Expand Vertical Parking Garage 2 - Independence - Specifications_R1 _ Final Construction Documents PART 2.pdf
PDF 44 MB Posted
- Attached to
- Y1LZ--573-339 BB Expand Vertical Parking Garage #2 (Independence) Minor Construction - Gainesville VAMC
- Solicitation number
- 36C77625B0001
About this file
This appears to be a construction specifications document (Part 2) for the expansion of Vertical Parking Garage #2 at the Gainesville VA Medical Center in Independence. The document is linked to solicitation number 36C77625B0001 for a minor construction project managed by the Department of Veterans Affairs Technology Acquisition Center. Without access to the actual content of the PDF, I cannot provide specific details about the construction specifications, material requirements, or technical standards contained within Part 2 of the specifications package.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
e:
me (if different than “Operator”), if applicable:
: ss s:
NOTICE OF INTENT
TO USE
NPDES GENERIC PERMIT FOR STORMWATER
DISCHARGE FROM LARGE AND SMALL
CONSTRUCTION ACTIVITIES
(RULE 62-621.300(4), F.A.C.)
You must submit this completed Notice of Intent (NOI) form to the Department to get coverage under the Generic Permit for Stormwater Discharge from Large and Small Construction Activities provided in subsection 62-621.300(4), F.A.C. The Generic Permit document [DEP Document 62-621.300(4)(a)] tells you what construction activity qualifies for coverage, how you obtain and terminate coverage, what you must do to minimize pollution from your construction site, and what conditions apply to your project to use the generic permit. You must submit the appropriate generic permit fee, as specified in paragraph 62-4.050(4)(d), F.A.C., with this NOI Form to obtain permit coverage. You must read and understand the requirements of the generic permit document and the attached instructions before completing this NOI form. Please print or type information in the appropriate areas below.
For construction activities also requiring an Individual Environmental Resource Permit (ERP), under Chapter 62 330, F.A.C.:
If your construction activities are already authorized by a valid Individual ERP issued by the Department, Water Management District or a Delegated Local Government, you may also elect to use this NOI form to provide the required notice of commencement of construction, in lieu of Form 62-330.350(1) (“Construction Commencement Notice”).
Do you wish to also provide notice of commencement of construction activities authorized under an Individual ERP permit through the use of this form? Yes No
I. IDENTIFICATION NUMBER:
A. Facility ID (if renewing coverage): _____________________________________________ B. ERP Permit Number* (if applicable): ___________________________________________ C. ERP Permitting Agency (if applicable): _________________________________________
*If the ERP permit authorizes phased construction, please also indicate which phase.
II. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) DEVELOPED AND READY TO BE
IMPLEMENTED: Yes No *If No, you may not submit your NOI at this time.
III. APPLICANT INFORMATION:
A. Operator Nam
* ERP Permittee Na B. Operator Statu
C. Addre
D. City E. State eF. Zip Cod
G. Responsible Authority
DEP Form 62-621.300(4)(b) Effective Date: 02/2015 y: ′ ″ y: te : e:
J. Project Contact:
K. Project Contact’s Phone No .:
L. Project Contact’s Fax No. :
M. Project Contact’s E-mail Address :
N. Additional E-mail correspondence, optiona l:
t:
e: ° ′ ″
A O s:
t y:
te: C te : G :
H. Responsible Authority’s Phone No
I. Responsible Authority’s Fax No
J. Responsible Authority’s E-mail Address
IV. PROJECT/SITE LOCATION INFORMATION:
A. Project Name:
B. Project Address/Location
C. Cit D. Sta E. Zip Cod
F. Count G. Latitude: ° Longitud
H. Is the site located on Indian Country Lands? Yes o N I. Water Management Distric
V. PROJECT/SITE ACTIVITY INFORMATION:
A. Indicate whether the project is Large or Small Construction (check only one):
Large Construction (Project will disturb 5 or more acres of land, Fee $400)
Small Construction (Project will disturb between 1 and 4.99 acres of land, Fee $250)
B. Approximate total area of land disturbance from commencement through completion of construction: _________ acres
C. SWPPP Location: ddress in Part III above Address in Part IV above ther address (specify below)
D. SWPPP Addres
E. Ci F. Sta . Zip Code
H. Construction Period: Start Da ompletion Date
VI. DEWATERING INFORMATION:
Yes A. Will dewatering operations be performed as part of the construction activities?
below. If no, skip this part and go to Part VII.
No If yes, complete
B. Is the project site currently identified as contaminated, or is there a site within 500 feet of the dewatering project identified as contaminated by a DEP or EPA cleanup/restoration program? You may use the Quick Link to DEP’s Contamination Locator Map (CLM) and DEP’s Institutional Controls Registry (ICR) Web Viewer to determine cleanup restoration status. You may access the CLM at: http://webapps.dep.state.fl.us/DepClnup/welcome.do or
C. H e:
http://ca.dep.state.fl.us/mapdirect/?focus=contamlocator. The ICR may be accessed at:
http://www.dep.state.fl.us/waste/categories/brownfields/pages/ICR.htm, or http://ca.dep.state.fl.us/mapdirect/?focus=icr
YES Continue to VI.C, below.
NO Continue to Part VII.
as the site been remediated?
YES Continue to Part VII.
NO Continue to VI.D, below.
D.
con cov Rul
Are the pollutants of concern (i.e. contamination) present in ground water at the dewatering project site at centrations equal to or exceeding the surface water criteria in Rule 62-302.530?
YES Dewatering activities do not qualify for coverage under this generic permit. However, the site may qualify for erage under Rule 62-621.300(1), F.A.C., or under an individual wastewater permit on the appropriate form listed in e 62-620.910, F.A.C.
NO Continue to Part VII.
VII. DISCHARGE INFORMATION:
A. MS4 Operator Name (if applicable
B. Receiving Water Nam
VIII.CERTIFICATION1:
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.
If providing notice of commencement of construction as required by an Individual Environmental Resource Permit, I also certify that I am authorized by the Permittee (identified in Part III.A., above), to commence construction activities authorized by the ERP Permit (identified in Part I.B., above).
Responsible Authority Name and Official Title (Type or Print):
Responsible Authority Signature: Date Signed:
1 Signatory requirements are contained in Rule 62-620.305, F.A.C.
INSTRUCTIONS – DEP FORM 62-621.300(4)(b)
NOTICE OF INTENT (NOI) TO USE GENERIC PERMIT FOR STORMWATER DISCHARGE FROM LARGE
AND SMALL CONSTRUCTION ACTIVITIES
Who Must File an NOI:
You must file the NOI and obtain coverage under the Construction Generic Permit if you discharge stormwater associated with large or small construction activities to surface waters of the State, including through a Municipal Separate Storm Sewer System (MS4), http://www.dep.state.fl.us/water/stormwater/npdes/docs/all_ms4_by_county.pdf.
Where to File NOI:
The Department encourages the electronic submission of NOIs using the Department’s Interactive Notice of Intent (iNOI) available at http://www.fldepportal.com/go/. NOIs also may be submitted by paper copy to the following address:
NPDES Stormwater Notices Center, MS #3585 Florida Department of Environmental Protection 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Permit Fee:
Permit fees for large and small construction activities to be covered under the generic permit are specified in paragraph 62 4.050(4)(d), F.A.C. and available on our http://www.dep.state.fl.us/water/stormwater/npdes/fees.htm. You must submit the appropriate generic permit fee (either for large 5+ acres $400 or small 1- 4.99 acres $250 construction activities) with the completed NOI to obtain coverage under the generic permit. Generic permit coverage will not be granted without payment of the appropriate permit fee.
If the NOI is submitted electronically, the permit fee must be paid on-line by credit card or check. If the NOI is submitted using a paper copy, the permit fee must be paid by either check or money order made payable to: “Florida Department of Environmental Protection”.
Part I – Identification Number:
If you are renewing coverage, please enter the project’s DEP identification number (generic permit coverage number) if known. If this is a new project without an ID number then leave this item blank. If you know your ERP Permit Number or ERP Permitting Agency (if applicable) please identify it here, if not then leave these items blank.
Part II – Stormwater Pollution Prevention Plan (SWPPP) Completed:
Check the box to indicate whether you have completed your Stormwater Pollution Prevention Plan. You must complete your SWPPP and be ready to implement it before submitting your NOI.
Part III – Applicant Information:
Item A.: Provide the legal name of the person, firm, contractor, public organization or other legal entity that owns or operates the construction activity described in this NOI. The operator is the legal entity that has authority to control those activities at the project necessary to ensure compliance with the terms and conditions of the generic permit.
Item B.: Enter the appropriate one letter code from the list below to indicate the legal status of the operator:
F = Federal; S = State; P = Private; M = Public (other than federal or state); O = Other
Items C. – F.: Provide the complete mailing address of the operator, including city, state and zip code.
DEP Form 62-621.300(4)(b) Effective Date: 02/2015 http://www.dep.state.fl.us/water/stormwater/npdes/fees.htm http://www.fldepportal.com/go http://www.dep.state.fl.us/water/stormwater/npdes/docs/all_ms4_by_county.pdf
Items G. – J.: Provide the name, telephone and fax number (including area code) and E-mail address of the person authorized to submit this NOI on behalf of the operator (e.g., Jane Smith, President of Smith Construction Company on behalf of the operator, Smith Construction Company; John Doe, Public Works Director on behalf of the operator, City of Townsville; etc.). This should be the same person as indicated in the certification in Part VI.
Part IV – Project/Site Location Information:
Items A. – E.: Enter the official or legal name and complete street address, including city, state and zip code of the project.
Do not provide a P.O. Box number as the street address. If it lacks a street address, describe the project site location (e.g., intersection of State Road 1 and Smith Street).
Item F.: Enter the county in which the project is located.
Item G.: Enter the latitude and longitude, in degrees-minutes-seconds format, of the approximate center of the project.
Item H.: Indicate whether the project is located on Indian Country Lands. If the project is located on Indian Lands you may not use this generic permit. Instead, you must apply to the http://cfpub.epa.gov/npdes/stormwater/const.cfm (EPA) for coverage.
Item I.: Enter the appropriate five or six letter code from the list below to indicate the http://www.dep.state.fl.us/secretary/watman/default.htm in which your project is located:
NWFWMD = Northwest Florida Water Management District SRWMD = Suwannee River Water Management District SFWMD = South Florida Water Management District SWFWMD = Southwest Florida Water Management District SJRWMD = St. John’s River Water Management District
Items J. – M.: Enter the name, telephone and fax number (including area code) and E-mail address of the project contact person. The project contact is the person who is thoroughly familiar with the project, the facts reported in this NOI and who can be contacted by the Department if necessary.
Item N.: Enter additional E-mail correspondence as needed to receive permit related documentation. (Optional)
Part V – Project/Site Activity Information:
Item A.: Check the appropriate box to indicate whether the project involves large construction activity or small construction activity. Check one box only.
“Large Construction Activity” means construction activity resulting in the disturbance of five (5) or more acres of total land area. Large construction activity also includes the disturbance of less than five acres of total land area that is part of a larger common plan of development or sale such as a subdivision that will ultimately disturb five acres or more.
“Small Construction Activity” means construction activity resulting in the disturbance of equal to or greater than one (1) acre and less than five (5) acres of total land area. Small construction activity also includes the disturbance of less than one acre of total land area that is part of a larger common plan of development or sale that will ultimately disturb equal to or greater than one acre and less than five acres.
Item B.: Provide the approximate total area of land disturbance, in acres, that the project will involve from commencement of construction through completion.
Items C. - G.: Indicate the location where the Stormwater Pollution Prevention Plan (SWPPP) can be viewed. Provide the address where the SWPPP can be viewed if other than as provided in Parts II or III of the NOI. Note that to be eligible for coverage under the generic permit, the SWPPP must have been prepared prior to filing this NOI.
Item H.: Enter the estimated construction start and completion dates in the MM/DD/YY format.
DEP Form 62-621.300(4)(b) Effective Date: 02/2015 http://www.dep.state.fl.us/secretary/watman/default.htm http://cfpub.epa.gov/npdes/stormwater/const.cfm
Part VI – Dewatering Information:
If your site has “noncontaminated ground water”, the CGP also authorizes discharges from ground water dewatering activities.
A site will be presumed to have uncontaminated if it is not contaminated and there are no known contamination sites within 500 feet of the site. You may use the Department’s http://webapps.dep.state.fl.us/DepClnup/welcome.do or the Institutional Controls Registry (ICR) Web Viewer http://www.dep.state.fl.us/waste/categories/brownfields/pages/ICR.htm, to determine the location of contaminate sites. The CGP does not authorize the discharge of contaminated ground water.
Part VII – Discharge Information:
To be covered under a CGP, you must provide the following information about where the discharge from your project will
go. NOIs submitted without discharge information cannot be processed.
Item A.: If stormwater from your project discharges to a MS4 enter the name of the MS4 (e.g., City of Tallahassee MS4, Orange County MS4, FDOT District 5 MS4, etc.). If stormwater from your project does not discharge to an MS4 but to surface waters of the State, leave this item blank or indicate “N/A” and skip to Item B. of this part. Please note that if your project discharges stormwater to an MS4, you must provide the MS4 operator with a copy of the completed NOI. http://www.dep.state.fl.us/water/stormwater/npdes/docs/all_ms4_by_county.pdf
Item B.: If your project discharges stormwater to surface waters of the State, and not to an MS4, enter the name of the receiving water body to which the stormwater is discharged. Please provide the first named water body to which the stormwater from the project is discharged (e.g., Cypress Creek, Tampa Bay, unnamed ditch to St. Johns River, Tate’s Hell Swamp, etc.).
In certain cases, stormwater from the project will discharge to both an MS4 and surface waters of the State. In this case, complete both Item A. and Item B.
Part VIII – Certification:
Type or print the name and official title of the Responsible Authority signing the certification. Please note that this must be the same person indicated in Item II.G. as the Responsible Authority. Sign and date the certification.
Section 403.161, F.S., provides severe penalties for submitting false information on this application (NOI) or any reports or records required by a permit. There are both civil and criminal penalties, in addition to the revocation of permit coverage for submitting false information.
Rule 62-620.305, F.A.C., requires that the NOI and any reports required by the permit be signed as follows:
A. For a corporation, by a responsible corporate officer as described in Rule 62-620.305, F.A.C.;
B. For a partnership or sole proprietorship, by a general partner or the proprietor, respectively; or C. For a municipality, state, federal or other public facility, by a principal executive officer or elected official.
DEP Form 62-621.300(4)(b) Effective Date: 02/2015 http://www.dep.state.fl.us/water/stormwater/npdes/docs/all_ms4_by_county.pdf http://www.dep.state.fl.us/waste/categories/brownfields/pages/ICR.htm http:http://webapps.dep.state.fl.us/DepClnup/welcome.do
Expand Vertical Parking Garage #2 (Independence) Specifications_R1 – Final Construction Documents Malcom Randall VAMC, FL Contract 36C24819D0021/D.O. 36C77623N0484, Project 573-339
01 74 19 - 1
SECTION 01 74 19
CONSTRUCTION WASTE MANAGEMENT
VERSION 04-01-22
PART 1 - GENERAL
1.1 DESCRIPTION
A. This section specifies the requirements for the management of non-hazardous building construction and demolition waste.
B. Waste disposal in landfills shall be minimized to the greatest extent possible. Of the inevitable waste that is generated, as much of the waste material as economically feasible shall be salvaged, recycled, or reused.
C. Contractor shall use all reasonable means to divert construction and demolition waste from landfills and incinerators, and facilitate their salvage and recycle not limited to the following:
1. Waste Management Plan development and implementation.
2. Techniques to minimize waste generation.
3. Sorting and separating of waste materials.
4. Salvage of existing materials and items for reuse or resale.
5. Recycling of materials that cannot be reused or sold.
D. At a minimum, the following waste categories shall be diverted from landfills:
1. Soil.
2. Inerts (e.g., concrete, masonry, and asphalt).
3. Clean dimensional wood and palette wood.
4. Green waste (biodegradable landscaping materials).
5. Engineered wood products (plywood, particle board and I-joists, etc.).
6. Metal products (e.g., steel, wire, beverage containers, copper, etc.).
7. Sheathings
8. Cardboard, paper, and packaging.
9. Bitumen roofing materials.
10. Plastics (e.g., ABS, PVC).
11. Carpet and/or pad.
12. Gypsum board.
13. Insulation.
14. Paint.
15. Fluorescent lamps.
01 74 19 - 2
1.2 RELATED WORK
A. Section 02 41 00, DEMOLITION.
B. Section 01 00 00, GENERAL REQUIREMENTS.
C. Section 01 81 13 SUSTAINABLE CONSTRUCTION REQUIREMENTS
1.3 QUALITY ASSURANCE
A. Contractor shall practice efficient waste management when sizing, cutting, and installing building products. Processes shall be employed to ensure the generation of as little waste as possible.
Construction /Demolition waste includes products of the following:
1. Excess or unusable construction materials.
2. Packaging used for construction products.
3. Poor planning and/or layout.
4. Construction error.
5. Over ordering.
6. Weather damage.
7. Contamination.
8. Mishandling.
9. Breakage.
B. Establish and maintain the management of non-hazardous building construction and demolition waste set forth herein. Conduct a site assessment to estimate the types of materials that will be generated by demolition and construction.
C. Contractor shall develop and implement procedures to recycle construction and demolition waste to a minimum of 50 percent.
D. Contractor shall be responsible for implementation of any special programs involving rebates or similar incentives related to recycling. Any revenues or savings obtained from salvage or recycling shall accrue to the contractor.
E. Contractor shall provide all demolition, removal, and legal disposal of materials. Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by local, state, federal regulations.
F. Contractor shall assign a specific area to facilitate separation of materials for reuse, salvage, recycling, and return. Such areas are to be kept neat and clean and clearly marked in order to avoid contamination or mixing of materials.
01 74 19 - 3
G. Contractor shall provide on-site instructions and supervision of separation, handling, salvaging, recycling, reuse and return methods to be used by all parties during waste generating stages.
H. Record on daily reports any problems in complying with laws, regulations and ordinances with corrective action taken.
1.4 TERMINOLOGY
A. Class III Landfill: A landfill that accepts non-hazardous resources such as household, commercial and industrial waste resulting from construction, remodeling, repair, and demolition operations.
B. Clean: Untreated and unpainted; uncontaminated with adhesives, oils, solvents, mastics and like products.
C. Construction and Demolition Waste: Includes all non-hazardous resources resulting from construction, remodeling, alterations, repair, and demolition operations.
D. Dismantle: The process of parting out a building in such a way as to preserve the usefulness of its materials and components.
E. Disposal: Acceptance of solid wastes at a legally operating facility for the purpose of land filling (includes Class III landfills and inert fills).
F. Inert Backfill Site: A location, other than inert fill or other disposal facility, to which inert materials are taken for the purpose of filling an excavation, shoring, or other soil engineering operation.
G. Inert Fill: A facility that can legally accept inert waste, such as asphalt and concrete exclusively for the purpose of disposal.
H. Inert Solids/Inert Waste: Non-liquid solid resources including, but not limited to, soil and concrete that does not contain hazardous waste or soluble pollutants at concentrations in excess of water-quality objectives established by a regional water board, and does not contain significant quantities of decomposable solid resources.
I. Mixed Debris: Loads that include commingled recyclable and non-recyclable materials generated at the construction site.
J. Mixed Debris Recycling Facility: A solid resource processing facility that accepts loads of mixed construction and demolition debris for the purpose of recovering re-usable and recyclable materials and disposing non-recyclable materials.
01 74 19 - 4
K. Permitted Waste Hauler: A company that holds a valid permit to collect and transport solid wastes from individuals or businesses for the purpose of recycling or disposal.
L. Recycling: The process of sorting, cleansing, treating, and reconstituting materials for the purpose of using the altered form in the manufacture of a new product. Recycling does not include burning, incinerating or thermally destroying solid waste.
1. On-site Recycling – Materials that are sorted and processed on site for use in an altered state in the work, i.e., concrete crushed for use as a sub-base in paving.
2. Off-site Recycling – Materials hauled to a location and used in an altered form in the manufacture of new products.
M. Recycling Facility: An operation that can legally accept materials for the purpose of processing the materials into an altered form for the manufacture of new products. Depending on the types of materials accepted and operating procedures, a recycling facility may or may not be required to have a solid waste facilities permit or be regulated by the local enforcement agency.
N. Reuse: Materials that are recovered for use in the same form, on-site or off-site.
O. Return: To give back reusable items or unused products to vendors for credit.
P. Salvage: To remove waste materials from the site for resale or re-use by a third party.
Q. Source-Separated Materials: Materials that are sorted by type at the site for the purpose of reuse and recycling.
R. Solid Waste: Materials that have been designated as non-recyclable and are discarded for the purposes of disposal.
S. Transfer Station: A facility that can legally accept solid waste for the purpose of temporarily storing the materials for re-loading onto other trucks and transporting them to a landfill for disposal, or recovering some materials for re-use or recycling.
1.5 SUBMITTALS
A. In accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and SAMPLES, furnish the following:
B. Prepare and submit to the COR a written demolition debris management plan. The plan shall include, but not be limited to, the following information:
01 74 19 - 5
3. Procedures to be used for debris management.
4. Techniques to be used to minimize waste generation.
5. Analysis of the estimated job site waste to be generated:
a. List of each material and quantity to be salvaged, reused, recycled.
b. List of each material and quantity proposed to be taken to a landfill.
6. Detailed description of the Means/Methods to be used for material handling.
a. On site: Material separation, storage, protection where applicable.
b. Off site: Transportation means and destination. Include list of materials.
1) Description of materials to be site-separated and self-hauled to designated facilities.
2) Description of mixed materials to be collected by designated waste haulers and removed from the site.
c. The names and locations of mixed debris reuse and recycling facilities or sites.
d. The names and locations of trash disposal landfill facilities or sites.
e. Documentation that the facilities or sites are approved to receive the materials.
C. Designated Manager responsible for instructing personnel, supervising, documenting and administer over meetings relevant to the Waste Management Plan.
D. Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling.
E. Target waste diversion rate by material and an overall diversion rate.
F. Final report documenting the results of implementation of the preconstruction waste management plan.
1.6 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced by the basic designation only. In the event that criteria requirements conflict, the most stringent requirements shall be met.
01 74 19 - 6
1. U.S. Green Building Council (USGBC): LEED Green Building Rating
System for New Construction
2. Green Building Initiative (GBI): Green Globes for New
Construction 2019
1.7 RECORDS
A. Maintain records to document the quantity of waste generated; the quantity of waste diverted through sale, reuse, or recycling; and the quantity of waste disposed by landfill or incineration.
PART 2 - PRODUCTS
2.1 MATERIALS
A. List of each material and quantity to be salvaged, recycled, reused.
B. List of each material and quantity proposed to be taken to a landfill.
C. Material tracking data: Receiving parties, dates removed, transportation costs, weight tickets, tipping fees, manifests, invoices, net total costs or savings.
PART 3 - EXECUTION
3.1 COLLECTION
A. Provide all necessary containers, bins, and storage areas to facilitate effective waste management.
B. Clearly identify containers, bins, and storage areas so that recyclable materials are separated from trash and can be transported to respective recycling facility for processing.
C. Hazardous wastes shall be separated, stored, and disposed of according to local, state, and federal regulations.
3.2 DISPOSAL
A. Contractor shall be responsible for transporting and disposing of materials that cannot be delivered to a source-separated or mixed materials recycling facility to a transfer station or disposal facility that can accept the materials in accordance with state and federal regulations.
B. Construction or demolition materials with no practical reuse or that cannot be salvaged or recycled shall be disposed of at a landfill or incinerator.
3.3 REPORT
A. With each application for progress payment, submit a summary of construction and demolition debris diversion and disposal including beginning and ending dates of period covered.
01 74 19 - 7
B. Quantify all materials diverted from landfill disposal through salvage or recycling during the period with the receiving parties, dates removed, transportation costs, weight tickets, manifests, invoices. Include the net total costs or savings for each salvaged or recycled material.
C. Quantify all materials disposed of during the period with the receiving parties, dates removed, transportation costs, weight tickets, tipping fees, manifests, invoices. Include the net total costs for each disposal.
- - - E N D - - -
01 74 19 - 8
THIS PAGE INTENTIONALLY LEFT BLANK
01 81 13 - 1
SECTION 01 81 13
SUSTAINABLE CONSTRUCTION REQUIREMENTS
VERSION 10-01-17
1.1. DESCRIPTION
A. This Section describes general requirements and procedures to comply with federal mandates and U.S. Department of Veterans Affairs (VA) policies for sustainable construction.
B. The Design Professional has selected materials and utilized integrated design processes that achieve the Government’s objectives. Contractor is responsible to maintain and support these objectives in developing means and methods for performing work and in proposing product substitutions or changes to specified processes. Obtain approval from Contracting Officer for all changes and substitutions to materials or processes. Proposed changes must meet, or exceed, materials or processes specified.
1.2. RELATED WORK
A. Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS.
B. Section 01 74 19 CONSTRUCTION WASTE MANANGEMENT.
1.3. DEFINITIONS
A. Recycled Content: Recycled content of materials is defined according to Federal Trade Commission Guides for the Use of Environmental
Marketing Claims (16 CFR Part 260). Recycled content value of a material assembly is determined by weight. Recycled fraction of assembly is multiplied by cost of assembly to determine recycled content value.
1. “Post-Consumer” material is defined as waste material generated by households or by commercial, industrial, and institutional facilities in their role as end users of the product, which can no longer be used for its intended purpose.
2. “Pre-Consumer” material is defined as material diverted from waste stream during the manufacturing process. Excluded is reutilization of materials such as rework, regrind, or scrap generated in a process and capable of being reclaimed within the same process that generated it.
01 81 13 - 2
B. Biobased Products: Biobased products are derived from plants and other renewable agricultural, marine, and forestry materials and provide an alternative to conventional petroleum derived products.
Biobased products include diverse categories such as lubricants, cleaning products, inks, fertilizers, and bioplastics.
C. Low Pollutant-Emitting Materials: Materials and products which are minimally odorous, irritating, or harmful to comfort and well-being of installers and occupants.
D. Volatile Organic Compounds (VOC): Chemicals that are emitted as gases from certain solids or liquids. VOCs include a variety of chemicals, some of which may have short- and long-term adverse health effects.
1.4. REFERENCE STANDARDS
A. Carpet and Rug Institute Green Label Plus program.
B. U.S. Department of Agriculture BioPreferred program (USDA
BioPreferred).
C. U.S. Environmental Protection Agency Comprehensive Procurement
Guidelines (CPG).
D. U.S. Environmental Protection Agency WaterSense Program
(WaterSense).
E. U.S. Environmental Protection Agency ENERGY STAR Program (ENERGY
STAR).
F. U. S. Department of Energy Federal Energy Management Program (FEMP).
G. Green Electronic Council EPEAT Program (EPEAT).
1.5. SUBMITTALS
A. All submittals to be provided by contractor to COR.
B. Sustainability Action Plan:
1. Submit documentation as required by this section; provide additional copies of typical submittals required under technical sections when sustainable construction requires copies of record submittals.
2. Within 30 days after Preconstruction Meeting provide a narrative plan for complying with requirements stipulated within this section.
3. Sustainability Action Plan must:
a. Make reference to sustainable construction submittals defined by this section.
b. Address all items listed under PERFORMANCE CRITERIA.
01 81 13 - 3
c. Indicate individual(s) responsible for implementing the plan.
C. Low Pollutant-Emitting Materials Tracking Spreadsheet: Within 30 days after Preconstruction Meeting provide a preliminary Low
Pollutant-Emitting Materials Tracking Spreadsheet. The Low
Pollutant-Emitting Materials Tracking Spreadsheet must be an electronic file and include all materials on Project in categories described under Low Pollutant-Emitting Materials in 01 81 13.
D. Construction Indoor Air Quality (IAQ) Management Plan:
1. Not more than 30 days after Preconstruction Meeting provide a
Construction IAQ Management Plan as an electronic file including descriptions of the following:
a. Instruction procedures for meeting or exceeding minimum requirements of ANSI/SMACNA 008-2008, Chapter 3, including procedures for HVAC Protection, Source Control, Pathway
Interruption, Housekeeping, and Scheduling.
b. Instruction procedures for protecting absorptive materials stored on-site or installed from moisture damage.
c. Schedule of submission of photographs of on-site construction
IAQ management measures such as protection of ducts and on-site stored oil installed absorptive materials.
d. Instruction procedures if air handlers must be used during construction, including a description of filtration media to be used at each return air grille.
e. Instruction procedure for replacing all air-filtration media immediately prior to occupancy after completion of construction, including a description of filtration media to be used at each air handling or air supply unit.
f. Instruction procedures and schedule for implementing building flush-out.
E. Product Submittals:
1. Recycled Content: Submit product data from manufacturer indicating percentages by weight of post-consumer and pre-consumer recycled content for products having recycled content
(excluding MEP systems equipment and components).
2. Biobased Content: Submit product data for products to be installed or used which are included in any of the USDA
BioPreferred program’s product categories. Data to include percentage of biobased content and source of biobased material.
01 81 13 - 4
3. Low Pollutant-Emitting Materials: Submit product data confirming compliance with relevant requirements for all materials on
Project in categories described under Low Pollutant-Emitting
Materials in 01 81 13.
4. For applicable products and equipment, submit product documentation confirming ENERGY STAR label, FEMP certification, WaterSense, and/or EPEAT certification.
F. Sustainable Construction Progress Reports: Concurrent with each
Application for Payment, submit a Sustainable Construction Progress
Report to confirm adherence with Sustainability Action Plan.
1. Include narratives of revised strategies for bringing work progress into compliance with plan and product submittal data.
2. Include updated and current Low Pollutant-Emitting Materials
Tracking Spreadsheet.
3. Include construction waste tracking, in tons or cubic yards, including waste description, whether diverted or landfilled, hauler, and percent diverted for comingled quantities; and excluding land-clearing debris and soil. Provide haul receipts and documentation of diverted percentages for comingled wastes.
G. Closeout Submittals: Within 14 days after Substantial Completion provide the following:
1. Final version of Low Pollutant-Emitting Materials Tracking
Spreadsheet.
2. Manufacturer’s cut sheets and product data highlighting the
Minimum Efficiency Reporting Value (MERV) for filtration media installed at return air grilles during construction if permanently installed air handling units are used during construction.
3. Manufacturer’s cut sheets and product data highlighting the
Minimum Efficiency Reporting Value (MERV) for final filtration media in air handling units.
4. Minimum 18 construction photographs including six photographs taken on three different occasions during construction of
ANSI/SMACNA 008-2008, Chapter 3 approaches employed, along with a brief description of each approach, documenting implementation of
IAQ management measures, such as protection of ducts and on-site stored or installed absorptive materials.
5. Flush-out Documentation:
01 81 13 - 5
a. Product data for filtration media used during flush-out.
b. Product data for filtration media installed immediately prior to occupancy.
c. Signed statement describing building air flush-out procedures including dates when flush-out was begun and completed and statement that filtration media was replaced after flush-out.
1.6. QUALITY ASSURANCE
A. Preconstruction Meeting: After award of Contract and prior to commencement of Work, schedule, and conduct meeting with COR and
Architect to discuss the Project Sustainable Action Plan content as it applies to submittals, project delivery, required Construction
Indoor Air Quality (IAQ) Management Plan, and other Sustainable
Construction Requirements. The purpose of this meeting is to develop a mutual understanding of the Sustainable Construction Requirements and coordination of contractor’s management of these requirements with the Contracting Officer and the Construction Quality Manager.
B. Construction Job Conferences: Status of compliance with Sustainable
Construction Requirements of these specifications will be an agenda item at regular job meetings conducted during the course of work at the site.
1.7. APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to extent referenced. Publications are referenced in text by basic designation only. Comply with applicable provisions and recommendations of the following, except as otherwise shown or specified.
B. Green Seal Standard GS-11, Paints, 1st Edition, May 20, 1993.
C. Green Seal Standard GC-03, Anti-Corrosive Paints, 2nd Edition, January 7, 1997.
D. Green Seal Standard GC-36, Commercial Adhesives, October 19, 2000.
E. Sheet Metal and Air Conditioning National Contractors’ Association
(SMACNA) IAQ Guidelines for Occupied Buildings under Construction, 2nd Edition (ANSI/SMACNA 008-2008), Chapter 3.
F. Federal Trade Commission Guides for the Use of Environmental
Marketing Claims (16 CFR Part 260).
G. ASHRAE Standard 52.2-2007.
01 81 13 - 6
PART 2 – PRODUCTS
2.1. PERFORMANCE CRITERIA
A. Construction waste diversion from landfill disposal must comprise at least 50 percent of total construction waste, excluding land clearing debris and soil. Alternative daily cover (ADC) does not qualify as material diverted from disposal.
B. Low Pollutant-Emitting Materials:
1. Adhesives, sealants, and sealant primers applied on site within the weatherproofing membrane must comply with VOC limits:
a. Flooring Adhesives and Sealants:
1) Indoor carpet adhesives: 50 g/L.
2) Wood Flooring Adhesive: 100 g/L.
3) Rubber Floor Adhesives: 60 g/L.
4) Subfloor Adhesives: 50 g/L.
5) Ceramic Tile Adhesives and Grout: 65 g/L.
6) Cove Base Adhesives: 50 g/L.
7) Multipurpose Construction Adhesives: 70 g/L.
8) Porous Material (Except Wood) Substrate: 50 g/L.
9) Wood Substrate: 30 g/L.
10) Architectural Non-Porous Sealant Primer: 250 g/L.
11) Architectural Porous Sealant Primer: 775 g/L.
12) Other Sealant Primer: 750 g/L.
13) Structural Wood Member Adhesive: 140 g/L.
14) Sheet-Applied Rubber Lining Operations: 850 g/L.
15) Top and Trim Adhesive: 250 g/L.
16) Architectural Sealant: 250 g/L.
17) Other Sealant: 420 g/L.
b. Non-Flooring Adhesives and Sealants:
1) Drywall and Panel Adhesives: 50 g/L.
2) Multipurpose Construction Adhesives: 70 g/L.
3) Structural Glazing Adhesives: 100 g/L.
4) Metal-to-Metal Substrate Adhesives: 30 g/L.
5) Plastic Foam Substrate Adhesive: 50 g/L.
6) Porous Material (Except Wood) Substrate Adhesive: 50 g/L.
7) Wood Substrate Adhesive: 30 g/L.
8) Fiberglass Substrate Adhesive: 80 g/L.
9) Architectural Non-Porous Sealant Primer: 250 g/L.
10) Architectural Porous Sealant Primer: 775 g/L.
01 81 13 - 7
11) Other Sealant Primer: 750 g/L.
12) PVC Welding Adhesives: 510 g/L.
13) CPVC Welding Adhesives: 490 g/L.
14) ABS Welding Adhesives: 325 g/L.
15) Plastic Cement Welding Adhesives: 250 g/L.
16) Adhesive Primer for Plastic: 550 g/L.
17) Contact Adhesive: 80 g/L.
18) Special Purpose Contact Adhesive: 250 g/L.
19) Structural Wood Member Adhesive: 140 g/L.
20) Sheet Applied Rubber Lining Operations: 850 g/L.
21) Top and Trim Adhesive: 250 g/L.
22) Architectural Sealants: 250 g/L.
23) Other Sealants: 420 g/L.
2. Aerosol adhesives applied on site within the weatherproofing membrane must comply with the following Green Seal GS-36.
a. Aerosol Adhesive, General-Purpose Mist Spray: 65 percent VOCs by weight.
b. Aerosol Adhesive, General-Purpose Web Spray: 55 percent VOCs by weight.
c. Special-Purpose Aerosol Adhesive (All Types): 70 percent VOCs by weight.
3. Paints and coatings applied on site within the weatherproofing membrane must comply with the following criteria:
a. VOC content limits for paints and coatings established in
Green Seal Standard GS-11.
b. VOC content limit for anti-corrosive and anti-rust paints applied to interior ferrous metal substrates of 250 g/L established in Green Seal GC-03.
c. Clear wood finishes, floor coatings, stains, primers, sealers, and shellacs applied to interior elements must not exceed VOC content limits.
d. Comply with the following VOC content limits:
1) Anti-Corrosive/Antirust Paints: 250 g/L.
2) Clear Wood Finish, Lacquer: 550 g/L.
3) Clear Wood Finish, Sanding Sealer: 350 g/L.
4) Clear Wood Finish, Varnish: 350 g/L.
5) Floor Coating: 100 g/L.
6) Interior Flat Paint, Coating or Primer: 50 g/L.
01 81 13 - 8
7) Interior Non-Flat Paint, Coating or Primer: 150 g/L.
8) Sealers and Undercoaters: 200 g/L.
9) Shellac, Clear: 730 g/L.
10) Shellac, Pigmented: 550 g/L.
11) Stain: 250 g/L.
12) Clear Brushing Lacquer: 680 g/L.
13) Concrete Curing Compounds: 350 g/L.
14) Japans/Faux Finishing Coatings: 350 g/L.
15) Magnesite Cement Coatings: 450 g/L.
16) Pigmented Lacquer: 550 g/L.
17) Waterproofing Sealers: 250 g/L.
18) Wood Preservatives: 350 g/L.
19) Low-Solids Coatings: 120 g/L.
4. Carpet installed in building interior must comply with one of the following:
a. Meet testing and product requirements of the Carpet and Rug
Institute Green Label Plus program.
5. Each non-carpet flooring element installed in building interior which is not inherently non-emitting (stone, ceramic, powder-coated metals, plated or anodized metal, glass, concrete, clay brick, and unfinished or untreated solid wood flooring) must comply with one of the following:
a. Meet requirements of the FloorScore standard as shown with testing by an independent third-party.
6. Composite wood and agrifiber products used within the weatherproofing membrane must contain no added urea-formaldehyde resins.
7. Laminating adhesives used to fabricate on-site and shop-applied composite wood and agrifiber assemblies must not contain added urea-formaldehyde.
C. Recycled Content:
1. Any products being installed or used that are listed on EPA
Comprehensive Procurement Guidelines designated product list must meet or exceed the EPA’s recycled content recommendations. The
EPA Comprehensive Procurement Guidelines categories include:
a. Building insulation.
b. Cement and concrete.
c. Consolidated and reprocessed latex paint.
01 81 13 - 9
d. Floor tiles.
e. Flowable fill.
f. Laminated paperboard.
g. Modular threshold ramps.
h. Nonpressure pipe.
i. Patio blocks.
j. Railroad grade crossing surfaces.
k. Roofing materials.
l. Shower and restroom dividers/partitions.
m. Structural fiberboard.
n. Nylon carpet and nylon carpet backing.
o. Compost and fertilizer made from recovered organic materials.
p. Hydraulic mulch.
q. Lawn and garden edging.
r. Plastic lumber landscaping timbers and posts.
s. Park benches and picnic tables.
t. Plastic fencing.
u. Playground equipment.
v. Playground surfaces.
w. Bike racks.
D. Biobased Content:
1. Materials and equipment being installed or used that are listed on the USDA BioPreferred program product category list must meet or exceed USDA’s minimum biobased content threshold. Refer to individual specification sections for detailed requirements applicable to that section.
a. USDA BioPreferred program categories include:
1) Adhesive and Mastic Removers.
2) Carpets.
3) Cleaners.
4) Composite Panels.
5) Corrosion Preventatives.
6) Erosion Control Materials.
7) Dust Suppressants.
8) Fertilizers.
9) Floor Cleaners and Protectors.
10) Floor Coverings (Non-Carpet).
11) Glass Cleaners.
01 81 13 - 10
12) Hydraulic Fluids.
13) Industrial Cleaners.
14) Interior Paints and Coatings.
15) Mulch and Compost Materials.
16) Multipurpose Cleaners.
17) Multipurpose Lubricants.
18) Packaging Films.
19) Paint Removers.
20) Plastic Insulating Foam.
21) Pneumatic Equipment Lubricants.
22) Roof Coatings.
23) Wastewater Systems Coatings.
24) Water Tank Coatings.
25) Wood and Concrete Sealers.
26) Wood and Concrete Stains.
E. Materials, products, and equipment being installed which fall into any of the following product categories must be Energy Star-labeled.
1. Applicable Energy Star product categories as of 09/14/2017 include:
a. Appliances:
1) Air Purifiers and Cleaners.
b. Electronics and Information Technology:
1) Audio/Video Equipment.
2) Computers.
3) Data Center Storage.
4) Telephones.
5) Uninterruptible Power Supplies.
c. Heating and Cooling Equipment:
1) Light Commercial Heating and Cooling Equipment.
d. Other:
1) Light Fixtures.
2) Roof Products.
3) Windows, Doors.
F. Materials, products, and equipment being installed which fall into any of the following categories must be FEMP-designated. FEMP-designated product categories as of 09/14/2017 include:
1. Exterior Lighting.
2. Fluorescent Ballasts.
01 81 13 - 11
3. Fluorescent Lamps, General Service.
4. Ice Machines, Water-Cooled.
5. Industrial Lighting (High/Low Bay).
6. Light Emitting Diode (LED) Luminaires.
G. Electronic products and equipment being installed which fall into any of the following categories shall be EPEAT registered.
Electronic products and equipment covered by EPEAT program as of
09/14/2017 include:
1. Computers.
2. Displays.
PART 3 - EXECUTION
3.1. FIELD QUALITY CONTROL
A. Construction Indoor Air Quality Management:
1. During construction, meet or exceed recommended control measures of ANSI/SMACNA 008-2008, Chapter 3.
2. Protect stored on-site and installed absorptive materials from moisture damage.
3. If permanently installed air handlers are used during construction, filtration media with a minimum efficiency reporting value (MERV) of 8 must be used at each return air grille, as determined by ASHRAE Standard 52.2-1999 (with errata but without addenda). Replace all filtration media immediately prior to occupancy.
4. Perform building flush-out as follows:
a. After construction ends, prior to occupancy and with interior finishes installed, perform a building flush-out by supplying a total volume of 14000 cu. ft. of outdoor air per sq. ft. of floor area while maintaining an internal temperature of at least 60 degrees Fahrenheit and a relative humidity no higher than 60 percent. OR
b. If occupancy is desired prior to flush-out completion, the space may be occupied following delivery of a minimum of 3500
cu. ft. of outdoor air per sq. ft. of floor area to the space.
Once a space is occupied, it must be ventilated at a minimum rate of 0.30 cfm per sq. ft. of outside air or design minimum outside air rate determined until a total of 14000 cu. ft./sq.
ft. of outside air has been delivered to the space. During each day of flush-out period, ventilation must begin a minimum
01 81 13 - 12 of three hours prior to occupancy and continue during occupancy.
5. Provide construction dust control in any indoor work areas, including any exterior work areas that will be enclosed at project completion (e.g., elevator control rooms, telecom room, elevator lobbies).
- - - E N D - - -
©2024, Walker Consultants. All rights reserved.
02 00 10 - 1
SECTION 02 00 10
REPAIR ITEMS FOR EXISTING STRUCTURE
VERSION ©2024 WALKER CONSULTANTS. ALL RIGHTS RESERVED.
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and
Supplementary Conditions and Divisions [1 - 9] Specification Sections apply to this Section.
PART 2 - PRODUCTS (NOT APPLICABLE)
PART 3 - EXECUTION
WI 1.0 GENERAL REQUIREMENTS
A. Scope of Work
1. Work consists of performing all tasks, specifically required and incidental, which are not identified under separate Work Item designation, but necessary to perform the work identified in this project. This work includes, but is not limited to the following items:
WI 1.1 – Project Mobilization
WI 1.3 – Concrete Shores and Reshores
WI 1.4 – Concrete Reinforcement
WI 1.5 – Temporary Signage
WI 1.7 – Owner’s Contingency
WI 1.1 PROJECT MOBILIZATION
A. Scope of Work
1. Work consists of coordinating, scheduling, obtaining, and assembling at construction site all equipment, materials, permits, supplies, manpower and other essentials and incidentals necessary to perform Work defined in this Contract. Payment of lump sum amount for mobilization shall be according to following schedule and shall be based on percentage of original contract amount earned.
02 00 10 - 2
B. Materials
1. None
C. Execution
1. At execution of agreement by all parties, mobilization payment shall not be more than 25% of mobilization lump sum amount.
2. When billing amount earned is greater than 10% but less than 25% of original contract amount, total payment for mobilization shall not be more than 50% of mobilization lump sum amount.
3. When billing amount earned is equal to or greater than 25% but less than 50% of original contract amount, total payment for mobilization shall not be more than 75% of mobilization lump sum amount.
4. When billing amount earned is equal to or greater than 50% of original contract amount, total payment for mobilization shall be
100% of mobilization lump sum amount.
WI 1.3 CONCRETE SHORES AND RESHORES
A. Scope of Work
1. Work consists of furnishing all labor, materials, equipment, supervision, and incidentals necessary to install temporary shoring and to maintain shores in place until Work requiring shores is complete and associated concrete has properly cured.
B. Materials
1. Shores shall be steel, rated at a minimum allowable load of 4,500 lb at 12 ft extension or steel shoring towers rated at a minimum allowable load of 40,000 lbs per four leg tower (based on two
20,000 lb crossed braced frames.).
C. Execution
1. Comply with ACI 301 and ACI 347 for shoring and reshoring in multi-story construction, except as modified in this Section.
2. For purpose of calculations: Construction Load = 50…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .