.PDF PDF
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
QA_007-_Complete_RFP_W15QKN-15-R-0017_r1.docx DOCX document
QA_006-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_005-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_0004-_Part_3_(Sections_A_through_M)_RFP_W15QKN-15-R-0017.docx DOCX document
Q A_003-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
Q A_002-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
CDRL_A021_SAR.docx DOCX document
CDRL_A010_Integrated_Program_Mgmt_Report_(IMPR).docx DOCX document
Attachment_0012-_Live-Fire_Acceptance_Testing_Requirements.docx DOCX document
CDRL_A011_Production_Status_Report.docx DOCX document
CDRL_A023_Opec_Plan.docx DOCX document
CDRL_A002_Status_of_GFP_Report.docx DOCX document
RFP_W15QKN-15-R-0017.pdf PDF
Attachment_0004_Non-Disclosure_Agreement_W15QKN-15-R-0017.doc DOC document
CDRL_A006_ECP.docx DOCX document
CDRL_A017_MSE.docx DOCX document
Attachment_0016-_Warranty_Repair_Source_Instructions.xlsx XLSX spreadsheet
CDRL_A012_Integrated_Master_Schedule_(IMS).docx DOCX document
CDRL_A018_Certification_Data.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions.docx DOCX document
Attachment_0007_-_FORM_3002.pdf PDF
CDRL_A022_Post_Award_Conference_(PAC).docx DOCX document
Attachment_0010-_Hazardous_Component_Safety_Data_Statement_(HCSDS).pdf PDF
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
CDRL_A004_Report _Production_or_delivery_Problem(s).docx DOCX document
Attachment_0008_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
CDRL_A007_NOR.docx DOCX document
Attachment_0014-_Past_Performance_Questionnaire.docx DOCX document
CDRL_A019_Accident_Incident_Report.docx DOCX document
CDRL_A001_QDR.doc DOC document
Attachment_0015-_Warranty_Tracking_Information.xlsx XLSX spreadsheet
Attachment_0009_-_SF_LLL.pdf PDF
CDRL_A009_RFV.docx DOCX document
Attachment_0005_DD2345_Form.pdf PDF
CDRL_A008_SCN.docx DOCX document
CDRL_A013_QMS_Audits..docx DOCX document
Attachment_0013_-_Demilitarized_Items.docx DOCX document
CDRL_A024_Marking.docx DOCX document
Attachment_0006_AMSTA-AR_1350_Form.pdf PDF
CDRL_A003_Physical_Inventories_Report.docx DOCX document
Attachment_0011-_Live_Fire_Testing_Government_Furnished_Property_(GFP)_List.docx DOCX document
CDRL_A014__Rework_Procedures.docx DOCX document
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
CDRL_A005_Contractors_CM_Plan.docx DOCX document
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST (1 Data Item)

Form Approved OMB No. 0704-0188
|
Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Managements and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20403. Please DO NO RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
|
A. CONTRACT NO.LINE ITEM
B. EXHIBIT
C. CATEGORY:
|
TDP______ TM______ OTHER____________________
|
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
|
Mortar Weapon Systems
|
1. DATA ITEM NO.
2. TITLE OF DATA ITEM

Test and Inspection Report

3. SUBTITLE
|
17. PRICE GROUP

A015

Product Acceptance FAT / LAT
|

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE
6. REQUIRING OFFICE
|
18 ESTIMATED
DI-NDTI-80809B
C.4.10, C.4.11.1 & C.4.13
SFAE-AMO-CAS
|
TOTAL PRICE
7. DD 250REQ
9. DIST STATEMENT REQUIRED

D

10. FREQUENCY
12. DATE OF FIRST SUB.
14. DISTRIBUTION
AS REQ
SEE BLK 16
a. ADDRESSEE
b. COPIES
|

8. APP CODE

11. AS OF DATE
13. DATE OF SUBS. SUB
Draft
Final
|

A

SEE BLK 16
AS REQ
Reg
Repro
|

16. REMARKS

RDAR-MEM-M

Mortar Weapons Systems

SOW PARA C.4.10 – Inspection and Test Report

BLK 11 & 12: Provide Inspection and Test Reports to Government no later than 7 days after completion of Test and Inspection prior to Government Source Inspection (SCI) and product acceptance.

SOW PARA C.4.11.1 – First Article Test (FAT) Report:

BLK 11 & 12: Provide FAT Inspection and Test Reports to Government no later than 15 days after completion of FAT Test and Inspection.

SOW PARA C.4.13 – Lot Acceptance Test (LAT) Report:

BLK 11: Provide LAT Inspection and Test Reports to Government no later than 7 days after completion of LAT.

BLK 12: Provide LAT Inspection and Test Notice to Government no later than 10 days before planned date for LAT Inspection and Test. Submit for each LAT.

The Lot Acceptance Test Report (LAT) shall contain copies of all the test results to the Government within 7 days after LAT for Government review and acceptance.

BLK 14: Submit Electronically to:

See Section J.

SFAE-AMO-CAS-GMS

15. TOTAL ---------->
0
2
0
|

G. PREPARED BY

F.CHASTEK

RDAR-EIQ-PE

H. DATE
I. APPROVED BY
J. DATE
|
15 JAN 2015
F.CHASTEK

RDAR-EIQ-PE //s//

15 JAN 2015
|
DD FORM 1423-1, FEB 2001
PREVIOUS EDITIONS ARE OBSOLETE Page____ of____Pages