VDOT 2020 Road and Bridge Specifications.pdf

PDF 7 MB Posted

Attached to
Arlington National Cemetery - Realignment of Columbia Pike
Solicitation number
693C73-21-R-000018
Issued by

About this file

This solicitation is for the Arlington National Cemetery - Columbia Pike Realignment Project in Arlington County, Virginia. The project consists of realigning Columbia Pike and S. Joyce Street, replacing Southgate Road with a new segment of S. Nash Street, expanding Foxcroft Heights Park, and modifying the Columbia Pike/Washington Boulevard interchange. Other work includes constructing pedestrian and bicycle facilities, installing street lighting, and extensively relocating utilities. The project will be split into a base schedule and one option, with a total expected cost over $10 million. Proposals are due on or about May 20, 2021 as specified in Block 13a of the solicitation. Offerors must submit qualifications related to experience on similar projects. The solicitation requires annual Representations and Certifications through SAM.gov and Form Vets-4212 through the Department of Labor website. Contract award is subject to permit receipt. Questions should be directed to eflhd.contracts@dot.gov.

View the file

Other files

File Type Posted
Amendment 0005 - VA ST ANC(1).pdf PDF
Amendment 0004 - VA ST ANC(1).pdf PDF
Amendment 0003 - VA ST ANC(1).pdf PDF
Amendment 0002 - VA ST ANC(1).pdf PDF
Amendment 0001 - VA ST ANC(1).pdf PDF
Arlington County Traffic Signal Specifications - 2019.pdf PDF
ANCSE DAR Project_Utiity Agreement_WG.pdf PDF
Final EFLHD ANC FONSI_LTL1.pdf PDF
Plans_lighting.pdf PDF
Plans_roadway and drainage-part 3.pdf PDF
ANCSE SIREPORT_DEQ_letter.pdf PDF
Final ANCSE Env Report.pdf PDF
Plans_signals.pdf PDF
Asbestos Related Info.pdf PDF
ANCSE DAR Project - Utilities Matrix 2021-04-23.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
FP14_Eng.pdf PDF
Plans_roadway and drainage-part 4.pdf PDF
Arlington County Construction Standards and Specifications - 2020.pdf PDF
MOA for the Southern Expansion project at ANC (2014-1094).pdf PDF
Plans_traffic control-part 1.pdf PDF
Plans_roadway and drainage-part 1.pdf PDF
ANCSE_Env_Memo 021920.pdf PDF
ANCSE DAR Project_Utiity Agreement_Verizon_Signedv1.pdf PDF
Final_EA_Appendices_ANC_Southern_Expansion.pdf PDF
VETS-4212 Form.pdf PDF
Plans_x-sections.pdf PDF
ANCSE DAR Project_Utility Agreement_Comcast.pdf PDF
Arlington County Lighting Specifications - 2020.pdf PDF
Plans_dry utilities.pdf PDF
ANCSE_Settlement_Agreement (FBL Signed - 01.11.20).pdf PDF
Plans_traffic control-part 2.pdf PDF
Executed LAND_ACQUISITION-224949-v2.pdf PDF
Plans_walls and tunnel.pdf PDF
ADV_Subcontracting Plan - VA ST ANC(1).doc DOC document
Plans_signing and markings.pdf PDF
Plans_wet utilities.pdf PDF
RFP Solicitation - VA ST ANC(1).pdf PDF
ANCSE DAR Project_Utility Agreement_Dominion.pdf PDF
Plans_roadway and drainage-part 2.pdf PDF
Final_EA_ANC_Southern_Expansion.pdf PDF
Plans_landscape.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

Road and Bridge Specifications ii iii

INTRODUCTION

These Road and Bridge Specifications are standard for all contracts awarded by the Commonwealth Transportation Board or the Commissioner. The requirements stated herein may be revised or amended from time to time, but only to the extent permitted under Supplemental Specifications, Special Provisions, and Special Provision Copied Notes included in the specific contract.

Reference by date and title will be made to these Specifications on plans and other contract documents as notification of their application to those documents. Copies of these Specifications may be obtained online at http://www.virginiadot.org/business/const/spec-default.asp.

iv v

2020 VDOT Road and Bridge Specifications

TABLE OF CONTENTS

DIVISION I—GENERAL PROVISIONS

SECTION 101—DEFINITIONS OF ABBREVIATIONS, ACRONYMS, AND TERMS

101.01—Abbreviations and Acronyms 101.02—Terms

SECTION 102 BIDDING REQUIREMENTS AND CONDITIONS

102.01—Prequalification of Bidders 102.02—Content of Proposal 102.03—Interpretation of Quantities in Proposal 102.04—Examination of Site of Work and Proposal 102.05—Preparation of Bid 102.06—Irregular Bids 102.07—Proposal Guaranty (Bid Bond) 102.08—Disqualification of Bidder 102.09—Submission of Bid 102.10—Withdrawal of Bid 102.11—eVA Business-To-Government Vendor Registration 102.12—Public Opening of Bids 102.13—”E-Verify” - Verification of Work Authorization

SECTION 103—AWARD AND EXECUTION OF CONTRACTS

103.01—Consideration of Bids 103.02—Award of Contract 103.03—Cancellation of Award 103.04—Forfeiture of Proposal Guaranty 103.05—Requirements of Contract Bond 103.06—Contract Documents 103.07—Failure to Furnish Bonds or Certificate of Insurance 103.08—Contract Audit 103.09—Execution of Contract 103.10—Assignments, Transfers, or Assumptions of the Contract

SECTION 104—SCOPE OF WORK

104.01—Intent of Contract 104.02—Changes in Quantities or Alterations in the Work 104.03—Differing Site Conditions

SECTION 105—CONTROL OF WORK

105.01—Notice to Proceed 105.02—Pre-Construction Conference 105.03—Authorities of Project Personnel, Communication and Decision Making 105.04—Gratuities 105.05—Character of Workers, Work Methods, and Equipment 105.06—Subcontracting 105.07—Cooperation of Contractor vi

105.08—Cooperation With Regard to Utilities 105.09—Cooperation among Contractors 105.10—Plans and Working Drawings 105.11—Conformity with Plans and Specifications 105.12—Coordination of Plans, Standard Drawings, Specifications, Supplemental

Specifications, Special Provisions, and Special Provision Copied Notes 105.13—State Force Construction Surveying 105.14—Maintenance during Construction 105.15—Removing and Disposing of Structures and Obstructions 105.16—Cleanup 105.17—Inspection of Work 105.18—Removal of Unacceptable and Unauthorized Work 105.19—Submission and Disposition of Claims

SECTION 106—CONTROL OF MATERIAL

106.01—Source of Supply and Quality Requirements 106.02—Material Delivery 106.03—Local Material Sources (Pits and Quarries) 106.04—Disposal Areas 106.05—Rights For and Use of Materials Found on Project 106.06—Samples, Tests, and Cited Specifications 106.07—Plant Inspection 106.08—Storing Materials 106.09—Handling Materials 106.10—Unacceptable Materials 106.11—Material Furnished by the Department 106.12—Critical Materials

SECTION 107— LEGAL RESPONSIBILITIES

107.01—Laws to Be Observed 107.02—Permits, Certificates, and Licenses 107.03—Federal-Aid Provisions 107.04—Furnishing Right of Way 107.05—Patented Devices, Materials, and Processes 107.06—Personal Liability of Public Officials 107.07—No Waiver of Legal Rights 107.08—Protecting and Restoring Property and Landscape 107.09—Contractor’s Responsibility for Utility Property and Services 107.10—Restoration of Work Performed by Others 107.11—Use of Explosives 107.12—Responsibility for Damage Claims 107.13—Labor and Wages 107.14—Equal Employment Opportunity 107.15—Use of Small, Women-Owned, and Minority-Owned Businesses (SWaMS) 107.16—Environmental Stipulations 107.17—Construction Safety and Health Standards 107.18—Sanitary Provisions 107.19—Railway-Highway Provisions 107.20—Construction Over or Adjacent to Navigable Waters 107.21—Size and Weight Limitations vii

SECTION 108—PROSECUTION AND PROGRESS OF WORK

108.01—Prosecution of Work 108.02—Limitation of Operations 108.03—Progress Schedule 108.04—Determination and Extension of Completion Date 108.05—Suspension of Work Ordered by the Engineer 108.06—Failure to Complete on Time 108.07—Default of Contract 108.08—Termination of Contract 108.09—Acceptance 108.10—Termination of Contractor’s Responsibilities

SECTION 109—MEASUREMENT AND PAYMENT

109.01—Measurement of Quantities 109.02—Plan Quantities 109.03—Scope of Payment 109.04—Payment for Non-Significant Changes and Additional Units of In-scope Work 109.05—Payment for Contract Changes 109.06—Common Carrier Rates 109.07—Eliminated Items 109.08—Partial Payments 109.09—Payment for Material on Hand 109.10—Final Payment

DIVISION II—MATERIALS

SECTION 200—GENERAL

200.01—Description 200.02—Conformance with Specifications 200.03—General Sampling and Testing Procedures 200.04—Acceptance Procedures for Aggregates 200.05—Handling and Storing Aggregates 200.06—Technician and Batcher Certification

SECTION 201—MINERAL FILLER

201.01—Description 201.02—Detail Requirements

SECTION 202—FINE AGGREGATE

202.01—Description 202.02—Materials 202.03—Detail Requirements

SECTION 203—COARSE AGGREGATE

203.01—Description 203.02—Materials 203.03—Detail Requirements

SECTION 204—STONE FOR MASONRY, RIPRAP, POROUS BACKFILL,

AND GABIONS

204.01—Description viii

204.02—Detail Requirements

SECTION 205—CRUSHER RUN AGGREGATE

205.01—Description 205.02—Materials 205.03—Detail Requirements

SECTION 206—LIGHTWEIGHT AGGREGATE

206.01—Description 206.02—Detail Requirements

SECTION 207—SELECT MATERIAL

207.01—Description 207.02—Detail Requirements 207.03—Job-Mix Formula for Select Material, Type I 207.04—Mixing 207.05—Acceptance of Select Material, Type I 207.06—Referee System for Select Material, Type I 207.07—Payment Adjustment System for Select Material, Type I

SECTION 208—SUBBASE AND AGGREGATE BASE MATERIAL

208.01—Description 208.02—Materials 208.03—Detail Requirements 208.04—Job-Mix Formula 208.05—Mixing 208.06—Acceptance 208.07—Referee System 208.08—Payment Adjustment System

SECTION 209—OPEN-GRADED SHOULDER MATERIAL

209.01—Description 209.02—Detail Requirements 209.03—Mixing

SECTION 210—ASPHALT MATERIALS

210.01—Description 210.02—Materials 210.03—Sampling & Testing 210.04—Tests 210.05—Storing and Shipping 210.06—Payment Adjustment System

SECTION 211—ASPHALT CONCRETE

211.01—Description 211.02—Materials 211.03—Job-Mix Formula 211.04—Asphalt Concrete Mixtures 211.05—Testing 211.06—Tests 211.07—Plant Inspection ix

211.08—Acceptance 211.09—Adjustment System 211.10—Referee System 211.11—Handling and Storing Aggregates 211.12—Asphalt Concrete Mixing Plant 211.13—Preparation of Mixture 211.14—Storage System 211.15—Initial Production

SECTION 212—JOINT MATERIALS

212.01—Description 212.02—Detail Requirements

SECTION 213—DAMP-PROOFING AND WATERPROOFING MATERIALS

213.01—Description 213.02—Detail Requirements

SECTION 214—HYDRAULIC CEMENT

214.01—Description 214.02—Detail Requirements

SECTION 215—HYDRAULIC CEMENT CONCRETE ADMIXTURES

215.01—Description 215.02—Materials 215.03—Detail Requirements

SECTION 216—WATER FOR USE WITH CEMENT OR LIME

216.01—Description 216.02—Detail Requirements

SECTION 217—HYDRAULIC CEMENT CONCRETE

217.01—Description 217.02—Materials 217.03—Handling and Storing Materials 217.04—Measurement of Materials 217.05—Equipment 217.06—Classification of Concrete Mixtures 217.07—Proportioning Concrete Mixtures 217.08—Acceptance 217.09—Mixing 217.10—Placement Limitations 217.11—Self Consolidating Concrete (SCC) 217.12—Low Shrinkage Class A4 Modified Concrete 217.13—Latex-modified Concrete, Very-Early-Strength (LMCVE), for Bridge Deck Overlays 217.14—High Early Strength Latex Modified Concrete (HESLMC) for Bridge Deck Overlays

SECTION 218—HYDRAULIC CEMENT MORTAR AND GROUT

218.01—Description 218.02—Materials x

218.03—Detail Requirements

SECTION 219—RIGHT-OF-WAY MONUMENTS

219.01—Description 219.02—Detail Requirements

SECTION 220—CONCRETE CURING MATERIALS

220.01—Description 220.02—Detail Requirements

SECTION 221—GUARDRAIL

221.01—Description 221.02—Detail Requirements

SECTION 222—MASONRY UNITS

222.01—Description 222.02—Detail Requirements

SECTION 223—STEEL REINFORCEMENT

223.01—Description 223.02—Detail Requirements

SECTION 224—CASTINGS

224.01—Description 224.02—Materials 224.03—Detail Requirements

SECTION 225—STEEL FORGINGS AND STEEL SHAFTING

225.01—Description 225.02—Detail Requirements .�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.�2�3

SECTION 226—STRUCTURAL STEEL

226.01—Description 226.02—Detail Requirements

SECTION 227—STEEL GRID FLOORING

227.01—Description 227.02—Materials 227.03—Detail Requirements

SECTION 228—STEEL PILES

228.01—Description 228.02—Detail Requirements

SECTION 229—ALUMINUM ALLOY

229.01—Description 229.02—Detail Requirements

SECTION 230—BRONZE AND COPPER ALLOY

230.01—Description 230.02—Detail Requirements xi

SECTION 231—PAINT

231.01—Description 231.02—Materials 231.03—Detail Requirements

SECTION 232—PIPE AND PIPE ARCHES

232.01—Description 232.02—Detail Requirements

SECTION 233—GALVANIZING

233.01—Description 233.02—Detail Requirements 233.03—Repair of Galvanized Surfaces

SECTION 234—GLASS BEADS FOR REFLECTORIZING TRAFFIC MARKINGS

234.01—Description 234.02—Detail Requirements

SECTION 235—RETROREFLECTORS

235.01—Description 235.02—Detail Requirements

SECTION 236—WOOD PRODUCTS

236.01—Description 236.02—Detail Requirements

SECTION 237—STRUCTURE BEDDING MATERIAL AND BEARING PADS

237.01—Description 237.02—Detail Requirements

SECTION 238—ELECTRICAL AND SIGNAL COMPONENTS

238.01—Description 238.02—Detail Requirements

SECTION 239—SODIUM CHLORIDE AND CALCIUM CHLORIDE

239.01—Description 239.02—Detail Requirements

SECTION 240—LIME

240.01—Description 240.02—Detail Requirements

SECTION 241—FLY ASH

241.01—Description 241.02—Detail Requirements

SECTION 242—FENCES

242.01—Description 242.02—Detail Requirements

SECTION 243—EPOXY-RESIN SYSTEMS

243.01—Description xii

243.02—Detail Requirements 243.03—Handling and Storing Materials 243.04—Acceptance

SECTION 244—ROADSIDE DEVELOPMENT MATERIALS

244.01—Description 244.02—Detail Requirements

SECTION 245—GEOSYNTHETICS AND LOW PERMEABILITY LINERS

245.01—Description 245.02—Shipping, Handling, and Storage Requirements 245.03—Testing and Documentation

SECTION 246—PAVEMENT MARKING

246.01—Description 246.02—Detail Requirements 246.03—Pavement Marking Materials

SECTION 247—REFLECTIVE SHEETING

247.01—Description 247.02—Detail Requirements 247.03—Reflective Sheeting Warranty Requirements

SECTION 248—STONE MATRIX ASPHALT CONCRETE

248.01—Description 248.02—Materials 248.03—Composition of SMA Mixture 248.04—Acceptance 248.05—SMA Mixing Plant

SECTION 249—FLOWABLE BACKFILL

249.01—Description 249.02—Materials 249.03—Mix Design

SECTION 250—CARBON FIBER MESH

250.01—Description 250.02—Materials

SECTION 251—GALVANIC ANODES

251.01—Description 251.02—Detail Requirements

SECTION 252—GRAVITY-FILL POLYMER CRACK SEALERS

252.01—Description 252.02—Materials

DIVISION III—ROADWAY CONSTRUCTION

SECTION 301—CLEARING AND GRUBBING

301.01—Description xiii

301.02—Procedures 301.03—Measurement and Payment

SECTION 302—DRAINAGE STRUCTURES

302.01—Description 302.02—Materials 302.03—Procedures 302.04—Measurement and Payment

SECTION 303—EARTHWORK

303.01—Description 303.02—Materials 303.03—Erosion and Siltation Control and Stormwater Pollution Prevention 303.04—Procedures 303.05—Tolerances 303.06—Measurement and Payment

SECTION 304—CONSTRUCTING DENSITY CONTROL STRIPS

304.01—Description 304.02—Materials 304.03—Equipment 304.04—Procedures 304.05—Tolerances 304.06—Measurement and Payment

SECTION 305—SUBGRADE AND SHOULDERS

305.01—Description 305.02—Materials 305.03—Procedures 305.04—Measurement and Payment

SECTION 306—LIME STABILIZATION

306.01—Description 306.02—Materials 306.03—Procedures 306.04—Measurement and Payment

SECTION 307—HYDRAULIC CEMENT STABILIZATION

307.01—Description 307.02—Materials 307.03—Field Laboratory 307.04—Weather Limitations 307.05—Procedures 307.06—Measurement and Payment

SECTION 308—SUBBASE COURSE

308.01—Description 308.02—Materials 308.03—Procedures 308.04—Tolerances 308.05—Measurement and Payment xiv

SECTION 309—AGGREGATE BASE COURSE

309.01—Description 309.02—Materials 309.03—Equipment 309.04—Procedures 309.05—Density Requirements 309.06—Measurement and Payment

SECTION 310—TACK COAT

310.01—Description 310.02—Materials 310.03—Procedures 310.04—Measurement and Payment

SECTION 311—PRIME COAT

311.01—Description 311.02—Materials 311.03—Procedures 311.04—Measurement and Payment

SECTION 312—SEAL COAT

312.01—Description 312.02—Materials 312.03—Equipment 312.04—Procedures 312.05—Measurement and Payment

SECTION 313—ASPHALT-STABILIZED OPEN-GRADED MATERIAL

313.01—Description 313.02—Materials 313.03—Proportioning 313.04—Acceptance 313.05—Placing limitations 313.06—Procedures 313.07—Measurement and Payment

SECTION 314—PENETRATION SURFACE COURSES

314.01—Description 314.02—Materials 314.03—Weather Limitations 314.04—Equipment 314.05—Procedures 314.06—Measurement and Payment

SECTION 315—ASPHALT CONCRETE PLACEMENT

315.01—Description 315.02—Materials 315.03—Equipment 315.04—Placement Limitations 315.05—Procedures 315.06—Pavement Samples 315.07—Pavement Tolerances xv

315.08—Measurement and Payment

SECTION 316—HYDRAULIC CEMENT CONCRETE PAVEMENT

316.01—Description 316.02—Materials 316.03—Equipment 316.04—Procedures 316.05—Thickness and Finished Grade Tolerances 316.06—Measurement and Payment

SECTION 317—STONE MATRIX ASPHALT CONCRETE PLACEMENT

317.01—Description 317.02—Materials 317.03—Composition of SMA Mixture 317.04—Acceptance 317.05—SMA Mixing Plant 317.06—Weather Restrictions 317.07—Placing and Finishing 317.08—Compaction 317.09—Trial Section 317.10—Prepaving Conference 317.11—Measurement and Payment

SECTION 318—PAVEMENT INTERLAYERS

318.01—Description 318.02—Materials 318.03—Procedures 318.04—Measurement and Payment

DIVISION IV—BRIDGES AND STRUCTURES

SECTION 401—STRUCTURE EXCAVATION

401.01—Description 401.02—Materials 401.03—Procedures 401.04—Measurement and Payment

SECTION 402—SHEET PILES

402.01—Description 402.02—Materials 402.03—Procedures 402.04—Measurement and Payment

SECTION 403—BEARING PILES

403.01—Description 403.02—Materials 403.03—Pile Types 403.04—Determination of Pile Lengths 403.05—Initial Preparation 403.06—Driving Piles 403.07—Determination of Nominal Pile Resistance xvi

403.08—Driving Criteria 403.09—Order List 403.10—Measurement and Payment

SECTION 404—HYDRAULIC CEMENT CONCRETE OPERATIONS

404.01—Description 404.02—Materials 404.03—Procedures 404.04—Bridge Deck Construction 404.05—Expansion and Fixed Joints 404.06—Bridge Seat Bearing Areas 404.07—Finishing Concrete Surfaces 404.08—Measurement and Payment

SECTION 405—PRESTRESSED CONCRETE

405.01—Description 405.02—Materials 405.03—Plant Review 405.04—Concrete Controls 405.05—Procedures 405.06—Tolerances 405.07—Measurement and Payment

SECTION 406—REINFORCING STEEL

406.01—Description 406.02—Materials 406.03—Procedures 406.04—Measurement and Payment

SECTION 407—STEEL AND OTHER METAL STRUCTURES

407.01—Description 407.02—Materials 407.03—Working Drawings 407.04—Fabrication Procedures 407.05—Handling, Storing, and Shipping Materials 407.06—Erection Procedures 407.07—Measurement and Payment

SECTION 408—BEARING DEVICES AND ANCHORS

408.01—Description 408.02—Materials and Fabrication 408.03—Procedures 408.04—Measurement and Payment

SECTION 409—STEEL GRID FLOORS

409.01—Description 409.02—Materials 409.03—Procedures 409.04—Measurement and Payment xvii

SECTION 410—RAILINGS AND PARAPETS

410.01—Description 410.02—Materials 410.03—Procedures 410.04—Measurement and Payment

SECTION 411—PROTECTIVE COATING OF METAL IN STRUCTURES

411.01—Description 411.02—Materials 411.03—Certifications 411.04—General Surface Preparation and Application Standards 411.05—Existing Structures 411.06—New Structures 411.07—Metal-Based Coatings 411.08—Observation Period 411.09—Environmental Protection 411.10—Health and Safety Protection 411.11—Measurement and Payment

SECTION 412—WIDENING, REPAIRING, AND RECONSTRUCTING

EXISTING STRUCTURES

412.01—Description 412.02—Materials 412.03—Procedures 412.04—Measurement and Payment

SECTION 413—DISMANTLING AND REMOVING EXISTING STRUCTURES

OR REMOVING PORTIONS OF EXISTING STRUCTURES

413.01—Description 413.02—Procedures 413.03—Measurement and Payment

SECTION 414—RIPRAP

414.01—Description 414.02—Materials 414.03—Procedures 414.04—Measurement and Payment

SECTION 415—CONCRETE SLOPE PROTECTION

415.01—Description 415.02—Materials 415.03—Procedures 415.04—Measurement and Payment

SECTION 416—WATERPROOFING

416.01—Description 416.02—Materials 416.03—Procedures 416.04—Measurement and Payment

SECTION 417—DAMP-PROOFING

417.01—Description xviii

417.02—Materials 417.03—Procedures 417.04—Measurement and Payment

SECTION 418—TIMBER STRUCTURES

418.01—Description 418.02—Materials 418.03—Procedures 418.04—Measurement and Payment

SECTION 419—BRIDGE CONDUIT SYSTEMS AND LIGHTING SYSTEMS

419.01—Description 419.02—Materials 419.03—Procedures 419.04—Measurement and Payment

SECTION 420—ADHESIVE-BASED JOINT SEALING SYSTEMS

420.01—Description 420.02—Materials 420.03—Procedures 420.04—Measurement and Payment

SECTION 421—ELASTOMERIC EXPANSION DAMS

421.01—Description 421.02—Materials 421.03—Procedures 421.04—Measurement and Payment

SECTION 422—NAVIGATION LIGHTS

422.01—Description 422.02—Materials 422.03—Procedures 422.04—Measurement and Payment

SECTION 423 – TOOTH EXPANSION JOINT ASSEMBLY

423.01—Description 423.02—Materials 423.03—Procedures 423.04—Measurement and Payment

SECTION 424 - ASPHALT PLUG JOINTS

424.01—Description 424.02—Materials 424.03—Procedures 424.04—Measurement and Payment

SECTION 425—RIGID CONCRETE BRIDGE DECK OVERLAYS

425.01—Description 425.02—Materials 425.03—Procedures 425.04—Measurement and Payment xix

SECTION 426—REPAIRING EXISTING STEEL STRUCTURES

426.01—Description 426.02—Materials 426.03—Procedures 426.04—Measurement and Payment

SECTION 427—SILICONE JOINT SEALANTS

427.01—Description 427.02—Materials 427.03—Procedures 427.04—Measurement and Payment

SECTION 428—CONCRETE SURFACE PENETRANT SEALER

428.01—Description 428.02—Materials 428.03—Procedures 428.04—Measurement and Payment

SECTION 429—BRIDGE DECK WATERPROOFING MEMBRANE SYSTEMS

429.01—Description 429.02—Types of Waterproofing Membranes 429.03—Materials 429.04—Equipment 429.05—Traffic Restrictions 429.06—Procedures 429.07—Quality Control and Quality Assurance and Acceptance of Waterproofing

Membrane Thickness for Type I and Type II Membranes 429.08—Waterproofing Membrane Acceptance 429.09—Measurement and Payment

SECTION 430—NBIS INSPECTION USING UNDER BRIDGE INSPECTION DEVICE . . . 638

430.01—Description 430.02—Notification Requirements 430.03—Rescheduling Inspection 430.04—Traffic Control during Inspection 430.05—Measurement and Payment

SECTION 431—EPOXY BRIDGE DECK OVERLAYS

431.01—Description 431.02—Materials 431.03—Procedures 431.04—Measurement and Payment

DIVISION V—INCIDENTAL CONSTRUCTION

SECTION 501—UNDERDRAINS, CROSSDRAINS, AND EDGEDRAINS

501.01—Description 501.02—Materials 501.03—Procedures 501.04—Measurement and Payment xx

SECTION 502—INCIDENTAL CONCRETE ITEMS

502.01—Description 502.02—Materials 502.03—Procedures 502.04—Measurement and Payment

SECTION 503—CONTRACTOR BOUNDARY SURVEYING

503.01—Description 503.02—Materials 503.03—Procedures 503.04—Measurement and Payment

SECTION 504—SIDEWALKS, STEPS, AND HANDRAILS

504.01—Description 504.02—Materials 504.03—Procedures 504.04—Measurement and Payment

SECTION 505—GUARDRAIL AND W-BEAM MEDIAN BARRIERS

505.01—Description 505.02—Materials 505.03—Procedures 505.04—Measurement and Payment

SECTION 506—RETAINING WALLS

506.01—Description 506.02—Materials 506.03—Procedures 506.04—Measurement and Payment

SECTION 507—FENCES

507.01—Description 507.02—Materials 507.03—Procedures 507.04—Measurement and Payment

SECTION 508—DEMOLITION OF PAVEMENT AND OBSCURING ROADWAY

508.01—Description 508.02—Procedures 508.03—Measurement and Payment

SECTION 509—FLOWABLE BACKFILL PLACEMENT

509.01—Description 509.02—Materials 509.03—Procedures 509.04—Measurement and Payment

SECTION 510—RELOCATING OR MODIFYING EXISTING

MISCELLANEOUS ITEMS

510.01—Description 510.02—Materials xxi

510.03—Procedures 510.04—Measurement and Payment

SECTION 511—ALLAYING DUST

511.01—Description 511.02—Materials 511.03—Procedures 511.04—Measurement and Payment

SECTION 512—MAINTAINING TRAFFIC

512.01—Description 512.02—Materials 512.03—Procedures 512.04—Measurement and Payment

SECTION 513—MOBILIZATION

513.01—Description 513.02—Measurement and Payment

SECTION 514 – FIELD OFFICE

514.01—Description 514.02—Procedures 514.03—Measurement and Payment

SECTION 515—PLANING OR MILLING PAVEMENT

515.01—Description 515.02—Equipment 515.03—Procedures 515.04—Performance Pavement Planing Testing 515.05—Measurement and Payment

SECTION 516—DEMOLITION OF BUILDINGS AND CLEARING PARCELS

516.01—Description 516.02—Procedures 516.03—Measurement and Payment

SECTION 517—CONTRACTOR CONSTRUCTION SURVEYING

517.01—Description 517.02—General Requirements 517.03—Contractor Responsibility for Examination of Data 517.04—Construction (C) projects 517.05—Minimum Plan (M) projects 517.06—No Plan (N) projects 517.07—Measurement and Payment

SECTION 518—TRAINEES ON CONSTRUCTION PROJECTS

518.01—Description 518.02—Procedures 518.03—Measurement and Payment

SECTION 519—SOUND BARRIER WALLS

519.01—Description xxii

519.02—Materials 519.03—Procedures 519.04—Measurement and Payment

SECTION 520—WATER AND SANITARY SEWER FACILITIES

520.01—Description 520.02—Materials 520.03—Procedures 520.04—Testing 520.05—Disinfecting Water Mains 520.06—Measurement and Payment

SECTION 521—MAILBOX POST

521.01—Description 521.02—Materials 521.03—Procedures 521.04—Measurement and Payment

DIVISION VI—ROADSIDE DEVELOPMENT

SECTION 601—SELECTIVE TREE REMOVAL, TRIMMING, AND CLEANUP

601.01—Description 601.02—Materials 601.03—Procedures 601.04—Measurement and Payment

SECTION 602—TOPSOIL

602.01—Description 602.02—Materials 602.03—Procedures 602.04—Measurement and Payment

SECTION 603—SEEDING

603.01—Description 603.02—Materials 603.03—Procedures 603.04—Measurement and Payment

SECTION 604—SODDING

604.01—Description 604.02—Materials 604.03—Procedures