FP2.10_ ROOF - FIRE PROTECTION PLAN Rev.3 markup 1.pdf
PDF 446 KB Posted
- Solicitation number
- BD-27-1053-1053C-CSR-132423
- Issued by
- Hampden County, Massachusetts
About this file
This file is a roof-level fire protection plan drawing for the Soldiers' Home in Holyoke, a Massachusetts state agency long-term care facility. The drawing (FP2.10) details the layout and specifications for fire suppression infrastructure located on the building's roof, including post-type hydrant valve controls, freestanding roof hydrants measuring 6" x 2-1/2" x 2-1/2", and upright sprinklers positioned in double-height areas accessible en route to the roof. The hydrant outlets are specified to be positioned at centerline elevations between 36 to 60 inches above the adjacent penthouse roof, with hydrants secured to the mechanical well wall. The facility is located at 110 Cherry Street in Holyoke, Massachusetts, and the drawing was originally issued on January 10, 2023, with three subsequent bulletins issued on January 31, 2025, June 11, 2025, and August 18, 2025. The project was developed by Payette Associates Inc. (Project Architect) and BR+A Consulting Engineers in collaboration with DCAMM, with the drawing prepared at a scale of 1/16" = 1'-0".
The fire protection plan is part of a broader preventative maintenance and inspection agreement for the facility's fire suppression system. Prospective contractors must comply with NFPA 25, NFPA 101, and Massachusetts Comprehensive Fire Safety Code (527 CMR) standards, with regulatory oversight from the Department of Public Health, Centers for Medicare & Medicaid Services, and the Department of Veterans Affairs. Services include annual inspection and testing of both wet pipe and dry pipe systems, control valve operation verification, supervisory switch testing, waterflow alarm testing, anti-freeze system verification, and pressure gauge testing and replacement. All contractors must provide one month advance regulatory notification prior to scheduled inspections and coordinate testing at least 48 hours in advance with the Facility Administrator. Prevailing wage rates established by the Massachusetts Department of Labor Standards apply, effective through December 4, 2028. Primary facility contacts are Jeremy Meade, Institutional Foreman (413-552-4765), and John Fydenkevez, Third Class Engineer (413-552-4748), with inspection reports and certifications required within five business days of test completion.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2W.2
5N
4N.1
POST-TYPE HYDRANT
VALVE CONTROL.
6"X2-1/2"X2-1/2"
FREESTANDING ROOF HYDRANT.
POST-TYPE HYDRANT
VALVE CONTROL.
6"X2-1/2"X2-1/2" FREESTANDING ROOF
HYDRANT, SECURED TO SIDE OF
MECHANICAL WELL WALL. HYDRANT OUTLETS
SHALL BE AT CENTERLINE ELEVATION 36" TO
60" ABOVE ADJACENT PENTHOUSE ROOF.
0W
1w
2w 2x
BW
CS
DS
ES FS GS
HS
GS.5
JS
KS
LW
KW
JW
HW
GW
FW.2
4N
5N
3N
2N.2
2N
CE
BE
AE
DE
EE
FE
GE
HE
JE
KE
00W
CW
DW
EW
EW.2
FW
EW.1
BS
AS
W4
LS
6"X2-1/2"X2-1/2" FREESTANDING ROOF
HYDRANT, SECURED TO SIDE OF
MECHANICAL WELL WALL. HYDRANT OUTLETS
SHALL BE AT CENTERLINE ELEVATION 36" TO
60" ABOVE ADJACENT PENTHOUSE ROOF.
WALL-POST-TYPE HYDRANT
VALVE CONTROL, 36" ABOVE
MECH. WELL ROOF.
FWR
FDV3
FDV1
FER
FDV2
PROVIDE UPRIGHT SPRINKLERS AT
DOUBLE HEIGHT AREA AT SPACE
ABOVE SE LOBBY W910A POP UP.
DOUBLE HEIGHT AREA IS
ACCESSIBLE EN ROUTE TO ROOF
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A P
F P
O
R .r v t
ROOF - FIRE PROTECTION
PLAN
FP2.10
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PACKAGE
110 Cherry Street Holyoke, MA 01040
1/16" = 1'-0"
ROOF - OVERALL FIRE PROTECTION PLAN
No. Description Date
1 BULLETIN #91 01/31/2025
2 BULLETIN #123 06/11/2025
3 BULLETIN #136 08/18/2025
swatts Snapshot https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/234507906
File details come from the government source that posted it. Updated .