| Ques. # | Question | Answer |
| 68 | It is assumed that “Soldier Radio Waveform (SRW) Radio System CLINs (0101, 0201, 0301…) apply to PWS 5.2 (the Receiver/Transceiver and do NOT include ancillary equipment or installation kits. It is assumed that “Radio Installation Kits and Ancillary Items CLINs (0131, 0231, 0331….) are for PWS 5.3. Please confirm. | CLINs 0101, 0201, 0301... SRW Radio Systems are linked to the Basic PWS Paragraph 5 (t) SRW Radio System and Receiver/Transceiver (R/T). The SRW Radio System includes the RT, software, amplifier and all necessary ancillary equipment required to make the system operational. |
SRW Radio System Installation Kits are linked to Basic PWS paragraphs 6.4.4 (t)HMMWV Kits and 6.4.5 (t) MRAP Kits.
SRW Radio System Ancillary Items are linked to Basic PWS paragraph 5.3 (t) Ancillary Capabilities, Equipment and Accessories. Offerors shall propose on the Pricing Spreadsheet tab for Ancillary Equipment their complete equipment proposal with individual prices. CLINs will be determined based on Offerors successfully proposed solutions.
See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing.
69 In the PWS (Section 6.4), the Government identifies two types of installation kits (HMMWV Kit and MRAP Kit), yet Section B CLIN 0131 (0231, 0331, etc.) is titled Radio Installation Kits and Ancillary Item. Should there be separate CLINs for the different Installation Kits in Section B and the Pricing Worksheet? If not, which Installation Kit should be bid in the Basic Contract for this CLIN? See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing. CLINs XX31 and XX32 have been changed/added to support pricing of HMMWV and MRAP Installation Kits.
70 6.7.4 Government FSR Training is not defined. Please provide additional requirements in order to properly price (i.e. Number of FSR, location of training, etc.) Paragraph 6.7.4 Government FSR Training has been changed from a threshold (t) to an objective (o) in the basic PWS and is removed from the pricing spreadsheet.
71 6.7.5 Other Required Training. Are Offerors to define and propose this requirement? If so, how will government evaluate price if different contractors have different content? Paragraph 6.7.5 Other Required Training has been changed from a threshold (t) to an objective (o) in the Basic PWS and is removed from the pricing spreadsheet.
72 6.8.4 Other manuals as required. Are Offerors to define and propose this requirement? If so, how will government evaluate price if different contractors have different content? Paragraph 6.8.4 Other manuals has been changed from a threshold (t) to an objective (o) in the Basic PWS and is removed from the pricing spreadsheet.
| 73 | Page C-18, Section 1.2.6 - Volume VI – Delivery Order 0001 Cost/Price Proposal. Section 1.2.6.1 requires a Cost Narrative – Cost Element supporting document which details each cost element build up and support. Does this narrative require the offeror to provide the Bases of Estimates for individual cost elements that support the estimated hours or other cost backup that make up the proposed prices? | The Cost Narrative shall include all information to support the proposed costs and cost element allocation to ensure that the proposed cost is fair and reasonable. For Firm-Fixed-Price proposed prices, a cost breakout is not required unless deemed necessary by the Contracting Officer if adequate competition is not attained. |
| 74 | Since not provided in Attachment 1, on which costing spreadsheet does the offeror provide the Radio Installations and Ancillary CLIN’s 131,231,331,431,531,631,731,831,931,1031? | SRW Radio System Installation Kits are linked to Basic PWS paragraphs 6.4.4 (t)HMMWV Kits and 6.4.5 (t) MRAP Kits. |
SRW Radio System Ancillary Items are linked to Basic PWS paragraph 5.3 (t) Ancillary Capabilities, Equipment and Accessories. Offerors shall propose on the Pricing Spreadsheet tab for Ancillary Equipment their complete equipment proposal with individual prices. CLINs will be determined based on Offerors successfully proposed solutions.
See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing. CLINs XX31 and XX32 have been changed/added to support pricing of HMMWV and MRAP Installation Kits.
75 Section L 1.2.3.3 states that the Contracting Officer has determined there is a high probability of adequate price competition in this acquisition.
Section L 1.2.6.1.2.6 further states that in accordance with FAR 15.403-1(b), data other than cost or pricing data is required to support cost realism. However Section 1.2.6.1.2.6 goes on to require that the Offeror’s cost proposal be broken out by cost element as specified in FAR 15.408, Table 15-2, and in further supporting detail as shown in the SAMPLE cost breakdown provided in Attachment 4.
Section 1.2.6.1.2.7 also requires the submission of Forward Pricing rates, payroll documentation and two years’ actual expense pool, allocation base and rate information.
The data being required by Sections 1.2.6.1.2.6 and 1.2.6.1.2.7 constitute cost and pricing data and should not be required for a proposal deemed to have adequate price competition.
The Contractor requests that the Government delete these requirements. If these requirements are not removed, please confirm that they are only applicable to the cost reimbursable CLINs.
| Section L Paragraph 1.2.3.3 states that the Contracting Officer has determined there is a high probability of adequate price competition in this acquisition. This statement is only applicable to the Basic Contract Cost/Price Proposal (Section L Paragraph 1.2.3). The Government has not deleted the cost data requirements of sections 1.2.6 and 1.2.8 (for Delivery Orders 0001 and 0002 respectively) because cost realism is being conducted on the delivery orders and proposals must be in accordance with FAR 15.408 Table 15-2. | |
| 76 | Section L – page C-10, 1.2.2.4 – Offeror shall briefly describe the specific work activity to be performed by itself, as the prime Offeror, and by each of its critical partners/subcontractors/ teammates in addition to providing the cage code for each. |
Please clarify what is to be provided for this requirement.
The offeror is expected to describe briefly what they will do and what role each of the critical partner/subs/teammates will do.
Example
Prime will manage the new roof on your house and provide the material for the roof.
Critical partner A will provide the labor for the installation of the roof.
77 CLIN 0131 (and the corresponding out-year CLINs) in the solicitation require pricing for radio installation kits and ancillary items. Installation kits and ancillary items could vary based on specific delivery order requirements. In addition, there is no defined quantity to bid. Please clarify how the Contractor is to price this CLIN. SRW Radio System Installation Kits are linked to Basic PWS paragraphs 6.4.4 (t)HMMWV Kits and 6.4.5 (t) MRAP Kits.
SRW Radio System Ancillary Items are linked to Basic PWS paragraph 5.3 (t) Ancillary Capabilities, Equipment and Accessories. Offerors shall propose on the Pricing Spreadsheet tab for Ancillary Equipment their complete equipment proposal with individual prices. CLINs will be determined based on Offerors successfully proposed solutions.
SRW Parts are associated with the items in Basic PWS paragraphs 5 (t) SRW Radio System and Receiver/Transceiver, 6.4.4 (t)HMMWV Kits and 6.4.5 (t) MRAP Kits. Offerors shall propose on the Pricing Spreadsheet tab for Parts List their most relevant parts list with individual prices. CLINs will be determined based on Offerors successfully proposed solutions.
See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing.
| 78 | Delivery Order 002 requires 554 SRW Applique Radio Systems and 712 installation kits. The Basic ID/IQ contract does not include a separate CLIN for installation kits. Against what CLIN should we price the additional 158 installation kits that are above and beyond the 554 radio systems? | See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing. CLINs XX31 and XX32 have been changed/added to support pricing of HMMWV and MRAP Installation Kits. Installation kits shall not be priced as part of the SRW Radio System in accordance with basic PWS paragraph 5. |
| 79 | Reference: RFP Attachment 0008, CDRL 34: CDRL 34: Logistics Management Information (LMI) Data Products. Provisioning Parts Lists (PPL) are made up of a number of data products that are called out in MIL-PRF-49506 (which is referenced in DI-ALSS-81529 (see block 4)). What specific Data Products (as referenced in MIL-PRD-49506) does the Government require for inclusion into the PPL? | See amendment 0006 attachment 20 LMI data fields for specific data products. AMC-P 700-25; Apdx D provides definitions for the fields in the LSA-036 and has been referenced in CDRL 34. |
| 80 | Reference: RFP Attachment 0008, CDRL 29: CDRL 29 (FMECA) – Block 16 indicates a submission upon Government request. Please provide a reasonable expectation of how long after the Government request the CDRL would need to be submitted (ie. 90 days after Government request). | Please see Amendment 0006 revised Attachment 0008 SRW CDRLs. |
| 81 | Reference: RFP, Section B: Please clarify if an Offeror is able to add additional CLINs to Section B to accommodate the different Radio Installation Kits and Ancillary Items? Currently only one CLIN per ordering period is available in Section B whereas an offeror may have multiple, differing, Radio Installation Kits and Ancillary Item CLINs to propose per ordering period. | SRW Radio System Ancillary Items are linked to Basic PWS paragraph 5.3 (t) Ancillary Capabilities, Equipment and Accessories. Offerors shall propose on the Pricing Spreadsheet tab for Ancillary Equipment their complete equipment proposal with individual prices. CLINs will be determined based on Offerors successfully proposed solutions. |
SRW Parts are associated with the items in Basic PWS paragraphs 5 (t) SRW Radio System and Receiver/Transceiver, 6.4.4 (t)HMMWV Kits and 6.4.5 (t) MRAP Kits. Offerors shall propose on the Pricing Spreadsheet tab for Parts List their most relevant parts list with individual prices. CLINs will be determined based on Offerors successfully proposed solutions.
See amendment 0006 RFP and Attachment 0001 SRW Pricing Spreadsheet for tabs to support the proposal and pricing. CLINs XX31 and XX32 have been changed/added to support pricing of HMMWV and MRAP Installation Kits.
| 82 | Reference: RFP Attachment 0001: Please provide clarification regarding how an offeror is to propose pricing for the following CLINs in the Attachment 0001 Price File? The price file indicates no alterations to the file are allowable. Regarding: CLINs 0131-0199*, 0231-0299*, 0331-0399*, 0431-0499*, 0531-0599*, 0631-0699*, 0731-0799*, 0831-0899*, 0931-0999*, 1031-1099* (*actual CLIN range from XX31 onward is TBD based on Offeror’s proposal) | There are 99 Lines available on the SRW Parts List tab. Updated Pricing Spreadsheet to require only the most relevant Parts be listed. Since this is a non-developmental item, the Parts should be limited to only the most relevant parts at the Basic Contract. If any obscure part is required this can be handled at a Delivery Order level. See amendment 0005 attachment 0001 SRW Pricing Spreadsheet for more information. |
| 83 | Reference Attachment 0012, Paragraph 1.1.4.3.2 and 1.1.4.3.3, Page C-8: Is it necessary to have 90% of the EMI/EMC and Environmental tests completed prior to proposal submission? Some tests take as long as or longer than the time that was available for the proposal. Could a test schedule be substituted for tests not completed by proposal submission? | Yes, in order to be found acceptable the Offeror must have test documentation attesting that 90% of the PWS EMI/ECM requirements Passed or Passed with Comment testing. |
No, a test schedule cannot be substituted for a test that is not completed.
84 Reference: RFP Attachment 0005, Paragraph 1.13, Page 9: Would a resultant awardee be allowed to propose and add a different SRW Radio System hardware offering to its awarded base IDIQ during the period of performance of the contract? Awardees would be allowed to propose different SRW Radio System hardware offerings during a delivery order competition and then again during any on-ramp/off-ramp opportunities.