QA_0004-_Part_3_(Sections_A_through_M)_RFP_W15QKN-15-R-0017.docx

DOCX document 14 KB Posted

Attached to
Part 3 of 3- Complete RFP (Sections A through M) for Mortar Weapon System: W15QKN-15-R-0017
Solicitation number
W15QKN15R0017
Issued by

About this file

Q A_004- Part 3 of 3 (Sections A through M) for RFP W15QKN-15-R-0017

View the file

Other files

File Type Posted
Attachment_0002-_Latest_Drawing_Revisions-16JULY2015.docx DOCX document
QA_009-_Complete_RFP_W15QKN-15-R-0017.docx DOCX document
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions_with_correction.docx DOCX document
Attachment_0017_Scheduled_Government_Furnished_Property.PDF PDF
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
QA_007-_Complete_RFP_W15QKN-15-R-0017_r1.docx DOCX document
QA_006-_RFP_W15QKN-15-R-0017.docx DOCX document
QA_005-_RFP_W15QKN-15-R-0017.docx DOCX document
Q A_003-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
Q A_002-_Part_2_(Sections_A_through_K)_for_RFP_W15QKN-15-R-0017.pdf PDF
CDRL_A021_SAR.docx DOCX document
CDRL_A010_Integrated_Program_Mgmt_Report_(IMPR).docx DOCX document
Attachment_0012-_Live-Fire_Acceptance_Testing_Requirements.docx DOCX document
CDRL_A011_Production_Status_Report.docx DOCX document
CDRL_A023_Opec_Plan.docx DOCX document
CDRL_A002_Status_of_GFP_Report.docx DOCX document
RFP_W15QKN-15-R-0017.pdf PDF
Attachment_0004_Non-Disclosure_Agreement_W15QKN-15-R-0017.doc DOC document
CDRL_A006_ECP.docx DOCX document
CDRL_A017_MSE.docx DOCX document
Attachment_0016-_Warranty_Repair_Source_Instructions.xlsx XLSX spreadsheet
CDRL_A012_Integrated_Master_Schedule_(IMS).docx DOCX document
CDRL_A018_Certification_Data.docx DOCX document
Attachment_0002-_Latest_Drawing_Revisions.docx DOCX document
Attachment_0007_-_FORM_3002.pdf PDF
CDRL_A022_Post_Award_Conference_(PAC).docx DOCX document
Attachment_0010-_Hazardous_Component_Safety_Data_Statement_(HCSDS).pdf PDF
Attachment_0001-_Mortar_Weapon_Systems_Parts.docx DOCX document
CDRL_A004_Report _Production_or_delivery_Problem(s).docx DOCX document
Attachment_0008_-_CERTIFICATE_OF_DESTRUCTION.doc DOC document
CDRL_A007_NOR.docx DOCX document
Attachment_0014-_Past_Performance_Questionnaire.docx DOCX document
CDRL_A019_Accident_Incident_Report.docx DOCX document
CDRL_A015__Product_Acceptance.docx DOCX document
CDRL_A001_QDR.doc DOC document
Attachment_0015-_Warranty_Tracking_Information.xlsx XLSX spreadsheet
Attachment_0009_-_SF_LLL.pdf PDF
CDRL_A009_RFV.docx DOCX document
Attachment_0005_DD2345_Form.pdf PDF
CDRL_A008_SCN.docx DOCX document
CDRL_A013_QMS_Audits..docx DOCX document
Attachment_0013_-_Demilitarized_Items.docx DOCX document
CDRL_A024_Marking.docx DOCX document
Attachment_0006_AMSTA-AR_1350_Form.pdf PDF
CDRL_A003_Physical_Inventories_Report.docx DOCX document
Attachment_0011-_Live_Fire_Testing_Government_Furnished_Property_(GFP)_List.docx DOCX document
CDRL_A014__Rework_Procedures.docx DOCX document
Attachment_0003-Pricing_Chart_for_the_Section_B_CLINs_W15QKN-15-R-0017.xlsx XLSX spreadsheet
CDRL_A005_Contractors_CM_Plan.docx DOCX document
Show 40 more

Latest 50 of 73 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers_004:

Part 3 of 3 Complete RFP (Sections A through M): W15QKN-15-R-0017 (Mortar Weapon Systems)

Question 1: We kindly request a fifteen (15) day submittal extension due to the extended holiday weekend, as we will not be able to kick off this proposal effort until Tuesday of next week.

RESPONSE: The Government will provide a (5) five business day extension due to holiday. An amendment to the RFP is forthcoming.

Question 2: With the Volume 1 page limitation and the required level of Integrated Master Schedule (IMS) detail discussed in solicitation paragraph L.4.1.3 a., will the Government consider allowing an unlimited page appendix for contractors to present their complete IMS and/or allow the complete IMS to be presented as a MS Project electronic file attachment?

RESPONSE: The Government finds no issue with excluding the IMS from the total page count. An amendment to the RFP is forthcoming.

Question 3: Regarding solicitation paragraphs L.2.3.1 b. and L.3.1, are we correct in interpreting that the Government requires 10 paper copies of Volume V: Solicitation offer?

RESPONSE: Volume V will be deleted from PARA L.3.1. Only one copy of the Standard Form 33 (SF 33) and continuation sheets (Sections A through M) signed by a person authorized to enter into the proposed contract on behalf of the Offeror is required. An amendment to the RFP is forthcoming.

Question 4: In the updated Attachment 0002, Latest Drawing Revisions, two drawings are listed as REV Def. Will the Government please clarify the revision level of these drawings?

RESPONSE: The two drawings listed as REV Def, should have been omitted from list. An amendment to the RFP is forthcoming.

Question 5: Attachment 0002 lists many QAP’s, drawings and revision updates which are not included in the provided TDP. Will the USG provide all of the technical data listed in Attachment 0002?

RESPONSE: The drawings and QAPs should be uploaded to FBO for access. They were provided after the original upload of the TDP.

Question 6: As stated in section M.4.4.4, the RFP states that the USG will compute the total evaluated price by summing the weighted evaluated prices from section B. Will the USG provide the weighting factors and methodology used to calculate the total evaluated price?

RESPONSE: The Government reserves the right to not disclose the weighting factors used to calculate the total evaluated price. The methodology being used to calculate the total evaluated price was provided in Section M, paragraph M.4.4.4.

Question 7: Solicitation section B.3 states that a single unit price will be applicable to all FATs for the Ordering Periods 1 through 5 under that specific item. However Attachment 0003 has input for FAT for all five ordering periods. Will the Government please clarify this difference?

RESPONSE: The Government is requesting single unit price will be applicable to all FATs for the Ordering Periods 1 through 5 under that specific item. The separate cells in Attachment 0003 pertaining to FAT should have been merged into one cell. For example, cells E4, F4, G4, H4, and I4 should be merged into one cell, covering all 5 Ordering Periods. An Amendment to the RFP is forthcoming.