Attachement A-5 V2-892PC2037MNC_BD_DRAWINGS_02-22-2021_Part1.pdf
PDF 25 MB Posted
- Solicitation number
- 36c10f21r0018
About this file
This document provides details for a federal construction contract opportunity. The solicitation number is 36c10f21r0018 for the Y1PC--Miramar National Cemetery Phase 2 Construction project. The Department of Veterans Affairs Office of Construction and Facilities Management is the agency seeking construction services to complete the second phase of development at the Miramar National Cemetery in San Diego, California. Responses are due by the date specified in Attachment A-5, which contains drawings related to the project scope and requirements. The construction work involves further infrastructure development and improvements at the cemetery to support expansion of burial services for veterans and their families.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
A/E OF RECORD STAMP
321 4 5 6 7 8 9 10
Project Director
February 22, 2021Revisions: Date:
N/A ofDwg.
John Gallup & Associates, LLC 3225 Shallowford Rd NE Suite 830 Marietta, GA 30062 770-321-4040
CONSULTANTCONSULTANTCONSULTANTCONSULTANTCONSULTANTCONSULTANT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
892PC2037.23
PHASE 2 DEVELOPMENT
PW FD
BID DOCUMENT
COVER SHEET
VOLUME 2
G-102 127 243
AutoCAD SHX Text Miramar National Cemetery
AutoCAD SHX Text
DATE FEBRUARY 22, 2021
AutoCAD SHX Text
PROJECT NUMBER: 892PC2037.23
AutoCAD SHX Text
DEPARTMENT OF VETERANS AFFAIRS
AutoCAD SHX Text
%%UOWNER
AutoCAD SHX Text
NATIONAL CEMETERY ADMINISTRATION
AutoCAD SHX Text
%%USHEET INDEX - VOLUME 2
AutoCAD SHX Text
%%UPROJECT TEAM
AutoCAD SHX Text NAME ROLE ROLE JG&A LANDSCAPE ARCHITECT-LEAD DESIGNER LANDSCAPE ARCHITECT-LEAD DESIGNER VDLA CEMETERY DESIGN/IRRIGATION DESIGN-SUBCONSULTANT CEMETERY DESIGN/IRRIGATION DESIGN-SUBCONSULTANT DAVY ARCHITECTURE ARCHITECTURE 3TERRAMP CIVIL MEP ENGINEERING CIVIL MEP ENGINEERING DESIGN BUILD CONSORTIUM SECURITY SECURITY R&R COST ESTIMATION COST ESTIMATION KIMLEY-HORN CIVIL#2 CIVIL#2
AutoCAD SHX Text
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
REGIONAL LOCATION MAP NOT TO SCALE
AutoCAD SHX Text Phase 2 Expansion
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT SITE
AutoCAD SHX Text SHEET DWG. SHEET TITLE DWG. SHEET TITLE DWG. SHEET TITLE SHEET TITLE 126 G-102 COVER SHEET - VOLUME 2 G-102 COVER SHEET - VOLUME 2 COVER SHEET - VOLUME 2 127 I-111 SITE IRRIGATION PLAN I-111 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 128 I-112 SITE IRRIGATION PLAN I-112 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 129 I-113 SITE IRRIGATION PLAN I-113 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 130 I-114 SITE IRRIGATION PLAN I-114 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 131 I-115 SITE IRRIGATION PLAN I-115 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 132 I-116 SITE IRRIGATION PLAN I-116 SITE IRRIGATION PLAN SITE IRRIGATION PLAN 133 I-501 IRRIGATION DETAILS I-501 IRRIGATION DETAILS IRRIGATION DETAILS 134 I-502 IRRIGATION DETAILS I-502 IRRIGATION DETAILS IRRIGATION DETAILS 135 I-503 IRRIGATION DETAILS I-503 IRRIGATION DETAILS IRRIGATION DETAILS 136 I-504 IRRIGATION DETAILS I-504 IRRIGATION DETAILS IRRIGATION DETAILS 137 I-505 IRRIGATION DETAILS I-505 IRRIGATION DETAILS IRRIGATION DETAILS 138 I-600 IRRIGATION EQUIPMENT LEGEND AND NOTES I-600 IRRIGATION EQUIPMENT LEGEND AND NOTES IRRIGATION EQUIPMENT LEGEND AND NOTES 139 L-111 SITE PLANTING PLAN L-111 SITE PLANTING PLAN SITE PLANTING PLAN 140 L-112 SITE PLANTING PLAN L-112 SITE PLANTING PLAN SITE PLANTING PLAN 141 L-113 SITE PLANTING PLAN L-113 SITE PLANTING PLAN SITE PLANTING PLAN 142 L-114 SITE PLANTING PLAN L-114 SITE PLANTING PLAN SITE PLANTING PLAN 143 L-115 SITE PLANTING PLAN L-115 SITE PLANTING PLAN SITE PLANTING PLAN 144 L-116 SITE PLANTING PLAN L-116 SITE PLANTING PLAN SITE PLANTING PLAN 145 L-117 PLANTING ENLARGEMENT PLAN - ADMINISTRATION BUILDING L-117 PLANTING ENLARGEMENT PLAN - ADMINISTRATION BUILDING PLANTING ENLARGEMENT PLAN - ADMINISTRATION BUILDING 146 LP501 PLANTING DETAILS LP501 PLANTING DETAILS PLANTING DETAILS 147 LP502 PLANTING DETAILS LP502 PLANTING DETAILS PLANTING DETAILS 148 L-600 PLANT MATERIAL SCHEDULE L-600 PLANT MATERIAL SCHEDULE PLANT MATERIAL SCHEDULE 149 L-601 PLANT MATERIAL SCHEDULE L-601 PLANT MATERIAL SCHEDULE PLANT MATERIAL SCHEDULE 150 A-002 SYMBOLS, ABBREVIATIONS, CODE ANALYSIS A-002 SYMBOLS, ABBREVIATIONS, CODE ANALYSIS SYMBOLS, ABBREVIATIONS, CODE ANALYSIS 151 AA-001 ADMINISTRATION BUILDING LIFE SAFETY PLAN AA-001 ADMINISTRATION BUILDING LIFE SAFETY PLAN ADMINISTRATION BUILDING LIFE SAFETY PLAN 152 AA-002 ADMINISTRATION BUILDING CONSTRUCTION PHASING PLAN AA-002 ADMINISTRATION BUILDING CONSTRUCTION PHASING PLAN ADMINISTRATION BUILDING CONSTRUCTION PHASING PLAN 153 AA-102 ADMINISTRATION BUILDING SITE PLAN AA-102 ADMINISTRATION BUILDING SITE PLAN ADMINISTRATION BUILDING SITE PLAN 154 AA-103 ADMINISTRATION BUILDING DEMOLITION FLOOR PLAN AA-103 ADMINISTRATION BUILDING DEMOLITION FLOOR PLAN ADMINISTRATION BUILDING DEMOLITION FLOOR PLAN 155 AA-104 ADMINISTRATION BUILDING FLOOR PLAN AA-104 ADMINISTRATION BUILDING FLOOR PLAN ADMINISTRATION BUILDING FLOOR PLAN 156 AA-105 ADMINISTRATION BUILDING DEMOLITION REFLECTED CEILING PLAN AA-105 ADMINISTRATION BUILDING DEMOLITION REFLECTED CEILING PLAN ADMINISTRATION BUILDING DEMOLITION REFLECTED CEILING PLAN 157 AA-106 ADMINISTRATION BUILDING REFLECTED CEILING PLAN AA-106 ADMINISTRATION BUILDING REFLECTED CEILING PLAN ADMINISTRATION BUILDING REFLECTED CEILING PLAN 158 AA-108 ADMINISTRATION BUILDING ROOF PLAN AA-108 ADMINISTRATION BUILDING ROOF PLAN ADMINISTRATION BUILDING ROOF PLAN 159 AA-109 ADMINISTRATION BUILDING FURNITURE AND SIGNAGE PLAN AA-109 ADMINISTRATION BUILDING FURNITURE AND SIGNAGE PLAN ADMINISTRATION BUILDING FURNITURE AND SIGNAGE PLAN 160 AA-201 ADMINISTRATION BUILDING EXTERIOR ELEVATIONS AA-201 ADMINISTRATION BUILDING EXTERIOR ELEVATIONS ADMINISTRATION BUILDING EXTERIOR ELEVATIONS 161 AA-202 ADMINISTRATION BUILDING INTERIOR ELEVATIONS AA-202 ADMINISTRATION BUILDING INTERIOR ELEVATIONS ADMINISTRATION BUILDING INTERIOR ELEVATIONS 162 AA-203 ADMINISTRATION BUILDING INTERIOR ELEVATIONS AA-203 ADMINISTRATION BUILDING INTERIOR ELEVATIONS ADMINISTRATION BUILDING INTERIOR ELEVATIONS 163 AA-204 ADMINISTRATION BUILDING INTERIOR ELEVATIONS AA-204 ADMINISTRATION BUILDING INTERIOR ELEVATIONS ADMINISTRATION BUILDING INTERIOR ELEVATIONS 164 AA-205 ADMINISTRATION BUILDING PERSPECTIVES VIEWS AA-205 ADMINISTRATION BUILDING PERSPECTIVES VIEWS ADMINISTRATION BUILDING PERSPECTIVES VIEWS 165 AA-301 ADMINISTRATION BUILDING SECTIONS AA-301 ADMINISTRATION BUILDING SECTIONS ADMINISTRATION BUILDING SECTIONS 166 AA-302 ADMINISTRATION BUILDING WALL SECTIONS AA-302 ADMINISTRATION BUILDING WALL SECTIONS ADMINISTRATION BUILDING WALL SECTIONS WALL SECTIONS WALL SECTIONS 167 AA-303 ADMINISTRATION BUILDING WALL SECTIONS AA-303 ADMINISTRATION BUILDING WALL SECTIONS ADMINISTRATION BUILDING WALL SECTIONS 168 AA-501 DETAILS AA-501 DETAILS DETAILS 169 AA-502 DETAILS AA-502 DETAILS DETAILS 170 AA-503 DETAILS AA-503 DETAILS DETAILS 171 AA-504 DETAILS AA-504 DETAILS DETAILS 172 AA-505 DETAILS AA-505 DETAILS DETAILS 173 AA-506 DETAILS AA-506 DETAILS DETAILS 174 AA-507 WALL TYPES AA-507 WALL TYPES WALL TYPES 175 AA-508 DETAILS AA-508 DETAILS DETAILS 176 AA-509 DETAILS AA-509 DETAILS DETAILS 177 AA-601 ADMINISTRATION BUILDING DOOR, WINDOW AND FINISH SCHEDULES AA-601 ADMINISTRATION BUILDING DOOR, WINDOW AND FINISH SCHEDULES ADMINISTRATION BUILDING DOOR, WINDOW AND FINISH SCHEDULES 178 AB-001 HONOR GUARD BUILDING LIFE SAFETY PLAN AB-001 HONOR GUARD BUILDING LIFE SAFETY PLAN HONOR GUARD BUILDING LIFE SAFETY PLAN 179 AB-102 HONOR GUARD BUILDING SITE PLAN AB-102 HONOR GUARD BUILDING SITE PLAN HONOR GUARD BUILDING SITE PLAN 180 AB-103 HONOR GUARD BUILDING FLOOR PLAN AND REFLECTED CEILING PLAN AB-103 HONOR GUARD BUILDING FLOOR PLAN AND REFLECTED CEILING PLAN HONOR GUARD BUILDING FLOOR PLAN AND REFLECTED CEILING PLAN 181 AB-104 HONOR GUARD BUILDING ROOF PLAN AB-104 HONOR GUARD BUILDING ROOF PLAN HONOR GUARD BUILDING ROOF PLAN 182 AB-105 HONOR GUARD BUILDING FURNITURE AND ACCESSORY PLAN AB-105 HONOR GUARD BUILDING FURNITURE AND ACCESSORY PLAN HONOR GUARD BUILDING FURNITURE AND ACCESSORY PLAN 183 AB-201 HONOR GUARD BUILDING EXTERIOR ELEVATIONS AB-201 HONOR GUARD BUILDING EXTERIOR ELEVATIONS HONOR GUARD BUILDING EXTERIOR ELEVATIONS 184 AB-202 HONOR GUARD BUILDING INTERIOR ELEVATIONS AB-202 HONOR GUARD BUILDING INTERIOR ELEVATIONS HONOR GUARD BUILDING INTERIOR ELEVATIONS 185 AB-203 HONOR GUARD BUILDING INTERIOR ELEVATIONS AB-203 HONOR GUARD BUILDING INTERIOR ELEVATIONS HONOR GUARD BUILDING INTERIOR ELEVATIONS 186 AB-301 HONOR GUARD BUILDING SECTIONS AND PERSPECTIVE VIEWS AB-301 HONOR GUARD BUILDING SECTIONS AND PERSPECTIVE VIEWS HONOR GUARD BUILDING SECTIONS AND PERSPECTIVE VIEWS 187 AB-302 HONOR GUARD BUILDING WALL SECTIONS AB-302 HONOR GUARD BUILDING WALL SECTIONS HONOR GUARD BUILDING WALL SECTIONS 188 AB-601 HONOR GUARD BUILDING DOOR, WINDOW AND FINISH SCHEDULES AB-601 HONOR GUARD BUILDING DOOR, WINDOW AND FINISH SCHEDULES HONOR GUARD BUILDING DOOR, WINDOW AND FINISH SCHEDULES SHEET DWG. SHEET TITLE DWG. SHEET TITLE DWG. SHEET TITLE SHEET TITLE 189 AC-001 MAINTENANCE COMPLEX VEHICLE BUILDING LIFE SAFETY PLAN AC-001 MAINTENANCE COMPLEX VEHICLE BUILDING LIFE SAFETY PLAN MAINTENANCE COMPLEX VEHICLE BUILDING LIFE SAFETY PLAN 190 AC-101 MAINTENANCE COMPLEX VEHICLE BUILDING FLOOR PLAN AC-101 MAINTENANCE COMPLEX VEHICLE BUILDING FLOOR PLAN MAINTENANCE COMPLEX VEHICLE BUILDING FLOOR PLAN 191 AC-102 MAINTENANCE COMPLEX VEHICLE BUILDING REFLECTED CEILING PLAN AC-102 MAINTENANCE COMPLEX VEHICLE BUILDING REFLECTED CEILING PLAN MAINTENANCE COMPLEX VEHICLE BUILDING REFLECTED CEILING PLAN 192 AC-103 MAINTENANCE COMPLEX STAFF BUILDING ENLARGED FLOOR/ROOF PLAN AND ELEVATION AC-103 MAINTENANCE COMPLEX STAFF BUILDING ENLARGED FLOOR/ROOF PLAN AND ELEVATION MAINTENANCE COMPLEX STAFF BUILDING ENLARGED FLOOR/ROOF PLAN AND ELEVATION 193 AC-301 MAINTENANCE COMPLEX VEHICLE BUILDING SECTION/ELEVATION AND PERSPECTIVE VIEW AC-301 MAINTENANCE COMPLEX VEHICLE BUILDING SECTION/ELEVATION AND PERSPECTIVE VIEW MAINTENANCE COMPLEX VEHICLE BUILDING SECTION/ELEVATION AND PERSPECTIVE VIEW 194 AC-302 MAINTENANCE COMPLEX VEHICLE BUILDING WALL SECTION AC-302 MAINTENANCE COMPLEX VEHICLE BUILDING WALL SECTION MAINTENANCE COMPLEX VEHICLE BUILDING WALL SECTION 195 AC-601 MAINTENANCE COMPLEX VEHICLE BUILDING DOOR, WINDOW AND FINISH SCHEDULES AC-601 MAINTENANCE COMPLEX VEHICLE BUILDING DOOR, WINDOW AND FINISH SCHEDULES MAINTENANCE COMPLEX VEHICLE BUILDING DOOR, WINDOW AND FINISH SCHEDULES 196 AD-101 COVERED VEHICLE PARKING STRUCTURE SITE/FLOOR PLAN, ROOF PLAN AD-101 COVERED VEHICLE PARKING STRUCTURE SITE/FLOOR PLAN, ROOF PLAN COVERED VEHICLE PARKING STRUCTURE SITE/FLOOR PLAN, ROOF PLAN 197 AD-201 COVERED VEHICLE PARKING STRUCTURE SECTION AD-201 COVERED VEHICLE PARKING STRUCTURE SECTION COVERED VEHICLE PARKING STRUCTURE SECTION 198 A-M-001 MECHANICAL GENERAL NOTES AND LEGENDS 98 A-M-001 MECHANICAL GENERAL NOTES AND LEGENDS A-M-001 MECHANICAL GENERAL NOTES AND LEGENDS MECHANICAL GENERAL NOTES AND LEGENDS 199 AA-MD-101 ADMINISTRATION BUILDING MECHANICAL DEMOLITION PLAN AA-MD-101 ADMINISTRATION BUILDING MECHANICAL DEMOLITION PLAN ADMINISTRATION BUILDING MECHANICAL DEMOLITION PLAN 200 AA-M-101 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN AA-M-101 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN 201 AA-M-101A3 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN ALTERNATE 3 AA-M-101A3 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN ALTERNATE 3 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN ALTERNATE 3 202 AB-M-101 HONOR GUARD BUILDING MECHANICAL FLOOR PLAN AB-M-101 HONOR GUARD BUILDING MECHANICAL FLOOR PLAN HONOR GUARD BUILDING MECHANICAL FLOOR PLAN 203 AC-M-101 WAREHOUSE BUILDING MECHANICAL FLOOR PLAN AC-M-101 WAREHOUSE BUILDING MECHANICAL FLOOR PLAN WAREHOUSE BUILDING MECHANICAL FLOOR PLAN 204 A-MD-103A2 MAINTENANCE COMPLEX MECHANICAL DEMOLITION FLOOR PLAN ADD ALTERNATE 2 A-MD-103A2 MAINTENANCE COMPLEX MECHANICAL DEMOLITION FLOOR PLAN ADD ALTERNATE 2 MAINTENANCE COMPLEX MECHANICAL DEMOLITION FLOOR PLAN ADD ALTERNATE 2 205 A-M-103A2 MAINTENANCE COMPLEX MECHANICAL FLOOR PLAN ALTERNATE 2 A-M-103A2 MAINTENANCE COMPLEX MECHANICAL FLOOR PLAN ALTERNATE 2 MAINTENANCE COMPLEX MECHANICAL FLOOR PLAN ALTERNATE 2 206 A-M-201 MECHANICAL SCHEDULES AND DETAILS A-M-201 MECHANICAL SCHEDULES AND DETAILS MECHANICAL SCHEDULES AND DETAILS 207 AA-P-101A3 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN ALTERNATE 3 AA-P-101A3 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN ALTERNATE 3 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN ALTERNATE 3 208 AA-P-101 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN AA-P-101 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN ADMINISTRATION BUILDING PLUMBING FLOOR PLAN 209 AB-P-101 HONOR GUARD BUILDING PLUMBING FLOOR PLAN AB-P-101 HONOR GUARD BUILDING PLUMBING FLOOR PLAN HONOR GUARD BUILDING PLUMBING FLOOR PLAN 210 AC-P-101 WAREHOUSE BUILDING PLUMBING FLOOR PLAN AC-P-101 WAREHOUSE BUILDING PLUMBING FLOOR PLAN WAREHOUSE BUILDING PLUMBING FLOOR PLAN 211 A-P-103A2 MAINTENANCE COMPLEX PLUMBING SITE PLAN ALTERNATE 2 A-P-103A2 MAINTENANCE COMPLEX PLUMBING SITE PLAN ALTERNATE 2 MAINTENANCE COMPLEX PLUMBING SITE PLAN ALTERNATE 2 212 A-P-301 PLUMBING SCHEDULES A-P-301 PLUMBING SCHEDULES PLUMBING SCHEDULES 213 A-P-401 PLUMBING DETAILS A-P-401 PLUMBING DETAILS PLUMBING DETAILS 214 A-P-501 PLUMBING RISERS A-P-501 PLUMBING RISERS PLUMBING RISERS 215 E-101 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND E-101 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND 216 E-102 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND E-102 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND 217 AA-E-201 ADMINISTRATION BUILDING LIGHTING FLOOR PLAN AA-E-201 ADMINISTRATION BUILDING LIGHTING FLOOR PLAN ADMINISTRATION BUILDING LIGHTING FLOOR PLAN 218 AA-E-301 ADMINISTRATION BUILDING POWER FLOOR PLAN AA-E-301 ADMINISTRATION BUILDING POWER FLOOR PLAN ADMINISTRATION BUILDING POWER FLOOR PLAN 219 AA-E-301A3 ADMINISTRATION BUILDING POWER FLOOR PLAN-ALTERNATE 3 AA-E-301A3 ADMINISTRATION BUILDING POWER FLOOR PLAN-ALTERNATE 3 ADMINISTRATION BUILDING POWER FLOOR PLAN-ALTERNATE 3 220 AA-E-401 ADMINISTRATION BUILDING SIGNAL FLOOR PLAN AA-E-401 ADMINISTRATION BUILDING SIGNAL FLOOR PLAN ADMINISTRATION BUILDING SIGNAL FLOOR PLAN 221 AB-E-201 HONOR GUARD BUILDING LIGHTING FLOOR PLAN AB-E-201 HONOR GUARD BUILDING LIGHTING FLOOR PLAN HONOR GUARD BUILDING LIGHTING FLOOR PLAN 222 AB-E-301 HONOR GUARD BUILDING POWER FLOOR PLAN AB-E-301 HONOR GUARD BUILDING POWER FLOOR PLAN HONOR GUARD BUILDING POWER FLOOR PLAN 223 AB-E-401 HONOR GUARD BUILDING SIGNAL FLOOR PLAN AB-E-401 HONOR GUARD BUILDING SIGNAL FLOOR PLAN HONOR GUARD BUILDING SIGNAL FLOOR PLAN 224 AC-E-201 WAREHOUSE BUILDING LIGHTING FLOOR PLAN AC-E-201 WAREHOUSE BUILDING LIGHTING FLOOR PLAN WAREHOUSE BUILDING LIGHTING FLOOR PLAN 225 AC-E-301 WAREHOUSE BUILDING POWER FLOOR PLAN AC-E-301 WAREHOUSE BUILDING POWER FLOOR PLAN WAREHOUSE BUILDING POWER FLOOR PLAN 226 AC-E-401 WAREHOUSE BUILDING SIGNAL FLOOR PLAN AC-E-401 WAREHOUSE BUILDING SIGNAL FLOOR PLAN WAREHOUSE BUILDING SIGNAL FLOOR PLAN 227 AD-E-301A2 MAINTENANCE BUILDING POWER FLOOR PLAN-ALTERNATE 2 AD-E-301A2 MAINTENANCE BUILDING POWER FLOOR PLAN-ALTERNATE 2 MAINTENANCE BUILDING POWER FLOOR PLAN-ALTERNATE 2 228 AD-E-401 MAINTENANCE BUILDING SIGNAL FLOOR PLAN AD-E-401 MAINTENANCE BUILDING SIGNAL FLOOR PLAN MAINTENANCE BUILDING SIGNAL FLOOR PLAN 229 S-100 GENERAL NOTES AND SPECIAL INSPECTIONS S-100 GENERAL NOTES AND SPECIAL INSPECTIONS GENERAL NOTES AND SPECIAL INSPECTIONS 230 S-101 TYPICAL DETAILS S-101 TYPICAL DETAILS TYPICAL DETAILS 231 S-200 ADMINISTRATION COMPLEX FOUNDATION PLAN S-200 ADMINISTRATION COMPLEX FOUNDATION PLAN ADMINISTRATION COMPLEX FOUNDATION PLAN 232 S-201 ADMINISTRATION COMPLEX LOWER ROOF PLAN S-201 ADMINISTRATION COMPLEX LOWER ROOF PLAN ADMINISTRATION COMPLEX LOWER ROOF PLAN 233 S-202 ADMINISTRATION COMPLEX DETAILS S-202 ADMINISTRATION COMPLEX DETAILS ADMINISTRATION COMPLEX DETAILS 234 S-300 HONOR GUARD FOUNDATION & ROOF FRAMING PLAN S-300 HONOR GUARD FOUNDATION & ROOF FRAMING PLAN HONOR GUARD FOUNDATION & ROOF FRAMING PLAN 235 S-301 HONOR GUARD DETAILS S-301 HONOR GUARD DETAILS HONOR GUARD DETAILS 236 S-302 HONOR GUARD-FOUNDATION & ROOF FRAMING PLAN-ALTERNATE FOR PRICING S-302 HONOR GUARD-FOUNDATION & ROOF FRAMING PLAN-ALTERNATE FOR PRICING HONOR GUARD-FOUNDATION & ROOF FRAMING PLAN-ALTERNATE FOR PRICING 237 S-400 MAINTENANCE COMPLEX VEHICLE BUILDING MEZZANINE FOUNDATION PLAN S-400 MAINTENANCE COMPLEX VEHICLE BUILDING MEZZANINE FOUNDATION PLAN MAINTENANCE COMPLEX VEHICLE BUILDING MEZZANINE FOUNDATION PLAN 238 S-401 MAINTENANCE COMPLEX VERTICAL BUILDING MEZZANINE FLOOR FRAMING PLAN S-401 MAINTENANCE COMPLEX VERTICAL BUILDING MEZZANINE FLOOR FRAMING PLAN MAINTENANCE COMPLEX VERTICAL BUILDING MEZZANINE FLOOR FRAMING PLAN 239 S-402 MEZZANINE DETAILS S-402 MEZZANINE DETAILS MEZZANINE DETAILS 240 S-500 COLUMBARIUM FOUNDATION PLAN & DETAILS S-500 COLUMBARIUM FOUNDATION PLAN & DETAILS COLUMBARIUM FOUNDATION PLAN & DETAILS 241 S-501 COLUMBARIUM DETAILS S-501 COLUMBARIUM DETAILS COLUMBARIUM DETAILS 242 S-600 COVERED VEHICLE PARKING STRUCTURE FOUNDATION & FRAMING PLAN S-600 COVERED VEHICLE PARKING STRUCTURE FOUNDATION & FRAMING PLAN COVERED VEHICLE PARKING STRUCTURE FOUNDATION & FRAMING PLAN 243 S-601 COVERED VEHICLE PARKING STRUCTURE DETAILS S-601 COVERED VEHICLE PARKING STRUCTURE DETAILS COVERED VEHICLE PARKING STRUCTURE DETAILS
AutoCAD SHX Text SECTION NO. SIZE PPC IGC FUTURE IGC NICHES ACREAGE SIZE PPC IGC FUTURE IGC NICHES ACREAGE PPC IGC FUTURE IGC NICHES ACREAGE IGC FUTURE IGC NICHES ACREAGE FUTURE IGC NICHES ACREAGE FUTURE IGC NICHES ACREAGE NICHES ACREAGE 22 3'x8' 544 0.42 3'x8' 544 0.42 544 0.42 0.42 0.42 23 3'x8' 2,884 1.79 3'x8' 2,884 1.79 2,884 1.79 1.79 1.79 1.79 24 3'X8' 2,197 1.40 3'X8' 2,197 1.40 2,197 1.40 1.40 1.40 1.40 25 3'X4' 1,824 0.59 3'X4' 1,824 0.59 1,824 0.59 0.59 0.59 26 3'X8' 2,913 0.89 3'X8' 2,913 0.89 2,913 0.89 0.89 0.89 27 3'X8' 1,570 0.47 3'X8' 1,570 0.47 1,570 0.47 0.47 0.47 28 3'X4' 2,190 0.71 3'X4' 2,190 0.71 2,190 0.71 0.71 0.71 29 3'X8' 1,061 0.32 3'X8' 1,061 0.32 1,061 0.32 0.32 0.32 0.32 30 3'X4' 827 0.26 3'X4' 827 0.26 827 0.26 0.26 31 3'X4' 1.313 0.39 31 3'X4' 1.313 0.39 3'X4' 1.313 0.39 1.313 0.39 1.313 0.39 0.39 32 3'X4' 1.254 0.38 3'X4' 1.254 0.38 1.254 0.38 0.38 0.38 0.38 33 3'X4' 422 0.14 3'X4' 422 0.14 422 0.14 0.14 0.14 34 3'X4' 1,124 0.35 3'X4' 1,124 0.35 1,124 0.35 0.35 0.35 35 3'X4' 1.122 0.37 3'X4' 1.122 0.37 1.122 0.37 0.37 0.37 36 3'X8' 1,292 0.89 3'X8' 1,292 0.89 1,292 0.89 0.89 0.89 Columb. 9,944 0.87 9,944 0.87 0.87 TOTAL 6,917 10,062 5,558 9,944 10.24 6,917 10,062 5,558 9,944 10.24 6,917 10,062 5,558 9,944 10.24 10,062 5,558 9,944 10.24 5,558 9,944 10.24 9,944 10.24 10.24
AutoCAD SHX Text
%%UGRAVESITE SUMMARY
CODE ANALYSIS - ADMINISTRATION BUILDING
• APPLICABLE CODE:
INTERNATIONAL BUILDING CODE 2006 (FOR PHASE 1 CONSTRUCTION),
INTERNATIONAL BUILDING CODE 2018 (FOR PHASE 2 CONSTRUCTION)
• OCCUPANCY CLASSIFICATION
ADMINISTRATION OFFICE
GROUP B – BUSINESS
• HEIGHT AND AREA LIMITATIONS
MAXIMUM ALLOWABLE HEIGHT: 2-STORY (40 FT)
ACTUAL HEIGHT: 1-STORY (APPROXIMATELY 20 FT)
MAXIMUM ALLOWABLE AREA: 9,000 GROSS SF
ACTUAL AREA: APPROXIMATELY 3,741 (EXISTING) + 776 (ADDITION) = 4,517 SF
• TYPE OF CONSTRUCTION:
TYPE VB, BUILDING ELEMENTS ARE ANY MATERIAL PERMITTED BY CODE
• FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
NONE
• AUTOMATIC FIRE SPRINKLER SYSTEM: NOT REQUIRED
NOT PROVIDED
• FIRE ALARM:
PROVIDED
• MEANS OF EGRESS
MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT
• REQUIRED: BUSINESS AREAS, 100 SF/OCCUPANT GROSS
• ACTUAL: 4,517 SF / 100 SF = 45 OCCUPANTS (PROPOSED)
MAXIMUM TRAVEL DISTANCE ALLOWED: 200 FT
CAPACITY OF EGRESS COMPONENTS
• EGRESS WIDTH PER OCCUPANT
• DOORS REQUIRED: 0.2-INCHES X 45 OCCUPANTS = 9-INCHES
• DOORS PROVIDED: MINIMUM 36” WIDTH X 84” HEIGHT
NUMBER OF EXITS
• ONE MEANS OF EGRESS: GROUP B, LESS THAN 50 OCCUPANTS
CORRIDORS
• REQUIRED FIRE-RESISTANCE RATING: 0-HOURS (SPACE REQUIRING ONLY A SINGLE MEANS OF EXIT)
• REQUIRED MINIMUM WIDTH: 36-INCHES
• ACTUAL: 60-INCHES
CODE ANALYSIS - HONOR GUARD BUILDING
• APPLICABLE CODE:
INTERNATIONAL BUILDING CODE 2018
• OCCUPANCY CLASSIFICATION
ADMINISTRATION OFFICE
GROUP B – BUSINESS
• HEIGHT AND AREA LIMITATIONS
MAXIMUM ALLOWABLE HEIGHT: 2-STORY (40 FT)
ACTUAL HEIGHT: 1-STORY (APPROX. 20 FT)
MAXIMUM ALLOWABLE AREA: 9,000 GROSS SF
ACTUAL AREA: APPROX. 1,235 SF
• TYPE OF CONSTRUCTION:
TYPE VB, BUILDING ELEMENTS ARE ANY MATERIAL PERMITTED BY CODE
• FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
NONE
• AUTOMATIC FIRE SPRINKLER SYSTEM:
NOT REQUIRED, NOT PROVIDED
• FIRE ALARM:
PROVIDED
• MEANS OF EGRESS
MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT
• REQUIRED: BUSINESS AREAS, 100 SF/OCCUPANT GROSS
• ACTUAL: 1,235 SF / 100 SF = 12 OCCUPANTS
MAXIMUM TRAVEL DISTANCE ALLOWED: 200 FT
CAPACITY OF EGRESS COMPONENTS
• EGRESS WIDTH PER OCCUPANT
• DOORS REQUIRED: 0.2-INCHES X 12 OCCUPANTS = 2.47-INCHES
• DOORS PROVIDED: MINIMUM 36” WIDTH X 84” HEIGHT
NUMBER OF EXITS
• ONE MEANS OF EGRESS: GROUP B, LESS THAN 50 OCCUPANTS
CORRIDORS
• REQUIRED FIRE-RESISTANCE RATING: 0-HOURS (SPACE REQUIRING ONLY A SINGLE MEANS OF EXIT)
• REQUIRED MINIMUM WIDTH: 36-INCHES
• ACTUAL: 36-INCHES
CODE ANALYSIS - MAINTENANCE STAFF BUILDING
• APPLICABLE CODE:
INTERNATIONAL BUILDING CODE 2006 (FOR PHASE 1 CONSTRUCTION),
INTERNATIONAL BUILDING CODE 2018 (FOR PHASE 2 CONSTRUCTION)
• OCCUPANCY CLASSIFICATION
ADMINISTRATION OFFICE
GROUP B – BUSINESS
• HEIGHT AND AREA LIMITATIONS
MAXIMUM ALLOWABLE HEIGHT: 2-STORY (40 FT)
ACTUAL HEIGHT: 1-STORY (APPROX. 21 FT)
MAXIMUM ALLOWABLE AREA: 9,000 GROSS SF
ACTUAL AREA: APPROX. 3,180 SF
• TYPE OF CONSTRUCTION:
TYPE VB, BUILDING ELEMENTS ARE ANY MATERIAL PERMITTED BY CODE
• FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
NONE
• AUTOMATIC FIRE SPRINKLER SYSTEM:
NOT REQUIRED, NOT PROVIDED
• FIRE ALARM:
PROVIDED
• MEANS OF EGRESS
MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT
• REQUIRED: BUSINESS AREAS, 100 SF/OCCUPANT GROSS
• ACTUAL: 3,180 SF / 100 SF = 32 OCCUPANTS (EXISTING)
MAXIMUM TRAVEL DISTANCE ALLOWED: 200 FT
CAPACITY OF EGRESS COMPONENTS
• EGRESS WIDTH PER OCCUPANT
• DOORS REQUIRED: 0.2-INCHES X 32 OCCUPANTS = 6.4-INCHES
• DOORS PROVIDED: MINIMUM 36” WIDTH X 84” HEIGHT
NUMBER OF EXITS
• ONE MEANS OF EGRESS: GROUP B, LESS THAN 50 OCCUPANTS
CORRIDORS
• REQUIRED FIRE-RESISTANCE RATING: 0-HOURS (SPACE REQUIRING ONLY A SINGLE MEANS OF EXIT)
• REQUIRED MINIMUM WIDTH: 36-INCHES
• ACTUAL: 60-INCHES
CODE ANALYSIS - MAINTENANCE VEHICLE BUILDING - MEZZANINE ADDITION
• APPLICABLE CODE:
INTERNATIONAL BUILDING CODE 2006 (FOR PHASE 1 CONSTRUCTION),
INTERNATIONAL BUILDING CODE 2018 (FOR PHASE 2 CONSTRUCTION)
• OCCUPANCY CLASSIFICATION
STORAGE
GROUP S-1 – MODERATE HAZARD STORAGE
• HEIGHT AND AREA LIMITATIONS
MAXIMUM ALLOWABLE HEIGHT: 2-STORY (40 FT)
ACTUAL HEIGHT: 1-STORY (APPROX. 24 FT)
MAXIMUM ALLOWABLE AREA: 9,000 GROSS SF
ACTUAL AREA: APPROX. 3,725 (EXISTING)
• TYPE OF CONSTRUCTION:
TYPE VB, BUILDING ELEMENTS ARE ANY MATERIAL PERMITTED BY CODE
• FIRE-RESISTANCE RATING REQUIREMENTS FOR BUILDING ELEMENTS:
NONE
• AUTOMATIC FIRE SPRINKLER SYSTEM:
NOT REQUIRED, NOT PROVIDED
• FIRE ALARM:
PROVIDED
• MEANS OF EGRESS
MAXIMUM FLOOR AREA ALLOWANCE PER OCCUPANT
• REQUIRED: BUSINESS AREAS, 300 SF/OCCUPANT GROSS
• ACTUAL AREA: APPROX. 3,725 (EXISTING) + 485 (ADDITION) = 4,210 SF
• ACTUAL: 4,210 SF / 300 SF = 14 OCCUPANTS (PROPOSED)
MAXIMUM TRAVEL DISTANCE ALLOWED: 200 FT
CAPACITY OF EGRESS COMPONENTS
• EGRESS WIDTH PER OCCUPANT
• DOORS REQUIRED: 0.2-INCHES X 13 OCCUPANTS = 2.6-INCHES
• DOORS PROVIDED: MINIMUM 36” WIDTH X 84” HEIGHT
NUMBER OF EXITS
• ONE MEANS OF EGRESS: GROUP S, LESS THAN 29 OCCUPANTS
DEODORIZER DRIP
- CC TYPICAL
T O
P O
F S
E A
T
T O
P O
F S
E A
T
" 2
ACCESSIBLE
TOILET
TOILET LAVATORY ACCESSIBLE
URINAL
URINAL GRAB BARS TOILET TISSUE
DISPENSER
MOP RACK WALL-MOUNTED
SOAP DISPENSER
PAPER TOWEL
DISPENSER /
WASTE
RECEPTACLE
CARD READER ACCESSIBLE
HI-LO
DRINKING
FOUNTAIN
COAT HOOK
DOOR MOUNT
SIGNAGE LOCATION -
LATCH SIDE
TOILET SEAT COVER
DISPENSER - CC (TYP)
T O
R
IM
T O
R
IM
" 4
M A
X
T O
P U
M P
T O
O P
E N
IN
G
T O
S P
O U
T
DEODORIZER DRIP
- CC TYPICAL
N O
T U
S E
D
N O
T U
S E
D
N O
T U
S E
D
M A
X
MIRROR WITH FRAME
[1 .5 m
[0.2 m]
9"
BRAILLE
CHARACTERS
NOTE:
SEE ABA UFAS SECTION 4.30.2 AND 4.30.4 FOR FONT AND
BRAILLE SPACING REQUIREMENTS.
5/8" MIN. EXIT TEXT
EQ EQ
1 1/2" 1 1/2"
E X I T
/8
M
IN
/2
M A
X
M A
X F
R O
M B
O T
T O
M O
F T
E X
T
M A
X F
R O
M B
O T
T O
M O
F B
R A
IL
L E
GENERAL NOTES:
1. MATCH EXISTING.
2. LETTERS, BRAILLE CHARACTERS & PICTOGRAM SYMBOL TO BE RAISED 1/32".
3. UPPER CASE CHARACTERS TO BE SANS SERIF, 5/8 MIN. TO 2" MAX. HEIGHT.
4. CHARACTER WIDTH TO HEIGHT RATIO TO BE BETWEEN 3:5 AND 1:1.
5. STROKE WIDTH TO HEIGHT RATION TO BE BETWEEN 1:5 AND 1:10.
6. CHARACTERS & SYMBOLS SHALL CONTRAST WITH PICTOGRAM ACCOMPANIED BY EQUIVALENT VERBAL DESCRIPTION
DIRECTLY BELOW.
7. PICTOGRAM IDENTIFICATION SIGN TO MATH DOOR SIGN.
8. SIGN TO BE A MINIMUM OF 6"x6".
MEN
DOOR SIGN
PERROOM SIGN
PER
LETTERS
RAISED 1/32"
HEIGHT OF
LETTERING TO
BE 5/8" MIN.
TO 2" MAX.
CORRESPONDING GRADE 11 BRAILLE
2'-0"
4" MIN.
12" MAX.
F.F.
/4 A-002 /4 A-002
T O
F .F
SUB-SURFACE IMAGE
CENTERED ON SIGN
BACKGROUND COLOR
SHALL CONTRAST W/
DOOR COLOR
UNISEX
1/4" THICK, EQUILATERAL
TRIANGLE WITHIN 12" DIAMETER CIRCLE
GENERAL NOTES:
1. SYMBOLS ARE TO BE CENTERED
ON THE DOOR AND ARE TO BE
DISTINCTLY DIFFERENT FROM
THE DOOR IN COLOR AND IN
CONTRAST.
2. ATTACH SIGNS USING ADHESIVE
AND THREE (3) FLATHEAD
CHROME, TAMPER-RESISTANT
WOOD SCREWS, COUNTERSUNK.
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
A-002
SYMBOLS, ABBREVIATIONS, CODE ANALYSIS 892PC2037.23
J ZUBIK HH LL
CODE ANALYSIS ABBREVIATIONS
& AND
@ AT
℄ CENTERLINE
(E) EXISTING
(N) NEW
# NUMBER OR POUND
⅊ PROPERTY LINE
∅ ROUND OR DIAMETER
A ASSEMBLY
AB ANCHOR BOLT
ABV ABOVE
AC ASPHALT CONCRETE PAVING
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADH ADHESIVE
ADJ ADJACENT
ADMIN ADMINISTRATION
AFF ABOVE FINISHED FLOOR
AGG AGGREGATE
AL, ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
AP ACCESS PANEL
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASPH ASPHALT
ASTM AMERICAN SOCIETY FOR
TESTING AND MATERIALS
AUTO AUTOMATIC
AVG AVERAGE
BO BOTTOM OF
B BUSINESS
BD BOARD
BEL BELOW
BET BETWEEN
BIT BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BPL BEARING PLATE
BRZ BRONZE
BS BOTH SIDES
BSMT BASEMENT
BUR BUILT-UP ROOFING
BVL BEVELED
CAB CABINET
CBC CALIFORNIA BUILDING CODE
CC CONTRACTOR SUPPLIED AND
INSTALLED
CEC CALIFORNIA ENERGY COMMISSION
CEM CEMENT
CEN CENTER
CER CERAMIC
CFCI CONTRACTOR FURNISHED,
CONTRACTOR INSTALLED
CHT CEILING HEIGHT
CI CAST IRON
CIPC CAST-IN-PLACE CONCRETE
CIR CIRCLE
CIRC CIRCUMFERENCE
CJ CONTROL JOINT
CK CALK(ING), CAULK(ING)
CLG CEILING
CLO CLOSET
CLR CLEAR(ANCE)
CM CENTIMETER(S)
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE OR CONTINUOUS
CONTR CONTRACT(OR)
CONST CONSTRUCTION
COORD COORDINATE
CPC CLIMATE PREDICTION CENTER
CPT CARPET
CPR COPPER
CR CARD READER
CSMT CASEMENT
CT CERAMIC TILE
CW COLD WATER
CX CONNECTION
D DEPTH
DGS DEPARTMENT OF GENERAL
SERVICES
DWG DRAWING(S)
E ELECTRICITY
(E) EXISTING
ELE ELEVATION
EQ EQUAL
ERF EPOXY RESIN FLOOR
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FIN FINISH
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACT(OR)
GD GRADE, GRADING
GEN GENERAL
GKT GASKET(ED)
GL GLASS, GLAZING
GLB GLASS BLOCK
GND GROUND
GSF GROSS SQUARE FOOT
GT GROUT
GWB GYPSUM WALLBOARD
GYP GYPSUM
HB HOSE BIBB
HC HOLLOW CORE
HDR HEADER
HDW HARDWARE
HEX HEXAGON(AL)
HH HANDHOLE
HHS HOLLOW STRUCTURAL
SECTIONS
H HEIGHT
HM HOLLOW METAL
HOR HORIZONTAL
HR HOUR
HT HEIGHT
HTG HEATING
HVAC HEATING, VENTILATING, AND
AIR CONDITIONING
HW HOT WATER
HWD HARDWOOD
ID INSIDE DIAMETER
IN INCH
INSUL INSULAT(E), (ED), (ION)
INT INTERIOR
J JOIST
J-BOX JUNCTION BOX
JC JANITOR'S CLOSET
JT JOINT
KIT KITCHEN
KO KNOCKOUT
L LENGTH
LAB LABORATORY
LAD LADDER
LAM LAMINATE(D)
LAV LAVATORY
LB LAG BOLT
LH LEFT HAND
LIN LINEAR
LL LIVE LOAD
LT(G) LIGHT(ING)
LWC LIGHT-WEIGHT CONCRETE
M METER(S)
MAS MASONRY
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MECH MECHANIC(AL)
MED MEDIUM
MEMB MEMBRANE
MET METAL
MFR MANUFACTURE(R)(D)
MH MANHOLE
MIN MINIMUM
MIR MIRROR
MISC MISCELLANEOUS
MLD MOLD(ING)
MM MILLIMETER(S)
MOD MODULAR
MOE MEANS OF EGRESS
MP METAL PANEL
MT MOUNT(ED), (ING)
MTL METAL
MUL MULLION
MWK MILLWORK
N NORTH
(N) NEW
NAT NATURAL
N/A NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NTS NOT TO SCALE
OA OVERALL
OC ON CENTER
OCC OCCUPANCY
OD OUTSIDE DIAMETER
OFF OFFICE
OJ OPEN-WEB JOIST
OLF OCCUPANCY LOAD FACTOR
OPG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY
AND HEALTH ADMINISTRATION
PAR PARALLEL
PB PANIC BAR
PBD PARTICLE BOARD
PCC PRECAST CONCRETE
PERF PERFORATED
PERI PERIMETER
PFB PREFABRICATE(D)
PFN PREFINISHED
PK PARKING
PL PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PNL PANEL
PNT PAINT
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT POINT
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWD PLYWOOD
2"
2"
2"
2' 2
A
B
C
D
000 SF
ROOM NAME
RM #
SHEET NUMBER
REFERENCE NUMBER
ENLARGED DETAIL
REFERENCE NUMBER
SHEET NUMBER
SHEET NUMBER
REFERENCE NUMBER
PARTIAL BUILDING SECTION
REFERENCE NUMBER
SHEET NUMBER
SHEET NUMBER
REFERENCE NUMBER
EQUIPMENT NUMBER
KEYNOTE REFERENCE
PARTITION TYPE
ROOM NAME, NUMBER, AND AREA
FINISH
MATERIAL
REFERENCE
CLEAR DIMENSION TO BUILDING MATERIAL
HIDDEN, FUTURE, OR
EXISTING TO BE REMOVED
PROPERTY LINES, BOUNDARY LINES
CENTERLINE, PROJECTIONS, EXT. ELEVATION LINES
DIMENSION TO CENTER-LINE OF BUILDING MATERIAL
DIMENSION TO FACE OF FINISH
SHEET NUMBER
STRUCTURAL GRID REFERENCE
LEVEL LINE, CONTROL POINT, OR DATUM
ELEVATION
BREAKLINE
MATCHLINE
ELEVATION DETAIL
REFERENCE DETAIL
WALL OR DETAILS SECTION
BUILDING OR SITE SECTION
DOOR NUMBER
WINDOW TYPE
REVISION
NEW OR
REQUIRED
POINT
ELEVATION
EXISTING
POINT
ELEVATION
ELEVATION REFERENCE
3/8" = 1'-0"1
TYPICAL MOUNTING HEIGHTS
QTY QUANTITY
R RISER
RAD RADIUS
RB RUBBER BASE
RBT RUBBER TILE
RCP REFLECTIVE CEILING PLAN
RD ROOF DRAIN
REFR REFRIGERATOR
REINF REINFORCE(D), (ING)
REM REMOVE
REQ REQUIRE(D), (MENT)
REV REVISION(S), REVISE(D)
RFG ROOFING
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RESTROOM
S SOUTH
SC SOLID CORE
SCH SCHEDULE
SD STORM DRAIN
SEC SECTION
SF SQUARE FOOT, FEET
SFGL SAFETY GLASS
SH SHELF, SHELVING
SHR SHOWER
SHT SHEET
SIM SIMILAR
SKL SKYLIGHT
SNT SEALANT
SP SOUNDPROOF(ING)
SPEC SPECIFICATION(S)
SPK SPEAKER
SPL SPECIAL
SQ SQUARE
SQ IN SQUARE INCH
SST STAINLESS STEEL
ST STEEL
STD STANDARD
STN STAIN
STO STORAGE
STR STRUCTURAL
SUSP SUSPENDED
SYS SYSTEM
TO TOP OF
T TREAD
TEL TELEPHONE
TEMP TEMPORARY
TFTI TENANT FURNISHED, TENANT
INSTALLED
T TREAD
TEL TELEPHONE
TEMP TEMPORARY
TFTI TENANT FURNISHED, TENANT
INSTALLED
TG TEMPERED GLAZING
T&G TONGUE AND GROOVE
THK THICK(NESS)
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOL TOTAL OCCUPANCY LOAD
TOP TOP OF PARAPET
TOR TOP OF ROOF
TOS TOP OF STEEL
TPD TOILET PAPER DISPENSER
TR TRANSOM
TSL TOP OF SLAB
TST TOP OF STEEL
TV TELEVISION
TW TOP OF WALL
TYP TYPICAL
UNF UNFINISHED
UNO UNLESS NOTED OTHERWISE
UR URINAL
VB VAPOR BARRIER
VCT VINYL COMPOSITE TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VNR VENEER
VT VINYL TILE
VTR VENT THROUGH ROOF
VV VA SUPPLIED AND INSTALLED
W WEST OR WIDTH, WIDE
W/ WITH
WC WATER CLOSET
WD WOOD
WG WIRED GLASS
WH WATER HEATER
WI WROUGHT IRON
WIN WINDOW
WM WIRE MESH
W/O WITHOUT
WP WATERPROOF(ING)
WSCT WAINSCOT
WSH WASHER
WWF WELDED WIRE FAB
SYMBOL LEGEND
3" = 1'-0"2
ACCESSIBLE SIGNAGE
SCOPE OF WORK
THE ARCHITECTURAL PORTION OF WORK FOR THE PHASE 2 EXPANSION INCLUDES;
ADMINISTRATION BUILDING ADDITION, CONSTRUCT NEW HONOR GUARD BUILDING,
MAINTENANCE VEHICLE BUILDING MEZZANINE ADDITION, MAINTENANCE COMPLEX STAFF
BUILDING MISCELLANEOUS UPGRADES, AND CONSTRUCT NEW COVERED VEHICLE PARKING
STRUCTURE. RECONFIGURE PARKING AT ADMINISTRATION AND HONOR GUARD BUILDING.
1" = 1'-0"3
RESTROOM SIGNAGE
1" = 1'-0"4
RESTROOM SIGNAGE 2
DOOR OPENING
Revision Date Dwg. 150 of 243
FEC
18 1
1 1 1 11
EXIT
EXIT EXIT
STORAGE
A207
H.A.C.
A201
MENS
RESTROOM
A202
WOMENS
RESTROOM
A204
STORAGE
A205
COMPANION
RESTROOM
A203
BREEZE
WAY
A200
RECEPTION
A101
354 SF
OLF = 150 SF
TOL = 2
CUSTOMER
ASSISTANCE
A103
OCC = A
128 SF
OLF = 150 SF
TOL = 1
OPEN
OFFICE
A104
OCC = B
783 SF
OLF = 150 SF
TOL = 5
ADMIN
OFFICE
A115
117 SF
OLF = 150 SF
TOL = 1
CORRIDOR
A111
OCC = N/A
452 SF
OLF = 0 SF
BREAK
ROOM
A108
161 SF
OLF = 15 SF
TOL = 11
RESTROOM
A109
OCC = RR
78 SF
OLF = 0 SF
RESTROOM
A110
OCC = RR
78 SF
OLF = 0 SF
ELEC
A112
OCC = N/A
71 SF
OLF = 0 SF
OPERATION
CENTER
A106
223 SF
OLF = 300 SF
TOL = 1
STORAGE
A107
BUDGET
OFFICE
A113
96 SF
OLF = 150 SF
TOL = 1
ASST.
DIRECTOR
A114
127 SF
OLF = 150 SF
TOL = 1
DIRECTOR
A105
214 SF
OLF = 150 SF
TOL = 1
CONFERENCE
A102
263 SF
OLF = 15 SF
TOL = 18
1 2 1
COVERED
ENTRY
A100
SEE AA 102 FOR
PATH OF TRAVEL
TO ACCESSIBLE
PARKING
MAX TRAVEL DISTANCE: 115'-0"
EGRESS TRAVEL DISTANCE
MAX TRAVEL DISTANCE ALLOWED: 200 FT
MAX TRAVEL DISTANCE PROVIDED: 115 FT
COMMON PATH OF TRAVEL
SIGNAGE (TACTILE)
1 EXIT
2 EXIT ROUTE
SEE FOR ACCESSIBLE SIGNAGE DETAILS./2 A-002
FEC FIRE EXTINGUISHER CABINET
LEGEND
EXIT SIGN
(E) 1-HR PARTITION
0' 2' 4' 8'
1/4" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 001
ADMINISTRATION COMPLEX
LIFE SAFETY PLAN
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
LIFE SAFETY PLAN
OCCUPANCY LOAD TABLE -
ADMINISTRATION COMPLEX
ROOM NO. ROOM NAME AREA
OCCUPANT LOAD FACTOR
PER TABLE 1004.1.2
OCCUPANT LOAD
A101 RECEPTION 354 SF 150 SF 2
A102 CONFERENCE 263 SF 15 SF 18
A104 OPEN OFFICE 783 SF 150 SF 5
A105 DIRECTOR 214 SF 150 SF 1
A106 OPERATION CENTER 223 SF 300 SF 1
A113 BUDGET OFFICE 96 SF 150 SF 1
A114 ASST. DIRECTOR 127 SF 150 SF 1
A115 ADMIN OFFICE 117 SF 150 SF 1
A205 STORAGE 39 SF 300 SF 0
TOTAL OCCUPANCY LOAD: 30
Revision Date Dwg. 151 of 243
45'-0"
11'-10"
COMM
C O
M M
COMM(E)COMM
(E) E (E) E (E) E
(E) E
(E) E
(E) E
(E) E
TEMPORARY MODULAR
TRAILER
32'x60'
VAULT FOR TEMPORARY 4"
SEWER CONNCETION
VAULT FOR TEMPORARY
WATER CONNECTION
DECOMPOSED
GRANITE
WALKWAY
DECOMPOSED
GRANITE
ACCESSIBLE
RAMP
PROVIDE ROOF
SUPPORT PADS
FOR ELEC/DATA,
TYP
UP
RAMP
W
(E ) W
(E) W
W
(E) W
(E ) S
(E) S
S
S
ADMINISTRATION
COMPLEX
ELEC
ROOM
15 14 13 12 11
1314151617
N O
P A
R K
IN
G
T
R
T F
B F
R
F T
B F
T
T F
B F
60'-0"
11'-0"
10'-11" 10'-11" 11'-0"
R E
F
UP
WH
MODULAR TRAILER LAYOUT
WORKSTATIONS (6) AND RECORD
STORAGE
OFFICE
CONFERENCE ROOM
ACCESSIBLE RESTROOM
COFFEE MESS / BREAKROOM
ACCESSIBLE STAIRS, RAMP, GUARD
RAIL AND HANDRAILS
WINDOWS (13)
2 4 5
NOTE
1. CARPET IN PRIVATE AND
OPEN OFFICE.
2. HARD SURFACE FLOOR TILE
IN RESTROOM, BREAK ROOM,
AND UTILITY.
2 2 3
GEN
(E) PARKING
PROVIDE ELEC/DATA
WEATHERHEAD,
SEE (SIM)
FOR ROOF
FLASHING
/3 AA 508
GENERAL NOTES
1. SEE ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION
0' 8' 16' 32'
1/16" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 002
ADMINISTRATION COMPLEX
CONSTRUCTION PHASING PLAN
892PC2037.23
J ZUBIK HH LL
CD2
1/16" = 1'-0"1
PHASING PLAN
CONSTRUCTION SEQUENCING:
1. CONTRACTOR TO WORK IN ACCORDANCE WITH SPECIFICATIONS SECTION
01 - GENERAL REQUIREMENTS.
2. CONTRACTOR SHALL PROCEED WITH WORK IN THE ADMINISTRATION
BUILDING AREA ACCORDING TO THE FOLLOWING:
A. CEMETERY STAFF VACATES THE ADMINISTRATION BUILDING AND
TURNS IT OVER TO THE CONTRACTOR. THE BALANCE OF THE
BUILDING REMAINS OCCUPIED AND ALL SERVICES MAINTAINED
UNTIL THE STAFF VACATES.
B. CONTRACTOR INSTALLS NEW ELECTRICAL SERVICE PANELS AND
ATS ON THE SOUTH WALL. INSTALL NEW TELE/DATA SERVICE IN
LOCATION OF NEW TELE/DATA ROOM. ELECTRICAL SERVICE AND
TELE/DATA ARE ENERGIZED AND COMMISSIONED.
C. TEMPORARY CEMETERY OFFICE TRAILER IS INSTALLED ALONG WITH
ASSOCIATED SIGNAGE, PATHS AND RAMPS.
D. UTILITIES ARE PROVIDED TO THE TEMPORARY CEMETERY OFFICE
TRAILER. DO NOT DISRUPT SERVICE TO THE GRAVESITE LOCATOR
AND THE PUBLIC RESTROOMS.
E. ALL EQUIPMENT AND FURNITURE TO BE RELOCATED TO THE
TEMPORARY OFFICE TRAILER BY CONTRACTOR IS IN PLACE AND
FULLY FUNCTIONAL.
F. CEMETERY STAFF VACATES THE BALANCE OF THE ADMINISTRATION
BUILDING.
G. THE REMAINDER OF THE ADMINISTRATION BUILDING RENOVATION
AND SITE WORK ARE COMPLETED.
H. UPON COMPLETION OF CONSTRUCTION ALL UTILITIES SUCH AS
ELECTRICAL POWER, IT/DATA, SECURITY, WATER, SEPTIC SYSTEM
AND FIRE ALARM ARE ENERGIZED AND COMMISSIONED.
I. FURNISHINGS AND EQUIPMENT FOR RENOVATED BUILDING ARE
INSTALLED AND FULLY OPERATIONAL BEFORE CEMETERY STAFF
MOVE INTO THE ADMINISTRATION BUILDING.
J. PROJECT SHALL NOT BE CONSIDERED COMPLETE UNTIL ALL
ARCHITECTURAL AND SITE WORK IS COMPLETED, CEMETERY STAFF
HAVE ESTABLISHED OPERATIONS IN NEW/RENOVATED FACILITIES,
TEMPORARY OFFICE TRAILER HAS BEEN REMOVED, AND SITE
REPAIRS HAVE BEEN COMPLETED.
3. CONTRACTOR SHALL COORDINATE WITH VA R.E. (RESIDENT ENGINEER)
FOR SCHEDULING THE TRANSFER OF I.T. (INFORMATION TECHNOLOGY)
SERVICES.. DELAYS DUE TO TIME OF I.T. SERVICES TRANSFER WILL NOT
SERVE AS A BASIS FOR EXTENDING CONTRACT TIME FOR COMPLETION,
NOR AS A BASIS FOR ADDITIONAL COMPENSATION.
4. CONTRACTOR SHALL FURNISH THE R.E. WITH A SCHEDULE OF
APPROXIMATE DATES ON WHICH THE CONTRACTOR INTENDS TO
ACCOMPLISH WORK IN EACH ARE OF THE SITE, BUILDING, OR PORTION
THEREOF. SEQUENCE OF WORK SHALL ACCORD WITH THE REQUIREMENTS
DESCRIBED AND AS MUTUALLY AGREEABLE TO THE CEMETERY DIRECTOR,
R.E. AND CONTRACTOR.
5. CONTRACTOR SHALL NOTIFY THE R.E. TWO WEEKS IN ADVANCE, IN
WRITING, OF THE PROPOSED DATE OF STARTING WORK IN EACH AREA OF
THE SITE.
6. CONTRACTOR SHALL MAINTAIN UTILITY SERVICES AND ACCESS TO STAFF
AND VISITOR PARKING AREAS AT ALL TIMES.
7. CONTRACTOR SHALL MAINTAIN ACCESS TO THE PUBLIC RESTROOM AND
GRAVESITE LOCATOR AT ALL TIMES.
8. NO CONTRACTOR VEHICLES ARE TOO BE PARKED ON SITE OR ALONG THE
CEMETERY ENTRANCE. CONTRACTOR SHALL ARRANGE FOR PARKING OFF
SITE.
MODULAR TRAILER NOTES:
1. THIS DRAWING IS A REPRESENTATION OF CONDITIONS AS WE KNOW THEM
BASED ON RECORD DRAWINGS AND VISUAL OBSERVATIONS. IT IS NOT
BASED ON AN INSTRUMENT SURVEY AND THE CONTRACTOR SHALL VERIFY
LOCATIONS AND DISTANCES PRIOR TO BIDDING.
2. THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN
APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED
BY THE OWNER OF ITS REPRESENTATIVE. THE CONTRACTOR SHALL
DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE
COMMENCING WORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY
AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY THE CONTRACTOR'S
FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UNDERGROUND UTILITIES.
Revision Date Dwg. 152 of 243
SB SB
SB
V A
N N
O P
A R
K
IN
G
ADMINISTRATION
COMPLEX
15 14 13 12 11
14151617
T
R
T F
B F
R
F T
B F
T
T F
B F
SB
SB
SB
SB SB
V A
N
NO
PA
R K
IN
G
N O
P A R
K I N
G
BR EAK
GR ADE
BR
E
AK
GR
A
DE
N O
P A R K
I N G
3 7
19 20 2118
23 24 2522
5 4 3 2
1668/60
501/48
431/34
1587/73
648/34
2526/93
2452/89
966/71
. 0
. 0
.0
1 .
0.
9. 0
8. 00
387. 0
. 0
0 0
. 0
3. 0
385.
60 TP
385.
56 TP
385.
56 TP
386.
43 TP
386.
05 TP
386.
04 TP
385.
85 TP
385.
47 TP
385.
47 TP
385.
37 TP
385.
14 TP
385.
56 TP
385.
14 TP
384.
41 TP
384.
68 TP
384.
68 TP
384.
28 TP
384.
28 TP
383.
81 TP
385.
14 TP
386.
05 TP
383.
68 TP
MAINTENANCE
COMPLEX
STAFF
BUILDING
MAINTENANCE COMPLEX
VEHICLE BUILDING
ADM
INISTRATION
COMPLEX
(5) 6" STE PS
1.5%
391.0 +
+ 388.5
TW 393.5
FS 388.5
1.5%
TW 393.5
FS 388.24
+ 388.41
2% + 388.0
5.26' HT
WA LL
5.0' HT
WA LL
1.5%
TW 391.5
FS 388.5
3.
TW 391.5
FS 389.3
9 .0+
.5
9 0 .0
9 0 .5
TW 391.5
FS 391.0
TW 391.5
FS 389.7
.4
1.5%
. 0
+ 387.33
+ 387.0
+ 387.0
.5 %
1.5
+ 387.24
+ 387.24
+ 385.0
+ 386.0
4%
+ 387.0
4%
2%
385.0 +
385.0 +
+ 387.0
+ 386.0
2.8%
. 8%
.1 0
+ 385.24
.65
+ 385.24
.6
43' @ 4.65% =
2' DROP IN ELEV .
43' @ 4.65% =2' DROP IN ELEV .
2.5% 4%
4% 2%
385.23 +
TW 387.5
TW 387.84
CHE EK WALL
TW 387.84
CHE EK WALL
+ 387.0
+ 386.0
2.8%
3.8%
1.
+ 388.0 + 387.0
+ 386.0 + 385.0
385.0 +
(5) 6" STE PS
+ 387.5
.0
.5
.5
.0
TW 392.7
FS 387.5
5.2' HT
WA LL
TW 388.0
FS 387.5
TW 392.7
FS 387.7
5.0' HT
WA LL
TW 394.10
FS 388.10
6.0' HT
WA LL
TW 394.10
FS 388.10
6.0' HT
WA LL
6" HT
CHE EK WALL
3.0' HT
CHE EK WALL
1.8' HT
CHE EK WALL
2.2' HT
CHE EK WALL
TW 388.55
FS 388.05
6" HT
CHE EK WALL
TW 388.65
FS 388.15
6" HT
CHE EK WALL
+ 387.5
TW 388.53
FS 388.03
6" HT
CHE EK WALL
387.9 4 +
.0
.7
.4
.0
TW 388.0
FS 386.5
1.5' HT
CHE EK WALL
TW 388.0
FS 387.5
6" HT
CHE EK WALL
6" HT
CHE EK WALL
TW 388.0
FS 385.0
3.0' HT
CHE EK WALL
T
F
B F
T F
B F
T
F
B F
T
F
B F
T F
B F
T F
B F
T
R
T
F
B F
R
R
R
R
8T
8T
8T
8T
16 16
16 15
SB
SB
2 00 / 16 4 SF
- / 20 SF - / 80 SF
- / 50 SF
- / 30 SF
- / 90 SF
- / 17 SF
3 95 / 53 6 SF
2 41 / 47 6 SF
1 09 / 20 4 SF
3 5 / 1 43 SF
1 90 / 19 8 SF
- / 192 SF
- / 116 SF
- / 32 SF
TR
F
T B
F
T
F T
T
F
T
BF
T
T
B F T
F
T
B F
F
M M M
M
M
M
M M M
M
M
M
M
M
M
M
MM
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M M
M
T
F
B F
T
F
B F
T
F
B F
HONOR GUARD
B UILDING
EJ
EJ
EJ
E J
E J
GEN
ACCESS TO
CORTAGE LANE
PARKING
DECOMPOSED
GRANITE
ADDITION
ADDITION
[3 .7 m
[1.5 m]
5' - 0"
MAIN
ENTRY
TRUNCATED DOMES,
SEE
SPLASH BLOCK, TYP
[2 .7 m
[2 .7 m
[2 .6 m
[6.1 m]
20' - 0"
(E) LIGHT TO REMAIN
(E) FLAG POLES (6)
TO REMAIN
(E) BOLLARDS
TO REMAIN, TYP
/6 LC510
AA 509
GENERAL NOTES
1. SEE CIVIL DRAWINGS FOR ADDITIONAL INFORMATION.
2. SEE LANDSCAPE DRAWINGS FOR SITE ELEMENTS.
MIRAMAR RD
N O
B E
L D
R
KEY PLAN
N
LEGEND
COMMON PATH OF TRAVEL
SCALE: 1" = 400'-0"
0' 8' 16' 32'
1/16" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 102
ADMINISTRATION COMPLEX
SITE PLAN
892PC2037.23
J ZUBIK HH LL
1/16" = 1'-0"1
SITE PLAN
Revision Date Dwg. 153 of 243
A1 A2 A3 A4 A5 A6 A7 A8
AA
AB
AC
AD
AE
AF
DIRECTOR
A104
GENERAL
OFFICE
A105
CORRIDOR
A111
RELOCATE
(E) SECURITY ALARM
REMOVE (E) WALL AS
NECESSARY FOR NEW
CONSTRUCTION
RELOCATE
(E) GRAVE
LOCATOR
REMOVE (E) PARTIAL
HEIGHT WALL
(E) ROOF OVERHANG
ABOVE, TYP
(E) ROOF OVERHANG ABOVE, TYP.
MENS
RESTROOM
A202
H.A.C.
A201
COMPANION
RESTROOM
A203
WOMENS
RESTROOM
A204
STORAGE
A205
BREEZE
WAY
A200
CONFERENCE
A102
CUSTOMER
ASSISTANCE
A103
BREAK
ROOM
A108
RESTROOM
A109
RESTROOM
A110
ELEC
A112
OPERATION
CENTER
A106
STORAGE
A107
RECEPTION
A101
REPLACE
(E) CARD
READER
REPLACE
(E) CARD
READER
(E) ELECTRICAL
PANELS TO REMAIN
(E) EDGE OF
PAVEMENT
(E) WALL ABOVE
TO BE DEMOLISHED
PORTION OF (E) WALL
TO BE REMOVED
REMOVE
(E) CARD READER
REMOVE (E) COUNTER TOP
AND STORE FOR RE-USE
(E) COLUMN TO REMAIN,
PROTECT IN PLACE
COVERED
ENTRY
A100
[12.2 m]
40' - 0"
[1.8 m]
5' - 9"
[0 .6 m
[0.6 m]
2' - 0"
[1 .5 m
[2 .1 m
[0.4 m]
1' - 4"
[2.6 m]
8' - 6"
[1.7 m]
5' - 6"
[0 .4 m
[0.9 m]
3' - 0"
[9.8 m]
32' - 3"
[2 .1 m
[3 .7 m
(E) EMERGENCY
GENERATOR ACTION
PANEL TO REMAIN
(E) CONDENSER
TO BE RELOCATED
(E) CONDENSER
UNIT TO REMAIN
LEGEND
WALL TO BE DEMOLISHED
FIXTURE TO BE DEMOLISHED
(E) TO REMAIN
0' 2' 4' 8'
1/4" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 103
ADMINISTRATION COMPLEX
DEMOLITION FLOOR PLAN
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
FLOOR PLAN - DEMOLITION
EXISTING: 3,741 GSF
Revision Date Dwg. 154 of 243
A1 A2 A3 A4 A5 A6
A7
A7
A8
A8 A12
A12
A13
A13
AA
AB
AC
AD
AE
AF
AA 301
[6.4 m]
21' - 0"
[3.2 m]
10' - 6"
[3.2 m]
10' - 6"
(N) CR (N) CR
(N) CR
BATTERED COLUMN,
TYP
RELOCATED
(E) GRAVE LOCATOR
RELOCATED
(E) FIRE ALARM
RELOCATED
(E) SECURITY
ALARM
(E) ROOF ABOVE
RELOCATED (E)
CONDENSER
AA 202
AA 202
A9
A9
A10
A10
A11
A11
AA 301
HP-1
STOREFRONT
SYSTEM
(E) STOREFRONT SYSTEM
TO REMAIN, TYP.
AA 203 10
AA 203
AA 201
AA 2011
(E) ROOF ABOVE
AA 301
AA 2038
AA 301
AA 2048
STOREFRONT SYSTEM,
TYP
AA 2044
(N) CR 2
STORAGE
A207
14 SF
H.A.C.
A201
39 SF
MENS
RESTROOM
A202
219 SF
WOMENS
RESTROOM
A204
219 SF
COMPANION
RESTROOM
A203
54 SF
STORAGE
A205
39 SF
BREEZE
WAY
A200
388 SF
CONFERENCE
A102
263 SF
RECEPTION
A101
354 SF
CUSTOMER
ASSISTANCE
A103
128 SF
OPEN
OFFICE
A104
783 SF
CORRIDOR
A111
452 SF
BREAK
ROOM
A108
161 SF
RESTROOM
A109
78 SF
RESTROOM
A110
78 SF
ELEC
A112
71 SF
OPERATION
CENTER
A106
223 SF
ASST.
DIRECTOR
A114
127 SF
BUDGET
OFFICE
A113
96 SF
DIRECTOR
A105
214 SF
STORAGE
A107
30 SF
ADMIN
OFFICE
A115
117 SF
A105A
A A
A207A
A111B
A115A
A B
1.1
[3.0 m]
10' - 0"
[3.1 m]
10' - 0"
[4 .1 m
[2 .3 m
[1 .1 m
[2 .1 m
[1 .8 m
[0.8 m]
2' - 8" [0.2 m] 6"
[2.6 m]
8' - 6"
E Q
[1 .0 m
R O
E Q
[0.9 m]
3' - 1"
ROOF ABOVE
A6
A5A5
A7
(N) CR
STOREFRONT
SYSTEM
[0 .6 m
[3 .8 m
[0 .5 m
[1 .3 m
[0 .6 m
[5.5 m]
18' - 0"
[2.6 m]
8' - 6"
[0.6 m]
2' - 0"
[2.6 m]
8' - 6"
[0.6 m]
2' - 0"
[2.6 m]
8' - 6"
[0.6 m]
2' - 0"
[2.6 m]
8' - 6"
[0.6 m]
2' - 0"
[2.6 m]
8' - 6"
[0.6 m]
2' - 0"
[6 .8 m
(E) BATTERED COLUMN,
TYP
CAST STONE,
TYP
[1.5 m]
4' - 10"
[1.6 m]
5' - 2"
[1 .3 m
[1 .5 m
ALIGN WITH
(E) STOREFRONT, TYP
A1
AA 303
AA 201
PARTIAL HEIGHT WALL SOLID SURFACE
COUNTERTOP
(E) FEC
SOLID SURFACE
COUNTERTOP
[3.2 m]
10' - 8"
(E) ELECTRICAL PANEL
AA 503
AA 20410
(E) COLUMN
AA 301
ALIGN
WITH
(E)WALL
(E) EDGE OF
PAVEMENT
COVERED
ENTRY
A100
AA 2014
[3.1 m]
10' - 2"
[1.8 m]
5' - 10"
[0.6 m]
2' - 0"
[0 .6 m
[1 .0 m
R .O
[0 .5 m
SB SB
[0 .3 m
S L O
P E
T O
T O
P O
F W
A L
L
AA 501
TYP
(E)101B (E)101C
(E )1
A
(E)107A
(E )1
A
(E )1
A
(E )1
A
(E )1
A
(E)112A
(E )1
A
(E )1
A
SB2
(E) CR
(E) HB
(E) HB
(E )2
A
(E )2
A
(E )2
A
(E)203A
(E )2
A
AA 303
(E) EMERGENCY
GENERATOR
ACTION PLAN TO
REMAIN
AA 203
DRAIN PIPE WITH
LAMBS SPOUT (2)
AA 502
[1.7 m]
5' - 6"
[1.2 m]
4' - 0"
[2.0 m]
6' - 6"
GENERAL NOTES
1. CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS AND CONDITIONS
SHOWN AND REPORT ANY DISCREPANCIES TO THE RESIDENT
ENGINEER IMMEDIATELY FOR RESOLUTION PRIOR TO PROCEEDING.
2. SEE AA109 FOR FURNITURE PLAN AND SCHEDULE.
3. SEE AA601 FOR ROOM FINISH PLAN AND SCHEDULE.
4. SEE AA601 FOR DOOR SCHEDULE AND FRAME ELEVATIONS.
5. SEE LANDSCAPE FOR SIDEWALK LAYOUT AND JOINT PATTERN.
LEGEND
WALL TYPES:
EXTERIOR WALL:
PORTLAND CEMENT PLASTER ON METAL LATH ON (2) LAYERS #15
ASPHALT FELT ON 1/2" PLYWOOD ON WOOD FRAMING, SIZE FRAMING
PER STRUCTURAL DRAWINGS
EXTERIOR WALL:
MANUFACTURED MASONRY ON METAL LATH ON (2) LAYERS #15
ASPHALT FELT ON 1/2" PLYWOOD ON WOOD FRAMING, SIZE FRAMING
PER STRUCTURAL DRAWINGS
INTERIOR PARTITION:
WALL TYPE TO BE A1, UNLESS OTHERWISE NOTED
(E) TO REMAIN
(N) CONSTRUCTION
SPLASH BLOCK, SEE SB /9 AA 508
SB2 SPLASH BLOCK, SEE /6 AA 508
(N) CR DUAL AUTHENTICATION CARD
READER (CARD AND PIN)
(N) CR 2 AUTHENTICATION CARD
READER (CARD ONLY)
0' 2' 4' 8'
1/4" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 104
ADMINISTRATION COMPLEX
FLOOR PLAN
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
FLOOR PLAN
EXISTING: 3,741 GSF
ADDITIONAL: 776 GSF
TOTAL: 4,517 GSF
Revision Date Dwg. 155 of 243
A1 A2 A3 A4 A5 A6 A7 A8
AA
AB
AC
AD
AE
AF
(E) SOFFIT TO BE REMOVED
(E) LIGHT FIXTURE TO BE REMOVED, TYP
MENS
RESTROOM
A202
WOMENS
RESTROOM
A204
STORAGE
A205
COMPANION
RESTROOM
A203
H.A.C.
A201
BREEZE
WAY
A200
RECEPTION
A101
CONFERENCE
A102
OPERATION
CENTER
A106
STORAGE
A107
BREAK
ROOM
A108
CORRIDOR
A111
RESTROOM
A109
RESTROOM
A110
ELEC
A112
DIRECTOR
A104
GENERAL
OFFICE
A105
(E) WALL
TO BE DEMOLISHED
(E) EXIT SIGN TO BE RELOCATED
(E) LIGHT FIXTURE TO REMAIN, TYP
(E) COLUMN TO REMAIN,
PROTECT IN PLACE
(E) CAMERA TO BE RELOCATED
DEMOLITION OF EXTERIOR WALL(E) GYPSUM WALLBOARD CEILING, TYP
(E) SUSPENDED ACOUSTIC CEILING, TYP
(E) TONGUE AND GROOVE CEDAR CEILING TO REMAIN
(E) CEILING MOUNTED
GRAVE LOCATOR SIGN
TO BE RELOCATED
(E) CEILING FAN TO BE
REMOVED
(E) LIGHT FIXTURE
TO BE REMOVED
(E) GYPSUM WALLBOARD
CEILING TO BE REMOVED
(E) AIR INTAKE
(E) SUPPLY/ RETURN GRILL
TO REMAIN, TYP
COVERED
ENTRY
A100
(E) FAN COIL UNIT
TO BE RELOCATED,
SEE MECHANICAL
(E) FAN COIL UNIT
TO REMAIN, TYP
(E) FAN COIL UNIT TO
BE REMOVED, TYP
(E) SUPPLY/RETURN AIR DIFFUSER TO BE REMOVEDCUSTOMER
ASSISTANCE
A103
(E) LIGHT FIXTURE
TO REMAIN, TYP
GENERAL NOTES
1. SEE MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION
LEGEND
WALL TO BE DEMOLISHED
FIXTURE TO BE DEMOLISHED
(E) TO REMAIN
0' 2' 4' 8'
1/4" = 1'-0"
N
John Gallup & Associates, LLC 3225 Shallowford Rd NE Marietta, GA 30062 770-321-4040
DISABLED VETERAN + EMPLOYEE OWNED
1053 TENTH AVENUE
SAN DIEGO, CA 92101
PHONE 619.238.3811
www.davyarchitecture.com
CONSULTANT A/E OF RECORD
Drawing Title
Approved Project Director
Project Title
Location
Date Checked Drawn
Project Number
Building Number
Drawing Number
Dwg. of
987654321
F
E
D
C
B
A
987654321
F
E
D
C
B
A
CONSULTANT CONSULTANT CONSULTANT CONSULTANT CONSULTANT
Phase:
Approved Project Director
STAMP Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
BID DOCUMENT
F ile
P a th
VA FORM 08 - 6231
February 22, 2021
PHASE 2 DEVELOPMENT
Miramar National Cemetery 5795 Nobel Drive, San Diego, CA 92122
AA 105
ADMINISTRATION COMPLEX
DEMOLITION REFLECTED CEILING PLAN
892PC2037.23
J ZUBIK HH LL
1/4" = 1'-0"1
REFLECTED CEILING PLAN - DEMOLITION
Revision Date Dwg. 156 of 243
A1 A2 A3 A4 A5 A6
A7
A7 A8
A12
A12
A13
A13
AA
AB
AC
AD
AE
AF
AA 301
A9
A9
A10
A10
A11
A11
AA 301
AA 201
AA 2011
AA 301
AA 301
(E) TONGUE AND GROOVE CEDAR CEILING, TYP
(E)…
This is the start of the file's text. The full file is on GovTribe.