VPS CDRL D001 BDD.pdf
PDF 289 KB Posted
- Attached to
- Virtual Paint Simulator (VPS) Federal contract opportunity
- Solicitation number
- N6134022Q0017
About this file
This Contract Data Requirements List (CDRL) outlines technical data items required under Solicitation N6134022Q0017 for the Virtual Paint Simulator (VPS). The Navy requires the contractor to deliver a Baseline Description Document describing the VPS system, with draft submissions due 30 days prior to Physical Configuration Audits at the first and last training device sites. Final submission is due 15 days after installation at the last site. The contractor must deliver two draft and one final PDF copies to the Government points of contact and each of the eight training device sites. The CDRL specifies distribution statements, review periods, resubmission requirements, and data item descriptions in accordance with DoD standards. Pricing shall be estimated for four groups depending on the effort required to conform to Government standards for depth, format and quality of the technical data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| VPS_CSS_09SEP.pdf | ||
| ATT1_Virtual Paint Simulator SOW 29Aug2022 V1-1.pdf | ||
| ATT3_TCCD_VPS SOW Attachment.pdf | ||
| VPS CDRL E001 COTS.pdf | ||
| VPS CDRL A001 TEST PLAN.pdf | ||
| ATT2_VPS REQUIREMENTS CHECKLIST.pdf | ||
| VPS CDRL F001 IOT.pdf | ||
| VPS CDRL A002 TEST INSPECTION REPORT.pdf | ||
| VPS CDRL C001 TSSPD.pdf | ||
| VPS CDRL C002 BOM.pdf | ||
| VPS CDRL B001 CPSMR.pdf | ||
| VPS_CSS.pdf | ||
| ATT1_VPS_SOW.pdf | ||
| ATT3_VPS_TCCD.pdf | ||
| N6134022Q0017.pdf | ||
| VPS CDRL D002 CMP.pdf | ||
| VPS CDRL A003 COMPUTER SOFTWARE PRODUCT END ITEMS.pdf | ||
| VPS CDRL D003 CASR.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: D001 |
| title: BASELINE DESCRIPTION DOCUMENT (BDD) |
| sub: N/A |
| auth: DI-SESS-81121A |
| ref: SOW PARA 5.5 |
| req_ofc: PMA-205 |
| dd250: XX |
| appcode: A |
| dist: D |
| freq: 3 TIMES |
| asof: N/A |
| firstsub: SEE BLK 16 |
| subsub: SEE BLK 16 |
| addressee1: NAWCTSD ILSM |
| draft1: 1 |
| reg1: 1 |
| repro1: 0 |
| addressee2: CNATTU Norfolk |
| draft2: 0 |
| reg2: 1 |
| repro2: 0 |
| addressee3: CNATTU Whidbey Isla |
| draft3: 0 |
| reg3: 1 |
| repro3: 0 |
| addressee4: CNATT DET Atsugi |
| draft4: 0 |
| reg4: 1 |
| repro4: 0 |
| addressee5: CNATTU Jacksonville |
| draft5: 0 |
| reg5: 1 |
| repro5: 0 |
| addressee6: CNATTU Lemoore |
| draft6: 0 |
| reg6: 1 |
| repro6: 0 |
| addressee7: CNATTU Oceana |
| draft7: 0 |
| reg7: 1 |
| repro7: 0 |
| addressee8: CNATTU North Island |
| draft8: 0 |
| reg8: 1 |
| repro8: 0 |
| addressee9: CNATTU New River |
| draft9: 0 |
| reg9: 1 |
| repro9: 0 |
| addressee10: NAWCTSD ISEO |
| draft10: 1 |
| reg10: 1 |
| repro10: 0 |
| addressee11: NAWCTSD PJM |
| draft11: 0 |
| reg11: 0 |
| repro11: 0 |
| addressee12: NAWCTSD PCO |
| draft12: 0 |
| reg12: 0 |
| repro12: 0 |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 2 |
| total_reg: 10 |
| total_repro: 0 |
| remarks: 1. BLK 8: THE GOVERNMENT WILL HAVE FIFTEEN (15) CALENDAR DAYS FOR REVIEW AND ACCEPTANCE/REJECTION OF SUBMISSION. THE CONTRACTOR SHALL HAVE TEN (10) CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS. |
2. BLK 9: THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D- DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY. ADMINISTRATIVE OR OPERATIONAL USE 23 JANUARY 2017. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO COMMANDER, NAVAL AIR WARFARE CENTER, TRAINING SYSTEMS DIVISION, LOGISTICS MANAGER, 12211 SCIENCE DRIVE ORLANDO FL32826-3224
3. BLK 12: FIRST SUBMISSION SHALL BE A DRAFT COPY DELIVERED FOR REVIEW THIRTY (30) CALENDAR DAYS PRIOR TO THE PHYSICAL CONFIGURATION AUDIT (PCA) AT THE FIRST DEVICE SITE.
4. BLK13: SECOND SUBMISSION SHALL BE A DRAFT COPY DELIVERED FOR REVIEW THIRTY (30) CALENDAR DAYS PRIOR TO THE PHYSICAL CONFIGURATION AUDIT (PCA) AT THE LAST DEVICE SITE.
THE FINAL SUBMISSIONS SHALL BE DUE 15 CALENDAR DAYS AFTER INSTALLATION AT LAST TRAINING DEVICE SITE WITH COMMENTS FROM ALL PREVIOUS DELIVERIES INCORPORATED.
5. BLK 14: DOCUMENTS SHALL BE PREPARED WITH THE CONTRACTOR’S PUBLISHING SOFTWARE, AND DESIGNED FOR VIEWING IN UNSECURED PDF FORMAT. DOCUMENT AND ILLUSTRATION SOURCE FILES (MICROSOFT WORD, EXCEL, ILLUSTRATOR, ETC.) SHALL BE PROVIDED WITH THE FINAL SUBMISSION IN ADDITION TO THE PDF FORMAT. FINAL SUBMISSIONS SHALL BE SUBMITTED BY CD-ROM OR DVD-ROM TO THE DESIGNATED GOVERNMENT TECHNICAL POINTS OF CONTACT AND EACH (8) TRAINING DEVICE SITE.
DELIVERY TO PCO AND PJM SHALL BE LETTER ONLY.
| group: | |
| total_price: | |
| prep_name: JEREMIAH NELSON, ILSM | |
| line_item: | |
| exhibit: D | |
| xtdp: Off | |
| xtm: Off | |
| othercat: SESS | |
| system: VIRTUAL PAINT SIMULATOR | |
| ctr_no: | |
| contr: TBD | |
| remarksb: | |
| Page2: 1 | |
| Reset: | |
| 2022-07-21T14:57:07-0500 | |
| NELSON.JEREMIAH.ADAM.1159202514 |
| prep_date: 7/21/22 | |
| app_by: MARCUS GOBRECHT, LVL I DEP | |
| 2022-08-15T15:00:26-0400 | |
| GOBRECHT.MARCUS.ALLEN.1034513160 |
| app_date: 8/15/22 |
| Page: 1 |
| of_pages: 2 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .