Summary of VHH PM Fire Sprinkler Project Scope of Work
This is a Scope of Work document for a preventative maintenance and inspection contract issued by the Veterans Home at Holyoke, a state agency in Massachusetts, under the Massachusetts Operational Services Division TRD03 trade category. The contract seeks qualified vendors to provide comprehensive annual inspection, testing, and maintenance (ITM) services for the fire suppression system at the 234-bed long-term care facility located at 120 Cherry Street in Holyoke. Services include wet pipe and dry pipe system requirements, control valve operation, supervisory switch testing, waterflow alarm testing, anti-freeze system verification, and pressure gauge testing and replacement. A mandatory bid walkthrough is scheduled for Wednesday, August 19, 2026, from 10:00 AM to 12:00 PM. Primary contacts are Jeremy Meade, Institutional Foreman, and John Fydenkevez, Third Class Engineer, reachable at 413-552-4765 and 413-552-4748 respectively. The contract does not specify an award date, contract term, or renewal options in the provided document.
All services must comply with NFPA 25, NFPA 101, and 527 CMR Massachusetts Comprehensive Fire Safety Code standards, with oversight from the Department of Public Health, Centers for Medicare & Medicaid Services, and the Department of Veterans Affairs. The contractor must provide advance regulatory notification one month prior to scheduled inspections and coordinate all testing at least 48 hours in advance with the Facility Administrator to minimize disruption to residents. All completed inspection reports, certifications, and deficiency logs must be submitted within five business days of test completion and comply with documentation standards required by the Massachusetts DPH, CMS, VA, and other applicable authorities. The document does not specify pricing terms, funding sources, contract amounts, or set-asides.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHH PM Fire Sprinkler Project # VHH120FIRESPRINKLER
AWARDING ENTITY
Awarding Entity: Veterans Home at Holyoke Agency Name and Address: 120 Cherry Street Holyoke, MA Project Number: VHH120FIRESPRINKLER
CONTACT INFORMATION
Name and Title: Jeremy Meade, Institutional Foreman John Fydenkevez, Third Class Engineer Phone: 413-552-4765 413-552-4748 Email Address: jeremy.meade@mass.gov john.fydenkevez@mass.gov
CONTRACT AND BIDDING INFORMATION
Project Name: VHH PM Fire Sprinkler Project Description (brief overview): Fire sprinkler system inspection, testing and maintenance Bid Walkthrough: Wednesday 8/19/2026 10:00 – 12:00 OSD Trade Category: TRD03
SCOPE OF WORK
1. Project Overview & Objective The Contractor shall provide comprehensive annual inspection, testing, and maintenance (ITM) services for the fire suppression system at the Veterans Home at Holyoke, a 234-bed long-term care facility located in Massachusetts.
The selected Contractor shall provide all professional labor, supervision, materials, tools, equipment, and documentation necessary to ensure the fire suppression system remains fully operational, compliant with all state/federal regulations.
2. Applicable Codes and Regulatory Standards All services performed under this agreement must strictly adhere to the latest editions adopted by the Commonwealth of Massachusetts:
· NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems.
· NFPA 101: Life Safety Code.
· 527 CMR: Massachusetts Comprehensive Fire Safety Code.
· Regulatory Authorities: Department of Public Health (DPH), Centers for Medicare & Medicaid Services (CMS), and the Department of Veterans Affairs (VA).
3. Scheduling Requirements and Notifications
· Advance Regulatory Warning: The Provider must monitor the inspection schedule and formally notify the facility management of pending required regulatory inspections exactly one (1) month prior to the scheduled testing date.
· Operational Coordination: The Provider must coordinate all testing schedules with the Facility Administrator at least 48 hours in advance to ensure minimal disruption to residents and facility operations.
4.Technical Specifications and Scope of Services
· Wet Pipe & General System Requirements
· Main Drain: Conduct a main drain test annually to verify water supply conditions.
· Control Valves: Close and open all control valves annually to ensure proper operation.
· OS&Y Valves: Lubricate and exercise Outer Screw and Yoke (OS&Y) valves annually.
· Supervisory Switches: Test all supervisory switches semi-annually.
· Waterflow Alarms: Test mechanical waterflow alarms quarterly and electrical waterflow alarms semi-annually.
· Valve Supervision: Verify and record that all Main, Post Indicator Valves (PIV), and zone valves are properly supervised.
· Alarms: Test fire alarms quarterly utilizing the inspector's test valves.
· Pressure Gauges: Test and replace pressure gauge every five (5) years.
· Alarm Valves: Conduct an internal check of all alarm valves every five (5) years.
· Anti-Freeze Systems: Test anti-freeze loops annually to verify proper solution concentration.
· Dry Pipe System Requirements
· Low Pressure Alarm: Test the low-pressure alarm component quarterly.
· Priming Level: Check and verify the water priming level quarterly.
· Flow Testing: Conduct an annual flow test and a comprehensive 3-year flow test.
· System Identification: Provide and securely attach high-visibility valve tags to all relevant components.
5. DELIVERABLES & REPORTING
· Documentation Standards: The Provider shall deliver fully documented inspection reports that comply with all layout and data standards required by the Massachusetts DPH, CMS, VA, and any other Authority Having Jurisdiction (AHJ).
· Submission Timeline: All completed inspection reports, certifications, and deficiency logs must be submitted to the Facility Administrator within five (5) business days of test completion.