CDRL_A017_MSE.docx
DOCX document 19 KB Posted
- Attached to
- Part 3 of 3- Complete RFP (Sections A through M) for Mortar Weapon System: W15QKN-15-R-0017
- Solicitation number
- W15QKN15R0017
About this file
CDRL A017
View the file
Other files
Show 40 more
Latest 50 of 73 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item)
| Form Approved OMB No. 0704-0188 |
| | |
| Public reporting burden for this collection of information is estimated to average 440 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Managements and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20403. Please DO NO RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E. |
| | |
| A. CONTRACT NO.LINE ITEM |
| B. EXHIBIT |
| C. CATEGORY: |
| | |
| TDP______ TM______ OTHER____________________ |
| | |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| | |
| Mortar Weapon Systems |
| | |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
Measurement System Evaluation (MSE)
| 3. SUBTITLE |
| | |
| 17. PRICE GROUP |
A017
Equipment System Design Documentation for Product Acceptance
4. AUTHORITY (Data Acquisition Document No.)
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| | |
| 18 ESTIMATED |
| DI-QCIC-81960 |
| C.4.5 |
| RDAR-EIQ-WB |
| | |
| TOTAL PRICE |
| 7. DD 250REQ |
| 9. DIST STATEMENT REQUIRED |
D
| 10. FREQUENCY |
| 12. DATE OF FIRST SUB. |
| 14. DISTRIBUTION |
| ONE/R |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| | |
8. APP CODE
| 11. AS OF DATE |
| 13. DATE OF SUBS. SUB |
| Draft |
| Final |
| | |
A
AS REQ
| Reg |
| Repro |
| | |
16. REMARKS
RDAR-MEM-WB
Mortar Weapons Systems
The measurement and inspection equipment system design documentation for acceptance of product describes the Acceptance Inspection Equipment (AIE).
BLK 12: Submit 90 days prior to First Article Delivery or production if the First Article is waived. The USG will respond within 60 days of receipt.
Revisions, when applicable, are to be submitted within ten (10) calendar days of receipt of USG response. If documentation was approved on a prior contract with this contract activity and no changes were made, submit revised design for approval.
Final approval: Final approval, through verification, will be performed on-site at the contractor location NLT 90 days prior to First Article Test (FAT) or start of production if FAT is waived.
THE DATA WILL OUTLINE THE OPERATION, INSPECTION PROCEDURES TO BE EMPLOYED TO CONDUCT QUALITY CONFORMANCE TESTS BY THE CONTRACTOR.
BLK 13: If AIE changes occur after initial approval, submit revised design for approval.
BLK 12: Submit NLT 30 days prior to delivery of first article.
BLK 8: The USG will respond within 30 days of receipts of the original and any required revisions.
BLK 14: submit electronically to:
See Section J
SFAE-AMO-CAS-GMS
| 15. TOTAL ----------> |
| 0 |
| 3 |
| 0 |
| | |
G. PREPARED BY
F.CHASTEK
RDAR-EIQ-PE
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| | |
| 15 JAN 2015 |
| F.CHASTEK |
RDAR-EIQ-PE
| 15 JAN 2015 |
| | |
| DD FORM 1423-1, FEB 2001 |
| PREVIOUS EDITIONS ARE OBSOLETE Page____ of____Pages |
File details come from the government source that posted it. Updated .