About this file

This is a Fire Protection Riser Diagram for the Soldiers' Home in Holyoke, a long-term care facility operated by the Massachusetts Department of Veterans Services. The diagram illustrates the fire suppression system infrastructure for a multi-level building extending from ground level (elevation 0'-0") through eight floors plus a penthouse and roof level (elevation 116'-0"). The system includes wet pipe and dry pipe standpipe risers, floor control valve assemblies, fire department connections, roof hydrants with post indicators and control valves with tamper switches, pressure gauges at the top of each standpipe, and check valves. The design incorporates multiple fire department valve locations throughout the building at typical intervals, with drain and spill provisions connected to outdoor drainage areas. The diagram references the Fire Pump Room Layout document (FP2.00) for additional system details and was originally issued on January 10, 2023, as part of the bid documents for the long-term care facility project located at 110 Cherry Street in Holyoke, Massachusetts.

The riser diagram establishes the technical specifications and component placement necessary for the preventative maintenance and inspection agreement referenced in the related RFQ. This schematic serves as the baseline documentation for contractors bidding on fire suppression system services, which must comply with NFPA 25, NFPA 101, and 527 CMR Massachusetts Comprehensive Fire Safety Code standards. The diagram enables qualified vendors to understand the full scope of the system requiring annual inspection, testing, and maintenance, including the specific locations and quantities of control valves, fire department connections, alarm check valves, standpipe risers, and roof hydrant assemblies that must be tested and certified during the preventative maintenance program.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEVEL 5

ELEVATION 60'-0"

LEVEL 4

ELEVATION 46'-0"

LEVEL 3

ELEVATION 32'-0"

LEVEL 2

ELEVATION 18'-0"

LEVEL 1

ELEVATION 0'-0"

GROUND LEVEL

ELEVATION -14'-0"

LEVEL 6

ELEVATION 74'-0"

LEVEL 8

ELEVATION 102'-0"

PENTHOUSE

ELEVATION 116'-0"

ROOF

ELEVATION 116'-0"

LEVEL 7

ELEVATION 88'-0"

TH

TH

FDC

FD

C

D S

DS

D S

DS

D S

DS

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

SD

S D

S D

SD

S D

S D

S D

S D

S D

S D

FS

P

FS

P

FSP

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FSP FSP FSP

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FS

P

FSP

FSP

FS

P

FS

P

FS

P

FS

P

FDC

FSP

F

F

6"

6"

3"

6"

6"

10"FIRE PROTECTION

WATER SERVICE

FLOOR CONTROL VALVE ASSEMBLY (FCVA)

(TYPICAL)

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

8"x2 1/2"x4-WAY FLUSH WALL MOUNTED FIRE

DEPARTMENT CONNECTION

8"x2 1/2"x4-WAY FLUSH WALL MOUNTED

FIRE PUMP TEST HEADER

6"

8" 8"

3"

STANDPIPE

ISOLATION VALVE

(TYPICAL)

6"

3"

6"

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

PRESSURE GAUGE AT TOP

OF EACH STANDPIPE RISER

(TYPICAL)

3"

DRY ALARM CHECK VALVE (DACV)

MAIN ALARM CHECK

VALVE (MACV)

8"

8"CHECK VALVE

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

DS TO LOADING/RECEIVING AREA

FLOOR CONTROL VALVE ASSEMBLY (FCVA)

(TYPICAL)

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

8"8" 6"

8"

SD SPILLED TO OED

(BY PLUMBING)

REFER TO FP2.00 FOR FIRE

PUMP ROOM LAYOUT

8"

10"

2"

SD SPILLED TO OED

(BY PLUMBING)

6"X2 1/2"X 2 1/2" FREE-STANDING

ROOF HYDRANT

POST INDICATOR ROOF HYDRANT

CONTROL VALVE WITH TAMPER

SWITCH

8"x2 1/2"x4-WAY FREESTANDING FIRE

DEPARTMENT CONNECTION

6"X2 1/2"X 2 1/2" FREE-STANDING

ROOF HYDRANT

POST INDICATOR ROOF HYDRANT

CONTROL VALVE WITH TAMPER

SWITCH

4"SD SPILL TO GRADE

4"SD SPILL TO GRADE

DRY ALARM CHECK VALVE (DACV)

DS TO EAST SUPER CANOPY

SD SPILLED TO OED

(BY PLUMBING)

6"X2 1/2"X 2 1/2" FREE-STANDING

ROOF HYDRANT

POST INDICATOR ROOF HYDRANT

CONTROL VALVE WITH TAMPER

SWITCH

6"X2 1/2"X 2 1/2" FREE-STANDING

ROOF HYDRANT

POST INDICATOR ROOF HYDRANT

CONTROL VALVE WITH TAMPER

SWITCH

2 1/2"FIRE DEPARTMENT VALVE (FDV)

(TYPICAL)

DS TO SOUTH SUPER CANOPY

6"X2 1/2"X 2 1/2" FREE-STANDING

ROOF HYDRANT

POST INDICATOR ROOF HYDRANT

CONTROL VALVE WITH TAMPER

SWITCH

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR

SPR SPR

SPR SPR

SPR

SPR

SPR

SPR

SPR SPR

SPR SPR

SPR

SPR

SPR

SPR

SPR SPR

STAIR #2

PENTHOUSE PENTHOUSE

Project Name:

DCAMM Project Number:

Project Location

Project Architect

Site Number:

CAMIS Number:

Building Number:

Secretariat:

F ile

P a th

Original Issue Date

Revisions

Drawing Title:

Drawing Number:

Project Consultant

HLY2102

Payette Associates Inc.

290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com

Project Number:

40158.00

HLY 00

N/A

256 HLY 0010

E.O.H.H.S

BR+A CONSULTING ENGINEERS

10 Guest Street, 4th Floor

Boston, MA 02135

617.254.0016 brplusa.com

B

IM

/H o ly o k e S o ld ie rs

H o m e /3

H

S H

C

S B

R

A P

F P

O

R .r v t

FIRE PROTECTION RISER

DIAGRAM

FP4.00

01/10/2023

SOLDIERS' HOME

IN HOLYOKE

LONG-TERM

CARE PACKAGE

110 Cherry Street Holyoke, MA 01040

BID DOCUMENTS

No. Description Date https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/234508597

File details come from the government source that posted it. Updated .