FP2.01_ LEVEL 1 -FIRE PROTECTION PLAN Rev.5 markup.pdf
PDF 3 MB Posted
- Solicitation number
- BD-27-1053-1053C-CSR-132423
- Issued by
- Hampden County, Massachusetts
About this file
This is a Fire Protection Plan document for the Soldiers' Home in Holyoke, a Massachusetts state agency, prepared by Payette Associates Inc. as the project architect and BR+A Consulting Engineers as the project consultant. The document presents a detailed Level 1 fire protection system plan for a 234-bed long-term care facility located at 110 Cherry Street (also referenced as 120 Cherry Street) in Holyoke, Massachusetts. The fire suppression system design includes both wet pipe and dry pipe sprinkler zones, with comprehensive piping layouts showing main supply lines ranging from 2 inches to 8 inches in diameter, multiple fire department connections, supervisory valves, and flow control devices distributed across the facility. The plan incorporates five revisions through Bulletin 97 dated February 14, 2025, addressing design modifications and clarifications. The drawings detail specific requirements for low-point drains, beam penetrations, sidewall sprinklers, and zone-specific configurations to ensure compliance with NFPA-13 standards. A mandatory site walkthrough was scheduled for August 19, 2026, from 10:00 a.m. to 12:00 p.m., with quotes due August 27, 2026.
The preventative maintenance and inspection services must comply with NFPA 25, NFPA 101, and Massachusetts 527 CMR Comprehensive Fire Safety Code standards, with regulatory oversight from the Department of Public Health, Centers for Medicare & Medicaid Services, and the Department of Veterans Affairs. The scope requires annual inspection, testing, and maintenance of both wet and dry pipe systems, including control valve operation, supervisory switch testing, waterflow alarm testing, anti-freeze verification, and pressure gauge testing and replacement. Contractors must provide advance regulatory notification one month prior to scheduled inspections and coordinate all testing at least 48 hours in advance with the Facility Administrator. Inspection reports, certifications, and deficiency logs must be submitted within five business days of test completion. Prevailing wage rates apply to this work as established in the Massachusetts Department of Labor Standards wage schedule effective through December 4, 2028. Primary facility contacts are Jeremy Meade, Institutional Foreman (413-552-4765), and John Fydenkevez, Third Class Engineer (413-552-4748).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX
EX
EX
EX
BW
DW
EW
FW
GW
HW
JW
KW
LW
BE
CE
DE
EE
FE
GE
HE
JE
CS
DS
ES
FS
GS
HS
JS
PC
LS
3E
2W
3N
4N
4E
1W
3W
2N
2E
1E
4W
1N
AW
AS
2W.2
AE
NW
MS
KE
BS
5N
4N.1
6"FSP DN & RISE
3"SD DN & RISE
4"PRV
4"FCVA - ZONE 1
2-1/2"FDV
6"SUPERVISED VALVE
6"FSP UP
3"SD UP
6"FSP UP&DN
3"SD UP&DN
4"FCVA - ZONE 2
2-1/2"FDV
8"FSP DN & RISE IN 2-HR RATED SHAFT
6"FSP UP
3"SD UP
4"DS TO EXTERIOR CANOPY
4"DS TO EXTERIOR CANOPY
6"FSP DROP TO
4"DACV
4"DS RISE
ZO
NE-1
ZO
NE-2
ZONE-1
ZONE-2
DRY ZONE-2
DRY ZONE-3
SEE FP 3.00 FOR ENLARGED PLAN
SEE FP 3.01 FOR ENLARGED PLAN
SEE FP 3.01 FOR ENLARGED PLAN
8" FSP
8" FSP
4" SD
4" S
D
4"SD DROP TIGHT TO
COLUMN, INSIDE
COLUMN ENCLOSURE.
4"SD - SPILL TO GRADE.
4"SD DROP.
4"SD - SPILL TO GRADE.
4" SD
4" S
D
FP10
PROVIDE DRY SPRINKLERS BELOW
BUILDING STRUCTURE. SPRINKLERS NOT
REQUIRED BELOW SEPARATED STRUCTURE
8"FSP DN&RISE
8"FDC DN&RISE
8"FDC DN
8"FDC BURIED
8" FDC
8" FDC
8" F
D C
3'-6" DIFFERENCE IN CEILING
ELEVATION. PROVIDE SIDEWALL
SPRINKLERS PER NFPA-13
REQUIREMENTS
PROVIDE LOW POINT DRAIN
PROVIDE LOW POINT DRAIN
6"BEAM PENETRATION
MOP & 16'-8"
4"BEAM PENETRATION
MOP @ 16'-8"
(TYPICAL FOR 2" BRANCH)
4"BEAM PENETRATION
IN MIDDLE THIRD OF BEAM
6"BEAM PENETRATION
MOP & 16'-8"
PROVIDE LOW POINT DRAIN
6"BEAM PENETRATION
MOP & 16'-8"
2" SPR-2
4" BEAM PEN
MOP @ 15-8" AFF
PROVIDE LOW POINT DRAIN
4" DS
4" SPR
-1
4" DS
4" SPR-1
4" D S
4" S
P R
-2
4 " D S
4" S
PR-2
4" S
PR
-2
4" D
S
4" S
PR
-2
2" S
PR
-2
4" D
S
4" S
PR-2
4" S
PR-2
4" S
P R
-1
2" SPR-1
2" SPR-1
2" SPR-1
4" DS
4" DS
4" DS
4" DS
4" D S
4" D S
4" SPR-1
2" SPR-1
4" S
P R
-1
DRY ZONE-2
8" X 2-1/2" X 4-WAY
FREESTANDING FIRE
DEPARTMENT INLET
CONNECTION
SOFFIT < 1000FT3
NO SPRINKLERS NEEDED
DIFF IN CEILINGS IS >3'-0"
SPRINKLERS REQUIRED IN
FP11 FE1
4"BP
4"BP
4"BP
6"BP
6"BP
4"BP
3"BP
4"BP
4"BP
4"BP
6"BP
6"BP
6"BP
6"BP
6"BP
4"BP
4"BP
4"BP
3"BP
4"BP
4"BP
4"BP
2" D S
2" DS
2" DS
2" DS
1" DS
4" DS
4" DS
4" D S
2" DS
2" D
S
2" D
S
1" D
S
4" D
S
E111
LOBBY
N188
CANTEEN
STORAGE/
PREP
E131
RETAIL
STORE
N112
GREAT
ROOM
W112
PUBLIC
ELEVATOR
LOBBY
W170
PT/OT
N191
CHAPEL
SERVICE
ELEVATOR
W110A
SERVICE
ELEVATOR
LOBBY
N2
CONVENIENCE
STAIR
N1
STAIR
W1
STAIR
E1
STAIR
W174
OT
GROUPS/
MODALITIES
W147A
VESTIBULE
W143
ASST
PROGRAM
DIRECTOR
W140
STORAGE
W152
TREAMENT
ROOM
W145
PROGRAM
DIRECTOR
W142B
DINING /
SOCIAL
ACTIVITIES
W147B
COMM.
CENTER
W171
ADL SUITE
N1D1
TEL/DATA
W110
CORRIDOR
W150
PUBLIC TLT
W1V2
N.
ELECTRICAL
W154
TOILET
ROOM
W148
LOCKERS
W149
PUBLIC TLT
W1V1
E.
ELECTRICAL
W151
TLT /
SHOWER
W172
STORAGE
N192
SACRISTY
N189B
PUBLIC TLT
(W)
N189A
PUBLIC TLT
(M)
N187
CANTEEN
SEATING
E132
HAIR CARE
N195
PUBLIC TLT
N194
CHAPEL
OFFICE
W160
KITCHEN
W175
STAFF
LOUNGE
W170A
STORAGE
RACKS
W158
LAUNDRYW170B
TLT
W153
TOILET
ROOM
W175B
STAFF TLT
W144
NURSING
DIR. ADH
OFFICE
W146
COUNSELOR
OFFICE
W147
WAITING
ROOM
W175A
LOCKERS
W155
QUIET
ROOM
N111
WAITING /
RECEPTION
N193
CORRIDOR
N190
ANTE-CHAPEL
N100
CORRIDOR
W162
BARIATRIC
TOILET
W161
PUBLIC TLT
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
PASSENGER
ELEVATOR
MN1
SHAFT
MN2
SHAFT
N186
EXAM
W111
LOBBY
W111
CORRIDOR
W163
LACTATION
N192A
SUPPORT
W165
VRF
N182
LAB
N181
PANO
N184
SOILED
WORKROOM
N185
EXAM
E130
SECURITY /
CONCIERGE
E115
TREASURY
E119
HR LIAISON
E129
SUPERINTENDENT
OFFICE
E126
COO
OFFICE
E127
CFO
OFFICE
E112
FIRE
COMMAND
E123
ADON
OFFICE
E124
DIR.
NURSING
OFFICE
E113
CONFERENCE
ROOM
E117
PRINT /
COPY
E101A
KITCHENETTE
E104
TRUSTEE
CONF.
ROOM
E100B
STAFF TLT
E100A
STAFF TLT
E128
DEPUTY
SUPERINTENDENT
OFFICE
E102
CORRIDOR
E114
ADMISSIONS
(3)
E100
WAITING
E125
DIR SOCIAL
WORK
OFFICE
E116
TREASURER
E109
OFFICE
E106
OPEN
OFFICE
E118
LEGAL
COUNSEL
OFFICE
E103A
ADMINISTRATIVE
ASSISTANTS
(2)
E105
VRF
E121
MEDICAL
DIRECTOR
E103B
SOCIAL
WORK (2)
E122
DIRECTOR
OF
COMMUNICATION
E120
LABOR
OFFICE
E100C
COFFEE
BAR
W173
PT OFFICE
E133
HOBBY
ROOM
N183
CLEAN
SUPPLY
N180
WAITING
W171A
CLOSET
W101A
CIRCULATION
E103
CORRIDOR
E101
CORRIDOR
E108
STAFF
LOUNGE/
CONFERENCE
ROOM
W101
CIRCULATION
E107
OFFICE
E110
OFFICE
W157
SOILED
UTILITY
W156
CLEAN
SUPPLY W159
JANITOR
CLOSET
W102
CORRIDOR
W142C
DINING /
SOCIAL
ACTIVITIES
W142A
DINING /
SOCIAL
ACTIVITIES
N187A
CANTEEN
E106A
OPEN
OFFICE
4"DS DN&RISE
N1
W1
E1
W2
N2
E2
S1
0'
Project Name:
DCAMM Project Number:
Project Location
Project Architect
Site Number:
CAMIS Number:
Building Number:
Secretariat:
F ile
P a th
Original Issue Date
Revisions
Drawing Title:
Drawing Number:
Project Consultant
HLY2102
Payette Associates Inc.
290 Congress Street, Fifth Floor Boston, MA 02210-1005 Tel: 617-895-1000 www.payette.com
Project Number:
40158.00
10' 20' 40'
HLY 00
N/A
256 HLY 0010
E.O.H.H.S
BR+A CONSULTING ENGINEERS
10 Guest Street, 4th Floor
Boston, MA 02135
617.254.0016 brplusa.com
B
IM
/H o ly o k e S o ld ie rs
H o m e /3
H
S H
C
S B
R
A P
F P
O
R .r v t
LEVEL 1 - FIRE
PROTECTION PLAN
FP2.01
01/10/2023
SOLDIERS' HOME
IN HOLYOKE
LONG-TERM
CARE PACKAGE
110 Cherry Street Holyoke, MA 01040
1/16" = 1'-0"
LEVEL 1 - OVERALL FIRE PROTECTION PLAN
No. Description Date
1 BULLETIN 016 11/17/2023
2 BULLETIN # 28R1 03/08/2024
3 BULLETIN # 37 04/11/2024
4 BULLETIN #91 01/31/2025
5 BULLETIN #97 02/14/2025
https://app.procore.com/1526478/project/drawing_areas/1845139/drawing_log/329743378
File details come from the government source that posted it. Updated .