This memorandum from an environmental consulting firm summarizes asbestos investigations conducted for the Arlington National Cemetery Southern Expansion project. The investigations found asbestos containing materials buried on site, primarily in the eastern portion of the South Parking parcel. Mitigation measures are required during excavation and utility installation and will be detailed in the plans and specifications. However, uncertainties exist. The Defense Access Road project, which is separate from the Southern Expansion, will also impact investigation areas but is not bound by the expansion project's mitigation plans. Additionally, the full quantity of asbestos-containing materials requiring off-site disposal cannot be accurately determined until focused sampling is conducted in proposed excavation and utility areas. These uncertainties could impact cost and schedule planning if not addressed. The memorandum recommends ensuring the Defense Access Road project implements similar asbestos mitigation measures and conducting additional sampling to identify asbestos-containing materials requiring disposal.

This federal contract opportunity is for the Arlington National Cemetery - Columbia Pike Realignment Project in Arlington County, Virginia. The project scope includes realigning Columbia Pike and surrounding streets, expanding a park, modifying an interchange, and installing pedestrian and bicycle facilities. It will also include site preparation work for a subsequent expansion contract. The project value is over $10 million and will be awarded as a base schedule and option. The solicitation number is 693C73-21-R-000018 and bids are due in May 2021. Offerors must demonstrate experience on similar projects. The solicitation and any addenda will be available on beta.sam.gov. Registration in the System for Award Management database is required for payment. Subcontracting plans are mandatory for non-small businesses. The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
Amendment 0005 - VA ST ANC(1).pdf PDF
Amendment 0004 - VA ST ANC(1).pdf PDF
Amendment 0003 - VA ST ANC(1).pdf PDF
Amendment 0002 - VA ST ANC(1).pdf PDF
Amendment 0001 - VA ST ANC(1).pdf PDF
Arlington County Traffic Signal Specifications - 2019.pdf PDF
ANCSE DAR Project_Utiity Agreement_WG.pdf PDF
Final EFLHD ANC FONSI_LTL1.pdf PDF
Plans_lighting.pdf PDF
Plans_roadway and drainage-part 3.pdf PDF
ANCSE SIREPORT_DEQ_letter.pdf PDF
Final ANCSE Env Report.pdf PDF
Plans_signals.pdf PDF
ANCSE DAR Project - Utilities Matrix 2021-04-23.pdf PDF
ADV_Offerors Qualifications Form.doc DOC document
FP14_Eng.pdf PDF
Plans_roadway and drainage-part 4.pdf PDF
Arlington County Construction Standards and Specifications - 2020.pdf PDF
MOA for the Southern Expansion project at ANC (2014-1094).pdf PDF
Plans_traffic control-part 1.pdf PDF
Plans_roadway and drainage-part 1.pdf PDF
ANCSE_Env_Memo 021920.pdf PDF
ANCSE DAR Project_Utiity Agreement_Verizon_Signedv1.pdf PDF
Final_EA_Appendices_ANC_Southern_Expansion.pdf PDF
VDOT 2020 Road and Bridge Specifications.pdf PDF
VETS-4212 Form.pdf PDF
Plans_x-sections.pdf PDF
ANCSE DAR Project_Utility Agreement_Comcast.pdf PDF
Arlington County Lighting Specifications - 2020.pdf PDF
Plans_dry utilities.pdf PDF
ANCSE_Settlement_Agreement (FBL Signed - 01.11.20).pdf PDF
Plans_traffic control-part 2.pdf PDF
Executed LAND_ACQUISITION-224949-v2.pdf PDF
Plans_walls and tunnel.pdf PDF
ADV_Subcontracting Plan - VA ST ANC(1).doc DOC document
Plans_signing and markings.pdf PDF
Plans_wet utilities.pdf PDF
RFP Solicitation - VA ST ANC(1).pdf PDF
ANCSE DAR Project_Utility Agreement_Dominion.pdf PDF
Plans_roadway and drainage-part 2.pdf PDF
Final_EA_ANC_Southern_Expansion.pdf PDF
Plans_landscape.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hana Engineers and Consultants, LLC. • 7501 Boulder View Drive • Suite 620 • Richmond, Virginia 23225 • hanaengineers.com

February 19, 2020

Gregg Schwieterman Project Manager HNTB Corporation 2900 South Quincy Street, Suite 600 Arlington, VA 22206

Subject: Uncertainties associated with Hazardous Materials aspects of the Arlington National

Cemetery Southern Expansion (ANCSE) and Defense Access Road (DAR) Project

Dear Mr. Schwieterman, The purpose of this memo is to summarize the status of the environmental (i.e., hazardous materials) investigations related to the Arlington National Cemetery Southern Expansion (ANCSE) project and highlight some uncertainties associated with the property. Due to the status of the FOB2 property on the Federal Facilities Docket, Hana prepared an Environmental Site Inspection (SI) Report for the property in accordance with Comprehensive Environmental Response Compensation and Liability Act (CERCLA) requirements. The SI Report concluded that no remedial action was required at the FOB2 property based on future land use as part of ANC. However, this conclusion was predicated on the implementation of appropriate mitigation measures for Asbestos Containing Material (ACM) during the ANCSE Construction phase. The Virginia Department of Environmental Quality (VDEQ) Federal Facilities Section concurred with the SI Report in a letter dated December 13, 2019, which reiterated the need for appropriate mitigation measures during any excavation, grading or utility work. Hana will be assisting HNTB with the preparation of plans and specifications to identify all appropriate mitigation measures for

ANCSE.

Although the plans and specifications for ANCSE will identify appropriate mitigation measures for ANCSE, there are some uncertainties that should clarified to the project stakeholders moving forward. These uncertainties are identified and discussed below:

1. Portions of the ANCSE investigation area will be impacted by the Defense Access Road (DAR) project, which will include excavation, grading and utility installation. Since this project is a separate federal project from the ANCSE project, the plans and specifications detailing ACM mitigation measures for ANCSE are not applicable to the DAR project. However, if the DAR project does not also implement and document similar mitigation measures, this would be in violation of the concurrence letter from VDEQ and present potential regulatory issues.

Therefore, we recommend that ANC and/or USACE ensure that the DAR project receives all necessary data and reports related to this issue so that they can implement appropriate mitigation measures.

2. The quantity of ACM-impacted material requiring disposal cannot be accurately determined with the data collected to date. As the SI Report indicates, ACM is known to be buried in certain areas

Hana Engineers and Consultants, LLC. • 7501 Boulder View Drive • Suite 620 • Richmond, Virginia 23225 • hanaengineers.com of the site, primarily the eastern portion of the South Parking parcel. However, at the time the SI Report was prepared, specific areas of excavation and utility installation had not been identified. Therefore, previous sampling did not attempt to characterize material in these areas for future disposal. We believe focused sampling in areas proposed for excavation or utilities may be warranted so that material requiring off-site disposal during construction could be identified and quantified. Therefore, material requiring special disposal will not be firmly identified until the construction phase. We want to make clear that this presents great uncertainty with respect to planning for cost and schedule, as ACM material must be packaged, transported and disposed in accordance with 40 CFR Part 61, Subpart M and 9VAC20-81-620. Please note that this uncertainty also applies to the DAR project.

We wished to bring these uncertainties to your attention so that you can inform USACE and other stakeholders. We are glad to discuss these further with you and the project team.

Please contact me at 757-470-8361 or jeff.zoeckler@hanaengineers.com if you have any questions.

Sincerely, Jeff R. Zoeckler Vice President mailto:jeff.zoeckler@hanaengineers.com

T-21

Parking Parcel

Navy Annex/FOB2 Parcel

Southgate Road Right of Way Parcel

NEX Service Station Parcel

Air Force Memorial Parcel

T-6

T-40

T-39

T-35

T-23

B-10

T-9

T-38

T-31

T-11

T-25

T-27 T-24

T-22

T-13 T-19

T-12

T-41

T-42

T-14

T-8

T-7

T-4

T-5

T-3

T-2

T-1

T-43

T-37T-36

T-34

T-33

T-30

T-32

T-10

T-20

T-28

T-29

T-26

T-18

T-16

T-17

T-15

Filename: C:\Users\Christina Anderson\Documents\HANA\GIS\ANCSE\MXD\Results\Figure 7 - Asbestos Sampling Results.mxd

Asbestos Sampling Results Project No: 64516 Date: December 2016

ARLINGTON NATIONAL CEMETERY

SOUTHERN EXPANSION

Figure: 7

0 210 420105 Feet

Legend Soil Sampling Results - Asbestos

Not Detected

<0.25%

0.25

0.84

2%

Not Sampled

Bulk Debris Sampling Results - Asbestos Not Detected

10%

15%

20%

Not Sampled

Site Boundary

Parcel Boundaries

2015 ACM Soil Removal Area (approximate)

Former FOB2 Footprint

MEMORANDUM

Hana Engineers and Consultants, LLC. • 7501 Boulder View Drive • Suite 620 • Richmond, Virginia 23225 • hanaengineers.com 1

Date: January 13, 2021

To: Gregg Schweiterman, HNTB

From: Jeff Zoeckler, Vice President

Subject: Summary of asbestos survey and sampling

Dear Mr. Schweiterman, This memorandum summarizes the investigation to identify potential asbestos containing material (ACM) associated with inactive steam pipe within utility vaults along Southgate Rd, Columbia Pike, and within the ANC complex. A photographic log is included in Attachment 1. Analytical results are included in Attachment 2.

An initial site visit was conducted on November 23, 2020 by Hana and its subcontractor (ECS). The purpose of the visit was to locate and identify any potential ACM. A total of 5 vaults were opened.

Approximate vault locations are presented on Figure 1. After opening Vault 1, it was found to be filled with water and no steam pipes were identified. Water depth was approximately 8 feet deep. Vault 2 was also filled with water, but the steam pipe was just visible under the water surface. Vault 3 was approximately 14.5 feet deep and had approximately 2 feet of standing water and the top of a steam pipe was exposed. Steam pipes were also partially exposed in Vaults 4 and 5, which also contained water.

None of the observed steam pipes appeared to be wrapped with insulation. A closer inspection of the pipe was not conducted. The vaults could not be entered as they are considered a confined space and would require appropriate safety precautions for entry.

On January 6, 2021, Hana and subcontractors ECS and ACE Environmental conducted an inspection of inside the vaults and sampling of potential ACM. The air withing the vaults were monitored for potentially hazardous conditions. A safety wench and tripod were set up above the vault and the inspector was harnessed to the wench. The indoor air was continuously monitored while the inspector was inside the vault. Water was not pumped out of the vaults prior to inspection. Vaults 3, 4, and 5 were inspected. Upon inspection, the steam pipe did not have any visible insulation. The inspector identified other materials that could have contained ACM. These materials included: residual pipe material, steam pipe gasket, rubberized pipe fitting, fiberboard pipe covering, textured wall coating, white powder around pipe fitting (Vault 4).

The samples were analyzed by Scientific Analytical Institute, Inc. The results are provided in Attachment

2. None of the samples collected contained any ACM.

Please contact me at 757-470-8361 or jeff.zoeckler@hanaengineers.com if you have any questions.

Sincerely, Jeff R. Zoeckler, Vice President

Figure 1 Utility Vault Locations

Vault 1

Vault 2

Vault 3

Vault 4 Vault 5

Attachment 1 Photographic Log

PHOTOGRAPH LOG

Facility Name:

ANC

Site Location:

Along Southgate Dr and Columbia Pike

Project No.

64563

Photo No.

Date:

11/23/20

Description:

View North – Vault 1

Inside Vault 1

ANC

Site Location:

Along Southgate Dr and Columbia Pike

View East – Vault 2

View South – Vault 3

ANC

Site Location:

Along Southgate Dr and Columbia Pike

View Northeast – Vault 4

Inside Vault 4

ANC

Site Location:

Along Southgate Dr and Columbia Pike

View North – Vault 5

Inside Vault 5

ANC

Site Location:

Along Southgate Dr and Columbia Pike

01/6/21

Entry into Vault 5

Entry into Vault 5

ANC

Site Location:

Along Southgate Dr and Columbia Pike

Entry into Vault 4

Degrading Gasket in Vault

ANC

Site Location:

Along Southgate Dr and Columbia Pike

Textured wall inside Vault

View south - Vault 3

ANC

Site Location:

Along Southgate Dr and Columbia Pike

Inside Vault 3

Attachment 2 Analytical Results

Bulk Asbestos Analysis By Polarized Light Microscopy

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

11275/ ANCProject:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael HamillAttn:Customer: ECS Mid-Atlantic, LLC 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151

Analysis ID: 71957320_PLM

Date Reported: 1/11/2021

Date Received: 1/7/2021

Lab Order ID: 71957320

None Detected

Residual Steam Pipe Material Brown, Black Non Fibrous Heterogeneous

Crushed71957320PLM_1

Other 100%

None Detected

Residual Steam Pipe Material Brown, Black Non Fibrous Heterogeneous

Crushed71957320PLM_2

Other 100%

None Detected

Black Steam Pipe Gasket Black Non Fibrous Heterogeneous

Dissolved71957320PLM_3

Fiber Glass Other 5% 95%

None Detected

Black Steam Pipe Gasket Black Non Fibrous Heterogeneous

Dissolved71957320PLM_4

Fiber Glass Other 5% 95%

None Detected

Black Rubberized Pipe Fitting Black Non Fibrous Homogeneous

Ashed71957320PLM_5

Other 100%

None Detected

Black Rubberized Pipe Fitting Black Non Fibrous Homogeneous

Ashed71957320PLM_6

Other 100%

None Detected

Brown Fiberboard Pipe Covering

Brown Non Fibrous Heterogeneous

Ashed71957320PLM_7

Fiber Glass Other 10% 90%

None Detected

Brown Fiberboard Pipe Covering

Brown Non Fibrous Heterogeneous

Ashed71957320PLM_8

Fiber Glass Other 10% 90%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Yanelis Delgado (14)

P-F-002 r15 1/16/2021

Bulk Asbestos Analysis By Polarized Light Microscopy

EPA Method: 600/R-93/116 and 40 CFR, Part 763, Subpart E, App.E

11275/ ANCProject:

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos Fibrous

Components Non-Fibrous Components

Attributes

Treatment

Michael HamillAttn:Customer: ECS Mid-Atlantic, LLC 14026 Thunderbolt Place Suite 100 Chantilly, VA 20151

Analysis ID: 71957320_PLM

Date Reported: 1/11/2021

Date Received: 1/7/2021

Lab Order ID: 71957320

None Detected

White Wall Texture Coating Cream Non Fibrous Homogeneous

Crushed71957320PLM_9

Other 100%

None Detected

White Wall Texture Coating Cream Non Fibrous Homogeneous

Crushed71957320PLM_10

Other 100%

None Detected

White Wall Texture Coating Cream Non Fibrous Homogeneous

Crushed71957320PLM_11

Other 100%

None Detected

White Power Steam Pipe Fitting

White Non Fibrous Homogeneous

Dissolved71957320PLM_12

Other 100%

None Detected

White Power Steam Pipe Fitting

White Non Fibrous Homogeneous

Dissolved71957320PLM_13

Other 100%

None Detected

White Power Steam Pipe Fitting

White Non Fibrous Homogeneous

Dissolved71957320PLM_14

Other 100%

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogeneous soil samples be conducted by TEM for confirmation of “None Detected” by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program. Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Approved SignatoryAnalyst

Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

Yanelis Delgado (14)

P-F-002 r15 1/16/2021

Client: ECS Mid-Atlantic, LLC Contact: Michael Hamill Address: 14026 Thunderbolt Place, Suite Phone: (703)-471 -8400 Fax:

Email: mhamill@ecslimited.com

Project: 11 2751AN C

Client Notes:

P.O.#. 112751ANC

Date Submitted: 1/6/2021 0:00

Analysis: PLM EPA 600/R-93/116 TumAroundTime: 3dav

!Samele Number Data1 B

1\0 6/ ·?;1D "Instructions:

Use Column •e• for your contact info

' To See an Example Click the ' bottom Exampla Tab.

Enter aamplea batween •cc• and ">>" o'• 7 Begin Samples with a •« "above Ille first sample Scientific and end with • •»• ba/ow Ille last sample. Analytical ,. Institute ,,.. !t-.J

Only Enter your data on the first sheet "Shee/1 •

Note: Data 1 and Data 2 are optional •· 4604 Dundas Drive

' fields that do not show up on the official Greensboro, NC 27407 report, however they wUI be Included Phone: 336.292,3888 in the electronic deta retumed to you Fax: 336.292.3313 to facilitate vour rein""'ration of the reoort data. Email: lab@sailab.com

Samele Descrlf!tlon

Data2

Residual Steam Pipe Material Facility Manhole Residual Steam Pipe Material Manhole 3 Access Black Steam Pipe Gasket Facility Manhole Black Steam Pipe Gasket Manhole 3 Access Black Rubberized Pipe Fitting Manhole 3 Access Black Rubberized Pipe Fitting Manhole 3 Access Brown Fiberboard Pipe Covering Manhole 3 Access Brown Fiberboard Pipe Covering Manhole 3 Access White Wall Texture Coating Manhole 3 Access White Wall Texture Coating Manhole 3 Access White Wall Texture Coating Manhole 4 Access White Power Steam Pipe Fitting Manhole 4 Access White Power Steam Pipe Fitting Manhole 4 Access White Power Steam Pipe Fitting Manhole 4 Access

1(1 I@~

A Ctfp ~ R·~ ft.;, v'>'l!-4 .,!'f

"M-:r. ,-c:: ,~~i~ E~ .. El

'"'"'"'~ Received By

I

Asbestos_Sampling_Memo.pdf
Asbestos sampling
arlington national cemetEry southern expansion (ancse)
FROM: Jeff Zoeckler, Hana Project Manager
DATE: January 13, 2021

File details come from the government source that posted it. Updated .