This document provides information on a federal contract solicitation for the Arlington National Cemetery - Columbia Pike Realignment Project in Arlington County, Virginia. The project involves realigning Columbia Pike and adjacent roads, expanding a park, modifying an interchange, and constructing pedestrian and bicycle facilities. It will be awarded as one base schedule and one option, with the total cost expected to exceed $10 million. Offerors must demonstrate experience on similar complex transportation projects. The solicitation will be issued on or around May 20, 2021, with proposals due on a date specified in the SF 1442. The Eastern Federal Lands Highway Division of the Federal Highway Administration will administer the contract and be responsible for questions concerning construction projects. Annual representations and certifications must be completed online at SAM.gov. Firms must also register in SAM for payment. Subcontracting plans are required from businesses other than small businesses for opportunities over $750,000 or $1.5 million for construction.

View the file

Other files

File Type Posted
Amendment 0005 - VA ST ANC(1).pdf PDF
Amendment 0004 - VA ST ANC(1).pdf PDF
Amendment 0003 - VA ST ANC(1).pdf PDF
Amendment 0001 - VA ST ANC(1).pdf PDF
Arlington County Traffic Signal Specifications - 2019.pdf PDF
ANCSE DAR Project_Utiity Agreement_WG.pdf PDF
Final EFLHD ANC FONSI_LTL1.pdf PDF
Plans_lighting.pdf PDF
Plans_roadway and drainage-part 3.pdf PDF
ANCSE SIREPORT_DEQ_letter.pdf PDF
Final ANCSE Env Report.pdf PDF
Plans_signals.pdf PDF
Asbestos Related Info.pdf PDF
ANCSE DAR Project - Utilities Matrix 2021-04-23.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
FP14_Eng.pdf PDF
Plans_roadway and drainage-part 4.pdf PDF
Arlington County Construction Standards and Specifications - 2020.pdf PDF
MOA for the Southern Expansion project at ANC (2014-1094).pdf PDF
Plans_traffic control-part 1.pdf PDF
Plans_roadway and drainage-part 1.pdf PDF
ANCSE_Env_Memo 021920.pdf PDF
ANCSE DAR Project_Utiity Agreement_Verizon_Signedv1.pdf PDF
Final_EA_Appendices_ANC_Southern_Expansion.pdf PDF
VDOT 2020 Road and Bridge Specifications.pdf PDF
VETS-4212 Form.pdf PDF
Plans_x-sections.pdf PDF
ANCSE DAR Project_Utility Agreement_Comcast.pdf PDF
Arlington County Lighting Specifications - 2020.pdf PDF
Plans_dry utilities.pdf PDF
ANCSE_Settlement_Agreement (FBL Signed - 01.11.20).pdf PDF
Plans_traffic control-part 2.pdf PDF
Executed LAND_ACQUISITION-224949-v2.pdf PDF
Plans_walls and tunnel.pdf PDF
ADV_Subcontracting Plan - VA ST ANC(1).doc DOC document
Plans_signing and markings.pdf PDF
Plans_wet utilities.pdf PDF
RFP Solicitation - VA ST ANC(1).pdf PDF
ANCSE DAR Project_Utility Agreement_Dominion.pdf PDF
Plans_roadway and drainage-part 2.pdf PDF
Final_EA_ANC_Southern_Expansion.pdf PDF
Plans_landscape.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7321R000018 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: CONSTRUCTION

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: ACQUISITIONS

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

VA ST ANC(1)06/02/20210002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/20/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project VA ST ANC(1):

The purpose of this Amendment is to:

1) Provide links to download additional Government Furnished Information (GFI) including alignment data and surface models for modeling earthwork quantities.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The proposal due date of June 29, 2021, at 2:00 p.m. EST remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0002

Amendment Info

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project VA-ST-ANC(1)

Arlington National Cemetery - Columbia Pike Realignment Solicitation: 693C73-21-R-00018

The purpose of this Amendment is to:

1) Provide links to download additional Government Furnished Information (GFI) including alignment data and surface models for modeling earthwork quantities.

2) Provide a summary of responses to questions/clarifications asked by potential bidders.

The proposal due date of June 29, 2021, at 2:00 p.m. EST remains unchanged.

Additional GFI

Secure File Downloads:

Available until: 02 July 2021

Click link to download:

VA-ST-ANC(1)_GFI-Alignment and Surface.zip

41.02 MB, Fingerprint: eac9ecaa7518d8aef57603221520c81f (What is this?)

Disclaimer/Limitations for the use of CAD files/GFI:

The above link is to project CAD files that are being provided in response to multiple bidder inquiries for calculating earthwork quantities. In accordance with FAR 52.236-4, the government is providing these files for informational purposes only and is for the sole use of the organization responding to Solicitation 693C73-21-R-00018 for the VA-ST-ANC(1) project. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. The use of these files by any interested bidder is at their sole discretion and risk and the government is not responsible for the corruption of files or the discovery of any errors or omissions. The issued for construction plans (signed and sealed) will govern if there are any discrepancies found.

https://slfts.fhwa.dot.gov/seos/1000/mpd/ui030720212715fe218a4f7e5ba8ed30abf5af3a52 https://slfts.fhwa.dot.gov/courier/web/1000@/wmFingerprint.html

Questions/Clarifications

Questions / Clarifications

The following questions and issues were submitted to EFLHD. The Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.

1. Request For Proposal Section SF-1442 (Solicitation, Offer, and Award) page 6 in the section titled “Schedules of Work” states “The Government will award the project as a Base Contract (Schedule A) with the option to award Schedule B (Government Option 1)…” Additional text indicates that Schedule B may be awarded at a future time. Please confirm that Government Option 1 (Schedule B) will definitively be awarded to the contractor who is awarded the Base Contract (Schedule A) regardless of whether award of Option 1 is at time of award of the Base Contract or at a later date (not later than September 15, 2021 or 30 days after start of construction activities. A significant amount of excess spoils are generated in Option 1 that are needed for the Base Contract and we seek clarification that the contractor that is awarded the Base Contract will also have control of the Option 1 work including excess spoils.

Response: It is the government’s intent to award both Schedule A and Schedule B (Government Option 1) to the same contractor.

2. Addendum No. 1 included the XML files for the existing and proposed terrain models. However, horizontal alignment surfaces/layers were not included. Please provide these as soon as possible. These are urgently needed to build an earthworks model.

Response: Additional CAD files will be included in a future amendment as Government Furnished Information (GFI).

3. The following questions are associated with Plan Sheet G(1), alignment Data Tables:

a) Washington Blvd Off-Ramp: Please verify Coordinates (Start) for Curve C13 are correct.

b) Columbia Pike – Washington Blvd Off- Ramp – Washington Blvd On-Ramp: It would appear that Columbia Pike Line L1 coordinates (End) do not correspond with Washington Blvd Off-Ramp L6 coordinates (end) or Washington Blvd On-Ramp L8 coordinates (Start). Should these three points be equal coordinates?

c) Bearing for L16 Southgate Road does not correspond with azimuth or bearing stated on sheet 1G.

Please confirm.

Response:

a) Coordinates are correct based on the CADD design file.

b) L6 End (Off-Ramp) corresponds to L8 Start (On-Ramp). These alignments intersect at the

Proposed Columbia Pike Baseline Alignment, and both points are stated correctly on the plans. L1 along the Proposed Col. Pike Baseline Alignment does not end at the same point at the intersection of L6 and L8 for the two ramps. This point is stated correctly on the plans.

c) Bearing S80*35’36” equals Azimuth 260*35’36”. We believe these values are correctly stated on the plan and the alignment data is accurate.

4. Traffic Control Plan Sheets 1J(1C)-6, 1J(1C)-8, and 1J(1C)-10 all show temporary concrete traffic barrier on the outside of each travel direction. The typical section on Sheet 1J(1C)-2A only shows the temporary concrete traffic barrier on one side (one direction of travel). Please clarify if the section is incorrect.

Questions/Clarifications

Response: 1J(1C)-6 shows barrier on both sides of Southgate Road which is correct as a worst-case scenario to account for potential longer term hazards such as equipment or drop-off conditions within the clear zone. The south side to protect the work area may not be required depending on field conditions and contractor’s ability to maintain the required clear zone. The north side is meant to protect pedestrians on temporary sidewalk facilities that are at roadway grade. The north side for pedestrian safety may be orange water-filled barrier as long as no drop-off condition exists.

1J(1C)-8 shows barrier on both sides of Southgate Road which is correct – Same conditions apply as on sheet 1J(1C)-6. 1J(1C)-10 shows barrier on both sides of Southgate Road which is correct – Same conditions apply as on sheet 1J(1C)-6. 1J(1C)-2A demonstrates the required clear zone that must be maintained at all times to equipment and/or drop-off conditions. If encroachment into the clear zone is needed for an extended period of time, barrels may need to be replaced with barrier depending on means and methods. At minimum, so long as the clear zone is maintained, barrels should delineate the work area.

5. Is Bid Item No. B6120, CLEANOUT (VDOT SECTION 501-CLEANOUTS), for the tunnel underdrain system as shown on Plan Sheet CG401?

Response: Yes.

6. Is Bid Item No. B6140, STANDARD UNDERDRAIN SYSTEM (VDOT SECTION 00501-4" PERF.

HDPE UD), for the tunnel underdrain system as shown on Plan Sheet CG401?

Response: Yes.

7. Is Bid Item No. B6160, STANDARD UNDERDRAIN SYSTEM (VDOT SECTION 00501-4" SOLID HDPE UD), for the tunnel underdrain system as shown on Plan Sheet CG401?

Response: Yes.

8. Is Bid Item B6180, STANDARD UNDERDRAIN SYSTEM (VDOT SECTION 00501-6" SOLID HDPE UD), for the tunnel underdrain system as shown on Plan Sheet CG401?

Response: Yes.

9. Does Bid Item B6060, MANHOLE (VDOT SECTION 00302-MANHOLE MH-2, include the manholes for the tunnel underdrain system as shown on Plan Sheet CG401?

Response: Yes, however these are the same manholes that are depicted on sheet CG101 for the storm sewer system for the tunnel.

10. Bid Item B5720, MEMBRANE WATERPROOFING (VDOT SECTION 416-WATERPROFFING MEMBRANE-TUNNEL), VDOT Section 416 is a specification for epoxy-resin compounds and aggregates for surface applications on concrete bridge decks. There are no refences in the specification to membrane waterproofing or protection boards. Please provide a special provision with material requirements for the membrane waterproofing and protection board.

Response: Specifications and material requirements should be as per Section 429 for Type II – Hot Applied Elastomeric Membrane System. The Pay Item description should read “VDOT SECTION 429 for TUNNEL WATERPROOFING MEMBRANE, TYPE II”. Membrane reinforcement will be incidental to this pay item and not measured separately for payment. The asphalt concrete wearing surface referenced in the specification is not included in this contract.

U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
Project VA-ST-ANC(1)
Arlington National Cemetery - Columbia Pike Realignment
Solicitation: 693C73-21-R-00018