VHA PCRA 31May2023-Final 573-339.docx

DOCX document 49 KB Posted

Attached to
Y1LZ--573-339 BB Expand Vertical Parking Garage #2 (Independence) Minor Construction - Gainesville VAMC
Solicitation number
36C77625B0001
Issued by

About this file

This is a Pre-Construction Risk Assessment (PCRA) template document for a vertical expansion project of the Independence Parking Garage at the Malcom Randall Medical Center (Project #573-339). The template outlines minimum requirements for categorizing construction, renovation, and maintenance activities and determining safety risk levels and precautions.

The document is primarily a template that defines three activity types (Inspection/Upkeep, Small-scale, and Large-scale construction) and their associated control measures. It includes tables for documenting affected adjacent areas and points of contact, with the Glory Lot and Daniel Brophy (Construction Area POC) identified as key stakeholders. The template contains a permit form to be posted at construction sites and requires various safety plans including excavation, dust control, pollution prevention, crane operations, fall protection, and confined space entry procedures depending on the activity type. This appears to be a standard template document rather than a completed assessment for the specific parking garage project.

View the file

Other files

File Type Posted
36C77625B0001 Amendment 0013.docx DOCX document
DEVIATION FEB 2025.docx DOCX document
852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899.docx DOCX document
52.204-8 ANNUAL REPS AND CERTS DEV FEB 2025.docx DOCX document
36C77625B0001 0012.docx DOCX document
36C77625B0001 0011.docx DOCX document
36C77625B0001 Amendment 0010.docx DOCX document
Tech Questions Tracker - Gainesville Final.docx DOCX document
36C77625B0001 0009.docx DOCX document
Wage Rates - Alachua County 2.11.25 - Gainesville.pdf PDF
36C77625B0001 0008.docx DOCX document
Wage Rates - Alachua County 1.31.25 - Gainesville.pdf PDF
36C77625B0001 0007.docx DOCX document
36C77625B0001 0006.docx DOCX document
Clarification to technical question No. 17 and No. 18.docx DOCX document
36C77625B0001 0005.docx DOCX document
Amended Response for Question No. 4.docx DOCX document
A411_amended_signed.pdf PDF
PG601_amended_signed.pdf PDF
PG551_amended_signed.pdf PDF
36C77625B0001 0004.docx DOCX document
Tech Questions Tracker - Gainesville R1.docx DOCX document
36C77625B0001 0003.docx DOCX document
2025-01-07 573-339 Site Visit Attendance_.pdf PDF
Wage Rates - Alachua County 1.3.25 - Gainesville.pdf PDF
36C77625B0001 0002.docx DOCX document
36C77625B0001 0001.docx DOCX document
Expand Vertical Parking Garage 2 - Independence - Drawings_R1.pdf PDF
Expand Vertical Parking Garage 2 - Independence - Specifications_R1 _ Final Construction Documents PART 2.pdf PDF
Expand Vertical Parking Garage 2 - Independence - Specifications_R1 _ Final Construction Documents PART 1.pdf PDF
Expand Vertical Parking Garage 2 - Independence - Specifications_R1 _ Final Construction Documents PART 3.pdf PDF
36C77625B0001_1.docx DOCX document
312000b 2009 Phase 1 Geotech Investigation.pdf PDF
312000a 2010 Phase 2 Geotech Investigation.pdf PDF
Wage Rates - Alachua County 8.9.24 - Gainesville.pdf PDF
Site Visit Instructions Gainesville.docx DOCX document
VAAR 852.219-75 Limitations on Subcontracting.docx DOCX document
312000c 2009 Phase 1 Geotech Lateral Pile Analysis Report.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PCRA Introductory Information and Instructions

Use this template as a baseline for performing facility Pre-Construction Risk Assessments (PCRA) for Construction, Renovation, and Maintenance work (referred to as the “activity” in this document). The template provides minimum requirements for categorizing activity type(s) and safety risk to determine the level of precautions needed to prevent impact related to Construction, Renovation and Maintenance on patients, employees, and contractors.

Ensure that the activity statement of work and any drawings available are used for the PCRA assessment and included in the project file with the completed PCRA.

Communication and coordination of all types of activity with affected areas are to be included among the control measures. The development of communication and coordination plans must begin during the activity planning phase.

Facilities may customize this template to incorporate site-specific information and requirements.

NOTE: This VHA PCRA template pertains specifically to non-infection-related safety for Construction, Renovation, and Maintenance activities. It must be used in conjunction with the VHA Infection Control Risk Assessment (ICRA) for the activity, if required, which specifically addresses infection risks outside the scope of this PCRA.

PERMIT: See the last page of this document for a fillable permit form to be used for posting at the activity site.

Activity Location: Independence Parking Garage; Malcom Randall Medical Center

Activity Name, Number, and/or Brief Description: 573-339 Expand Vertical Parking Garage #2 (Independence) Vertical expansion of the Independence Parking Garage

Table 1 - Construction, Renovation, and/or Maintenance Activity Type and Control Measures

NOTE: If any of the bulleted criteria in a higher activity type pertains to the work that will be done (even if the other criteria are in a lower type), use the higher activity type for the VHA PCRA.

Controls defined in Table 1 for the activity must be in place before the activity begins and maintained until work is completed and the area is activated. Control measures for each activity must also include the control measures in the preceding row(s).

As the activity progresses, a full re-evaluation of remaining activity type and risk is required prior to changing the level of control measures.

Large Scale Construction

Activity Type determined from Table 1:

Activity Type and Description
Control Measures

Inspection/upkeep generally defined as follows:

· Work can be completed in a single shift, not to exceed 10 hours.

· Patients, employees and/or visitors may be in the area depending on the activity.

· Work that does not create dust or debris.

· Work that does not create vapors or fumes.

· Removal of ceiling tile or access to mechanical or electrical chase for visual inspection that will not impair fire safety systems and are limited to 1 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift.

· Minor interior updates (e.g., replacing floor or ceiling tiles, carpentry work to include hanging signage, and painting with hand tools) that do not create vibration or noise.

· Limited building system maintenance that does not require Lock Out Tag Out (LOTO) such as plumbing on potable systems limited to faucet replacement, steam trap replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.

1. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

2. Site visits of construction area are required weekly by member of multi-disciplinary team. Site visits will be documented on standard checklist.

3. Site specific safety plan, task hazard analysis, and hazard communication required to be provided by the contractor and approved where a contact is in place. For internal work the shop involved must work with Safety to ensure proper precautions are in place.

4. Must address identified hazards and controls that will be implemented to ensure minimal impact to patients, employees, contractors and facility.

5. Communication and coordination plan for all affected areas

Small scale Construction, Renovation and general maintenance/repair work, generally defined as follows:

· Prolonged work that may take longer than a single shift but not exceeding six months.

· Patients and employees are not to be in the area until activity is completed.

· Work that creates some noise and vibration due to power tool use.

· Selective demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements that may

· disturb asbestos, lead or silica

· create the potential for falling objects

· create vibration and/or noise in excess of 80 dB(A) in surrounding areas.

· cause penetrations in fire or smoke barrier

· Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing that requires utility outages or work on the steam system that may require:

· LOTO

· The use of compressed gas cylinders

· Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that require LOTO.

· Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit, a single device and the installation of ductwork, diffusers, and terminal units for an area that may require:

· Work on ladders

· Rigging, hoisting or lifting of equipment or materials overhead

· Modification of existing fire alarm and suppression systems requiring system outages and ILSMs or obstruction of exits and or impact on corridors.

· Architectural, structural, or any other work that may cause vapors or fumes such as:

· Roofing work

· Flooring work

· Painting or other large-scale use of such substances.

All control measures in the row above and the following:

1. Hazard communication chemical inventory required to be provided by the contractor and approved.

2. Where construction, Renovation and maintenance are done in an accredited facility, and ILSM assessment is required to be done and ILSMs put into place in accordance with TJC LS.01.02.01 and the local facility policy including Fire watch if necessary. Staff is trained and the ILSM is verified regularly

3. Hot Work or burn permits in place and staff trained

4. LOTO procedures in place and staff trained on their use

5. Site visits will be reviewed using the criteria in standardized guide.

6. Daily inspections of the site are to be conducted by the General Contractor or shop supervisor and documented on their daily log.

Large-scale construction, renovation, or maintenance generally defined as follows:

· Work exceeding 6 months in duration.

· Patients and employees are not to be in the area until activity is completed.

· Excavation or heavy equipment use taking place

· Dig safe required utility location

· Trench safety

· Dust control plan

· Equipment exhaust, Noise, Vibration

· Confined space entry required (permit required or not)

· Requires crane work

· General crane work

· Lift over buildings

· Includes elevated work

· Roof work, fall protection

· Window work, scaffolding and fall protection

· Odor control

· Welding, cutting or use of torches requiring burn permits

· Demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC that may

· require asbestos, lead or silica abatement

· create the potential for falling objects

· create vibration and/or noise in excess of 90 dB(A) in surrounding areas.

· cause breaches to fire or smoke barrier

· The installation building components such as new walls, ceilings and doors including framing, drywall and associated plaster work that requires transport of significant materials through building and up elevators i.e., weight limits of floors and elevators

· Plumbing work requiring LOTO and system shutdown and startup such as the installation of:

· new medical gas systems,

· steam/heating hot water, condensate systems,

· Potable water and sanitary drainage, multiple sinks, showers and toilets including associated plumbing.

· Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc. requiring LOTO and system isolation.

· Installation of fire alarm and suppression systems requiring outages of those systems and ILSMs or closure of exits/corridors

· Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls requiring lifting and support of equipment and systems.

All control measures in the two rows above and the following Activity Hazard Analyses and Control Plans (check all that apply):

1. Excavation safety plan in place ☐

2. Dust control plan in place ☐

3. Pollution prevention plan in place ☐

4. Dig safe paper work in place ☐

5. Crane lift plan in place ☐

a. Crane placement

b. Crane swing

c. Crane load evaluation

6. Fall protection plan in place and staff trained ☐

7. Confined entry plan in place and staff trained ☐

Table 2. Affected Adjacent Area Assessment

In addition to the minimum precautions noted above for the Activity Type, it is critical that the activity be coordinated with the areas adjacent to the activity to ensure operations in those areas are not disrupted or impacted. List the adjacent areas in Table 2 below and develop activity-specific coordination plans and associated communication plans with each area to address activity work that could impact or disrupt the operation of the areas, in general as follows:

· If adjacent area is vacant (e.g., work outside, construction of new building, etc.):

· Coordination is typically not necessary other than potentially traffic flow and pedestrian access.

· If adjacent area is non-continuously occupied (e.g., areas where outpatient care is provided, employee health, etc.):

· Develop a list of activities that will potentially impact or disrupt the operation of the area (e.g., work involving noise, vibration or exit obstruction) and meet with POC to coordinate execution of work in a way that mitigates the impact (e.g., conduct work after hours).

· If adjacent area is occupied continuously (e.g., areas where inpatient care is provided, residential areas such as Community Living Centers, etc.):

· Develop a list of activities that will potentially impact or disrupt the operation of the area (e.g., work involving noise, vibration or exit obstruction) and meet with POC to coordinate execution of work in a way that mitigates the impact (e.g., move affected party temporarily).

Area
Service(s)/Type(s) of Area(s)

(e.g., OR, Unit/Ward, Sterile Processing, Administrative, etc)*

Point of Contact (POC)
POC Contact Information
Construction plan communicated to POC?

Activity Area**

Parking Garage
Daniel Brophy
daniel.brophy1@va.gov;

352-548-6000 x104780

YES

Area Above

NA
NA
NA
NA

Area Below

NA
NA
NA
NA

Adjacent Area 1

Glory Lot
Edwin J Burnett
edwin.burnett@va.gov;;

352-376-1611 x106927

YES

Adjacent Area 2

Adjacent Area 3

Adjacent Area 4

* There may be more than one Service/type of area for each row. List all. The information entered on this table must be used in the ICRA if required.

** List the area(s) in which the construction/renovation/maintenance activity will occur.

Infection Control Risk Assessment (ICRA)

Consult with Infection Prevention and Control regarding the assessment of potential infection risks associated with the activity and the need for control measures. See VHA Directive 7715 and the VHA ICRA Template for more information.

Is an ICRA required for the Activity? Yes ☐ No ☒ VHA Pre-Construction Risk Assessment (PCRA)

VHA-PCRA-2023-1.0 Page 2 of 2 Pre-Construction Risk Assessment (PCRA) Permit

This page must be posted at the entrance to the project area, or other designated area

Unique permit number:

Location and brief description of construction/renovation/maintenance

Project manager

Project start date

Contact phone number

Completion date

Contractor or lead shop

Permit expiration date

Activity Type Inspection/Upkeep, Small-scale, or Large-scale)

Activity Type
Control measures to be in place for the duration of the activity

(Check the box for the Activity Type to indicate the Control Measures)

Inspection/Upkeep

1. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

2. Site visits of construction area are required weekly by member of multi-disciplinary team. Site visits will be documented on standard checklist.

3. Site specific safety plan, task hazard analysis, and hazard communication required to be provided by the contractor and approved.

4. Must address identified hazards and controls that will be implemented to ensure minimal impact patients, employees, contractors and facility.

5. Communication and coordination plan for all affected areas

Small-scale

All control measures in the row above and the following:

1. Hazard communication chemical inventory required to be provided by the contractor and approved.

2. ILSMs in place and staff trained on situation

3. Hot Work or burn permits in place and staff trained

4. LOTO procedures in place and staff trained on their use

5. Site visits will be reviewed using the criteria in standardized guide.

6. Daily inspections of the site are to be conducted by the General Contractor and documented on their daily log.

Large-scale

All control measures in both rows above and the following Activity Hazard Analyses and Control Plans as applicable (check all that apply):

1. Excavation safety plan in place ☐

2. Dust control plan in place ☐

3. Pollution prevention plan in place ☐

4. Dig safe paperwork in place ☐

5. Crane lift plan in place ☐

a. Crane placement

b. Crane swing

c. Crane load evaluation

6. Fall protection plan in place and staff trained ☐

7. Confined entry plan in place and staff trained ☐

Additional requirements:

Is an Infection Control Risk Assessment (ICRA) required for the Activity? Yes ☐ No ☐

Infection Prevention and Control signature:

Date:

Project Manager signature

Date

Safety Officer signature

Date

Chair, Construction Safety Committee signature

Date

*The location of all Activity Hazard Analyses and Control Plans (excavation, dust, pollution, etc.) as applicable shall be identified on this permit and shall be made available to all workers on the job.