This is a fire protection system technical drawing document prepared by Payette Associates Inc. for the Soldiers' Home in Holyoke, a Massachusetts state agency facility located at 110 Cherry Street. The drawing set, designated FP3.00 (Fire Protection Enlarged Views, Revision 2), provides detailed specifications and layouts for the fire suppression system installation at this 234-bed long-term care facility. The technical drawings illustrate fire protection components across multiple levels including the north stairwell areas (Levels 0 through 8) and the fire pump room, showing the configuration of sprinkler systems, standpipe isolation and drain valves, fire department connections, pressure reducing valves, and related infrastructure. Key equipment specifications detailed in the drawings include a horizontal split case fire pump rated at 1,250 gallons per minute at 185 PSI boost, fire pump test headers, fire department inlet connections, jockey pump controllers with automatic transfer switches, and a nitrogen generator system. The drawings reference civil engineering documents for additional water service information and specify installation requirements such as pipe diameters, valve orientations, and connection locations relative to building features like the driveway and hydrants. The document was originally issued on January 10, 2023, with subsequent revisions documented in two bulletins (Bulletin #75 dated September 25, 2024, and Bulletin #91 dated January 29, 2025), indicating ongoing design refinements for this long-term care facility project.

The technical specifications and design standards reflected in these drawings are intended to comply with the preventative maintenance and inspection requirements outlined in the related Massachusetts Operational Services Division TRD03 contract opportunity, which mandates compliance with NFPA 25, NFPA 101, and 527 CMR Massachusetts Comprehensive Fire Safety Code standards. The drawings serve as the technical foundation for the fire suppression system scope of work that includes annual inspection, testing, and maintenance of wet pipe and dry pipe systems, control valve operation, supervisory switch testing, waterflow alarm testing, and pressure gauge testing and replacement, with work subject to prevailing wage requirements and regulatory oversight from the Department of Public Health, Centers for Medicare & Medicaid Services, and the Department of Veterans Affairs.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EX

LW

2W

1W

2N

1N

3"SD UP

6"FSP UP

6"FSP DROP

2-1/2"FDV

2"STANDPIPE DRAIN VALVE

6"STANDPIPE ISOLATION VALVE

4"PRV

4"FCVA

N1

STAIR

LW

2W1W 2N1N

6"FSP UP&DN

3"SD UP&DN

2-1/2"FDV

4"PRV

4"FCVA - ZONE 2

N1

STAIR

LW

2W

2N 1N

6"FSP UP&DN

3"SD UP&DN

2-1/2"FDV

4"PRV

4"FCVA - ZONE 2

N1

STAIR

LW

2W1W

2N1N

6"FSP UP&DN

4"SD UP&DN

2 1/2"FDV

4"PRV

4"FCVA

N1

STAIR

LW

2W1W 2N1N

6"FSP DN&RISE

3"SD DN&RISE

2-1/2"FDV

4"PRV

4"FCVA - ZONE 2

N1

STAIR

BW

1W

AW

W054

FIRE PUMP

ROOM

W1

STAIR

10" F

10" X 2-1/2" X 6"-WAY WALL MOUNTED FIRE

PUMP TEST HEADER FACING DRIVEWAY.

INSTALL IN VERTICAL ORIENTATION. AS

TIGHT AS POSSIBLE TO NORTHWEST

CORNER OF FIRE PUMP ROOM

8" X 2-1/2" X 4"-WAY WALL MOUNTED FIRE

DEPARTMENT INLET CONNECTION. FACING

DRIVEWAY, WITHIN 50-FT OF A HYDRANT

IN VERTICAL ORIENTATION

HORIZONTAL SPLIT CASE FIRE PUMP

1,250 GPM AT 185 PSI BOOST

10"SUCTION

PIPE TO RUN 10xPIPE DIAMTERS

BEFORE ENTERING FIRE PUMP

8"DISCHARGE

8"BYPASS

8"METER LOOP

JOCKEY PUMP CONTROLLER

10"F INCOMING FIRE PROTECTION WATER

SERVICE. REFER TO CIVIL ENGINEERING

DOCUMENTS FOR ADDITIONAL INFORMATION.

PROVIDE 10"DCVA AT FIRE PUMP ROOM

8" FSP

SOLID STATE SOFT START FIRE PUMP

CONTROLLER WITH AUTOMATIC

TRANSFER

SWITCH

4" DS

8"F DROP

8"MACV

8"FSP DROP

6"PRV

6"DACV FOR LOADING DOCK AND

MAINTENANCE GARAGE AREAS

6"DS RISE

4"DACV FOR CANOPY

4"DS RISE

4"SD TEST

NITROGEN GENERATOR MOUNTED ON WALL

8' - 4"

10" TH

10" F

10" F

8" FDC

INSTALL DRY VALVE DRAINS THROUGH

EXISTING SLAB AND EXTEND HORIZONTALLY

UNDERGROUND TO CLOSEST STORM WATER

LINE. MAKE NEW CONNECTION TO STORM

WATER LINE PER VALVE

FHYD UG1

UG2

FPI FPO

FP04

MAVI

MAVO

FP05

FP03

DVI

DVO

D1

FP06

DCVO

DCVI

D2

FW0

W045C

RECEIVING

ENTRY

W010

CORRIDOR

0'

Project Name:

DCAMM Project Number:

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

F ile

P a th

Original Issue Date

Revisions

Drawing Title:

Drawing Number:

Project Consultant

HLY2102

Payette Associates Inc.

290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com

Project Number:

40158.00

10' 20' 40'

HLY 00

N/A

256 HLY 0010

E.O.H.H.S

BR+A CONSULTING ENGINEERS

10 Guest Street, 4th Floor

Boston, MA 02135

617.254.0016 brplusa.com

B

IM

/H o ly o k e S o ld ie rs

H o m e /3

H

S H

C

S B

R

A P

F P

O

R .r v t

FIRE PROTECTION

ENLARGED VIEWS

FP3.00

01/10/2023

SOLDIERS' HOME

IN HOLYOKE

LONG-TERM

CARE PACKAGE

110 Cherry Street Holyoke, MA 01040

1/4" = 1'-0"

LEVEL 0 ENLARGED NORTH STAIR PART PLAN - FIRE PROTECTION PLAN

1/4" = 1'-0"

LEVEL 1 ENLARGED NORTH STAIR PART PLAN - FIRE PROTECTION PLAN -

1/4" = 1'-0"

LEVEL 2 ENLARGED NORTH STAIR PART PLAN - FIRE PROTECTION PLAN

1/4" = 1'-0"

LEVEL 3-7 ENLARGED NORTH STAIR PART PLAN - FIRE PROTECTION PLAN

1/4" = 1'-0"

LEVEL 8 ENLARGED NORTH STAIR PART PLAN - FIRE PROTECTION PLAN

1/4" = 1'-0"

LEVEL 0 ENLARGED FIRE PUMP ROOM PART PLAN - FIRE PROTECTION PLAN

No. Description Date

1 BULLETIN #75 09/25/2024

2 BULLETIN #91 01/29/2025