This sources sought notice from the Department of Veterans Affairs seeks capability statements from small businesses for the construction of Project 516-005, Building One Renovation at the Veterans Affairs Medical Center in Bay Pines, Florida. The project includes general construction, interior demolition, alterations, structural modifications, and healthcare equipment installation. The estimated price range is between $20-50 million. Responses are due by October 8, 2020 and should include company information, small business status and certification, bonding capacity, and relevant construction experience. The notice states a solicitation for the project is expected to be issued in November 2020.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bay Pines VAMC Inpatient & Outpatient Improvements
Construction Documents B1 - Pact Primary Care Renovations
Specifications Vol. 3 of 4 Divisions 21 – 26
Project No. 516CA2005 December 21, 2020
BAY PINES VAMC Project No. 516CA2005 Inpatient & Outpatient Improvements Construction Documents B1 PACT Primary Care Renovations 04/21/20
SPECIFICATIONS
Architect of Record:
4/21/20 Signature and Stamp Date
Civil Engineer of Record:
4/21/20 Signature and Stamp Date
Landscape Architect of Record:
4/21/20 Signature and Stamp Date
B1 PACT Primary Care Renovations 04/21/20
Structural Engineer of Record:
4/21/20 Signature and Stamp Date
Telecommunications Engineer of Record:
4/21/20 Signature and Stamp Date
Fire Protection Engineer of Record:
4/21/20 Signature and Stamp Date
Telecommunications Engineer of R
B1 PACT Primary Care Renovations 04/21/20
TABLE OF CONTENTS
00 01 10-1
Section 00 01 10
TABLE OF CONTENTS
Sect. No. Section Title DATE
VOLUME 1
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 4/21/20 01 32 16.13 Network Analysis Schedules – Major Construction
Project Design-Bid-Build 4/21/20
01 33 23 Shop Drawings, Product Data, and Samples 4/21/20 01 35 26 Safety Requirements 4/21/20 01 42 19 Reference Standards 4/21/20 01 45 00 Quality Control 4/21/20 01 45 29 Testing Laboratory Services 4/21/20 01 57 19 Temporary Environmental Controls 4/21/20 01 74 19 Construction Waste Management 4/21/20 01 81 13 Sustainable Construction Requirements 4/21/20 01 91 00 General Commissioning Requirements 4/21/20
DIVISION 02 – EXISTING CONDITIONS
02 21 13 Site Surveys 4/21/20 02 41 00 Demolition 4/21/20 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 4/21/20 02 83 33.13 Lead-Based Paint Removal and Disposal 4/21/20
DIVISION 03 - CONCRETE
03 30 53 Cast-In-Place Concrete 4/21/20 03 41 33 Precast Structural Pretensioned Concrete 4/21/20 03 45 13 Precast Architectural Concrete Trim 4/21/20
DIVISION 04 - MASONRY
04 05 13 Masonry Mortaring 4/21/20 04 05 16 Masonry Grouting 4/21/20 04 20 00 Unit Masonry 4/21/20
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 4/21/20 05 36 00 Composite Metal Decking 4/21/20 05 50 00 Metal Fabrications 4/21/20
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 4/21/20 06 20 00 Finish Carpentry 4/21/20
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 16 Cold Fluid Applied Waterproofing 4/21/20
00 01 10-2
07 21 13 Thermal Insulation 4/21/20 07 22 00 Roof and Deck Insulation 4/21/20 07 54 23 Thermoplastic Polyolefin (TPO) Roofing 4/21/20 07 60 00 Flashing and Sheet Metal 4/21/20 07 71 00 Roof Specialties 4/21/20 07 81 00 Applied Fireproofing 4/21/20 07 84 00 Firestopping 4/21/20 07 92 00 Joint Sealants 4/21/20 07 95 13 Expansion Joint Cover Assemblies 4/21/20
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 4/21/20 08 12 16 Interior Aluminum Framing 4/21/20 08 14 00 Interior Wood Doors 4/21/20 08 17 10 Integrated Door Assemblies 4/21/20 08 31 13 Access Doors and Frames 4/21/20 08 33 13 Coiling Counter Doors 4/21/20 08 71 00 Door Hardware 4/21/20 08 80 00 Glazing 4/21/20 08 90 00 Wall Louvers 4/21/20
VOLUME 2
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation For Floor Finishes 4/21/20 09 06 00 Schedule for Finishes 4/21/20 09 22 16 Non-Structural Metal Framing 4/21/20 09 29 00 Gypsum Board 4/21/20 09 30 13 Ceramic/Porcelain Tiling 4/21/20 09 51 00 Acoustical Ceilings 4/21/20 09 65 13 Resilient Wall Base 4/21/20 09 65 16 Resilient Sheet Flooring 4/21/20 09 65 19 Resilient Tile Flooring 4/21/20 09 67 23.50 Resinous Terrazzo Flooring (RES-5) 4/21/20 09 68 00 Carpeting 4/21/20 09 84 33 Sound-Absorbing Wall Units 4/21/20 09 91 00 Painting 4/21/20
DIVISION 10 – SPECIALTIES
10 21 23 Cubicle Curtains and Curtain Tracks 4/21/20 10 26 00 Wall Protection 4/21/20 10 28 00 Toilet, Bath, and Laundry Accessories 4/21/20 10 31 00 Manufactured Fireplaces 4/21/20 10 44 13 Fire Extinguisher and Valve Cabinets 4/21/20 10 56 13 Wood-Clad Metal Library Shelving 4/21/20
DIVISION 11 - EQUIPMENT
11 00 00 Healthcare Equipment Schedule 4/21/20 11 73 00 Ceiling Mounted Patient Lift System 4/21/20
00 01 10-3
DIVISION 12 - FURNISHINGS
12 34 00 Plastic Laminate Casework 4/21/20
DIVISION 14– CONVEYING EQUIPEMENT
14 92 00 6” Pneumatic Tubes 4/21/20
VOLUME 3
DIVISION 21- FIRE SUPPRESSION
21 05 12 Motor Requirements For Fire-Suppression Equipment 4/21/20 21 10 00 Water-Based Fire-Suppression Systems 4/21/20 21 13 13 Wet-Pipe Sprinkler Systems 4/21/20
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 4/21/20 22 05 12 General Motor Requirements for Plumbing Equipment 4/21/20 22 05 19 Meters and Gages for Plumbing Piping 4/21/20 22 05 23 General-Duty Valves for Plumbing Piping 4/21/20 22 07 11 Plumbing Insulation 4/21/20 22 08 00 Commissioning of Plumbing Systems 4/21/20 22 11 00 Facility Water Distribution 4/21/20 22 11 23 Domestic Water Pumps 4/21/20 22 13 00 Facility Sanitary and Vent Piping 4/21/20 22 13 23 Sanitary Waste Interceptors 4/21/20 22 14 00 Facility Storm Drainage 4/21/20 22 14 29 Sump Pumps 4/21/20 22 40 00 Plumbing Fixtures 4/21/20 22 62 00 Vacuum Systems for Healthcare Facilities 4/21/20 22 63 00 Gas Systems for Healthcare Facilities 4/21/20
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC and Steam Generation 4/21/20 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 4/21/20
23 05 13 Coordination Drawings 4/21/20 23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment 4/21/20
23 05 93 Testing, Adjusting, and Balancing for HVAC 4/21/20 23 07 11 HVAC and Boiler Plant Insulation 4/21/20 23 08 00 Commissioning of HVAC Systems 4/21/20 23 09 23 Direct-Digital Control System for HVAC 4/21/20 23 09 24 Variable Frequency Drives (VFD) for HVAC 4/21/20 23 10 00 Facility Fuel Oil Systems 4/21/20 23 21 13 Hydronic Piping 4/21/20 23 21 23 Hydronic Pumps 4/21/20 23 22 13 Steam and Condensate Heating Piping 4/21/20 23 25 00 HVAC Water Treatment 4/21/20 23 31 00 HVAC Ducts and Casings 4/21/20 23 34 00 HVAC Fans 4/21/20
00 01 10-4
23 36 00 Air Terminal Units 4/21/20 23 37 00 Air Outlets and Inlets 4/21/20 23 40 00 HVAC Air Cleaning Devices 4/21/20 23 72 00 Air-To-Air Energy Recovery Equipment 4/21/20 23 73 00 Indoor Central-Station Air-Handling Units 4/21/20 23 82 00 Convection Heating and Cooling Units 4/21/20 23 82 16 Air Coils 4/21/20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 4/21/20 26 05 13 Medium-Voltage Cables 4/21/20 26 05 19 Low-Voltage Electrical Power Conductors and Cables 4/21/20 26 05 26 Grounding and Bonding for Electrical Systems 4/21/20 26 05 33 Raceway and Boxes for Electrical Systems 4/21/20 26 05 41 Underground Electrical Construction 4/21/20 26 05 73 Overcurrent Protection Device Coordination Study 4/21/20 26 08 00 Commissioning of Electrical Systems 4/21/20 26 09 23 Lighting Controls 4/21/20 26 11 16 Secondary Unit Substations 4/21/20 26 13 16 Medium-Voltage Fusible Interrupter Switches 4/21/20 26 22 00 Low-Voltage Transformers 4/21/20 26 23 00 Low-Voltage Switchgear 4/21/20 26 24 13 Distribution Switchboards 4/21/20 26 24 16 Panelboards 4/21/20 26 27 26 Wiring Devices 4/21/20 26 29 21 Enclosed Switches and Circuit Breakers 4/21/20 26 32 13 Engine Generators 4/21/20 26 36 23 Automatic Transfer Switches 4/21/20 26 43 13 Surge Protective Devices 4/21/20 26 51 00 Interior Lighting 4/21/20 26 55 71 Medical and Surgical Lighting Fixtures 4/21/20 26 56 00 Exterior Lighting 4/21/20
VOLUME 4
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 4/21/20 27 05 26 Grounding and Bonding for Communications Systems 4/21/20 27 05 33 Raceways and Boxes for Communications Systems 4/21/20 27 11 00 Telecommunications Room Fittings 4/21/20 27 15 00 Communications Structured Cabling 4/21/20 27 41 31 Master Antenna Television Equipment and Systems 4/21/20 27 51 16 Public Address and Mass Notification Systems 4/21/20 27 52 23 Nurse Call and Code Blue Systems 4/21/20
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 11 Requirements for Electronic Safety and Security Installations
4/21/20
28 05 13 Conductors and Cables for Electronic Safety and Security
4/21/20
28 05 26 Grounding and Bonding for Electronic Safety and Security
4/21/20
28 05 33 Raceways and Boxes for Electronic Safety and 4/21/20
00 01 10-5
Security 28 13 11 Physical Access Control System (PACS) 4/21/20 28 16 11 Intrusion Detection System 4/21/20 28 23 00 Video Surveillance 4/21/20 28 26 00 Electronic Personal Protection System (EPPS) 4/21/20 28 31 00 Fire Detection and Alarm 4/21/20
DIVISION 31 – EARTHWORK
31 20 11 Earthwork (Short Form) 4/21/20 31 23 19 Dewatering 4/21/20 31 23 23.33 Flowable Fill 4/21/20
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 4/21/20 32 12 16 Asphalt Paving 4/21/20 32 17 23 Pavement Markings 4/21/20 32 84 00 Planting Irrigation 4/21/20 32 90 00 Planting 4/21/20
DIVISION 33 – UTILITIES
33 10 00 Water Utilities 4/21/20 33 40 00 Storm Sewer Utilities 4/21/20
DIVISION 34 - TRANSPORTATION
34 71 13 Passive Vehicle Barriers 4/21/20
B1 PACT Primary Care Renovations 04/21/20
21 05 12 - 1
SECTION 21 05 12
MOTOR REQUIREMENTS FOR FIRE-SUPPRESSION EQUIPMENT
PART 1 - GENERAL
1.1 DESCRIPTION:
This section specifies the furnishing, installation and connection of motors for fire-suppression equipment.
1.2 RELATED WORK:
A. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS: General electrical requirements that are common to more than one Section of
Division 26.
B. Section 26 29 11, LOW-VOLTAGE MOTOR STARTERS: Starters, control and protection for motors.
C. Section 26 24 19, MOTOR-CONTROL CENTERS: Multiple motor control assemblies, which include motor starters.
D. Other sections specifying motor driven equipment in Division 21.
1.3 SUBMITTALS:
A. In accordance with Section 26 05 11, REQUIREMENTS FOR ELECTRICAL
INSTALLATIONS, submit the following:
B. Shop Drawings:
1. Sufficient information, clearly presented, shall be included to determine compliance with drawings and specifications.
2. Include electrical ratings, dimensions, mounting details, materials, horsepower, RPM, enclosure, starting characteristics, torque characteristics, code letter, full load and locked rotor current, service factor, and lubrication method.
C. Manuals:
1. Submit simultaneously with the shop drawings, companion copies of complete maintenance and operating manuals, including technical data sheets and application data.
D. Certification: Two weeks prior to final inspection, unless otherwise noted, submit four copies of the following certification to the Senior
Senior Resident Engineer:
1. Certification that the motors have been properly applied, installed, adjusted, lubricated, and tested.
1.4 APPLICABLE PUBLICATIONS:
A. Publications listed below (including amendments, addenda, revisions, supplements and errata) form a part of this specification to the extent referenced. Publications are referenced in the text by designation only.
B. National Electrical Manufacturers Association (NEMA):
MG 1-98.................Motors and Generators
B1 PACT Primary Care Renovations 04/21/20
21 05 12 - 2
MG 2-01.................Safety Standard and Guide for Selection, Installation and Use of Electric Motors and
Generators
C. National Fire Protection Association (NFPA):
70-08...................National Electrical Code (NEC)
PART 2 - PRODUCTS
2.1 MOTORS:
A. For alternating current, fractional and integral horsepower motors, NEMA
Publications MG 1 and MG 2 shall apply.
B. Voltage ratings shall be as follows:
1. Single phase:
a. Motors connected to 120-volt systems: 115 volts.
b. Motors connected to 208-volt systems: 200 volts.
c. Motors connected to 240 volt or 480 volt systems: 230/460 volts, dual connection.
2. Three phase:
a. Motors connected to 208-volt systems: 200 volts.
b. Motors, less than 74.6 kW (100 HP), connected to 240 volt or 480 volt systems: 230/460 volts, dual connection.
c. Motors, 74.6 kW (100 HP) or larger, connected to 240-volt systems:
230 volts.
d. Motors, 74.6 kW (100 HP) or larger, connected to 480-volt systems:
460 volts.
e. Motors connected to high voltage systems: Shall conform to NEMA
Standards for connection to the nominal system voltage shown on the drawings.
C. Number of phases shall be as follows:
1. Motors, less than 373 W (1/2 HP): Single phase.
2. Motors, 373 W (1/2 HP) and larger: 3 phase.
3. Exceptions:
a. Hermetically sealed motors.
b. Motors for equipment assemblies, less than 746 W (one HP), may be single phase provided the manufacturer of the proposed assemblies cannot supply the assemblies with three phase motors.
D. Horsepower ratings shall be adequate for operating the connected loads continuously in the prevailing ambient temperatures in areas where the motors are installed, without exceeding the NEMA standard temperature rises for the motor insulation.
B1 PACT Primary Care Renovations 04/21/20
21 05 12 - 3
E. Motor designs, as indicated by the NEMA code letters, shall be coordinated with the connected loads to assure adequate starting and running torque.
F. Motor Enclosures:
1. Shall be the NEMA types shown on the drawings for the motors.
2. Where the types of motor enclosures are not shown on the drawings, they shall be the NEMA types, which are most suitable for the environmental conditions where the motors are being installed.
3. Enclosures shall be primed and finish coated at the factory with manufacturer's prime coat and standard finish.
G. Additional requirements for specific motors, as indicated in other sections, shall also apply.
H. Energy-Efficient Motors (Motor Efficiencies): All permanently wired polyphase motors of 746 Watts or more shall meet the minimum full-load efficiencies as indicated in the following table, and as specified in this specification. Motors of 746 Watts or more with open, drip-proof or totally enclosed fan-cooled enclosures shall be NEMA premium efficiency type, unless otherwise indicated. Motors provided as an integral part of motor driven equipment are excluded from this requirement if a minimum seasonal or overall efficiency requirement is indicated for that equipment by the provisions of another section.
Minimum Efficiencies
Open Drip-Proof
Minimum Efficiencies
Totally Enclosed Fan-Cooled
Rating kW (HP)
RPM
RPM
RPM
Rating kW (HP)
RPM
RPM
RPM
0.746 (1) 82.5% 85.5% 77.0% 0.746 (1) 82.5% 85.5% 77.0%
1.12 (1.5) 86.5% 86.5% 84.0% 1.12 (1.5) 87.5% 86.5% 84.0%
1.49 (2) 87.5% 86.5% 85.5% 1.49 (2) 88.5% 86.5% 85.5%
2.24 (3) 88.5% 89.5% 85.5% 2.24 (3) 89.5% 89.5% 86.5%
3.73 (5) 89.5% 89.5% 86.5% 3.73 (5) 89.5% 89.5% 88.5%
5.60 (7.5) 90.2% 91.0% 88.5% 5.60 (7.5) 91.0% 91.7% 89.5%
7.46 (10) 91.7% 91.7% 89.5% 7.46 (10) 91.0% 91.7% 90.2%
11.2 (15) 91.7% 93.0% 90.2% 11.2 (15) 91.7% 92.4% 91.0%
14.9 (20) 92.4% 93.0% 91.0% 14.9 (20) 91.7% 93.0% 91.0%
18.7 (25) 93.0% 93.6% 91.7% 18.7 (25) 93.0% 93.6% 91.7%
22.4 (30) 93.6% 94.1% 91.7% 22.4 (30) 93.0% 93.6% 91.7%
29.8 (40) 94.1% 94.1% 92.4% 29.8 (40) 94.1% 94.1% 92.4%
37.3 (50) 94.1% 94.5% 93.0% 37.3 (50) 94.1% 94.5% 93.0%
44.8 (60) 94.5% 95.0% 93.6% 44.8 (60) 94.5% 95.0% 93.6%
B1 PACT Primary Care Renovations 04/21/20
21 05 12 - 4
56.9 (75) 94.5% 95.0% 93.6% 56.9 (75) 94.5% 95.4% 93.6%
74.6 (100) 95.0% 95.4% 93.6% 74.6 (100) 95.0% 95.4% 94.1%
93.3 (125) 95.0% 95.4% 94.1% 93.3 (125) 95.0% 95.4% 95.0%
112 (150) 95.4% 95.8% 94.1% 112 (150) 95.8% 95.8% 95.0%
149.2 (200) 95.4% 95.8% 95.0% 149.2 (200) 95.8% 96.2% 95.4%
I. Minimum Power Factor at Full Load and Rated Voltage: 90 percent at 1200
RPM, 1800 RPM and 3600 RPM.
J. Premium efficiency motors shall be used where energy cost/kW x (hours use/year) > 50.
PART 3 - EXECUTION
3.1 INSTALLATION:
Install motors in accordance with manufacturer’s recommendations, the
NEC, NEMA, as shown on the drawings and/or as required by other sections of these specifications.
3.2 FIELD TESTS
Megger all motors after installation, before start-up. All shall test free from grounds.
- - - E N D - - -
B1 PACT Primary Care Renovations 05/18/2011-1-16
21 08 00 - 1
SECTION 21 08 00
COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section apply to all sections of Division 21.
B. This project will have selected building systems commissioned. The complete list of equipment and systems to be commissioned is specified in Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS. The commissioning process, which the Contractor is responsible to execute, is defined in Section 01 91 00 GENERAL COMMISSIONING REQUIRMENTS. A
Commissioning Agent (CxA) appointed by the VA will manage the commissioning process.
1.2 RELATED WORK
A. Section 01 00 00 GENERAL REQUIREMENTS.
B. Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS.
C. Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 SUMMARY
A. This Section includes requirements for commissioning the Fire
Suppression systems, subsystems and equipment. This Section supplements the general requirements specified in Section 01 91 00
General Commissioning Requirements.
B. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for more details regarding processes and procedures as well as roles and responsibilities for all Commissioning Team members.
1.4 DEFINITIONS
A. Refer to Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS for definitions.
1.5 COMMISSIONED SYSTEMS
A. Commissioning of a system or systems specified in Division 21 is part of the construction process. Documentation and testing of these systems, as well as training of the VA’s Operation and Maintenance personnel in accordance with the requirements of Section 01 91 00 and of Division 21, is required in cooperation with the VA and the
Commissioning Agent.
B. The Fire Suppression systems commissioning will include the systems listed in Section 01 91 00 General Commissioning Requirements:
B1 PACT Primary Care Renovations 05/18/2011-1-16
21 08 00 - 2
1.6 SUBMITTALS
A. The commissioning process requires review of selected Submittals. The
Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to
Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details.
B. The commissioning process requires Submittal review simultaneously with engineering review. Specific submittal requirements related to the commissioning process are specified in Section 01 91 00 GENERAL
COMMISSIONING REQUIREMENTS.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 CONSTRUCTION INSPECTIONS
A. Commissioning of the building fire suppression systems will require inspection of individual elements of the fire suppression construction throughout the construction period. The Contractor shall coordinate with the Commissioning Agent in accordance with Section 01 91 00 and the Commissioning plan to schedule inspections as required to support the Commissioning Process.
3.2 PRE-FUNCTIONAL CHECKLISTS
A. The Contractor shall complete Pre-Functional Checklists to verify systems, subsystems, and equipment installation is complete and systems are ready for Systems Functional Performance Testing. The
Commissioning Agent will prepare Pre-Functional Checklists to be used to document equipment installation. The Contractor shall complete the checklists. Completed checklists shall be submitted to the VA and to the Commissioning Agent for review. The Commissioning Agent may spot check a sample of completed checklists. If the Commissioning Agent determines that the information provided on the checklist is not accurate, the Commissioning Agent will return the marked-up checklist to the Contractor for correction and resubmission. If the
Commissioning Agent determines that a significant number of completed checklists for similar equipment are not accurate, the Commissioning
Agent will select a broader sample of checklists for review. If the
Commissioning Agent determines that a significant number of the broader sample of checklists is also inaccurate, all the checklists for the
B1 PACT Primary Care Renovations 05/18/2011-1-16
21 08 00 - 3 type of equipment will be returned to the Contractor for correction and resubmission. Refer to SECTION 01 91 00 GENERAL COMMISSIONING
REQUIREMENTS for submittal requirements for Pre-Functional Checklists, Equipment Startup Reports, and other commissioning documents.
3.3 CONTRACTORS TESTS
A. Contractor tests as required by other sections of Division 21 shall be scheduled and documented in accordance with Section 01 00 00 GENERAL
REQUIREMENTS. All testing shall be incorporated into the project schedule. Contractor shall provide no less than 7 calendar days’ notice of testing. The Commissioning Agent will witness selected
Contractor tests at the sole discretion of the Commissioning Agent.
Contractor tests shall be completed prior to scheduling Systems
Functional Performance Testing.
3.4 SYSTEMS FUNCTIONAL PERFORMANCE TESTING
A. The Commissioning Process includes Systems Functional Performance
Testing that is intended to test systems functional performance under steady state conditions, to test system reaction to changes in operating conditions, and system performance under emergency conditions. The Commissioning Agent will prepare detailed Systems
Functional Performance Test procedures for review and approval by the
COR. The Contractor shall review and comment on the tests prior to approval. The Contractor shall provide the required labor, materials, and test equipment identified in the test procedure to perform the tests. The Commissioning Agent will witness and document the testing.
The Contractor shall sign the test reports to verify tests were performed. See Section 01 91 00 GENERAL COMMISSIONING REQUIREMENTS, for additional details.
3.5 TRAINING OF VA PERSONNEL
A. Training of the VA operation and maintenance personnel is required in cooperation with the COR and Commissioning Agent. Provide competent, factory authorized personnel to provide instruction to operation and maintenance personnel concerning the location, operation, and troubleshooting of the installed systems. Contractor shall submit training agendas and trainer resumes in accordance with the requirements of Section 01 91 00. The instruction shall be scheduled in coordination with the COR after submission and approval of formal training plans. Refer to Section 01 91 00 GENERAL COMMISSIONING
B1 PACT Primary Care Renovations 05/18/2011-1-16
21 08 00 - 4
REQUIREMENTS and Division 21 Sections for additional Contractor training requirements.
----- END -----
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 1
SECTION 21 10 00
WATER-BASED FIRE-SUPPRESSION SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. The design and installation of a new electric fire pump in the Building
1. The new fire pump will be a one for one replacement of the existing fire pump with regards to capacity and pressure, which is 1,000 gpm at
50 psi.
B. Remove the existing electric fire pump and all associated piping, valves, equipment and controllers.
C. Existing piping to be reused, replaced or removed as indicated on the drawings. Removal of piping to include all valves, flow switches, supervisory devices, hangers, supports, and associated fire alarm system conduit and wire.
1.2 RELATED WORK
A. Treatment of penetrations through rated enclosures: Section 07 84 00, FIRESTOPPING.
B. Access panels for plaster ceilings: Section 08 31 13, ACCESS DOORS AND
FRAMES.
C. Painting of exposed pipe: Section 09 91 00, PAINTING.
D. Section 21 05 11, COMMON WORK RESULTS FOR FIRE SUPPRESSION.
E. Alarm Supervision: Section 28 31 00, FIRE DETECTION AND ALARM.
F. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
1.3 DESIGN CRITERIA
A. The design, materials, equipment, installation, inspection, and testing of the fire pump shall be in accordance with the required advisory provisions of NFPA 13, 20 and 25.
1.4 QUALIFICATIONS:
A. Designer's Qualifications: Design work and shop drawings shall be prepared by a licensed engineer practicing in the field of Fire
Protection Engineering or a NICET (National Institute for Certification in Engineering Technologies) Level III sprinkler technician.
B. Installer's Qualifications: The installer shall possess a valid State fire protection contractor’s license. The installer shall provide documentation of having successfully completed three projects of similar size and scope.
C. On-site emergency service within four hours notification.
1.5 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 2
B. All plans shall be stamped by qualified P.E.
C. Emergency service point of contact name and 24 hour emergency telephone number.
D. Manufacturer’s Literature and Data:
1. Pipe and fittings.
2. Valves
3. Drips
4. Pressure Gages
5. Pipe Hangers and Supports
6. Water Flow Switches
7. Valve Tamper Switches
8. Fire Pump
9. Jockey Pump
10. Fire Pump Controller and Transfer Switch
11. Fire Pump Test Data
E. Detailed drawings in accordance with NFPA 20 (2007 edition). Drawings shall be prepared using CADD software and include all new and existing piping. Use format in use at the VA medical center. Drawings are subject to change during the bidding and construction periods. Any wall and ceiling changes occurring prior to the submittal of contractors shop drawings shall be incorporated into the contractors detailed design at no additional contract cost.
F. Operation and Maintenance Data:
1. Indicating Valves
2. Water Flow and valve tamper switches
3. Fire Pump
4. Jockey Pump
5. Copy of NFPA 25
G. Recommended preventive maintenance schedule.
1.6 AS-BUILT DOCUMENTATION
A. A mylar as-built drawing and two blueline copies shall be provided for each drawing. One copy of final CADD drawing files shall be in electronic format.
B. Four sets of manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
C. Four copies of the hydrostatic report and NFPA 20 material and test certificate.
D. Four sets of operation and maintenance data updated to include submittal review comments and any equipment substitutions including one copy of
NFPA 25.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 3
E. Manufacturers literature, reports and operation and maintenance data shall be in a labeled 3-ring binder.
1.7 WARRANTY
A. All work performed and materials and equipment furnished under this contract shall be free from defects for a period of one year from date of acceptance by the government.
B. All new piping and equipment incorporated into the new system shall be hydrostatically tested and warranted as new.
1.8 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
B. National Fire Protection Association (NFPA)
13-16...................Installation of Sprinkler Systems
14-16...................Installation of Standpipe and Hose Systems
20-16...................Installation of Centrifugal Fire Pump
24-16...................Installation of Private Fire Service Mains and
Their Appurtenances
25-14...................Inspection, Testing and Maintenance of water
Based Fire Protection Systems
70-14...................National Electrical Code
72-16...................National Fire Alarm Code
C. Underwriters Laboratories Inc. (UL)
2009....................Fire Protection Equipment Directory
D. Factory Mutual Engineering Corporation (FM)
2009....................Approval Guide.
E. American Society of Sanitary Engineering (ASSE)
1015-2005...............Double Check Backflow Prevention Assembly
F. Complete maintenance and inspection service for the fire pump shall be provided by a factory trained authorized representative of the manufacturer of the major equipment for a period of five years after acceptance of the entire installation by the government.
G. Contractor shall provide all necessary test equipment, parts and labor to perform required maintenance.
H. All inspections, testing and maintenance work required by NFPA 25, NFPA
20, NFPA 13 and recommended by the equipment manufacturer shall be provided. Work shall include operation of sprinkler system alarm and supervisory devices.
I. Maintenance and testing shall be performed on a quarterly basis. A computerized preventive maintenance schedule shall be provided and shall
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 4 describe the protocol for preventive maintenance of equipment. The schedule shall include a systematic examination, adjustment, and cleaning of all equipment.
J. Non-included Work: Maintenance service shall not include the performance of any work due to improper use, accidents or negligence for what the contractor is not responsible.
K. Service and emergency personnel shall report to the Engineering Office or their authorized representative upon arrival at the hospital and again upon the completion of the required work. A copy of the work ticket containing a complete description of work performed and parts replaced shall be provided.
L. Emergency Service:
1. Normal and overtime emergency call-back service shall consist of an on-site response to calls within four of notification.
2. Overtime emergency call-back service shall be limited to minor adjustments and repairs to effect the integrity of the system.
3. The fire pump must be operational before the responding service person leaves the facility.
M. The contractor shall maintain a log at the fire pump controller. The log shall list the date and time of all examinations and trouble calls, condition of the system, and name of technician. Each trouble call shall be fully described, including the nature of the trouble, necessary correction performed, and parts replaced.
PART 2 - PRODUCTS
2.1 GENERAL
All devices and equipment shall be Underwriters Laboratories Inc. listed for their intended purpose. All sprinklers shall be Factory Mutual approved.
2.2 PIPING AND FITTINGS
A. Pipe and fittings from inside face of building 300 mm (12 in.) above finished floor to a distance of approximately 1500 mm (5 ft.) outside building: Ductile Iron, flanged fittings and 316 stainless steel bolting.
B. Fire Protection water supply within the building up to sprinkler system isolation valves shall be per NFPA 13.
C. Threaded or flanged fittings shall be ANSIB1 6.3 cast iron, class 125 minimum. Threaded fittings are not permitted on pipe with wall thickness less than schedule 40.
D. All fittings on galvanized piping shall be galvanized in accordance with
ASTM A53.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 5
E. Slip type or clamp-on type rubber gasketed fittings shall be listed for each piping application.
F. Piping Materials Standards:
1. Ferrous piping – follow ASTM A 795 Standard
2. Welded and seamless steel pipe – follow ANSI/ASTM A 53
3. Wrought steel pipe – follow ANSI/ASME B36.10M
4. Electric resistance welded steel pipe – follow ASTM A 135
5. Seamless copper tube – follow ASTM B 75
6. Seamless copper water tube - follow ASTM B 88
7. Wrought seamless copper and copper alloy tube - follow ASTM B 251
8. Fluxes for soldering applications of copper and copper alloy tube – follow ASTM B 813
9. Brazing filler metal - follow AWS A5.8
10. Solder metal, 95-5 - follow ASTM B 32
11. Alloy material - follow ASTM B 446
12. Non-hmetallic piping CPVC pipe - follow ASTM F 442
G. Fitting Materials Standards:
1. Cast iron threaded fitting, Class 125 and 250 - follow ASME B16.4
2. Cast iron pipe flanges and flanged fittings - follow ASME B16.1
3. Malleable iron threaded fittings, Class 150 and 300 steel - follow
ASME B16.3
4. Factory made wrought steel buttweld fittings - follow ASME B16.9
5. Buttwelding ends for pipe, valves, flanges, and fitting - follow ASME
B16.25
6. Wrought copper and copper alloy solder joint pressure fittings – follow ASME B16.22
7. Cast copper alloy solder joint pressure fitting - follow ASME B16.18
8. Chlorinated polyvinyl chloride (CPVC) - follow ASTM F 437
2.3 VALVES
A. Listed Indicating Valves:
1. Gate: OS&Y, 1200 kPa (175 lb.) WOG or equal.
2. Butterfly: Gear operated, indicating type, 1200 kPa (175 lb.) WOG or equal. Butterfly valves are to be installed in a manner that does not interfere with the operation of any system component.
3. Ball (inspectors test and drain only): iron body, stainless steel trim, for 2050 kPa (300 psi) service, indicating type.
4. Ball and butterfly valves shall not be used on incoming water service, and on the suction side of either the fire pump or jockey pump.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 6
B. Check Valves: Swing type, rubber faced or wafer type spring loaded butterfly check valve, 1200 kPa (175 lb.) WOG or equal.
C. Drain Valves: Threaded bronze angle, globe, ball or butterfly, 1000 kPa
(150 lb.) WOG or equal equipped with reducer and hose connection with cap or connected to a drain line.
2.4 AUTOMATIC BALL DRIPS
Cast brass 20 mm (3/4 in.) in line automatic ball drip with both ends threaded with iron pipe threads.
2.5 TOOLS AND REPLACEMENT PARTS
A. Sprinkler system water flow switch: one of each size provided.
B. Sprinkler system valve tamper switch: one of each type provided.
2.6 FIRE PUMP
A. Provide a fire pump system, complete with pump, motor, controller, accessories, and complying with all the requirements of NFPA 20 latest edition. Pump shall deliver not less than 65 percent of rated head at
150 percent of rated capacity. Churn pressure shall not exceed
140 percent of rated design pressure. B. Provide a horizontal base mounted, split case, bronze fitted, single stage, double suction, centrifugal fire pump.
C. Mount pump on a fabricated steel base complete with coupling and direct connect to a open drip-proof, ball bearing, squirrel cage induction motor. Locked rotor current shall not exceed the values specified in
NFPA 20.
D. Provide fire pump controller, approved for fire pump service, completely assembled, wired and tested at the factory. Mark controller “Fire Pump
Controller”. Enclose equipment in approved NEMA 3R enclosure. The combined manual and automatic type controller shall include the following:
1. Disconnect switch, externally operable, quick break type.
2. Circuit breaker, time delay type with trips in all phases for
300 percent of the motor full load current.
3. Motor starter soft start type capable of being energized automatically through the pressure switch or manually be means of an externally operable handle.
4. Running period timer set to keep motor in operation, when started automatically, for a period not to exceed ten minutes.
5. Pilot lamp to indicate circuit breaker closed and power available.
6. Ammeter test link and voltmeter test line.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 7
7. Alarm relay to energize an audible or visible alarm through an independent source of power to indicate circuit breaker open or power failure.
8. Provide means on the controller to operate an alarm contact continuously while the pump is running.
//9. Provide all necessary wiring and interface circuitry to enable fire alarm system to accept monitoring signals from controller. //
E. Provide fire pump controller with an automatic and manual built-in emergency transfer switch specifically approved for fire pump service.
All wiring between the fire pump controller and the transfer switch shall be done at the factory and the entire unit assembly factory tested. The transfer switch shall include emergency power isolation switch, control relays, solid state sensing and timing equipment as well as the power transfer switch all in an NEMA 3R enclosure.
F. Hydrostatically test the pump at 150 percent of the working pressure but in no case to less than 1700 kPa (250 psi). Provide a complete factory performance test and furnish characteristic curves prepared from the test results.
G. Include the following accessories with the fire pump unit:
1. Eccentric tapered suction reducer.
2. Concentric tapered discharged increaser.
3. Hose valves.
4. Caps and chains.
5. Pressure gages.
6. Circulation relief valve.
7. Automatic air release valve.
8. Ball drip valve.
9. Coupling guard.
10. Water measuring device.
11. Test header.
H. Provide the services of a factory-trained representative to align coupling and be available to assist in final acceptance test.
I. Set main relief valve to prevent pressure on the fire protection system components in excess of that pressure which the system is capable of withstanding. Install in accordance with NFPA 20.
J. Water Measuring Device: Capable of water flow of not less than
175 percent of pump rated capacity, to test the pump. Provide discharge drain line from the device to a suitable drain.
LK Pump Settings:
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 8
1. Jockey Pump Stop Point: Pump churn pressure plus the minimum static supply pressure.
2. Jockey Pump Start Point: Jockey pump stop point less 70 kPa (10 psi).
3. Fire Pump Start Point: Jockey pump start point less 35 kPa (5 psi).
Use 70 kPa (10 psi) increments for each additional fire pump.
4. Where minimum run timer is provided, fire pump shall continue to operate after attaining these pressures. Final pressures shall not exceed pressure rating of the system.
5. When the operating differential of pressure switches does not permit these settings, settings shall be as close as equipment will permit.
Establish settings through observation of pressures on test gages.
6. When minimum run timer is provided, the fire pump shall continue to operate at churn pressure beyond the stop setting. Final pressure shall not exceed the pressure rating of the system components.
2.7 JOCKEY PUMP
A. Provide jockey pump capable of delivering 15 gpm when operating at a total developed head of 30 PSI.
B. Pump shall be close coupled turbine type, cast iron frame and case, bronze impeller, bronze fitted, stainless steel shaft, tungsten carbide mechanical seal.
C. D. Jockey Pump Controller: UL Listed, with magnetic starter, fusible disconnect switch, hand-off automatic selector switch, control circuit transformer, running period timer, adjustable Mercury tube pressure switch, and NEMA 2, driptight.
E. Jockey pumps must be sized to make up the allowable leakage rate within
10 minuets or 1 GPM whichever is larger and should have rated capacities of not less than accepted leakage rate. They shall have discharge pressure sufficient to maintain the desired fire protection system pressure.
2.8 IDENTIFICATION SIGNS
Provide for all new and existing sectional valves, riser control valves, system control valves, drain valves, test and drain connections and alarm devices with securely attached identification signs (enamel on metal) in accordance with NFPA 13.
2.9 WATERFLOW SWITCHES
A. Integral, mechanical, non-coded, non-accumulative retard type, with two sets of SPDT auxiliary contacts and adjustable from 0 to 90 seconds. Set flow switches at an initial setting between 20 and 30 .
B. All conduit and wiring connected thereto, shall be provided in Section
28 31 00, FIRE DETECTION AND ALARM.
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 9
2.10 VALVE SUPERVISORY SWITCHES
A. Provide each indicating sprinkler, standpipe and fire pump control valve with adequate means for mounting a valve supervisory switch.
B. Mount switch so as not to interfere with normal operation of the valve and adjust to operate within two revolutions toward the closed position of the valve control, or when the stem is moved no more than one fifth of the distance from its normal position.
C. The mechanism shall be contained in a weatherproof die cast aluminum housing, which shall provide a 20 mm (3/4 in.) tapped conduit entrance and incorporate the necessary facilities for attachment to the valves.
D. Switch housing to be finished in red baked enamel.
E. Supervisory switches for ball and butterfly valves may be integral with the valve.
F. All conduit and wiring connected thereto shall be provided in Section 28
31 00, FIRE DETECTION AND ALARM.
2.11 WALL, FLOOR AND CEILING PLATES
A. Exposed piping passing through walls, floors or ceilings shall be provided with chrome colored escutcheon plates.
B. Comply with NFPA 101 Fire Barrier Penetration codes.
2.12 PRESSURE GAUGE
A. Provide the appropriate pressure gauge, 690 kPa (100 psi) or 1280 kPa
(200 psi) pressure gauge on the suction and discharge of the fire pump.
2.13 HANGERS
A. Hangers shall be designed to support five times the weight of the water filled pipe pluse 250 Lb (114Kg) at each point of piping support.
B. These points of support shall be adequate to support the system.
C. The spacing between hangers shall not exceed the value given for the type of pipe as indicated in NFPA 13 tables.
D. Hanger components shall be ferrous.
E. Detailed calculations shall be submitted, when required by the reviewing
Authority, showing stress developed in hangers, piping, fittings and safety factors allowed.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Supervisory Switches: For each indicating main service entrance, fire pump supply and discharge, jockey pump supply and discharge control valve, provide a supervisory switch that is connected to the fire alarm system.
B. Drains, Test Pipes and Accessories:
B1 PACT Primary Care Renovations 04/21/20
21 10 00 - 10
1. Provide a drain connection on valved sections and drains at other locations for complete drainage of the system. Discharge riser outside over splash block, indirectly over standpipe drain connected to storm sewer, or as indicated. The main drain shall be capable of full discharge test without allowing water to flow onto the floor.
C. Piping arrangement shall avoid contact with other piping and equipment and allow clear access to other equipment or devices requiring access or maintenance.
D. Cutout disks, which are created by cutting holes in the walls of pipe for flow switches and non-threaded pipe connections, shall be affixed near to the pipe where the originated. They shall be displayed until final inspection and then removed.
E. Firestopping shall comply with Section 07 84 00, FIRESTOPPING. All holes through stairways, smoke barrier walls, and fire walls shall be sealed on a daily basis.
F. Install access doors in ceilings of rooms where above ceiling access is required.
Q. Provide and install “Fire Pump Out of Service” signs. Locate signs by the fire department connection, the fire alarm control panel, the remote fire alarm annunciator and any other location requested by the AHJ.
3.2 TEST
A. Centrifugal Fire Pumps: NFPA 20.
3.3 INSTRUCTIONS
Furnish the services of a competent instructor for not less than two four-hour periods for instructing personnel in the operation and maintenance of the fire pump and sprinkler system, on the dates requested by the COTR.
- - - END - - -
B1 PACT Primary Care Renovations 04/21/20
21 13 13 - 1
SECTION 21 13 13
WET-PIPE SPRINKLER SYSTEMS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Design, installation and testing shall be in accordance with
NFPA 13.
B. The design, modification and installation of a hydraulically calculated automatic wet-pipe system complete and ready for operation, as indicated on the drawings and as further required by these specifications.
1.2 RELATED WORK
A. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
B. Section 33 10 00, WATER UTILITIES.
C. Section 07 84 00, FIRESTOPPING.
D. Section 09 91 00, PAINTING.
E. Section 28 31 00, FIRE DETECTION AND ALARM.
F. Section 21 30 13, ELECTRIC-DRIVEN FIRE PUMPS.
1.3 DESIGN CRITERIA
A. Design Basis Information: Provide design, materials, equipment, installation, inspection, and testing of the automatic sprinkler system in accordance with the requirements of NFPA 13.
1. Perform hydraulic calculations in accordance with NFPA 13 utilizing the Area/Density method. Do not restrict design area reductions permitted for using quick response sprinklers throughout by the required use of standard response sprinklers in the areas identified in this section.
2. Sprinkler Protection: Sprinkler hazard classifications shall be in accordance with NFPA 13. The hazard classification examples of uses and conditions identified in the Annex of NFPA 13 shall be mandatory for areas not listed below. Request clarification from the
Government for any hazard classification not identified. To determining spacing and sizing, apply the following coverage classifications:
a. Light Hazard Occupancies: Patient care, treatment, and customary access areas.
B1 PACT Primary Care Renovations 04/21/20
21 13 13 - 2
b. Ordinary Hazard Group 1 Occupancies: Laboratories, Mechanical
Equipment Rooms, Transformer Rooms, Electrical Switchgear Rooms, Electric Closets, and Repair Shops.
c. Ordinary Hazard Group 2 Occupancies: Storage rooms, trash rooms, clean and soiled linen rooms, pharmacy and associated storage, laundry, kitchens, kitchen storage areas, retail stores, retail store storage rooms, storage areas, building management storage, boiler plants, energy centers, warehouse spaces, file storage areas for the entire area of the space up to 140 square meters
(1500 square feet) and Supply Processing and Distribution (SPD).
3. Hydraulic Calculations: Calculated demand including hose stream requirements shall fall no less than 10 percent below the available water supply curve.
4. Water Supply: Base water supply on a flow test of:
a. Location Flow Hydrant #23 Pressure Hydrant #8
b. Static pressure: 70 psi
e. Residual pressure: 55 psi
f. Flow: 1,061 gpm
g. Date: November 22, 2017
5. Zoning:
a. For each sprinkler zone provide a control valve, flow switch, and a test and drain assembly with pressure gauge. For buildings greater than two stories, provide a check valve at each control valve.
b. Sprinkler zones shall conform to the smoke barrier zones shown on the drawings.
6. Provide seismic protection in accordance with NFPA 13. Contractor shall submit load calculations for sizing of sway bracing for systems that are required to be protected against damage from earthquakes.
1.4 SUBMITTALS
A. Submit as one package in accordance with Section 01 33 23, SHOP
DRAWINGS, PRODUCT DATA, AND SAMPLES. Prepare detailed working drawings that are signed by a NICET Level III or Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field
B1 PACT Primary Care Renovations 04/21/20
21 13 13 - 3 of Fire Protection Engineering. As the Government review is for technical adequacy only, the installer remains responsible for correcting any conflicts with other trades and building construction that arise during installation. Partial submittals will not be accepted. Material submittals shall be approved prior to the purchase or delivery to the job site. Suitably bind submittals in notebooks or binders and provide an index referencing the appropriate specification section. In addition to the hard copies, provide submittal items in
Paragraphs 1.4(A)1 through 1.4(A)5 electronically in pdf format on a compact disc or as directed by the COR. Submittals shall include, but not be limited to, the following:
1. Qualifications:
a. Provide a copy of the installing contractors contractor’s license.
b. Provide a copy of the NICET certification for the NICET Level III or Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a
Registered Professional Engineer licensed in the field of Fire
Protection Engineering.
c. Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years.
2. Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA
13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Include a plan showing the piping to the water supply test location.
3. Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet.
4. Calculation Sheets:
a. Submit hydraulic calculation sheets in tabular form conforming to the requirements and recommendations of the Plans and
Calculations chapter of NFPA 13.
B1 PACT Primary Care Renovations 04/21/20
21 13 13 - 4
5. Valve Charts: Provide a valve chart that identifies the location of each control valve. Coordinate nomenclature and identification of control valves with COR. Where existing nomenclature does not exist, the chart shall include no less than the following: Tag ID
No., Valve Size, Service (control valve, main drain, aux. drain, inspectors test valve, etc.), and Location.
6. Final Document Submittals: Provide as-built drawings, testing and maintenance instructions in accordance with the requirements in
Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES. In addition, submittals shall include, but not be limited to, the following:
a. A complete set of as-built drawings showing the installed system with the specific interconnections between the system switches and the fire alarm equipment. Provide a complete set in the formats as follows. Submit items 2 and 3 below on a compact disc or as directed by the COR.
1) One full size (or size as directed by the COR) printed copy.
2) One complete set in electronic pdf format.
3) One complete set in a format as directed by the COR.
b. Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA
13. Certificates shall be provided to document all parts of the installation.
c. Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. The manuals shall include the manufacturer's name, model number, parts list, and tools that should be kept in stock by the owner for routine maintenance, including the name of a local supplier, simplified wiring and controls diagrams, troubleshooting guide, and recommended service organization, including address…