ATT2_VPS REQUIREMENTS CHECKLIST.pdf

PDF 309 KB Posted

Attached to
Virtual Paint Simulator (VPS) Federal contract opportunity
Solicitation number
N6134022Q0017
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document is a requirements checklist for a solicitation seeking a virtual paint simulator. The Navy Naval Air Systems Command solicitation requires quoters to demonstrate in their quotes that they can manufacture, deliver, and set up hardware at eight training sites. Quotes must also identify and mitigate risks, support a post-award kickoff meeting within 10 days of award and bi-weekly meetings. Additional requirements include conducting a ready-to-ship technical interchange meeting prior to first shipment, providing two simulator modes for instructor-led and self-directed training, including 15 specified simulation features, and providing six required trainer labs. Quoters must also demonstrate the ability to conduct required test and acceptance, logistics, and cybersecurity tasking, as well as complete 21 documentation deliverables. The checklist will be used by technical evaluators to determine quote acceptability.

View the file

Other files for this federal contract opportunity

Other files attached to Virtual Paint Simulator (VPS), newest first.
File Type Posted
VPS_CSS_09SEP.pdf PDF
ATT1_Virtual Paint Simulator SOW 29Aug2022 V1-1.pdf PDF
ATT3_TCCD_VPS SOW Attachment.pdf PDF
VPS CDRL C002 BOM.pdf PDF
VPS CDRL B001 CPSMR.pdf PDF
VPS CDRL F001 IOT.pdf PDF
VPS CDRL A002 TEST INSPECTION REPORT.pdf PDF
VPS CDRL C001 TSSPD.pdf PDF
VPS_CSS.pdf PDF
ATT1_VPS_SOW.pdf PDF
ATT3_VPS_TCCD.pdf PDF
N6134022Q0017.pdf PDF
VPS CDRL D002 CMP.pdf PDF
VPS CDRL A003 COMPUTER SOFTWARE PRODUCT END ITEMS.pdf PDF
VPS CDRL D003 CASR.pdf PDF
VPS CDRL D001 BDD.pdf PDF
VPS CDRL E001 COTS.pdf PDF
VPS CDRL A001 TEST PLAN.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUIREMENTS CHECKLIST

Government evaluators will use the Requirements Checklist below to determine whether a quoter is technically acceptable.

Reference Requirement Criteria Result

Proposal Page

Number(s)

Evaluators’ Explanation of Why Quoter’s Proposal is

Unacceptable (if applicable)

L.B.2.0:

TECHNICAL

Check One

The quoter’s quote demonstrated that they could manufacture, deliver, and set-up the hardware at all eight training sites as required in accordance with (IAW) SOW paragraph 3.1 and 3.2.1

Acceptable Unacceptable

The quoter’s quote demonstrated that they could identify and mitigate cost, schedule, and performance risks IAW SOW paragraph 3.1 support and participate in post contract award kick-off meeting within 10 days of contract award IAW SOW paragraph 3.1 support and participate in a bi-weekly meeting/teleconference IAW SOW paragraph 3.1 support and participate Ready-to-Ship Technical Interchange Meeting prior to shipment of the first device IAW SOW paragraph 3.1 provide the two modes required for simulator operation: Instructor Led Training and Self-Directed Training IAW SOW paragraph 3.2.2 and TCCD provide all 15 simulation features: realistic spray simulation, paint booth training environment, various paintable part categories, various paint gun models, Binks Mach 1 98- 1141 spray gun model, spray gun adjustments, coatings, film coverage, VR learning tool, performance feedback, performance reporting, instruction, and performance stats IAW SOW paragraph

3.2.3 and TCCD provide all six required trainer labs IAW SOW paragraph 3.2.5 and TCCD conduct the required test and acceptance tasking IAW SOW paragraph 4.0 conduct the required logistics tasking IAW SOW paragraph 5.0 conduct the required cybersecurity tasking IAW SOW paragraph 6.0 complete and submit the 21 Documentation Deliverables IAW SOW paragraph 7.0

Technical Evaluators’ Signatures:

Date:_______________________

_________________________________________________ Date:_______________________

_________________________________________________ Date: ______________________

_________________________________________________ Date: ______________________

_________________________________________________ Date: ______________________

_________________________________________________ Date: ______________________

_________________________________________________ Date: ______________________

_________________________________________________ Date: ______________________

SOURCE SELECTION INFORMATION – SEE FAR 2.101 AND 3.104

File details come from the government source that posted it. Updated .