V2-892PC2037MNC_BD_DRAWINGS_02-22-2021_Part2.pdf
PDF 25 MB Posted
- Solicitation number
- 36c10f21r0018
About this file
This document provides details on a federal contract opportunity for construction services. The solicitation number is 36c10f21r0018 for the Y1PC--Miramar National Cemetery Phase 2 Construction project. The opportunity type is a solicitation issued by the Department of Veterans Affairs Office of Construction and Facilities Management. The description provided indicates this opportunity is for phase two of construction services at the Miramar National Cemetery. No further details on required construction products or services, response dates, or other salient information are included in this document.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FEC
A1 A2 A3 A4 A5 A6 A7 A8 A12 A13
AA
AB
AC
AD
AE
AF
A9 A10 A11
MENS
RESTROOM
A202
WOMENS
RESTROOM
A204
COMPANION
RESTROOM
A203
BREEZE
WAY
A200
STORAGE
A205
H.A.C.
A201
RECEPTION
A101
CONFERENCE
A102
CUSTOMER
ASSISTANCE
A103
OPEN
OFFICE
A104
BUDGET
OFFICE
A113
DIRECTOR
A105
ASST.
DIRECTOR
A114
OPERATION
CENTER
A106
BREAK
ROOM
A108
CORRIDOR
A111
ADMIN
OFFICE
A115
RESTROOM
A109
RESTROOM
A110
ELEC
A112
STORAGE
A107
F1 F1 F1 F1F1
EQUIPMENT RACK
(E) POWER / DATA
F2 F2 F2 F2 F2F2 F2
F3 F3 F3F3 F3F3 F3
F3
F4F4
F4 F4
F5
F6 F6
(E)101B (E)101C
A105A
(E)107A
A115A
A111B
A B
(E )1
A
A A
(E )1
A
(E )1
A
A207A
F7
F7 F7 F7 F7 F7 F7 F7 F7 F7 F7 F7 F7 F7 F7
F7 F7
F7
F7
F7
F7
F7F7F7 F7
F7
104.1
111.1
111.2.1111.2.2111.3
113.1
113.2
GENERAL NOTES
1. SEE A-002 FOR ADDITIONAL SIGNAGE INFORMATION.
0' 2' 4' 8'
1/4" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 109
ADMINISTRATION COMPLEX
FURNITURE AND SIGNAGE PLAN
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
FURNITURE AND SIGNAGE PLAN
F7 CORNER GUARD FULL HEIGHT 26
F6 METAL LOCKERS (E) 2 (E) TO BE REMOVED
F5 ROUND TABLE WITH (4) CHAIRS 36" DIA x 30" H 1
F4 EXECUTIVE FURNITURE - (1) EXECUTIVE CHAIR, (2) GUEST
CHAIRS, (2) DESKS
F3 WORK STATION - (1) CHAIR, (2) DESKS 96" x 96" SPACE 8
F2 METAL STORAGE CABINET 36" W x 18" D x 72" H 7 (E) TO BE RELOCATED
F1 METAL LATERAL FILE CABINET 36" W x 24" D x 42" H 5
MARK DESCRIPTION DIMENSIONS QTY NOTES
FURNITURE SCHEDULE - ADMINISTRATION COMPLEX
113.2 1* ASSISTANT DIRECTOR
[BRAILLE]
113.1 1* DIRECTOR
[BRAILLE]
113 BUDGET OFFICE
111.3 1* CUSTOMER ASSISTANCE
[BRAILLE]
111.2.2 1* CEMETARY REPS
[BRAILLE]
111.2.1 1* CEMETARY REPS
[BRAILLE]
111.1 (E) 2* EXIT
[BRAILLE]
RELOCATE (E)
111 CORRIDOR
104.1 1* ADMIN OFFICER
[BRAILLE]
104 OPEN OFFICE
SIGN # SIGN TYPE MESSAGE REMARKS
ROOM # ROOM NAME
SIGNAGE SCHEDULE - ADMINISTRATION COMPLEX
* MATCH (E) SIGNAGE TYPE INFORMATION
Revision Date Dwg. 159 of 243
AA T.O.R.
20' - 2 1/2"
AA F.F.
0' - 0"
AAABACADAEAF
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
CAST STONE CAP
BATTERED COLUMN
GUTTER
AA 301
AA T.O.S.
13' - 0"
CONDENSER UNIT, SEE MECHANICAL
PORTLAND CEMENT
PLASTER
CAST STONE BASE
STANDING SEAM
METAL ROOF
MANUFACTURED
MASONRY COLUMN
CARD READER
RAIN CHAIN TO
SPLASH BLOCK
A111B
(E) CJ
(E) HB
(E) HOSE BIBB
WALL PACK LIGHT
LOUVER, SEE
MECHANICAL
PAINT OR FOG COAT
COMPLETE PANEL
TO MATCH
CUT BACK (E)
PLASTER AND INFILL
TO MATCH
AA T.O.R.
20' - 2 1/2"
AA F.F.
0' - 0"
A2 A3 A4 A5 A6 A7 A8 A12 A13
AA T.O. CAST STONE
14' - 0"
AA B.O. SOFFIT
9' - 0"
A9 A10
A11
AA 301
AA T.O.S.
13' - 0"
AA 301
STOREFRONT
MANUFACTURED MASONRY COLUMN
STANDING SEAM METAL ROOF
GUTTER
CAST STONE CAP
CAST STONE BASE
OPEN TO
BEYOND
GRADE
SIDEWALK
DRAIN PIPING WITH
LAMBS SPOUT (2)
RAIN CHAIN TO
SPLASH BLOCK
RAIN CHAIN TO
SPLASH BLOCK
33333
AA F.F.
0' - 0"
A8A12A13
AA T.O. CAST STONE
14' - 0"
ALUMINUM SCUPPER BOX
WITH 4" DOWNSPOUT
PORTLAND CEMENT
PLASTER
CAST STONE
CAP
MANUFACTURED MASONRY
COLUMN
WALL PACK
LIGHT
SPLASH BLOCK, SEE
CONDENSER UNITS,
SEE MECHANICAL
/6 AA 508
EXPANSION JOINT IN
CORNER, SEE /9 AA 502
AA F.F.
0' - 0"
ABACAD
AA B.O. SOFFIT
9' - 0"
RELOCATED
GRAVE LOCATOR
PORTLAND CEMENT
PLASTER WALL
(E) BATTERED COLUMN
4" CAST STONE BASE
(E
M A
T C
H
GENERAL NOTES
1. SEE STRUCTURAL DRAWINGS FOR CONCRETE SLAB AND
FOOTINGS.
2. SLOPE ALL SIDEWALKS AND GRADE AWAY FROM BUILDING
MINIMUM 1/4" : 12" UNLESS NOTED OTHERWISE BY CIVIL OR
LANDSCAPE DRAWINGS.
3. SEE AA601 FOR DOOR, WINDOW, AND LOUVER SCHEDULES.
0' 2' 4' 8'
1/4" = 1'-0"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 201
ADMINISTRATION COMPLEX
EXTERIOR ELEVATIONS
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
EAST
1/4" = 1'-0"3
SOUTH
1/4" = 1'-0"2
EAST - 2
1/4" = 1'-0"4
GRAVE LOCATOR WALL
Revision Date Dwg. 160 of 243
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
(E) STOREFRONT
STOREFRONT
RELOCATED
(E) FIRE ALARM,
(E) SECURITY ALARM,
HEIGHT TO MATCH EXISTING A104B
2 4 4 4
(E)104A (E)103A
WALL BASE
AS SCHEDULED
SIGNAGE AS SCHEDULED
SIGNAGE AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
STOREFRONT (E) STOREFRONT
MECHANICAL
SHADE CLOTH, TYP
3 3 3 3
WALL BASE
AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
STOREFRONT
A115A
1.1
WALL BASE
AS SCHEDULED
SOFFIT
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
(E)101C
(E) STOREFRONT
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
(E) STOREFRONT
OPEN
TO
BEYOND
OPEN TO
BEYOND
(E) ELECTRICAL PANEL
CARD READER
PARTIAL
HEIGHT
WALL
WALL BASE
AS SCHEDULED
[1.7 m]
5' - 6"
[1 .1 m
[1 .1 m
[2.6 m]
8' - 6"
(E) FEC
AA 506
AA 506
SS-1 SS-1
(E)106A (E)109A (E)110A
WALL BASE
AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
A111B
SIGNAGE AS
SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
A104B
4 4 4 2
(E)104A WALL BASE AS
SCHEDULED,
ENTIRE ROOM
STOREFRONT
(E) STOREFRONT
AIR RETURN GRILLES,
SEE MECHANICAL
GENERAL NOTES
1. SEE AA109 FOR FURNITURE AND SIGNAGE SCHEDULES.
2. SEE AA601 FOR DOOR AND DOOR FRAME SCHEDULES.
3. SEE AA601 FOR GLAZING INFORMATION.
4. SEE A002 FOR FIXTURE MOUNTING HEIGHTS AND SIGNAGE DETAILS.
5. SEE AA601 FOR FINISH SCHEDULE.
0' 2' 4' 8'
1/4" = 1'-0"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 202
ADMINISTRATION COMPLEX
INTERIOR ELEVATIONS
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"3
CORRIDOR A111 - SOUTH
1/4" = 1'-0"7
OPEN OFFICE A104 - SOUTH
1/4" = 1'-0"5
OPEN OFFICE A104 - EAST
1/4" = 1'-0"4
CORRIDOR A111 - WEST
1/4" = 1'-0"1
CORRIDOR A111 - NORTH
1/4" = 1'-0"2
CORRIDOR A111 - EAST
1/4" = 1'-0"6
OPEN OFFICE A104 - NORTH
Revision Date Dwg. 161 of 243
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
(E) GLAZING
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
STOREFRONT
GLAZING
WALL BASE
AS SCHEDULED
A105A
SIGNAGE AS
SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
AA B/FRAME
14' - 0"
STOREFRONT
A114A
WALL BASE
AS SCHEDULED
FAN COIL UNIT AT 9'-0" AFF,
SEE MECHANICAL
SIGNAGE AS
SCHEDULED
LIGHT FIXTURE AT 9'-6" AFF,
SEE ELECTRICAL
AA F.F.
0' - 0"
AA B.O. SOFFIT 2
18' - 0"
AA B/FRAME
14' - 0"
OPEN TO
BEYOND
(E) GLAZING
LIGHT FIXTURE AT 9'-6" AFF,
SEE ELECTRICAL
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
AA B/FRAME
14' - 0"
(E) STOREFRONT
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
(E) DOOR
CARD
READER (E)107A
WALL BASE AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
AA B/FRAME
14' - 0"
(E)106A
(E) WINDOW
(E) STOREFRONT
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
(E) GLAZING
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B/FRAME
14' - 0"
(E) STOREFRONT
(E) LIGHT FIXTURE TO REMAIN
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
GLAZING
STOREFRONT
A105A
WALL BASE
AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT 2
18' - 0"
AA B/FRAME
14' - 0"
(E) WINDOW
GWB INFILL
WALL BASE
AS SCHEDULED
FAN COIL UNIT AT 9'-0" AFF,
SEE MECHANICAL
(E) LIGHT FIXTURE TO REMAIN
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
GENERAL NOTES
1. SEE AA109 FOR FURNITURE AND SIGNAGE SCHEDULES.
2. SEE AA601 FOR DOOR AND DOOR FRAME SCHEDULES.
3. SEE AA601 FOR GLAZING INFORMATION.
4. SEE A002 FOR FIXTURE MOUNTING HEIGHTS AND SIGNAGE DETAILS.
5. SEE AA601 FOR FINISH SCHEDULE.
AA F.F.
0' - 0"
AA B.O. SOFFIT 2
18' - 0"
FAN COIL UNIT AT 9'-0" AFF,
SEE MECHANICAL
A114A
WALL BASE
AS SCHEDULED
STOREFRONT
LIGHT FIXTURE AT 9'-6" AFF,
SEE ELECTRICAL
0' 2' 4' 8'
1/4" = 1'-0"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 203
ADMINISTRATION COMPLEX
INTERIOR ELEVATIONS
892PC2037.23
Checker HH LL
1/4" = 1'-0"2
BUDGET OFFICE A113 / ASST. DIRECTOR A114 - EAST
1/4" = 1'-0"4
BUDGET OFFICE A113 / ASST. DIRECTOR A114 - WEST
1/4" = 1'-0"1
BUDGET OFFICE A113 - NORTH
1/4" = 1'-0"3
BUDGET OFFICE A113 - SOUTH
1/4" = 1'-0"5
OPERATION CENTER A106 - NORTH
1/4" = 1'-0"6
OPERATION CENTER A106 - EAST
1/4" = 1'-0"7
OPERATION CENTER A106 - SOUTH
1/4" = 1'-0"8
OPERATION CENTER A106 - WEST
1/4" = 1'-0"9
DIRECTOR A105 - NORTH
1/4" = 1'-0"10
DIRECTOR A105 - EAST
1/4" = 1'-0"11
DIRECTOR A105 - SOUTH
1/4" = 1'-0"12
DIRECTOR A105 - WEST
1/4" = 1'-0"13
ASST. DIRECTOR A114 - SOUTH
Revision Date Dwg. 162 of 243
AA F.F.
0' - 0"
RELOCATED
(E) GRAVE LOCATOR
2 x WOOD FRAME, PAINTED
[0 .7 m
FAN COIL UNIT,
SEE MECHANICAL
AA F.F.
0' - 0"
AA F.F.
0' - 0"
WALL BASE
AS SCHEDULED
A207A
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
WALL BASE
AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
STOREFRONT
MECHANICAL
SHADE CLOTH
AA F.F.
0' - 0"
AA B.O. SOFFIT
9' - 0"
STOREFRONT
A115A
1.1
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
WALL BASE
AS SCHEDULED
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
(E)107A
GENERAL NOTES
1. SEE AA109 FOR FURNITURE AND SIGNAGE SCHEDULES.
2. SEE AA601 FOR DOOR AND DOOR FRAME SCHEDULES.
3. SEE AA601 FOR GLAZING INFORMATION.
4. SEE A002 FOR FIXTURE MOUNTING HEIGHTS AND SIGNAGE DETAILS.
5. SEE AA601 FOR FINISH SCHEDULE.
0' 2' 4' 8'
1/4" = 1'-0"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 204
ADMINISTRATION COMPLEX
INTERIOR ELEVATIONS
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
STORAGE A207 - NORTH
1/4" = 1'-0"2
STORAGE A207 - EAST
1/4" = 1'-0"3
STORAGE A207 - SOUTH
1/4" = 1'-0"4
STORAGE A207 - WEST
1/4" = 1'-0"5
ADMIN OFFICE A115 - NORTH
1/4" = 1'-0"6
ADMIN OFFICE A115 - EAST
1/4" = 1'-0"7
ADMIN OFFICE A115 - SOUTH
1/4" = 1'-0"8
ADMIN OFFICE A115 - WEST
1/4" = 1'-0"9
STORAGE A107 - SOUTH
1/4" = 1'-0"10
STORAGE A107 - WEST
Revision Date Dwg. 163 of 243
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 205
ADMINISTRATION COMPLEX
PERSPECTIVE VIEWS
892PC2037.23
J ZUBIK HH LL
SOUTH VIEW
NORTHEAST VIEW
Revision Date Dwg. 164 of 243
AA T.O.R.
20' - 2 1/2"
AA F.F.
0' - 0"
A1 A2 A3 A4 A5 A6 A7 A8 A12 A13
AA T.O. CAST STONE
14' - 0"
A9 A10
A11
AA T.O.S.
13' - 0"
CAST STONE CAP
WOMENS
RESTROOM
A204
STORAGE
A205
BREEZE
WAY
A200
CONFERENCE
A102
CUSTOMER
ASSISTANCE
A103
OPEN
OFFICE
A104
ADMIN
OFFICE
A115 4 4 4 2
A104B
PHOTOVOLTAIC PANELS
ON ALUM RACK
AA F.F.
0' - 0"
AB AC AD AE AF
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA 302
AA 302
BATTERED COLUMN
STOREFRONT
STANDING SEAM METAL ROOF
RESTROOM
A109
CORRIDOR
A111
OPEN
OFFICE
A104
CAST STONE BASE
RAIN CHAIN
GUTTER
CAST STONE CAP
A115AA111B
1.1
AA T.O.R.
20' - 2 1/2"
AA F.F.
0' - 0"
A1 A2 A3 A4 A5 A6 A7 A8 A12 A13
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
A9 A10
A11
MANUFACTURED
MASONRY COLUMN
CAST STONE CAP
MEMBRANE ROOFING
OPEN
TO BEYOND
OPEN
TO
BEYOND
MENS
RESTROOM
A202
BREEZE
WAY
A200
RECEPTION
A101
CORRIDOR
A111
AA 303
PHOTOVOLTAIC PANELS
ON ALUM RACK
HVAC UNIT, SEE MECHANICAL
A114A
HVAC UNIT, SEE MECHANICAL
AA T.O.R.
20' - 2 1/2"
AA F.F.
0' - 0"
AA AB AC AD AE AF
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
AA B.O. SOFFIT 2
18' - 0"
DUCTWORK,
SEE MECHANICAL
ASST.
DIRECTOR
A114
BUDGET
OFFICE
A113
CORRIDOR
A111
OPEN
OFFICE
A104
AA F.F.
0' - 0"
AB AC AD AE AF
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
RESTROOM
A109
CORRIDOR
A111
OPEN
OFFICE
A104
BATTERED COLUMN
ROOF DRAIN PIPING
WITH LAMBS SPOUT (2)
STANDING SEAM METAL ROOF
GUTTER
CAST STONE CAP
ROOF DRAIN
AND OVERFLOW
PHOTOVOLTAIC PANELS
ON ALUM RACK
AA 303
A111B A115A
1.1
0' 24' 48' 96'
3/16" = 1'-0"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 301
ADMINISTRATION COMPLEX
SECTIONS
892PC2037.23
Checker HH LL
3/16" = 1'-0"1
SECTION 1
3/16" = 1'-0"3
SECTION 3
3/16" = 1'-0"2
SECTION 2
3/16" = 1'-0"5
SECTION 5
3/16" = 1'-0"4
SECTION 4
Revision Date Dwg. 165 of 243
AF
AA T.O. CAST STONE
14' - 0"
AA B.O. SOFFIT
9' - 0"
CONCRETE SLAB,
SEE STRUCTURAL
WALL BASE,
AS SCHEDULED
GYPSUM WALLBOARD
OPEN OFFICE EXTERIOR
ALUMINUM FRAME
WOOD HEADER,
SEE STRUCTURAL
GYPSUM WALLBOARD
TONGUE AND
GROOVE WOOD
CEILING ON JOIST,
SEE STRUCTURAL
SHEATHING SEALED
AIR BARRIER
GUTTER
STANDING SEAM
METAL ROOF ON
WEATHER BARRIER
ON PLYWOOD
FORMED
METAL FASCIA
MANUFACTURED
MASONRY
BEYOND
CAST STONE
BASE
VAPOR BARRIER
AND FILL UNDER
CONCRETE SLAB
AWNING VENT
COBBLE
CAST STONE CAP
FLASHING AT
DOWNSIDE SLOPE OF
COLUMN
FLASHING AT UPSIDE
SLOPE OF COLUMN
FLASHING AT SIDE
SLOPE OF COLUMN
AA 501
AA 501
AA 508
SIM
/3 AA 503
AA 502
[1.1 m]
3' - 6"
WITH SHADE
WITHOUT SHADE
CONTINUOUS AIR BARRIER
AA F.F.
0' - 0"
AD AE
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
AA T.O.S.
13' - 0"
CONCRETE SLAB,
SEE STRUCTURAL
WALL BASE
AS SCHEDULED
OPEN OFFICE
ALUMINUM FRAME
GYPSUM WALLBOARD
CAST STONE CAP
MANUFACTURED
MASONRY ON METAL
LATH ON (2) LAYERS
WEATHER BARRIER ON
PLYWOOD
STANDING SEAM
METAL ROOF ON
WEATHER BARRIER
ON PLYWOOD
WOOD CEILING ON JOIST,
SEE STRUCTURAL
MEMBRANE ROOF
ON COVER BOARD
ON R-30
TAPERED INSULATION
ON PLYWOOD
(E) GYPSUM
WALLBOARD
CORRIDORRESTROOM
WOOD HEADER,
SEE STRUCTURAL
FIRE BLOCKING
VAPOR BARRIER AND FILL
UNDER CONCRETE SLAB
ACOUSTICAL
CEILING TILE
DUCTWORK, SEE MECH.
(E) WALL
AA 502
SOFFIT BEYOND
AA 501
AA 502
(E) CONCRETE SLAB
A111B
(E) CONCRETE FOOTING
AA 501
SIM
A115A
1.1
CONTINUOUS AIR BARRIER
GENERAL NOTES
1. SEE STRUCTURAL DRAWINGS FOR CONCRETE SLAB AND
FOOTINGS.
2. SLOPE ALL SIDEWALKS AND GRADE AWAY FROM BUILDING
MINIMUM 1/4" : 12" UNLESS NOTED OTHERWISE BY CIVIL OR
LANDSCAPE DRAWINGS.
3. PROVIDE WOOD BLOCKING FOR ALL WALL AND CEILING MOUNTED
FIXTURES, ACCESSORIES, ETC.
0' 6' 12' 24'
3/4" = 1'-0'
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 302
ADMINISTRATION COMPLEX
WALL SECTIONS
892PC2037.23
J ZUBIK HH LL
3/4" = 1'-0"1
WALL SECTION 1
3/4" = 1'-0"2
WALL SECTION 2
Revision Date Dwg. 166 of 243
A13
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
EXTERIOR CORRIDOR
CONCRETE SLAB,
SEE STRUCTURAL
WALL BASE,
AS SCHEDULED
DOOR.
R-19 BATT INSULATION
VAPOR BARRIER
AND FILL UNDER
CONCRETE SLAB,
SEE STRUCTURAL
WOOD HEADER
GYPSUM WALLBOARD
ACOUSTICAL
CEILING PANEL
CAST STONE BASE
FOOTING, SEE
STRUCTURAL
PAD ELEVATION,
SEE CIVIL
FINISH GRADE,
SEE CIVIL
CAST STONE CAP
MANUFACTURED
MASONRY ON METAL
LATH ON (2) LAYERS
WEATHER BARRIER
ON PLYWOOD
FIRE BLOCKING
MANUFACTURED
MASONRY BEYOND
PORTLAND
CEMENT PLASTER
ON SHEATHING
PORTLAND CEMENT
PLASTER ON
SHEATHING ON
SUSPENDED FRAMING
MEMBRANE ROOFING ON
COVER BOARD ON R-30
TAPERED INSULATION
ON WOODAA 502
AA 503
COBBLE, SEE
LANDSCAPE
CONTINUOUS AIR BARRIER
GENERAL NOTES
1. SEE STRUCTURAL DRAWINGS FOR CONCRETE SLAB AND
FOOTINGS.
2. SLOPE ALL SIDEWALKS AND GRADE AWAY FROM BUILDING
MINIMUM 1/4" : 12" UNLESS NOTED OTHERWISE BY CIVIL OR
LANDSCAPE DRAWINGS.
3. PROVIDE WOOD BLOCKING FOR ALL WALL AND CEILING MOUNTED
FIXTURES, ACCESSORIES, ETC.
AA F.F.
0' - 0"
AF
AA T.O. CAST STONE
14' - 0"
AA B.O. SOFFIT
9' - 0"
EXTERIOROPEN OFFICE
1' - 0"1' - 0"11"2' - 1"
CONCRETE SLAB,
SEE STRUCTURAL
GYPSUM WALLBOARD
WOOD CEILING
ON JOIST, SEE
STRUCTURAL
SHEATHING
SEALED AIR
BARRIER
GUTTER
STANDING SEAM
METAL ROOF ON
WEATHER BARRIER
ON PLYWOOD
GUTTER
FORMED
METAL FASCIA
RAIN CHAIN
MANUFACTURED
MASONRY ON
METAL LATH ON (2)
LAYERS WEATHER
BARRIER ON
PLYWOOD
CAST STONE
BASE
VAPOR BARRIER
AND FILL UNDER
CONCRETE SLAB
COBBLE, SEE
LANDSCAPE
CAST STONE CAP
SPLASH BLOCK
AA 508
SIM
AA 505
AA 502
AA 502
AA 508
SIM
AA 505
AA 503
AA 503
R-19 BATT INSULATION
AA 502
HSS COLUMN,
SEE STRUCTURAL
DRAIN PIPE WITH
LAMBS SPOUT (2)
AA F.F.
0' - 0"
AA T.O. CAST STONE
14' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
EXTERIOR
CAST STONE BASE
CAST STONE CAP
FIRE BLOCKING
(E) PORTLAND
CEMENT PLASTER
ON SHEATHING ON
SUSPENDED
FRAMING
MEMBRANE ROOFING ON
COVER BOARD ON R-30
TAPERED INSULATION
ON WOOD
R-19, BATT
INSULATION
BREEZE WAYSTORAGE
MANUFACTURED
MASONRY BEYOND
(E) COBBLE,
SEE LANDSCAPE
FOOTING,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
GYPSUM WALLBOARD
R-19 BATT
INSULATION
PORTLAND CEMENT
PLASTER ON METAL
LATH ON (2) LAYERS
WEATHER BARRIER
ON PLYWOOD
(E) FINISH GRADE,
SEE CIVIL
AA 505
AA 502
AA 504
AA 505
CONTINUOUS AIR
BARRIER
AA F.F.
0' - 0"
AA B.O. DECK
11' - 4"
AA B.O. SOFFIT
9' - 0"
BREEZEWAYSTORAGE
(E) PORTLAND
CEMENT PLASTER
ON SHEATHING ON
SUSPENDED
FRAMING
(E) PAVING
GYPSUM WALLBOARD
R-19 BATT
INSULATION
WALL INFILL,
PORTLAND CEMENT
PLASTER ON METAL
LATH ON (2) LAYERS
WEATHER BARRIER
ON PLYWOOD
(E) MEMBRANE ROOFING
0' 6' 12' 24'
3/4" = 1'-0'
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 303
ADMINISTRATION COMPLEX
WALL SECTIONS
892PC2037.23
J ZUBIK HH LL
3/4" = 1'-0"1
WALL SECTION 5
3/4" = 1'-0"2
WALL SECTION 6
3/4" = 1'-0"3
WALL SECTION 7
3/4" = 1'-0"4
WALL SECTION 8
Revision Date Dwg. 167 of 243
1' - 0"
11 1/2" 3/4"
5/8" GYPSUM WALLBOARD
WOOD FRAMING
SEALANT WITH BACKER ROD
ALUMINUM WINDOW FRAME
COL
/4
5/8" GYPSUM
WALLBOARD
ACOUSTIC
CEILING TILE
[0.3 m]
11"
[0 .2 m
[0.2 m]
8"
5/8" GYPSUM
WALLBOARD
HEADER, SEE
STRUCTURAL
SEALANT WITH
BACKER ROD
SEALANT ALL AROUND
INTERIOREXTERIOR
R-19 BATT INSULATION
1/2" PLYWOOD SHEATHING
PORTLAND CEMENT PLASTER ON
SELF-FURRING METAL LATH
(2) LAYERS OF NO.15 FELT
PAPER
FORMED METAL FLASHING,
OVERLAP WATER BARRIER
ON METAL FLASHING
CASING BEAD
HOLLOW METAL FRAME
SCHEDULED DOOR
5/8" GYPSUM WALLBOARD
WOOD BLOCKING
SEALANT ALL AROUND
INTERIOREXTERIOR
R-19 BATT INSULATION
1/2" PLYWOOD SHEATHING
PORTLAND CEMENT
PLASTER ON SELF-FURRING
METAL LATH
(2) LAYERS OF NO.15 FELT
PAPER
FORMED METAL FLASHING,
OVERLAP WATER BARRIER
ON METAL FLASHING
CASTING BEAD
SEALANT WITH BACKER ROD
HOLLOW METAL FRAME
SCHEDULED DOOR
WATERTABLE,
WHERE OCCURS
R-19 BATT INSULATION
5/8" GYPSUM WALLBOARD
SEALANT ALL AROUND
HOLLOW METAL FRAME
SCHEDULED DOOR
WOOD BLOCKING
5/8" GYPSUM WALLBOARD
MECHANICAL
SHADE CLOTH
SYSTEM
ALUMINUM
ENCLOSURE
PANEL BY
SHADE MFR
AF
HEADER, SEE STRUCTURAL
ALUMINUM FRAME,
ALIGN EXTERIOR FACE OF
FRAME WITH COLUMN LINE
SEALANT
WITH BACKER ROD
CASING BEAD
FORMED METAL FLASHING,
LAP WATER BARRIER OVER
METAL FLASHING
PORTLAND CEMENT
PLASTER ON METAL LATH
ON (2) LAYERS 15# ASPHALT
FELT ON 1/2" PLYWOOD ON
WOOD FRAMING
R-19 BATT INSULATION
INTERIOREXTERIOR
/4
4 3/4"
/4
R .O
P
E R
S H
E E
T A
A
1" 11 1/2" 3/4"
4 1/2" 7 1/2"
SEALANT WITH
BACKER ROD
COL
/2
" 4
1' - 0"
4 1/2" 7 1/2"
R .O
P
E R
D O
O R
S C
H E
D U
L E
GYPSUM
WALLBOARD
BEYOND
AWNING HUNG
OPERABLE SASH
WALL BASE
AS SCHEDULED
FINISH FLOOR
AS SCHEDULED
CONCRETE
SLAB, SEE
STRUCTURAL
INSECT SCREEN AT
ALL OPERABLE WINDOWS, TYP
ALUMINUM FRAME
ALIGN EXTERIOR FACE OF FRAME
WITH COLUMN LINE
CAST STONE
BASE BEYOND
EASED CONCRETE EDGING
COBBLE
SEE LANDSCAPE
NOTE:
INSTALL INSECT SCREENS
AT ALL OPERABLE
WINDOWS - TYPICAL
SEALANT WITH BACKER ROD
ALUMINUM WINDOW
FRAME
COL
/4
COL
1' - 0"
9" 11 1/2" 3/4"
/2
/4
STEEL COLUMN,
SEE STRUCTURAL
5/8" GYPSUM
WALLBOARD
SEALANT WITH BACKER ROD
2-1/2" ALUMINUM JAMB
EXTENSION TRIM BY FRAME
MFR, MATCH FRAME FINISH
SEALANT BEHIND TRIM
SEALANT AT CAST STONE BELOW
ALUMINUM FRAME ALIGN EXTERIOR
FACE WITH COLUMN LINE
MANUFACTURED MASONRY ON
MORTAR BED ON METAL LATH
ON (2) 15# ASPHALT FELT ON
1/2" PLYWOOD ON WOOD
FRAMING
CAST STONE BELOW
3" +/-
1' - 0"
SEALANT WITH BACKER ROD
4 1/4"
10"
1 3/8" 4 1/2"
PIN ANCHOR TYP.,
SEE STRUCTURAL, PROVIDE
SEALANT AT PIN
CAST STONE SILL
WITH DRIP EDGE
/8
2" 2"
SEALANT WITH BACK ROD
THRU WALL
METAL FLASHING
WITH 1/4" HEMMED DRIP
WITH WEEPS 48" OC.
PLYWOOD SHEATHING,
SEE STRUCTURAL
CASING BEAD
EASED EDGE SOLID
SURFACE WINDOW SILL
SEALANT WITH BACKER ROD
WALL BEYOND
ALUMINUM FRAME
GLAZING
5/8" GYPSUM WALLBOARD
ON WOOD FRAMING
R-19 BATT INSULATION
INTERIOREXTERIOR
3 5/8" 5 5/8" 5/8"
COL
VAPOR BARRIER
SPLIT-FACE MASONRY,
SEE STRUCTURAL
COL
SEALANT WITH
BACKER ROD
ALUMINUM FRAME
SEALANT WITH
BACKER ROD
CORNER BEAD
SPLIT-FACE MASONRY VENEER
R-19, BATT INSULATION
5/8" GYPSUM WALLBOARD
ON 2x6 WOOD FURRING
/4
WATER TABLE
PLYWOOD SHEATHING,
SEE STRUCTURAL
AIR BARRIER
5/8" GYPSUM WALLBOARD ON
2x8 WD FRAMING
WINDOW SHADES
COL
HEADER, SEE STRUCTURAL
ALUMINUM FRAME
FLASHING & SEALANT
WITH BACKER ROD
CASING BEAD
PORTLAND CEMENT PLASTER
R-19 BATT INSULATION
INTERIOREXTERIOR
1 3/8" 8" 5/8"
METAL LATH
(2) LAYERS 15#
ASPHALT FELT
LAP OVER FLASHING
GLAZING
4 1/2"
1/2" PLYWOOD
CORNER BEAD
CASING BEAD
AND SEALANT WITH BACKER
ROD
WALL BEYOND
SEALANT W/ BACKER ROD
HOLLOW METAL FRAME
SCHEDULED DOOR
1/2" PLYWOOD ON 2x8
WOOD FRAMING
1" FLUSH ALUMINUM
WALL PANEL, BOTH SIDES
WOOD BLOCKING
ALUMINUM J-RECEIVER
R-19 BATT INSULATION
SEALANT WITH
BACKER ROD
COL
/2
4 1/2"
R .O
P
E R
D O
O R
S C
H E
D U
L E
GYPSUM
WALLBOARD
BEYOND
WALL BASE
AS SCHEDULED
FINISH FLOOR
AS SCHEDULED
CONCRETE
SLAB, SEE
STRUCTURAL
ALUMINUM FRAME
ALIGN EXTERIOR FACE OF FRAME
WITH COLUMN LINE
SPLIT-FACE MASONRY
VENEER BEYOND,
WHERE OCCURS
EASED CONCRETE EDGING
TOP OF PAVING, SEE CIVIL
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 501
DETAILS 892PC2037.23
J ZUBIK HH LL
3" = 1'-0"12
ALUM DOOR JAMB AT GWB COLUMN (HEAD SIM.)
3" = 1'-0"7
HOLLOW METAL DOOR FRAME - HEAD
3" = 1'-0"8
HOLLOW METAL DOOR FRAME - JAMB
3" = 1'-0"10
HOLLOW METAL DOOR FRAME - HEAD - INT
3" = 1'-0"1
STOREFRONT HEAD AT PORTLAND CEMENT WALL
3" = 1'-0"3
OPERABLE WINDOW SILL AT CONC SLAB
3" = 1'-0"2
WINDOW JAMB AT MANUFACTURED MASONRY
3" = 1'-0"9
WINDOW SILL AT SPLIT-FACE MASONRY WALL
3" = 1'-0"5
ALUM FRAME JAMB AT VENEER WALL
3" = 1'-0"4
WINDOW HEAD AT PORTLAND CEMENT WALL
3" = 1'-0"11
HM DOOR FRAME - HEAD - METAL WALL PANEL
3" = 1'-0"6
WINDOW SILL AT CONC SLAB
Revision Date Dwg. 168 of 243
/8
/8
1' - 2"
5 3/4" 8 1/4"
6 1/2" 3" +/-
2 1/2" 9 1/2" 2"
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD
1/2" PLYWOOD ON WOOD
STUD FRAMING
USE ONLY THE THICKEST
PIECES OF MANUFACTURED
MASONRY AT THE TOP
COURSE TO MINIMIZE VISUAL
EXPOSURE OF THE METAL
FLASHING
METAL FLASHING WITH/ 1/4"
HEMMED DRIP
CAST STONE
HIGH POINT OF CAST STONE
CAP TO ALIGN WITH HIGH
POINT OF CAST STONE CAP
AT ADJACENT WALL
METAL FLASHING,
PAINT TO MATCH
CAST STONE
SEALANT AT PIN
PIN ANCHOR TYP.,
SEE STRUCTURAL
WRAP ASPHALT FELT
OVER MEMBRANE ROOFING
MEMBRANE ROOFING WRAP
OVER TOP OF STUD
/8
/8
EQ. EQ.
2 1/2" 6 1/2" 3"
1/2" PLYWOOD ON WOOD
STUD FRAMING
METAL FLASHING WITH 1/4"
HEMMED DRIP
METAL FLASHING,
PAINT TO MATCH
CAST STONE
SEALANT AT PIN
PIN ANCHOR TYP.,
SEE STRUCTURAL
WRAP ASPHALT FELT
OVER MEMBRANE ROOFING
MEMBRANE ROOFING WRAP
OVER TOP OF STUD
CAST STONE
PORTLAND CEMENT PLASTER
ON METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD
1/2" PLYWOOD ON
WOOD STUD FRAMING
USE ONLY THE THICKEST
PIECES OF MANUFACTURED
MASONRY AT THE TOP
COURSE TO MINIMIZE
VISUAL EXPOSURE OF THE
METAL FLASHING
METAL FLASHING WITH
1/4" HEMMED DRIP
CAST STONE
HIGH POINT OF CAST STONE
CAP TO ALIGN WITH HIGH
POINT OF CAST STONE CAP
AT ADJACENT WALL
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD
COL
SEALANT
AT PIN, TYP.
PIN ANCHOR TYP.,
SEE STRUCTURAL
WRAP ASPHALT FELT OVER TOP
PLYWOOD SHEATHING
3" +/- 9" 9" 3" +/-
2" 1' - 0" 1' - 0" 2"
5 3/4" 8 1/4"
1' - 2" 1' - 2"
2' - 4"
/8
/8
1/2" 1"
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD
WEEP SCREED
FLASHING
3/4" TURN UP
Z-CLIP SEALANT AT
VERTICAL LEG & UNDER Z
STANDING SEAM METAL
ROOF ON 30# ASPHALT
FELT ON 5/8" PLYWOOD
R-30 INSULATION
TONGUE AND GROOVE WOOD
CEILING ON WOOD FRAMING
COL
11 21/32"
SEE WALL SECTIONS FOR
DIMENSIONS FROM
CENTERLINE AT TOP AND BOTTOM OF
INCLINED WALL
/4
SNAP ON CAP SEAM
STANDING SEAM METAL
ROOF ON 30# ASPHALT
FELT ON 5/8" PLYWOOD
SEE ROOF PLAN
TYP.
1' - 6"
ALUMINUM GABLE
FLASHING WITH
CAP SEAM
SEALANT
ALUMINUM CLIP
N O
M
B/SOFFIT
SEE ELEV
PERFORATED
ALUMINUM SOFFIT
ALUMINUM J-RECEIVER
SEE ROOF PLAN
TYP
1' - 0"
/4
N O
M
ALUM
CLIP
SEALANT
ALUM GABLE FLASHING
WITH J-CLOSURE
MECHANICALLY FASTENED SEAM
STANDING SEAM
METAL ROOF ON
30# ASPHALT FELT
ON 5/8" PLYWOOD
B/SOFFIT
SEE ELEV
[0.2 m]
8"
WALL, SEE PLAN
COL
2" 3" +/- 9"
/2
MANUFACTURED MASONRY ON
MORTAR BED ON METAL LATH ON
(2) LAYERS 15# ASPHALT FELT
ON 1/2" PLYWOOD ON
2x6 WD FRAMING
WEEP SCREED
FLASHING
STANDING SEAM
METAL ROOF
ALUM Z-RECEIVER
SET IN SEALANT
30# ASPHALT FELT
ON 5/8" PLYWOOD
R-30 INSULATION
TONGUE AND GROOVE CEILING
ON WD FRAMING
2" MIN. 2" MIN.
WELDED WATERTIGHT
METAL ROOF CURB
OR METAL ROOF VENT
SEALANT
MEMBRANE ROOFING
ON COVER BOARD ON
TAPERED R-30
INSULATION
WOOD BLOCKING
AS REQUIRED
WOOD FRAMING
SEE STRUCTURAL
5/8" PLYWOOD
COL
9" 3" +/-
/4
/4
8 1/2" 3 1/2"
1' - 0"
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON
(2) LAYERS 15# ASPHALT FELT
ON 1/2" PLYWOOD
WEEP SCREED
FLASHING
3/4" TURN-UP
SEALANT AT
VERTICAL LEG
& UNDER Z STANDING SEAM METAL ROOF
ON 30# ASPHALT FELT
ON 5/8" PLYWOOD
8-IN BATT INSULATION FS25
FOIL FACED WITH
EXTENDED FLANGES
TONGUE AND GROOVE
WOOD CEILING
SEALANT W/
BACKER ROD
J-BEAD
5/8" GWB W/ FURRING LAYER
AND WD FURRING
MEMBRANE
ROOFING
ON 1/2" PLYWOOD
ON 2x6 WD
FRAMING
R-19 BATT INSULATION
1-IN MIN AIR GAP
COL
9" 3" +/- SEE ROOF PLAN MANUFACTURED MASONRY
ON MORTAR SETTING BED
ON METAL LATH ON
(2) LAYERS 15#
ASPHALT FELT ON
1/2" PLYWOOD ON
2x6 WD FRAMING
WEEP SCREED
FLASHING & J-CLOSURE
MECHANICALLY FASTENED
SEAM
STANDING SEAM METAL
ROOF ON 30# ASPHALT FELT
ON 5/8" PLYWOOD
2x3 WD
BLOCKING
SEALANT
TONGUE AND GROOVE WD
CEILING ON WD FRAMING
/4
8-IN BATT INSULATION FS25
FOIL FACED WITH
EXTENDED FLANGES
1-IN MIN AIR GAP
PORTLAND CEMENT
PLASTER ON METAL
LATH ON (2) LAYERS 15#
ASPHALT FELT ON 1/2"
PLYWOOD SHEATHING
EXPANSION JOINT
CUT BACK (E) FINISH
AND INFILL TO MATCH
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 502
DETAILS 892PC2037.23
J ZUBIK HH LL
3" = 1'-0"4
CAST STONE CAP AT MANUFACTURED MASONRY
3" = 1'-0"1
CAST STONE CAP AT PORTLAND CEMENT PLASTER
3" = 1'-0"7
CAST STONE CAP AT MFR MASONRY WING WALL
3" = 1'-0"5
STANDING SEAM METAL ROOF AT COLUMN (LOW)
3" = 1'-0"10
STANDING SEAM METAL ROOF AT CURVED GABLE
3" = 1'-0"11
STANDING SEAM METAL ROOF AT STRAIGHT GABLE
3" = 1'-0"8
STANDING SEAM METAL ROOF AT COLUMN (HIGH)
3" = 1'-0"3
MEMBRANE ROOFING AT METAL ROOF CURB
3" = 1'-0"6
STANDING SEAM METAL ROOF AT HEAD WALL
3" = 1'-0"2
STANDING SEAM METAL ROOF AT AT RAKE WALL
6" = 1'-0"9
INSIDE CORNER FLASIHING
Revision Date Dwg. 169 of 243
/2
5/8" 6" 1"
EXTEND 1/2" PLYWOOD TO
UNDERSIDE OF STRUCTURE
TO PROVIDE AIR SEAL
CEILING SUSPENSION SYSTEM,
PROVIDE SEISMIC SPLAY
WIRES AND COMPRESSION
STRUTS PER MFR INSTRUCTIONS
SEALANT WITH BACKER ROD
5/8" GYPSUM WALLBOARD
SHEATHING
PORTLAND CEMENT PLASTER
ON SELF-FURRING METAL LATH
PORTLAND CEMENT PLASTER
ON METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD ON 2x6 WOOD
FRAMING
5/8" GYPSUM WALLBOARD
R-19 BATT INSULATION
INTERIOR EXTERIOR
COL
TUBE STEEL
COLUMN BEYOND,
SEE STRUCTURAL
PERFORATED
ALUMINUM SOFFIT
ALUMINUM F-RECEIVER
SEALANT WITH BACKER ROD
MANUFACTURED
MASONRY ON MORTAR
SETTING BED ON METAL
LATH ON (2) LAYERS 15#
ASPHALT FELT
1/2" PLYWOOD
ON 2x6 WOOD FRAMING
R-19 BATT INSULATION
9" 3" +/-
BO SOFFIT
SEE RCP
COL
BO SOFFIT
SEE RCP
R-19 BATT INSULATION
HEADER, SEE STRUCTURAL
(2) LAYERS 15# ASPHALT FELT
ON 1/2" PLYWOOD
ON 2x6 WOOD FRAMING
PERFORATED ALUMINUM SOFFIT
ALUMINUM F-RECEIVER
SEALANT WITH BACKER ROD
ALUMINUM FRAME AND GLAZING,
ALIGN EXTERIOR FACE OF FRAME
WITH COLUMN LINE
WOOD BLOCKING
SEALANT
CORNER BEAD
5/8" GYPSUM WALLBOARD
1' - 0"
/8
/4
1x4 TONGUE AND GROOVE
CEDAR CEILING ON FURRING
TUBE STEEL (BEYOND),
SEE STRUCTURAL
ALUMINUM J-RECEIVER
5/8" GYPSUM WALLBOARD
CEDAR WOOD FURRING
1/4"1/4"
FIN. CEILING
VARIES
WOOD FRAMING BEYOND,
SEE STRUCTURAL
DRAWINGS
1x4 TONGUE AND GROOVE
CEDAR CEILING ON FURRING
5/8" GYPSUM WALLBOARD
PARTITION PER PLAN
COL
3/8" 1' - 0" 1' - 0" 3/8"
2x6 WOOD FRAMING
GYPSUM WALLBOARD
BULKHEAD
REVEAL ANGLE
BO GWB BULKHEAD
ACOUSTICAL CEILING
TILE
M
IN
SEE RCP
COL
6" 1"
CAST STONE WALL BEYOND
1/2" PLYWOOD SHEATHING
PORTLAND CEMENT PLASTER
ON SELF-FURRING METAL LATH
(2) LAYERS OF NO.15
FELT PAPER
OVERLAP FELT PAPER
OVER DRIP MOLD FLANGE
WOOD HEADER,
SEE STRUCTURAL
DRIP MOLD WITH
WEEP HOLES
CASING BEAD
PORTLAND CEMENT PLASTER
ON METAL LATH ON (2) LAYERS
WEATHER BARRIER ON WD FRAMING
METAL REVEAL
PAINT TO MATCH CEILING
CEILING SUSPENSION SYSTEM
WITH SPLAY WIRES AND
COMPRESSION STRUTS PER
MANUFACTURER INSTRUCTIONS
5/8" GYPSUM BOARD
SHEATHING
PORTLAND CEMENT
ON SELF-FURRING METAL LATH
COL
R-19 BATT INSULATION
5/8" GWB ON 2x6 WD FRAMING
PERF ALUM
SOFFIT
ALUM
F-RECEIVER
SEALANT
CONTINUOUS
CASING BEAD
PORTLAND CEMENT
PLASTER ON
METAL LATH ON
(2) LAYERS 15# ASPHALT FELT
1/2" PLYWOOD
INTERIOR
B/SOFFIT
SEE ELEV
WD FRAMING
CONTINUOUS CONCEALED
COVE FIXTURE; SEE
ELECTRICAL DRAWINGS
MIRROR
A L
IG
N
REVEAL ANGLE
ALUM
J-RECEIVER
WHITE ACRYLIC
EXTRUDED
LUMINOUS LENS, MATTE
FINISH
FIN. CEILING
8'-0" AFF
5/8" GYP BD CEILING
ON SUSPENDED FRAMING
1/2" METAL REVEAL
1' - 6"
5/8" GWB SOFFIT
WD FRAMING
B.O. SOFFIT
7'-0" AFF
0' - 8"
R
/8
PERF ALUM
SOFFIT
ALUM
Z-TRIM
FLUSH ALUM
FASCIA PANEL
(2) LAYERS 15# ASPHALT FELT
ON 1/2" PLYWOOD
ALUM FASCIA TO
SOFFIT FLASHING
S E
E S
T R
U C
T U
R A
L
TUBE STEEL BEAM BEYOND,
SEE STRUCTURAL COL
STANDING SEAM METAL ROOF ON
30# ASPHALT FELT ON
5/8" PLYWOOD
WOOD BLOCKING
TUBE STEEL
CURVED BEAM
BEYOND
V
.I .F
WOOD
FRAMING
PERF ALUM SOFFIT
B/SOFFIT
SEE ELEV
1"
COL
COL
3" 9" 11 3/8" 5/8"
/8
/8
3/8"
3" 1"
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON
1/2" PLYWOOD ON
2x6 WD FRAMING
CAST STONE
BASE BELOW
PORTLAND CEMENT PLASTER
ON METAL LATH ON
(2) LAYERS 15# ASPHALT FELT
ON 1/2" PLYWOOD ON
2x6 WD FRAMING
R-19 BATT INSULATION
5/8" GYPSUM WALLBOARD
EXTERIOR
INTERIOR
PLAN
HSS TUBE STEEL,
SEE STRUCTURAL
ALUMINUM GABLE
FLASHING WITH CAP SEAM
1/8":1'-0"
PERFORATED
ALUMINUM SOFFIT
ALUMINUM J-RECEIVER
ALUMINUM CLIP
5/8" HAT CHANNEL 16 GA
AT 16" MAX OC
PORTLAND CEMENT PLASTER
ON METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD ON HSS FRAMING
WEEP SCREED
METAL FLASHING
SEALANT
METAL FLASHING
ALUMINUM J-RECEIVER
ALUMINUM J-RECEIVER
SEALANT
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 503
DETAILS 892PC2037.23
J ZUBIK HH LL
3" = 1'-0"1
SUSPENDED CEILING AT CEMENT PLASTER WALL
3" = 1'-0"2
METAL SOFFIT AT MANUFACTURED MASONRY
3" = 1'-0"3
METAL SOFFIT AT ALUMINUM FRAME
3" = 1'-0"4
WOOD CEILING AT PERIMETER, TYP.
3" = 1'-0"5
WOOD CEILING AT PARTITION TYP.
3" = 1'-0"7
GYPSUM BULKHEAD, TYP.
3" = 1'-0"10
PORTLAND CEMENT CEILING AT PLASTER WALL
3" = 1'-0"6
METAL SOFFIT AT PORTLAND CEMENT PLASTER
3" = 1'-0"8
CEILING AT COVE LIGHTING, TYP
3" = 1'-0"9
METAL SOFFIT AT METAL FASCIA
3" = 1'-0"11
PORTLAND CEMENT PLASTER AT MASONRY WALL
3" = 1'-0"12
METAL ROOF AND SOFFIT PROJECTION
Revision Date Dwg. 170 of 243
GYPSUM WALL BOARD WITH
SCHEDULED FINISH
CLEAR SILICONE
SEALANT
INTEGRAL EPOXY
RESIN COVED BASE
1/2" TO 1" RADIUS
EPOXY RESIN FLOOR
CERAMIC TILE
SEALANT
INTEGRAL EPOXY
RESIN COVED BASE
1/2" TO 1" RADIUS
EPOXY RESIN FLOOR
TYP ERF BASE
AT CERAMIC WALL TILE
TYP ERF BASE
A L
IG
N
J-MOLD
J-MOLD
SCHEDULED FLOOR
EXPANSION JOINT
EXTRUDED ALUM THRESHOLD SET IN
SEALANT. ANCHOR TO ONE SIDE
CONC SIDEWALK SLOPED AWAY
FROM DOOR, SEE CIVIL
SEALANT EACH SIDE
1-1/2"
1-1/2"
16 GA. METAL STUDS TYP.
AT REINFORCEMENT
EXTEND BACKING PLATE TO
NEXT FULL HT. STUD BEYOND
BOTH ENDS OF SUPPORTED
ITEM
INDIVIDUAL SCREW, TYP.
PROVIDE DOUBLE END STUDS,
WHEN THERE ARE SUPPORTED ITEMS
ON BOTH SIDES OF WALL
6"x16 GA MTL TRACK BACKING PLATE.
CUT AND FLATTEN FLANGES AS
SHOWN. FASTEN WITH (3) #10 S.M.S.
@ EACH STUD
NOTE: LOCATE CENTER OF
BACKING PLATE W/CENTER
OF EACH ATTACHMENT POINT
OF EQUIPMENT PIECE
10-1/2" RO
WOOD BLOCKING BETWEEN
STUDS TYP
RECESSED FIRE
EXTINGUISHER CABINET (FEC)
2x4 WOOD
STUDS
5/8"
GYPSUM
WALLBOARD
RECESSED FIRE
EXTINGUISHER CABINET (FEC)
5/8" GYPSUM WALL BOARD, TYP.
2x4 WOOD STUDS
SPACE AS REQUIRED
BY WALL TYPE INDICATED
ON PLAN 3
A F
F
PLAN
R .O
6 1/2" RO.
/2
R O
THERMALLY BROKEN
CURVED TRANSLUCENT
SKYLIGHT
FLASHING
3/4" TURN-UP
Z-CLIP SEALANT AT VERTICAL
LEG AND UNDER Z
STANDING SEAM METAL ROOF
ON 30# ASPHALT FELT
ON 5/8" PLYWOOD
8-IN BATT INSULATION FS25
FOIL FACED WITH
EXTENDED FLANGES (R-25)
METAL SOFFIT
ON WOOD FURRING
ALUM
F-RECEIVER
METAL
FLASHING
1-IN RIGID INSULATION (R-5)
/8
SEALANT WITH BACKER ROD
CASING BEAD
5/8" GYPSUM WALLBOARD
R-19 BATT INSULATION
RELOCATED
(E) GRAVE LOCATOR
SEALANT WITH BACK ROD
PORTLAND CEMENT
PLASTER ON METAL LATH
ON (2) LAYERS 15# ASPHALT
FELT ON 1/2" PLYWOOD ON
2x6 WOOD FRAMING WRAP
ASPHALT FELT AROUND
ROUGH OPENING
COL
7 5/8"
7 5/8"
WOOD HEADER,
SEE STRUCTURAL
ALUM J-RECEIVER
SEALANT W/ BACKER ROD
ALUM SOFFIT
RECEIVER
CONT 2x2 ALUM ANGLE CLIP
SUPPLIED BY LOUVER MFR
ALUM SOFFIT RECEIVER
SEALANT WITH BACKER ROD
ALUM J-RECEIVER
(E) 1" FLUSH ALUM
WALL PANEL
ON 1/2" PLYWOOD ON
2x8 WOOD FRAMING
SEALANT
WITH BACKER ROD
ARCHITECTURAL
LOUVER
SEALANT
WITH BACKER ROD
(E) PORTLAND CEMENT
PLASTER SLOPE TO DRAIN
(E) (2) LAYERS 15#
ASPHALT FELT
LAP OVER WOOD FRAMING
(E) METAL LATH
COL
/8
ALUM
J-RECEIVER
(E) 1" FLUSH ALUM
WALL PANEL ON
1/2" PLYWOOD ON
2x8 WD FRAMING
SEALANT WITH
BACKER ROD
ALUM
RECEIVER
ANGLE
ALUM 2x2 ANGLE
SUPPLIED BY
LOUVER MFR
ARCHITECTURAL
LOUVER
SEALANT
W/ BACKER ROD
(E) PORTLAND CEMENT
PLASTER
(E) METAL LATH
(E) (2) LAYERS 15#
ASPHALT FELT
DOUBLE 2x4 WD TOP PLATE 2x4 WOOD FRAMING
5/8" GYPSUM WALL BOARD
CORNER BEAD
TOP OF PARTITION
11'-4" AFF
3/4" #9 (9 GA) FLATTENED
EXPANDED CARBON STEEL
SECURITY MESH AS
MANUFACTURED BY ALABAMA
METAL INDUSTRIES OR APPROVED
EQUAL. FASTEN TO WOOD STUDS
AT 6" O.C. ON OUTSIDE FACE OF WALL.
(STORAGE ROOM A107)
1/2" / FT
SCHEDULED FLOOR
RUBBER FLOORING
TRANSITION
PARTITION WALL, SEE PLAN
GYPSUM WALLBOARD
TAPE AND FLOAT (BY OTHERS)
MULLION MATE END CAP
EXTRUSION (OPTIONAL)
MULLION MATE 3 (SERIES 30)FACTORY APPLIED GASKET
WITH ADHESIVE ON BOTH SIDES
WINDOW MULLION
/1
3 15/16" MAX OPENING
2 7/8" MIN TO
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 504
DETAILS 892PC2037.23
J ZUBIK HH LL
6" = 1'-0"6
EPOXY RESIN COVED WALL BASE
12" = 1'-0"2
THRESHOLD
1 1/2" = 1'-0"1
BACKING
3" = 1'-0"11
FIRE EXTINGUISHER CABINET
3" = 1'-0"4
SKYLIGHT END CURB
3" = 1'-0"5
GRAVE LOCATOR AT PORTLAND CEMENT PLASTER
3" = 1'-0"7
LOUVER AT PORTLAND CEMENT PLASTER
3" = 1'-0"8
LOUVER AT PORTLAND CEMENT PLASTER (JAMB)
3" = 1'-0"9
CEILING AT STORAGE ROOM, TYP
12" = 1'-0"3
RUBBER TRANSITION
6" = 1'-0"12
MULLION TO WALL CONNECTION
Revision Date Dwg. 171 of 243
SEALANT WITH
BACKER ROD
PIN ANCHOR TYP,
SEE STRUCTURAL,
PROVIDE SEALANT AT PIN
CAST STONE SILL
WITH DRIP EDGE
3 3/8"
SEALANT WITH BACK ROD
THRU WALL METAL FLASHING
WITH 1/4" HEMMED DRIP
WITH WEEPS 48" O.C..
SPLIT-FACE MASONRY,
SEE STRUCTURAL
5/8" GYPSUM WALLBOARD
ON WOOD FRAMING
R-19 BATT INSULATION
INTERIOREXTERIOR
3 5/8" 5 3/4" 5/8"
COL
R-19 BATT INSULATIONCASING BEAD
1/2" PLYWOOD
METAL LATH
PORTLAND CEMENT
PLASTER
(2) LAYERS 15# ASPHALT
FELT LAP OVER FLASHING
/8
8" 5/8"
VAPOR BARRIER
COL
3" +/-
TOP OF WALL DIMENSION
SEE WALL SECTION FOR 11 3/8" 5/8"
MANUFACTURED
MASONRY
MORTAR BED
METAL LATH
(2) LAYERS OF #15
ASPHALT FELT
1/2" PLYWOOD ON
2x6 WOOD STUDS
R-19 BATT
INSULATION AS
REQUIRED. SEE
WALL SECTIONS
5/8" GYPSUM
WALLBOARD ON
WOOD FRAMING
PER WALL TYPE
INDICATED ON PLANS
ANGLE VARIES PER
TOP AND BOTTOM
DIMENSIONS
NOTE:
INSTALL MANUFACTURED
MASONRY PIECES SUCH THAT
FACES ARE PLUMB BY APPLYING A
GREATER AMOUNT OF MORTAR
AT THE TOP OF STONE THAN AT
BOTTOM. ENSURE BACKS ARE
COMPLETELY BUTTERED WITH A
MORTAR BOND COAT OF MINIMUM
THICKNESS PER MFR.
INSTRUCTIONS.
3" +/-
BOTTOM OF WALL DIMENSIONS
SEE WALL SECTION FOR
COL
6"
1" +/-
3"
WEEP SCREED
CAST STONE WITH/ 1/2"
CHAMFER AND 2% SLOPED
TOP ON MORTAR BED
PIN ANCHOR, SEE
STRUCTURAL
SEALANT AT PIN
FLASHING ON SEALANT
BED WITH WEEPS 4'-0" O.C.
AND BEHIND WEEP
SCREED
COBBLE,
SEE LANDSCAPE
R-19 BATT INSULATION
COLUMN BEYOND,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
PORTLAND CEMENT
PLASTER ON METAL LATH
ON (2) LAYERS 15#
ASPHALT FELT ON 1/2"
PLYWOOD ON 2x6 WOOD
FRAMING
MANUFACTURED MASONRY
ON MORTAR BED ON
METAL LATH ON (2) LAYERS
15# ASPHALT FELT ON 1/2"
PLYWOOD ON 2x6 WOOD
FRAMING
COL
9" 3" +/- 1"
WEEP SCREED
CAST STONE WITH/ 1/2"
CHAMFER AND 2% SLOPED
TOP ON MORTAR BED
PIN ANCHOR, SEE
STRUCTURAL
SEALANT AT PIN
FLASHING ON SEALANT
BED WITH WEEPS 4'-0" O.C.
AND BEHIND WEEP
SCREED
COBBLE,
SEE LANDSCAPE
R-19 BATT INSULATION
COLUMN BEYOND,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
SPLIT-FACE MASONRY ON
MORTAR BED ON METAL
LATH ON (2) LAYERS 15#
ASPHALT FELT ON 1/2"
PLYWOOD ON 2X6 WD
FRAMING
COL
9"
WEEP SCREED
SPLIT-FACE MASONRY WITH 2%
SLOPED TOP ON MORTAR BED ON
METAL LATH ON (2) LAYERS OF 15#
ASPHALT ON 1/2" PLYWOOD
PIN ANCHOR, SEE STRUCTURAL
SEALANT AT PIN
FLASHING ON SEALANT BED W/
WEEPS 4'-0" O.C. AND BEHIND
WEEP SCREED
COMPRESSIBLE
JOINT FILLER W/SEALANT
PAVING, SEE LANDSCAPE
4" 1/2"
R-19 BATT INSULATION
COLUMN BEYOND,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
PRESSURE-TREATED
WD SOLE PLATE
SPLIT-FACE MASONRY ON
MORTAR BED ON METAL
LATH ON (2) LAYERS 15#
ASPHALT FELT ON 1/2"
PLYWOOD ON 2x6 WOOD
FRAMING
COL
9"
WEEP SCREED
SPLIT-FACE MASONRY WITH
2% SLOPED TOP ON MORTAR
BED ON METAL LATH ON (2)
LAYERS 15# ASPHALT FELT ON
1/2" PLYWOOD
PIN ANCHOR, SEE
STRUCTURAL
SEALANT AT PIN
FLASHING ON SEALANT
BED WITH WEEPS 4'-0" O.C.
AND BEHIND WEEP
SCREED
COBBLE,
SEE LANDSCAPE
R-19 BATT INSULATION
COLUMN BEYOND,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
4" 1/2"
PRESSURE-TREATED
WD SOLE PLATE
PORTLAND CEMENT
PLASTER ON
METAL LATH ON
(2) LAYERS 15# ASPHALT FELT
PLYWOOD SHEATHING
PER STRUCTURAL
GALV, DOUBLE-V
EXPANSION JOINT,
7/8 GROUND HEIGHT
BOTH VERTICAL AND
HORIZONTAL.
CONDITIONS. REFER TO
EXTERIOR WALL
ELEVATIONS.
WALL PER PLAN
NOTES:
1. CHAIN LINK FABRIC SHALL BE 2" MESH
11GA.
2. ALL CHAIN LINK FABRIC SHALL BE
KNUCKLED SALVAGE T&B
3. ALL FENCING SHALL HAVE BOTTOM RAIL
4. CONTRACTOR SHALL PREPARE AND
SUBMIT SHOP DRAWINGS FOR APPROVAL
PRIOR TO INSTALLATION
5. ALL FENCE POST SHALL BE STANDARD
ROUND PIPE, ASTM A53 GR.B (fy = 35 KSI)
6. ALL METAL & MESH TO BE GALVANIZED
HOT DIP
7. ALL SHARP EDGES, INCLUDING BOLTS
AND SCREWS TO BE GROUND SMOOTH
CLASS 1A, 3" O.D. STEEL TUBE POST WITH
CLOSURE CAP. 3/16" THICKNESS MIN.
TYPICAL @ 8'-0" O.C. MAX
8' - 0" BETWEEN POSTS
H T
T O
M A
T C
H E
X
IS
T
IN
G
FINISH GRADE
CONC FOOTING,
SEE /11 AA 505
/2
H T
T O
M A
T C
H E
X
IS
T
IN
G
W.P. SEALANT
SLOPE 1/8"
EXPANSION
JOINT FILLER
FINISH GRADE
4" THICK BY 12" WIDE MONO
CONCRETE MOW STRIP BAND
WITH EASED EDGE AND CONTROL
JOINTS AT EVERY 5'-0" O.C. CONTINUOUS
SMOOTH TROWEL FINISH (TYP.) SLOPE
TOP OF POSITIVE DRAINAGE. MOW
STRIP WHERE TURF AREA OCCURS.
CLASS 1A 3" NOM.
DIAMETER STEEL
PIPE POST @8'-0" O.C. MAX.
NOTES:
1. CHAIN LINK FABRIC SHALL BE 2" MESH 11GA.
2. ALL CHAIN LINK FABRIC SHALL BE KNUCKLED SALVAGE T&B
3. ALL FENCING SHALL HAVE A BOTTOM RAIL
4. CONTRACTOR SHALL PREPARE AND SUBMIT SHOP DRAWINGS
FOR APPROVAL PRIOR TO INSTALLATION
5. INSTALL CONC. BAND FLUSH WITH A.C. WHEN ADJUSTED TO A.C.
PAVING TYPICAL ALL SIDES
6. ALL FENCE POST SHALL BE STANDARD ROUND PIPE, ASTM A53
GR.B (fy = 35 KSI)
(4) #5 VERTICAL MIN.
#3 TIES AT 12" MAX. O.C.
3"
*ALL FOOTINGS SHALL BE
CONC. CLASS 520-C-25002' - 0"
M
IN
M
IN
COL
6"
1" +/-
3"
WEEP SCREED
CAST STONE WITH/ 1/2"
CHAMFER AND 2% SLOPED
TOP ON MORTAR BED
PIN ANCHOR, SEE
STRUCTURAL
SEALANT AT PIN
FLASHING ON SEALANT
BED WITH WEEPS 4'-0" O.C.
AND BEHIND WEEP
SCREED
R-19 BATT INSULATION
COLUMN BEYOND,
SEE STRUCTURAL
CONCRETE SLAB,
SEE STRUCTURAL
PORTLAND CEMENT
PLASTER ON METAL LATH
ON (2) LAYERS 15#
ASPHALT FELT ON 1/2"
PLYWOOD ON 2x6 WOOD
FRAMING
PAVING, SEE LANDSCAPE
1/2"
TRAFFIC SEALANT,
COLOR TO MATCH CONC.
1/4" R.
PREMOLDED
EJ. MATERIAL
CONCRETE OVER
METAL DECK
FINISHED FLOOR, SE PLAN
NOTE:
REFER TO PLAN FOR LOCATION OF EXPANSION JOINTS
1/2"
TRAFFIC SEALANT,
COLOR TO MATCH CONC.
1/4" R.
PREMOLDED
EJ. MATERIAL
FINISHED FLOOR, SE PLAN
NOTE:
REFER TO PLAN FOR LOCATION OF EXPANSION JOINTS
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 505
DETAILS 892PC2037.23
J ZUBIK HH LL
3" = 1'-0"1
SPLIT-FACE MASONRY VENEER AT WALL
3" = 1'-0"2
MANUFACTURED MASONRY AT BATTERED WALL
3" = 1'-0"3
PORTLAND CEMENT PLASTER AT GRADE
3" = 1'-0"9
CAST STONE BASE AT GRADE
3" = 1'-0"5
SPLIT-FACE MASONRY BASE AT SIDEWALK
3" = 1'-0"8
SPLIT-FACE MASONRY BASE AT GRADE
3" = 1'-0"4
CONTROL JOINT
3/8" = 1'-0"12
CHAINLINK FENCE
1" = 1'-0"11
CHAINLINK FENCE POST FOOTING
3" = 1'-0"6
PORTLAND CEMENT PLASTER AT SIDEWALK
3" = 1'-0"7
EXPANSION JOINT
3" = 1'-0"10
EXPANSION JOINT 2
Revision Date Dwg. 172 of 243
1' - 4"
2' - 0"
/4 " 3
/4
/2
WHITE MELAMINE ON ALL
INTERIOR SURFACES
PROVIDE BLOCKING IN WALL
AS REQUIRED FOR CABINET
ATTACHMENT
1" THICK ADJUSTABLE
SHELVES ON RECESSED
PILASTER STANDARDS AND
BRACKETS, TYP
PLASTIC LAMINATE DOOR
WITH CONCEALED HINGES
SOLID SURFACE
COUNTERTOP AND SPLASH
18" DEEP PLASTIC LAMINATE
DRAWER ON DRAWER GLIDES
1" THICK ADJUSTABLE SHELF
ON RECESSED PILASTER
STANDARDS AND BRACKETS
WHITE MELAMINE ON ALL
INTERIOR SURFACES
PLASTIC LAMINATE DOOR
WITH WIRE PULL,
CONCEALED HINGES AND
MAGNETIC CATCH
BASE AS SCHEDULED
70.00°
ANGLED SOLID SURFACE TOP
1 3/8"
UNDERCOUNTER LIGHTING,
SEE ELECTRICAL
2' - 0"
/2
(E) GYPSUM WALLBOARD COLUMN
BEYOND
1/2" DRYWALL REVEAL
PAINT TO MATCH ADJACENT WALL COLOR
SOLID SURFACE
COUNTER TOP
SUPPORT, PLAM TO MATCH
PROVIDE METAL
SUPPORT BRACKET
BETWEEN EACH FILE
CABINET, WOOD BLOCKING
AS REQUIRED
(FILE CABINET)
(E) WALL BASE
PROVIDE BLOCKING IN WALL
AS REQUIRED FOR CABINET
ATTACHMENT
WHITE MELAMINE ON ALL
INTERIOR SURFACES
PLASTIC LAMINATE DOOR,
WITH CONCEALED HINGES
(REFRIGERATOR)
70.00°
ANGLED SOLID SURFACE TOP
1' - 4"
1' - 7"
/2
SOLID SURFACE
COUNTER TOP
SUPPORT, PLAM TO MATCH
PROVIDE METAL
SUPPORT BRACKET
BETWEEN EACH FILE
CABINET, WOOD BLOCKING
AS REQUIRED
(FILE CABINET)
SCHEDULED WALL BASE
(E) GYPSUM WALLBOARD COLUMN
BEYOND
METAL LOCKER
SHIM TO LEVEL ON
PLYWOOD BASE
1/2" PLYWOOD ON
WD FRAMING
16" O.C.
NOTCH WD FOR
NATURAL AIR FLOW
SEALANT
W/BACKER ROD
WALL BASE
AS SCHEDULED
FINISH FLOOR
AS SCHEDULED
CONC SLAB
TOP OF SLAB
0'-0"
1' - 6"
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 506
DETAILS 892PC2037.23
J ZUBIK HH LL
1 1/2" = 1'-0"1
CASEWORK
1 1/2" = 1'-0"2
COUNTERTOP
1 1/2" = 1'-0"3
CASEWORK - UPPER
1 1/2" = 1'-0"4
COUNTERTOP 2
3" = 1'-0"7
LOCKER BASE
Revision Date Dwg. 173 of 243
T Y
P
DOUBLE 2x4 WD TOP PLATE
SCHEDULED CEILING
2x4 WD STUDS @ 24" O.C.
R-19 BATT INSULATION.
5/8" GYPSUM BOARD, ONE LAYER
EACH SIDE OF PARTITION.
USE MOISTURE RESISTANT
GYPSUM BOARD AT WET LOCATIONS
2x4 WD BASE PLATE
SCHEDULED WALL BASE
SCHEDULED FLOOR FINISH
DOUBLE 2x4 WD TOP PLATE
SCHEDULED CEILING
2x4 WD STUDS @ 16" O.C.
5/8" CEMENTITIOUS BACKER,
ONE LAYER EACH SIDE OF
PARTITION AT TILE LOCATIONS
2x4 WD BASE PLATE
SCHEDULED WALL BASE
SCHEDULED FLOOR FINISH
5/8" MOISTURE RESISTANT GYPSUM BOARD,
FINISH PER SCHEDULE
BULLNOSE TRIM
TOP OF TILE WAINSCOT, TYP.
6'-0"
NOTE:
CONSTRUCT PARTITION
PER PARTITION TYPE
DETAIL DRAWING. ALL
PARTITIONS WITH
CERAMIC TILE
WAINSCOT TO BE
FRAMED WITH
VERTICAL STUDS @16" O.C.
WITH CEMENT BD
BEHIND TILE WAINSCOT,
TYP.
COL
(E) WOOD FRAMING
BEYOND,
SEE STRUCTURAL
CONTINUOUS CLOSED CELL
SPONGE NEOPRENE FILLERS
(E) CEDAR WOOD FRAMING
(E) 1x4 TONGUE AND GROOVE
CEDAR CEILING
ON FURRING - SEAL EDGES
TUBE STEEL,
SEE STRUCTURAL
FIN. CEILING
VARIES
TOP OF PARTITION
11'-5" AFF
1' - 0"
/4
/4
1/4"
2 1/8" 6"
5/16"
2 3/4"
6 7/8"
ALUMINUM REVEAL MOLDING
- PAINT TO MATCH ADJACENT
HOLLOW METAL FRAME
1/2" CLEAR, LAMINATED
FORCED-ENTRY-RESISTANT GLASS
HOLLOW METAL FRAME - PAINT
TO MATCH ADJACENT WALL
1" ALUMINUM REVEAL
2x6 WD STUDS @24" O.C.
ALUMINUM
J-RECEIVER
SEALANT WITH
BACKER RODS
BOTH SIDES
2x6 WD BASE PLATE
SCHEDULED WALL BASE
SCHEDULED FLOOR FINISH
T Y
P
DOUBLE 2x6 WD TOP PLATE
SCHEDULED CEILING
2x6 WD STUDS @ 24" O.C.
R-19 BATT INSULATION.
5/8" GYPSUM BOARD, ONE LAYER
EACH SIDE OF PARTITION.
USE MOISTURE RESISTANT
GYPSUM BOARD AT WET LOCATIONS
2x6 WD BASE PLATE
SCHEDULED WALL BASE
SCHEDULED FLOOR FINISH
DOUBLE 2x4 WD TOP PLATE
SCHEDULED CEILING
2x4 WD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .