This document is the specifications for the Miramar National Cemetery Phase 2 construction project. It details requirements for plumbing systems including common work results, meters and gages, general motor requirements, insulation, commissioning, and asbestos abatement. Key products include water meters, pressure gauges, thermometers, and strainers. The project involves expansion of the cemetery including construction of a columbarium, memorial walk, carillon tower, and administration and maintenance buildings. The specifications provide technical requirements for various plumbing components and outline submittal, quality assurance, and execution procedures.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Miramar National Cemetery Phase 2 Expansion
Phase 2 Expansion-Volume 2-Specifications 22 February 2021
U.S. DEPARTMENT OF VETERANS AFFAIRS
National Cemetery Administration VA Project No: 892PC2037 Task Order No: 36C10F-19-N-0021
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
TABLE OF CONTENTS
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
NCA MASTER SPECIFICATIONS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
VOLUME 1
00 01 15 List of Drawing Sheets 05-10 00 01 13 Signature Page
DIVISION 01 - GENERAL REQUIREMENTS
01 00 01 General Requirements 03-20 01 32 16.13 Network Analysis Schedules 05-12 01 33 23 Shop Drawings, Product Data, and Samples 06-14 01 35 26 Safety Requirements 01 42 19 Reference Standards 06-14 01 45 00 Quality Control 01 45 29 Testing Laboratory Services 06-14 01 57 19 Temporary Environmental Controls 06-14 01 74 19 Construction Waste Management 06-14 01 81 13 Sustainable Construction Requirements 08-16 01 91 00 General Commissioning Requirements 12-15
DIVISION 02 – EXISTING CONDITIONS
02 41 10 Demolition and Site Clearing 06-14
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 06-14 03 48 21 Precast Concrete Burial Crypts (Double Depth Lawn
Crypt) 06-14
03 48 24 Precast Concrete Columbarium Units 06-14
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 06-14 04 05 16 Masonry Grouting 06-14 04 20 00 Unit Masonry 06-14 04 42 00 Stone Masonry 04 43 00 Natural Stone Veneer 10-18 04 70 00 Manufactured Masonry 04 72 00 Cast Stone Masonry 06-14 04 73 00 Columbarium Niche Covers 06-14
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Decking 05 31 00 Steel Decking 06-14 05 36 00 Composite Metal Decking 06-14 05 40 00 Cold-Formed Metal Framing 06-14 05 50 00 Metal Fabrications 06-14 05 51 00 Metal Stairs 06-14
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 12-15 06 20 00 Finish Carpentry 06-14 06 40 13 Interior Wood Ceiling
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 12-15 07 22 00 Roof Deck Insulation 07 41 13 Metal Roofing 07 54 19 Polyvinyl-Chloride Roofing 06-14 07 60 00 Flashing and Sheet Metal 06-14 07 71 00 Roof Specialties 06-14 07 72 00 Roof Accessories 06-14 07 92 00 Joint Sealants 06-14
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 06-14 08 31 13 Access Doors and Frames 06-14 08 41 13 Aluminum-Framed Entrances and Storefronts 06-14 08 62 23 Tubular Daylighting Devices 08 71 00 Door Hardware 08 80 00 Glazing 08 90 00 Louvers and Vents
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes 06-14 09 24 00 Portland Cement Plastering 06-14 09 29 00 Gypsum Board 06-14 09 30 13 Tiling 06-14 09 51 00 Acoustical Ceilings 06-14 09 65 13 Resilient Base and Accessories 06-14 09 65 16 Resilient Sheet Flooring 06-14 09 65 19 Resilient Tile Flooring 06-14 09 68 00 Carpeting 06-14 09 91 00 Painting 06-14
DIVISION 10 – SPECIALTIES
10 11 13 Markerboards 06-14 10 11 23 Tackboards 06-14
00 01 10-3
10 14 00 Exterior Signage 06-14 10 14 05 Interior Signage 06-14 10 28 00 Toilet and Bath Accessories 06-14 10 44 13 Fire Extinguisher Cabinets 06-14 10 44 16 Fire Extinguisher 10 51 13 Metal Lockers 06-14
DIVISION 11 - EQUIPMENT
11 83 00 Global Navigation Satellite System (GNSS) Reference
System 01-18
11 83 02 GNSS & GIS Mapping and Geodata 01-18
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 06-14 12 32 00 Manufactured Wood Casework 06-14 12 48 13 Entrance Floor Mat and Frames 06-14
Volume 2
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 11-16 22 05 19 Meters and Gages for Plumbing Piping 11-16 22 05 23 General-Duty Valves for Plumbing Piping 11-16 22 08 00 Commissioning of Plumbing Systems 12-15 22 11 00 Facility Water Distribution 11-16 22 13 00 Facility Sanitary Vents and Piping 11-16 22 14 00 Facility Storm Drainage 11-16 22 15 00 General Service Compressed-Air Systems 11-16 22 33 00 Electric Domestic Water Heaters 11-16 22 40 00 Plumbing Fixtures 11-16
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 11-16 23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment 11-16
23 05 93 Testing, Adjusting, and Balancing for HVAC 11-16 23 07 11 HVAC and Boiler Plant Insulation 11-16 23 08 00 Commissioning of HVAC Systems 12-15 23 23 00 Refrigerant Piping 11-16 23 31 00 HVAC Ducts and Casings 11-16 23 34 00 HVAC Fans 11-16 23 37 00 Air Outlets and Inlets 11-16 23 40 00 HVAC Air Cleaning Devices 11-16 23 81 00 Unitary HVAC Equipment 11-16
00 01 10-4
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 07-17 26 05 19 Low-Voltage Electrical Power Conductors and Cables 07-17 26 05 26 Grounding and Bonding for Electrical Systems 07-17 26 05 33 Raceway and Boxes for Electrical Systems 07-17 26 05 41 Underground Electrical Construction 07-17 26 05 73 Overcurrent Protective Device Coordination Study 07-17 26 08 00 Commissioning of Electrical Systems 12-15 26 22 00 Low-Voltage Transformers 07-17 26 24 13 Distribution Switchboards 07-17 26 24 16 Panelboards 07-17 26 27 26 Wiring Devices 07-17 26 29 11 Motor Controllers 07-17 26 29 21 Enclosed Switches and Circuit Breakers 07-17 26 51 00 Interior Lighting 07-17 26 56 00 Exterior Lighting 07-17
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 27 05 26 Grounding and Bonding for Communications Systems 11-16 27 05 33 Conduits and Backboxes for Communications Systems 11-16 27 08 00 Commissioning of Communication Systems 12-15 27 10 00 Control, Communication and Signal Wiring 11-16
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 08 00 Common Work Results for Electronic Safety and Security 12-15 28 31 00 Fire Detection and Alarm 03-18
DIVISION 31 – EARTHWORK
31 20 00 Earth Moving 11-16 31 23 19 Dewatering 11-16
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements 11-16 32 12 16 Asphalt Paving 11-16 32 17 23 Pavement Markings 11-16 32 31 13 Chain Link Fences and Gates 11-16 32 33 00 Site Furnishings 01-17 32 84 00 Planting Irrigation 01-17 32 90 00 Planting 11-16 32 97 00 Native-Naturalized Landscaping 32 97 13 Native-Naturalized Landscape Area Maintenance
DIVISION 33 – UTILITIES
33 08 00 Commissioning of Site Utility Systems 12-15 33 10 00 Water Utilities 11-16 33 30 00 Sanitary Sewerage Utilities 11-16 33 40 00 Storm Sewer Utilities 11-16 33 41 13 Foundation Drainage 01-17
SIGNATURE PAGE
00 01 13 - 1
SECTION 00 01 13
Lead Consultant/ Landscape Architect:
JG&A
Sections covered by this seal include: 00 01 10, 00 01 15, 01 00 00, 01 32 16.13, 01 33 23, 01 35 26, 01 42 19,01 45 00, 01 57 19, 01 74 19, 01 81 13,01 91 00, 03 48 24, 04 42 00, 04 70 00, 04 73 00, 10 14 00, 11 83 00, 11 83 02, 32 33 00, 33 08 00, Cemetery Planning/Landscape Architecture:
VDLA Landscape Architects
Sections covered by this seal include:
03 48 21, 32 84 00, 32 90 00, 32 97 00, 32 97 13, Irrigation Design VDLA Landscape Architects
Sections covered by this seal include:
32 84 00
00 01 13 - 2
Architecture:
Davy Architecture
Sections covered by this seal include:
04 05 13, 04 05 16, 04 20 00, 04 43 00, 04 72 00, 05 12 00, 05 31 00, 05 36 00, 05 40 00, 05 51 00, 06 10 00, 06 20 00, 06 40 13, 07 21 13, 07 22 00, 07 41 13, 07 54 19, 07 60 00, 07 71 00, 07 72 00, 07 92 00, 08 11 13, 08 31 13, 08 41 13, 08 62 23, 08 71 00, 08 80 00, 08 90 00, 09 06 00, 09 24 00, 09 29 00, 09 30 13, 09 51 00, 09 65 13, 09 65 16, 09 68 00, 09 91 00, 10 11 13, 10 11 23, 10 14 05, 10 28 00, 10 44 13, 10 44 16, 10 51 13, 12 24 00, 12 32 00, 12 48 13
Civil Engineering
KSA
01 45 29, 02 41 00, 03 30 53, 31 20 00, 31 23 19, 32 05 23, 32 12 16, 32 17 23, 32 31 13, 33 10 00, 33 30 00, 33 40 00, 33 41 13
Electrical Engineering
Sections covered by this seal include:
26 05 11, 26 05 19, 26 05 26, 26 05 33, 26 05 41, 26 05 73, 26 08 00, 26 22 00, 26 24 13, 26 24 16, 26 27 26, 26 29 11, 26 29 21, 26 51 00, 26 56 00, 27 05 11, 27 05 26, 27 05 33, 27 08 00, 27 10 00, 28 05 00, 28 31 00
02-22-21
00 01 13 - 3
Mechanical Engineer
Sections covered by this seal include:
23 05 11, 23 05 41, 23 05 93, 23 07 11, 23 08 00, 23 23 00, 23 31 00, 23 34 00, 23 37 00, 23 40 00, 23 81 00
Plumbing Engineer
Sections covered by this seal include:
22 05 11, 22 05 19, 22 05 23, 22 08 00, 22 11 00, 22 13 00, 22 14 00, 22 15 00, 22 33 00, 22 40 00
Structural Engineer Stenstrom-Schneider
Sections covered by this seal include:
04 05 13, 04 05 16, 04 20 00, 05 12 00, 05 31 00, 05 50 00, 05 51 00, 06 10 00
00 01 13 - 4
LIST OF DRAWING SHEETS
00 01 15 - 1
SECTION 00 01 15
The drawings listed below accompanying this specification form a part of the contract.
VOLUME 1
SHEET DWG. SHEET TITLE
1 G-101 COVER SHEET - VOLUME 1
2 G-110 OVERALL SITE PLAN AND PHASING PLAN
3 CD-001 (PUBLIC IMPROVEMENTS) TITLE SHEET
4 CD-002 (PUBLIC IMPROVEMENTS) GENERAL NOTES
5 CD-003 (PUBLIC IMPROVEMENTS) GENERAL NOTES
6 CD-004 (PUBLIC IMPROVEMENTS) EXISTING & DEMO PLAN
7 CD-005 (PUBLIC IMPROVEMENTS) IMPROVEMENT PLAN
8 CD-006 (PUBLIC IMPROVEMENTS) CURB RAMP
9 CD-007 (PUBLIC IMPROVEMENTS) CONSTRUCTION DETAILS
10 CD-008 (PUBLIC IMPROVEMENTS) CONSTRUCTION DETAILS
11 CD-009 (PUBLIC IMPROVEMENTS) EROSION CONTROL PLAN
12 CD-010 (PUBLIC IMPROVEMENTS) SIGNING AND STRIPING PLAN
13 CD-011 (PUBLIC IMPROVEMENTS) TRAFFIC SIGNAL MODIFICATION PLAN
14 T01 (PUBLIC IMPROVEMENTS) TRAFFIC CONTROL PLAN
15 B-100 EXISTING CONDITIONS
16 B-101 GEOTECHNICAL BORING LOCATION MAP AND LOGS
17 B-102 GEOTECHNICAL BORING LOCATION MAP AND LOGS
18 CE-101 EROSION CONTROL INDEX MAP
19 CE-401 EROSION CONTROL PLAN
20 CE-402 EROSION CONTROL PLAN
21 CE-403 EROSION CONTROL PLAN
22 CE-404 EROSION CONTROL PLAN
23 CE-405 EROSION CONTROL PLAN
24 CE-406 EROSION CONTROL PLAN
25 CE-501 EROSION CONTROL DETAILS
26 CD-101 DEMOLITION PLAN INDEX MAP
27 CD-401 DEMOLITION PLAN
28 CD-402 DEMOLITION PLAN
29 CD-403 DEMOLITION PLAN
30 CD-404 DEMOLITION PLAN
31 CD-405 DEMOLITION PLAN
32 CD-406 DEMOLITION PLAN
33 CG-101 GRADING INDEX MAP
34 CG-401 GRADING PLAN
35 CG-402 GRADING PLAN
36 CG-403 GRADING PLAN
37 CG-404 GRADING PLAN
38 CG-405 MEMORIAL WALK GRADING PLAN
39 CG-406 MAINTENANCE AREA GRADING PLAN
40 CG-407 HONOR GUARD BUILDING GRADING PLAN
41 CG-408 ADMINISTRATION BUILDING GRADING PLAN
42 CG-409 MEMORIAL WALK GRADING PLAN
43 CG-410 COLUMBARIUM GRADING PLAN
44 CS-401 HORIZONTAL CONTROL PLAN
45 CS-402 HORIZONTAL CONTROL PLAN
00 01 15 - 2
SHEET DWG. SHEET TITLE
46 CS-403 HORIZONTAL CONTROL PLAN
47 CS-404 HORIZONTAL CONTROL PLAN
48 CP-101 MASON CARTER LN PLAN AND PROFILE STA 112+00 TO STA 122+50
49 CP-102 MASON CARTER LN PLAN AND PROFILE STA 122+50 TO STA 133+00
50 CP-301 TYPICAL ROAD SECTIONS
51 CS-101 CONSTRUCTION ENTRANCE PLAN AND PROFILE
52 CS-102 CONSTRUCTION STAGING AREA
53 CU-101 WET UTILITY PLAN INDEX MAP
54 CU-201 STORM DRAIN PROFILES 1
55 CU-202 STORM DRAIN PROFILES 2
56 CU-203 STORM DRAIN PROFILES 3
57 CU-401 WET UTILITY PLAN 1
58 CU-402 WET UTILITY PLAN 2
59 CU-403 WET UTILITY PLAN 3
60 CU-404 WET UTILITY PLAN 4
61 CU-405 SUB-DRAIN CRYPT
62 CU-406 SUB-DRAIN CRYPT
63 CU-407 SUB-DRAIN CRYPT
64 CU-408 SUB-DRAIN COLUMBARIUM
65 CU-501 DRAINAGE DETAILS
66 CU-502 DRAINAGE DETAILS
67 CU-503 DRAINAGE DETAILS
68 CU-504 TRENCH AND IMPROVEMENT DETAILS
69 CU-505 UTILITY DETAILS
70 CU-506 UTILITY DETAILS
71 LC101 COLUMBARIUM SITE PLAN
72 LC102 MEMORIAL WALK SITE PLAN
73 LC103 CARILLON TOWER SITE PLAN
74 LC104 COLUMBARIUM LAYOUT PLAN
75 LC201 COLUMBARIUM ELEVATIONS
76 LC202 COLUMBARIUM ELEVATIONS
77 LC203 COLUMBARIUM ELEVATIONS
78 LC204 COLUMBARIUM ELEVATIONS
79 LC20 COLUMBARIUM ELEVATIONS
80 LC206 COLUMBARIUM ELEVATIONS
81 LC207 COLUMBARIUM ELEVATIONS
82 LC208 COLUMBARIUM ELEVATIONS
83 LC209 COLUMBARIUM ELEVATIONS
84 LC210 COLUMBARIUM ELEVATIONS
85 LC211 COLUMBARIUM ELEVATIONS
86 LC212 COLUMBARIUM ELEVATIONS
87 LC213 COLUMBARIUM ELEVATIONS
88 LC214 COLUMBARIUM ELEVATIONS
89 LC215 COLUMBARIUM ELEVATIONS
90 LC216 COLUMBARIUM LETTERING PLAN
91 LC500 COLUMBARIUM DETAILS
92 LC501 COLUMBARIUM DETAILS
93 LC502 COLUMBARIUM DETAILS
94 LC503 COLUMBARIUM DETAILS
95 LC504 COLUMBARIUM DETAILS
96 LC505 COLUMBARIUM DETAILS
97 LC506 COLUMBARIUM DETAILS
98 LC507 COLUMBARIUM DETAILS
99 LC508 COLUMBARIUM DETAILS
00 01 15 - 3
100 LC509 SITE DETAILS
101 LC510 SITE DETAILS 2
102 LS111 SIGNAGE PLAN
103 LS112 SIGNAGE PLAN
104 LS113 SIGNAGE PLAN
105 LS114 SIGNAGE PLAN
106 LS115 SIGNAGE PLAN
107 LS116 SIGNAGE PLAN
108 LS501 SITE SIGNAGE DETAILS
109 LS502 SITE SIGNAGE DETAILS
110 LS503 SITE SIGNAGE DETAILS
111 L-000 CONSTRUCTION ACCESS EXHIBITS
112 L-001 GRAVESITE No. PLAN-PPC SECTIONS 22 & 23 113 L-002 GRAVESITE No. PLAN-PPC SECTIONS 24 & 36 114 L-003 GRAVESITE No. PLAN-PPC SECTIONS 26,27,29,30,31,32, & 34
115 L-101 SITE CONSTRUCTION PLAN
116 L-102 SITE CONSTRUCTION PLAN
117 L-103 SITE CONSTRUCTION PLAN
118 L-104 SITE CONSTRUCTION PLAN
119 L-105 SITE CONSTRUCTION PLAN
120 L-106 SITE CONSTRUCTION PLAN
121 L-107 SITE ENLARGEMENT PLAN - ADMINISTRATION BUILDING
122 L-501 SITE CONSTRUCTION DETAILS
123 L-502 SITE CONSTRUCTION DETAILS
124 L-503 SITE CONSTRUCTION DETAILS
125 L-504 SITE CONSTRUCTION DETAILS
VOLUME 2
126 G-102 COVER SHEET - VOLUME 2
127 I-111 SITE IRRIGATION PLAN
128 I-112 SITE IRRIGATION PLAN
129 I-113 SITE IRRIGATION PLAN
130 I-114 SITE IRRIGATION PLAN
131 I-115 SITE IRRIGATION PLAN
132 I-116 SITE IRRIGATION PLAN
133 I-501 IRRIGATION DETAILS
134 I-502 IRRIGATION DETAILS
135 I-503 IRRIGATION DETAILS
136 I-504 IRRIGATION DETAILS
137 I-505 IRRIGATION DETAILS
138 I-600 IRRIGATION EQUIPMENT LEGEND AND NOTES
139 L-111 SITE PLANTING PLAN
140 L-112 SITE PLANTING PLAN
141 L-113 SITE PLANTING PLAN
142 L-114 SITE PLANTING PLAN
143 L-115 SITE PLANTING PLAN
144 L-116 SITE PLANTING PLAN
145 L-117 PLANTING ENLARGEMENT PLAN - ADMINISTRATION BUILDING
146 LP501 PLANTING DETAILS
147 LP502 PLANTING DETAILS
148 L-600 PLANT MATERIAL SCHEDULE
149 L-601 PLANT MATERIAL SCHEDULE
150 A-002 SYMBOLS, ABBREVIATIONS, CODE ANALYSIS
151 AA-001 ADMINISTRATION COMPLEX LIFE SAFETY PLAN
00 01 15 - 4
152 AA-002 ADMINISTRATION COMPLEX CONSTRUCTION PHASING PLAN
153 AA-102 ADMINISTRATION COMPLEX SITE PLAN
154 AA-103 ADMINISTRATION COMPLEX DEMOLITION FLOOR PLAN
155 AA-104 ADMINISTRATION COMPLEX FLOOR PLAN
156 AA-105 ADMINISTRATION COMPLEX DEMOLITION REFLECTED CEILING PLAN
157 AA-106 ADMINISTRATION COMPLEX REFLECTED CEILING PLAN
158 AA-108 ADMINISTRATION COMPLEX ROOF PLAN
159 AA-109 ADMINISTRATION COMPLEX FURNITURE AND SIGNAGE PLAN
160 AA-201 ADMINISTRATION COMPLEX EXTERIOR ELEVATIONS
161 AA-202 ADMINISTRATION COMPLEX INTERIOR ELEVATIONS
162 AA-203 ADMINISTRATION COMPLEX INTERIOR ELEVATIONS
163 AA-204 ADMINISTRATION COMPLEX INTERIOR ELEVATIONS
164 AA-205 ADMINISTRATION COMPLEX PERSPECTIVES VIEWS
165 AA-301 ADMINISTRATION COMPLEX SECTIONS
166 AA-302 ADMINISTRATION COMPLEX WALL SECTIONS
167 AA-303 ADMINISTRATION COMPLEX WALL SECTIONS
168 AA-501 DETAILS
169 AA-502 DETAILS
170 AA-503 DETAILS
171 AA-504 DETAILS
172 AA-505 DETAILS
173 AA-506 DETAILS
174 AA-507 WALL TYPES
175 AA-508 DETAILS
176 AA-509 DETAILS
177 AA-601 ADMINISTRATION BUILDING DOOR, WINDOW AND FINISH SCHEDULES
178 AB-001 HONOR GUARD BUILDING LIFE SAFETY PLAN
179 AB-102 HONOR GUARD BUILDING SITE PLAN
180 AB-103 HONOR GUARD BUILDING FLOOR PLAN AND REFLECTED CEILING PLAN
181 AB-104 HONOR GUARD BUILDING ROOF PLAN
182 AB-105 HONOR GUARD BUILDING FURNITURE AND ACCESSORY PLAN
183 AB-201 HONOR GUARD BUILDING EXTERIOR ELEVATIONS
184 AB-202 HONOR GUARD BUILDING INTERIOR ELEVATIONS
185 AB-203 HONOR GUARD BUILDING INTERIOR ELEVATIONS
186 AB-301 HONOR GUARD BUILDING SECTIONS AND PERSPECTIVE VIEWS
187 AB-302 HONOR GUARD BUILDING WALL SECTIONS
188 AB-601 HONOR GUARD BUILDING DOOR, WINDOW AND FINISH SCHEDULES
189 AC-001 MAINTENANCE COMPLEX VEHICLE BUILDING LIFE SAFETY PLAN
190 AC-101 MAINTENANCE COMPLEX VEHICLE BUILDING FLOOR PLAN
191 AC-102 MAINTENANCE COMPLEX VEHICLE BUILDING REFLECTED CEILING PLAN
192 AC-103 MAINT. COMPLEX STAFF BLDG ENLARGED FLR/ROOF PLAN & ELEV.
193 AC-301 MAINT. COMPLEX VEH. BLDG SECTION/ELEV. AND PERSPECTIVE VIEW
194 AC-302 MAINTENANCE COMPLEX VEHICLE BUILDING WALL SECTION
195 AC-601 MAINT. COMPLEX VEHICLE BLDG DOOR, WINDOW AND FINISH SCHED.
196 AD-101 COVERED VEH. PARKING STRUCTURE SITE/FLOOR PLAN, ROOF PLAN
197 AD-201 COVERED VEHICLE PARKING STRUCTURE SECTION
198 A-M-001 MECHANICAL GENERAL NOTES AND LEGENDS
199 AA-MD-101 ADMINISTRATION BUILDING MECHANICAL DEMOLITION PLAN
200 AA-M-101 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN
201 AA-M-101A3 ADMINISTRATION BUILDING MECHANICAL FLOOR PLAN ALTERNATE 3
202 AB-M-101 HONOR GUARD BUILDING MECHANICAL FLOOR PLAN
203 AC-M-101 WAREHOUSE BUILDING MECHANICAL FLOOR PLAN
204 A-MD-103A2 MAINT. COMPLEX MECHANICAL DEMOLITION FLOOR PLAN ADD ALT. 2
00 01 15 - 5
205 A-M-103A2 MAINTENANCE COMPLEX MECHANICAL FLOOR PLAN ALTERNATE 2
206 A-M-201 MECHANICAL SCHEDULES AND DETAILS
207 AA-P-101A3 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN ALTERNATE 3
208 AA-P-101 ADMINISTRATION BUILDING PLUMBING FLOOR PLAN
209 AB-P-101 HONOR GUARD BUILDING PLUMBING FLOOR PLAN
210 AC-P-101 WAREHOUSE BUILDING PLUMBING FLOOR PLAN
211 A-P-103A2 MAINTENANCE COMPLEX PLUMBING SITE PLAN ALTERNATE 2
212 A-P-301 PLUMBING SCHEDULES
213 A-P-401 PLUMBING DETAILS
214 A-P-501 PLUMBING RISERS
215 E-101 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
216 E-102 ELECTRICAL GENERAL NOTES AND SYMBOL LEGEND
217 AA-E-201 ADMINISTRATION BUILDING LIGHTING FLOOR PLAN
218 AA-E-301 ADMINISTRATION BUILDING POWER FLOOR PLAN
219 AA-E-301A3 ADMINISTRATION BUILDING POWER FLOOR PLAN-ALTERNATE 3
220 AA-E-401 ADMINISTRATION BUILDING SIGNAL FLOOR PLAN
221 AB-E-201 HONOR GUARD BUILDING LIGHTING FLOOR PLAN
222 AB-E-301 HONOR GUARD BUILDING POWER FLOOR PLAN
223 AB-E-401 HONOR GUARD BUILDING SIGNAL FLOOR PLAN
224 AC-E-201 WAREHOUSE BUILDING LIGHTING FLOOR PLAN
225 AC-E-301 WAREHOUSE BUILDING POWER FLOOR PLAN
226 AC-E-401 WAREHOUSE BUILDING SIGNAL FLOOR PLAN
227 AD-E-301A2 MAINTENANCE BUILDING POWER FLOOR PLAN-ALTERNATE 2
228 AD-E-401 MAINTENANCE BUILDING SIGNAL FLOOR PLAN
229 S-100 GENERAL NOTES AND SPECIAL INSPECTIONS
230 S-101 TYPICAL DETAILS
231 S-200 ADMINISTRATION COMPLEX FOUNDATION PLAN
232 S-201 ADMINISTRATION COMPLEX LOWER ROOF PLAN
233 S-202 ADMINISTRATION COMPLEX DETAILS
234 S-300 HONOR GUARD FOUNDATION & ROOF FRAMING PLAN
235 S-301 HONOR GUARD DETAILS
236 S-302 HONOR GUARD-FOUNDATION & ROOF FRAMING PLAN-ALT. FOR PRICING
237 S-400 MAINT. COMPLEX VEHICLE BUILDING MEZZANINE FOUNDATION PLAN
238 S-401 MAINT. COMPLEX VERTICAL BLDG MEZZANINE FLOOR FRAMING PLAN
239 S-402 MEZZANINE DETAILS
240 S-500 COLUMBARIUM FOUNDATION PLAN & DETAILS
241 S-501 COLUMBARIUM DETAILS
242 S-600 COVERED VEHICLE PARKING STRUCTURE FOUNDATION & FRAMING PLAN
243 S-601 COVERED VEHICLE PARKING STRUCTURE DETAILS
00 01 15 - 6
COMMON WORK RESULTS FOR PLUMBING
22 05 11 - 1
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
SECTION 22 05 11
PART 1 - GENERAL
1.1 DESCRIPTION
A. The requirements of this Section shall apply to all sections of
Division 22.
B. Definitions:
1. Exposed: Piping and equipment exposed to view in finished rooms.
C. Abbreviations/Acronyms:
1. ABS: Acrylonitrile Butadiene Styrene
2. AC: Alternating Current
3. ACR: Air Conditioning and Refrigeration
4. AI: Analog Input
5. AISI: American Iron and Steel Institute
6. AO: Analog Output
7. AWG: American Wire Gauge
8. BACnet: Building Automation and Control Network
9. BAg: Silver-Copper-Zinc Brazing Alloy
10. BAS: Building Automation System
11. BCuP: Silver-Copper-Phosphorus Brazing Alloy
12. BSG: Borosilicate Glass Pipe
13. CDA: Copper Development Association
14. C: Celsius
15. CLR: Color
16. CO: Carbon Monoxide
17. COR: Contracting Officer’s Representative
18. CPVC: Chlorinated Polyvinyl Chloride
19. CR: Chloroprene
20. CRS: Corrosion Resistant Steel
21. CWP: Cold Working Pressure
22. CxA: Commissioning Agent
23. db(A): Decibels (A weighted)
24. DDC: Direct Digital Control
25. DI: Digital Input
26. DISS: Diameter Index Safety System
27. DO: Digital Output
22 05 11 - 2
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
28. DVD: Digital Video Disc
29. DN: Diameter Nominal
30. DWV: Drainage, Waste and Vent
31. ECC: Engineering Control Center
32. EPDM: Ethylene Propylene Diene Monomer
33. EPT: Ethylene Propylene Terpolymer
34. ETO: Ethylene Oxide
35. F: Fahrenheit
36. FAR: Federal Acquisition Regulations
37. FD: Floor Drain
38. FED: Federal
39. FG: Fiberglass
40. FNPT: Female National Pipe Thread
41. FPM: Fluoroelastomer Polymer
42. GPM: Gallons Per Minute
43. HDPE: High Density Polyethylene
44. Hg: Mercury
45. HOA: Hands-Off-Automatic
46. HP: Horsepower
47. HVE: High Volume Evacuation
48. ID: Inside Diameter
49. IPS: Iron Pipe Size
50. Kg: Kilogram
51. kPa: Kilopascal
52. lb: Pound
53. L/s: Liters Per Second
54. L/min: Liters Per Minute
55. MAWP: Maximum Allowable Working Pressure
56. MAX: Maximum
57. MED: Medical
58. m: Meter
59. MFG: Manufacturer
60. mg: Milligram
61. mg/L: Milligrams per Liter
62. ml: Milliliter
63. mm: Millimeter
64. MIN: Minimum
65. NF: Oil Free Dry (Nitrogen)
22 05 11 - 3
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
66. NPTF: National Pipe Thread Female
67. NPS: Nominal Pipe Size
68. NPT: Nominal Pipe Thread
69. OD: Outside Diameter
70. OSD: Open Sight Drain
71. OS&Y: Outside Stem and Yoke
72. OXY: Oxygen
73. PBPU: Prefabricated Bedside Patient Units
74. PH: Power of Hydrogen
75. PLC: Programmable Logic Controllers
76. PP: Polypropylene
77. PPM: Parts per Million
78. PSIG: Pounds per Square Inch
79. PTFE: Polytetrafluoroethylene
80. PVC: Polyvinyl Chloride
81. PVDF: Polyvinylidene Fluoride
82. RAD: Radians
83. RO: Reverse Osmosis
84. RPM: Revolutions Per Minute
85. RTRP: Reinforced Thermosetting Resin Pipe
86. SCFM: Standard Cubic Feet Per Minute
87. SDI: Silt Density Index
88. SPEC: Specification
89. SPS: Sterile Processing Services
90. STD: Standard
91. SUS: Saybolt Universal Second
92. SWP: Steam Working Pressure
93. TEFC: Totally Enclosed Fan-Cooled
94. TFE: Tetrafluoroethylene
95. THHN: Thermoplastic High-Heat Resistant Nylon Coated Wire
96. THWN: Thermoplastic Heat & Water Resistant Nylon Coated Wire
97. T/P: Temperature and Pressure
98. USDA: U.S. Department of Agriculture
99. V: Volt
100. VAC: Vacuum
101. VA: Veterans Administration
102. VAMC: Veterans Administration Medical Center
103. VAC: Voltage in Alternating Current
22 05 11 - 4
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
104. WAGD: Waste Anesthesia Gas Disposal
105. WOG: Water, Oil, Gas
1.2 RELATED WORK
A. Section 01 00 00, GENERAL REQUIREMENTS.
B. Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.
C. Section 01 74 19, CONSTRUCTION WASTE MANAGEMENT.
D. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS.
E. Section 01 91 00, GENERAL COMMISSIONING REQUIREMENTS.
F. Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.
G. Section 03 30 00, CAST-IN-PLACE CONCRETE: Concrete and Grout.
H. Section 05 31 00, STEEL DECKING: Building Components for Attachment of
Hangers.
I. Section 05 36 00, COMPOSITE METAL DECKING: Building Components for
Attachment of Hangers.
J. Section 05 50 00, METAL FABRICATIONS.
K. Section 07 60 00, FLASHING AND SHEET METAL: Flashing for Wall and Roof
Penetrations.
L. Section 07 84 00, FIRESTOPPING.
M. Section 07 92 00, JOINT SEALANTS.
N. Section 09 91 00, PAINTING.
O. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL
COMPONENTS.
P. Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR PLUMBING EQUIPMENT.
Q. Section 22 07 11, PLUMBING INSULATION.
R. Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
S. Section 23 09 23, DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC.
T. Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS.
U. Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES.
V. Section 26 29 11, MOTOR CONTROLLERS.
W. Section 31 20 00, EARTH MOVING: Excavation and Backfill.
1.3 APPLICABLE PUBLICATIONS
A. The publications listed below shall form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.
22 05 11 - 5
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
B. American Society of Mechanical Engineers (ASME):
ASME Boiler and Pressure Vessel Code -
BPVC Section IX-2013....Welding, Brazing, and Fusing Qualifications
B31.1-2012..............Power Piping
C. American Society for Testing and Materials (ASTM):
A36/A36M-2012...........Standard Specification for Carbon Structural
Steel
A575-96(R2013)e1........Standard Specification for Steel Bars, Carbon, Merchant Quality, M-Grades
E84-2013a...............Standard Test Method for Surface Burning
Characteristics of Building Materials
E119-2012a..............Standard Test Methods for Fire Tests of
Building Construction and Materials
F1760-01(R2011).........Standard Specification for Coextruded
Poly(Vinyl Chloride) (PVC) Non-Pressure Plastic
Pipe Having Reprocessed-Recycled Content
D. International Code Council, (ICC):
IBC-2012................International Building Code
IPC-2012................International Plumbing Code
E. Manufacturers Standardization Society (MSS) of the Valve and Fittings
Industry, Inc:
SP-58-2009..............Pipe Hangers and Supports - Materials, Design, Manufacture, Selection, Application and
Installation
SP-69-2003..............Pipe Hangers and Supports - Selection and
Application
F. Military Specifications (MIL):
P-21035B................Paint High Zinc Dust Content, Galvanizing
Repair (Metric)
G. National Electrical Manufacturers Association (NEMA):
MG 1-2011...............Motors and Generators
H. National Fire Protection Association (NFPA):
51B-2014................Standard for Fire Prevention During Welding, Cutting and Other Hot Work
54-2012.................National Fuel Gas Code
70-2014.................National Electrical Code (NEC)
22 05 11 - 6
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
I. NSF International (NSF):
5-2012..................Water Heaters, Hot Water Supply Boilers, and
Heat Recovery Equipment
14-2012.................Plastic Piping System Components and Related
Materials
61-2012.................Drinking Water System Components – Health
Effects
372-2011................Drinking Water System Components – Lead Content
J. Department of Veterans Affairs (VA):
PG-18-10................Plumbing Design Manual
PG-18-13-2011...........Barrier Free Design Guide
1.4 SUBMITTALS
A. Submittals, including number of required copies, shall be submitted in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, and
SAMPLES.
B. Information and material submitted under this section shall be marked
"SUBMITTED UNDER SECTION 22 05 11, COMMON WORK RESULTS FOR PLUMBING",
with applicable paragraph identification.
C. Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available.
D. If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems.
Approval will be given only if all features of the equipment and associated systems, including accessibility, are equivalent to that required by the contract.
E. Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation.
F. Installing Contractor shall provide lists of previous installations for selected items of equipment. Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references.
G. Manufacturer's Literature and Data: Manufacturer’s literature shall be submitted under the pertinent section rather than under this section.
22 05 11 - 7
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
1. Electric motor data and variable speed drive data shall be submitted with the driven equipment.
2. Equipment and materials identification.
3. Firestopping materials.
4. Hangers, inserts, supports and bracing. Provide load calculations for variable spring and constant support hangers.
5. Wall, floor, and ceiling plates.
H. Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and equipment in each group to provide a completely compatible and efficient installation. Final review and approvals will be made only by groups.
I. Coordination Drawings: Complete consolidated and coordinated layout drawings shall be submitted for all new systems, and for existing systems that are in the same areas. The drawings shall include plan views, elevations and sections of all systems and shall be on a scale of not less than 1:32 (3/8 inch equal to one foot). Clearly identify and dimension the proposed locations of the principal items of equipment. The drawings shall clearly show the proposed location and adequate clearance for all equipment, controls, piping, pumps, valves and other items. All valves, trap primer valves, water hammer arrestors, strainers, and equipment requiring service shall be provided with an access door sized for the complete removal of plumbing device, component, or equipment. Equipment foundations shall not be installed until equipment or piping layout drawings have been approved. Detailed layout drawings shall be provided for all piping systems. In addition, details of the following shall be provided.
1. Mechanical equipment rooms.
2. Interstitial space.
3. Hangers, inserts, supports, and bracing.
4. Pipe sleeves.
5. Equipment penetrations of floors, walls, ceilings, or roofs.
J. Maintenance Data and Operating Instructions:
1. Maintenance and operating manuals in accordance with Section 01 00
00, GENERAL REQUIREMENTS, Article, INSTRUCTIONS, for systems and equipment. Include complete list indicating all components of the
22 05 11 - 8
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021 systems with diagrams of the internal wiring for each item of equipment.
2. Include listing of recommended replacement parts for keeping in stock supply, including sources of supply, for equipment shall be provided. The listing shall include belts for equipment: Belt manufacturer, model number, size and style, and distinguished whether of multiple belt sets.
K. Completed System Readiness Checklist provided by the Commissioning
Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00 COMMISSIONING OF PLUMBING SYSTEMS.
L. Submit training plans, trainer qualifications and instructor qualifications in accordance with the requirements of Section 22 08 00
COMMISSIONING OF PLUMBING SYSTEMS.
1.5 QUALITY ASSURANCE
A. Products Criteria:
1. Standard Products: Material and equipment shall be the standard products of a manufacturer regularly engaged in the manufacture, supply and servicing of the specified products for at least 5 years.
However, digital electronics devices, software and systems such as controls, instruments, computer work station, shall be the current generation of technology and basic design that has a proven satisfactory service record of at least 5 years.
2. Equipment Service: There shall be permanent service organizations, authorized and trained by manufacturers of the equipment supplied, located within 160 km (100 miles) of the project. These organizations shall come to the site and provide acceptable service to restore operations within four hours of receipt of notification by phone, e-mail or fax in event of an emergency, such as the shut-down of equipment; or within 24 hours in a non-emergency. Names, mail and e-mail addresses and phone numbers of service organizations providing service under these conditions for (as applicable to the project): pumps, compressors, water heaters, critical instrumentation, computer workstation and programming shall be submitted for project record and inserted into the operations and maintenance manual.
22 05 11 - 9
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
3. All items furnished shall be free from defects that would adversely affect the performance, maintainability and appearance of individual components and overall assembly.
4. The products and execution of work specified in Division 22 shall conform to the referenced codes and standards as required by the specifications. Local codes and amendments enforced by the local code official shall be enforced, if required by local authorities such as the natural gas supplier. If the local codes are more stringent, then the local code shall apply. Any conflicts shall be brought to the attention of the Contracting Officers Representative
(COR).
5. Multiple Units: When two or more units of materials or equipment of the same type or class are required, these units shall be products of one manufacturer.
6. Assembled Units: Manufacturers of equipment assemblies, which use components made by others, assume complete responsibility for the final assembled product.
7. Nameplates: Nameplate bearing manufacturer's name or identifiable trademark shall be securely affixed in a conspicuous place on equipment, or name or trademark cast integrally with equipment, stamped or otherwise permanently marked on each item of equipment.
8. Asbestos products or equipment or materials containing asbestos shall not be used.
9. Bio-Based Materials: For products designated by the USDA’s Bio-
Preferred Program, provide products that meet or exceed USDA recommendations for bio-based content, so long as products meet all performance requirements in this specifications section. For more information regarding the product categories covered by the Bio-
Preferred Program, visit http://www.biopreferred.gov.
B. Welding: Before any welding is performed, contractor shall submit a certificate certifying that welders comply with the following requirements:
1. Qualify welding processes and operators for piping according to ASME
"Boiler and Pressure Vessel Code", Section IX, "Welding and Brazing
Qualifications".
2. Comply with provisions of ASME B31 series "Code for Pressure
Piping".
http://www.biopreferred.gov/
22 05 11 - 10
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
3. Certify that each welder and welding operator has passed American
Welding Society (AWS) qualification tests for the welding processes involved, and that certification is current.
4. All welds shall be stamped according to the provisions of the
American Welding Society.
C. Manufacturer's Recommendations: Where installation procedures or any part thereof are required to be in accordance with the recommendations of the manufacturer of the material being installed, printed copies of these recommendations shall be furnished to the COR prior to installation. Installation of the item will not be allowed to proceed until the recommendations are received. Failure to furnish these recommendations can be cause for rejection of the material.
D. Execution (Installation, Construction) Quality:
1. All items shall be applied and installed in accordance with manufacturer's written instructions. Conflicts between the manufacturer's instructions and the contract documents shall be referred to the COR for resolution. Printed copies or electronic files of manufacturer’s installation instructions shall be provided to the COR at least 10 working days prior to commencing installation of any item.
2. All items that require access, such as for operating, cleaning, servicing, maintenance, and calibration, shall be easily and safely accessible by persons standing at floor level, or standing on permanent platforms, without the use of portable ladders. Examples of these items include, but are not limited to: all types of valves, filters and strainers, transmitters, and control devices. Prior to commencing installation work, refer conflicts between this requirement and contract documents to COR for resolution.
3. Complete layout drawings shall be required by Paragraph, SUBMITTALS.
Construction work shall not start on any system until the layout drawings have been approved by VA.
4. Installer Qualifications: Installer shall be licensed and shall provide evidence of the successful completion of at least five projects of equal or greater size and complexity. Provide tradesmen skilled in the appropriate trade.
22 05 11 - 11
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
5. If an installation is unsatisfactory to the COR, the Contractor shall correct the installation at no additional cost or additional time to the Government.
E. Guaranty: Warranty of Construction, FAR clause 52.246-21.
F. Plumbing Systems: IPC, International Plumbing Code. Unless otherwise required herein, perform plumbing work in accordance with the latest version of the IPC. For IPC codes referenced in the contract documents, advisory provisions shall be considered mandatory, the word “should” shall be interpreted as “shall”. Reference to the “code official” or
“owner” shall be interpreted to mean the COR.
G. Cleanliness of Piping and Equipment Systems:
1. Care shall be exercised in the storage and handling of equipment and piping material to be incorporated in the work. Debris arising from cutting, threading and welding of piping shall be removed.
2. Piping systems shall be flushed, blown or pigged as necessary to deliver clean systems.
3. The interior of all tanks shall be cleaned prior to delivery and beneficial use by the Government. All piping shall be tested in accordance with the specifications and the International Plumbing
Code (IPC). All filters, strainers, fixture faucets shall be flushed of debris prior to final acceptance.
4. Contractor shall be fully responsible for all costs, damage, and delay arising from failure to provide clean systems.
1.6 DELIVERY, STORAGE AND HANDLING
A. Protection of Equipment:
1. Equipment and material placed on the job site shall remain in the custody of the Contractor until phased acceptance, whether or not the Government has reimbursed the Contractor for the equipment and material. The Contractor is solely responsible for the protection of such equipment and material against any damage.
2. Damaged equipment shall be replaced with an identical unit as determined and directed by the COR. Such replacement shall be at no additional cost or additional time to the Government.
3. Interiors of new equipment and piping systems shall be protected against entry of foreign matter. Both inside and outside shall be cleaned before painting or placing equipment in operation.
22 05 11 - 12
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
4. Existing equipment and piping being worked on by the Contractor shall be under the custody and responsibility of the Contractor and shall be protected as required for new work.
1.7 AS-BUILT DOCUMENTATION
A. Submit manufacturer’s literature and data updated to include submittal review comments and any equipment substitutions.
B. Submit operation and maintenance data updated to include submittal review comments, substitutions and construction revisions shall be inserted into a three ring binder. All aspects of system operation and maintenance procedures, including piping isometrics, wiring diagrams of all circuits, a written description of system design, control logic, and sequence of operation shall be included in the operation and maintenance manual. The operations and maintenance manual shall include troubleshooting techniques and procedures for emergency situations.
Notes on all special systems or devices such as damper and door closure interlocks shall be included. A List of recommended spare parts
(manufacturer, model number, and quantity) shall be furnished.
Information explaining any special knowledge or tools the owner will be required to employ shall be inserted into the As-Built documentation.
C. The installing contractor shall maintain as-built drawings of each completed phase for verification; and, shall provide the complete set at the time of final systems certification testing. As-built drawings are to be provided, and a copy of them on Auto-Cad version provided on compact disk or DVD. Should the installing contractor engage the testing company to provide as-built or any portion thereof, it shall not be deemed a conflict of interest or breach of the ‘third party testing company’ requirement.
D. Certification documentation shall be provided prior to submitting the request for final inspection. The documentation shall include all test results, the names of individuals performing work for the testing agency on this project, detailed procedures followed for all tests, and a certification that all results of tests were within limits specified.
PART 2 - PRODUCTS
2.1 MATERIALS FOR VARIOUS SERVICES
22 05 11 - 13
A. Non-pressure PVC pipe shall contain a minimum of 25 percent recycled content. Steel pipe shall contain a minimum of 25 percent recycled content.
B. Plastic pipe, fittings and solvent cement shall meet NSF 14 and shall bear the NSF seal “NSF-PW”. Polypropylene pipe and fittings shall comply with NSF 14 and NSF 61. Solder or flux containing lead shall not be used with copper pipe.
C. Material or equipment containing a weighted average of greater than
0.25 percent lead shall not be used in any potable water system intended for human consumption, and shall be certified in accordance with NSF 61 or NSF 372.
D. In-line devices such as water meters, building valves, check valves, stops, valves, fittings, tanks and backflow preventers shall comply with NSF 61 and NSF 372.
E. End point devices such as drinking fountains, lavatory faucets, kitchen and bar faucets, ice makers supply stops, and end-point control valves used to dispense drinking water must meet requirements of NSF 61 and
NSF 372.
2.2 FACTORY-ASSEMBLED PRODUCTS
A. Standardization of components shall be maximized to reduce spare part requirements.
B. Manufacturers of equipment assemblies that include components made by others shall assume complete responsibility for final assembled unit.
1. All components of an assembled unit need not be products of same manufacturer.
2. Constituent parts that are alike shall be products of a single manufacturer.
3. Components shall be compatible with each other and with the total assembly for intended service.
4. Contractor shall guarantee performance of assemblies of components, and shall repair or replace elements of the assemblies as required to deliver specified performance of the complete assembly at no additional cost or time to the Government.
C. Components of equipment shall bear manufacturer's name and trademark, model number, serial number and performance data on a name plate securely affixed in a conspicuous place, or cast integral with, stamped or otherwise permanently marked upon the components of the equipment.
22 05 11 - 14
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
D. Major items of equipment, which serve the same function, shall be the same make and model.
2.3 COMPATIBILITY OF RELATED EQUIPMENT
A. Equipment and materials installed shall be compatible in all respects with other items being furnished and with existing items so that the result will be a complete and fully operational system that conforms to contract requirements.
2.4 SAFETY GUARDS
A. Pump shafts and couplings shall be fully guarded by a sheet steel guard, covering coupling and shaft but not bearings. Material shall be minimum 16-gage sheet steel; ends shall be braked and drilled and attached to pump base with minimum of four 8 mm (1/4 inch) bolts.
Reinforce guard as necessary to prevent side play forcing guard onto couplings.
B. All Equipment shall have moving parts protected from personal injury.
2.5 LIFTING ATTACHMENTS
A. Equipment shall be provided with suitable lifting attachments to enable equipment to be lifted in its normal position. Lifting attachments shall withstand any handling conditions that might be encountered, without bending or distortion of shape, such as rapid lowering and braking of load.
2.6 ELECTRIC MOTORS, MOTOR CONTROL, CONTROL WIRING
A. All material and equipment furnished and installation methods used shall conform to the requirements of Section 22 05 12, GENERAL MOTOR
REQUIREMENTS FOR PLUMBING EQUIPMENT; Section 26 29 11, MOTOR
CONTROLLERS; and, Section 26 05 19, LOW-VOLTAGE ELECTRICAL POWER
CONDUCTORS AND CABLES. All electrical wiring, conduit, and devices necessary for the proper connection, protection and operation of the systems shall be provided. Premium efficient motors shall be provided.
Unless otherwise specified for a particular application, electric motors shall have the following requirements.
B. Special Requirements:
1. Where motor power requirements of equipment furnished deviate from power shown on plans, provide electrical service designed under the requirements of NFPA 70 without additional cost or time to the
Government.
22 05 11 - 15
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
2. Assemblies of motors, starters, and controls and interlocks on factory assembled and wired devices shall be in accordance with the requirements of this specification.
3. Wire and cable materials specified in the electrical division of the specifications shall be modified as follows:
a. Wiring material located where temperatures can exceed 71° C (160°
F) shall be stranded copper with Teflon FEP insulation with jacket. This includes wiring on the boilers and water heaters.
b. Other wiring at boilers and water heaters, and to control panels, shall be NFPA 70 designation THWN.
c. Shielded conductors or wiring in separate conduits for all instrumentation and control systems shall be provided where recommended by manufacturer of equipment.
4. Motor sizes shall be selected so that the motors do not operate into the service factor at maximum required loads on the driven equipment. Motors on pumps shall be sized for non-overloading at all points on the pump performance curves.
5. Motors utilized with variable frequency drives shall be rated
“inverter-ready” per NEMA Standard, MG1.
C. Motor Efficiency and Power Factor: All motors, when specified as “high efficiency or Premium Efficiency” by the project specifications on driven equipment, shall conform to efficiency and power factor requirements in Section 22 05 12, GENERAL MOTOR REQUIREMENTS FOR
PLUMBING EQUIPMENT, with no consideration of annual service hours.
Motor manufacturers generally define these efficiency requirements as
“NEMA premium efficient” and the requirements generally exceed those of the Energy Policy Act (EPACT), revised 2005. Motors not specified as
“high efficiency or premium efficient” shall comply with EPACT.
D. Single-phase Motors: Capacitor-start type for hard starting applications. Motors for centrifugal pumps may be split phase or permanent split capacitor (PSC).
E. Poly-phase Motors: NEMA Design B, Squirrel cage, induction type. Each two-speed motor shall have two separate windings. A time delay (20 seconds minimum) relay shall be provided for switching from high to low speed.
F. Rating: Rating shall be continuous duty at 100 percent capacity in an ambient temperature of 40° C (104° F); minimum horsepower as shown on
22 05 11 - 16
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021 drawings; maximum horsepower in normal operation shall not exceed nameplate rating without service factor.
G. Insulation Resistance: Not less than one-half meg-ohm between stator conductors and frame shall be measured at the time of final inspection.
2.7 VARIABLE SPEED MOTOR CONTROLLERS
A. Refer to Section 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS and Section 26 29 11, MOTOR CONTROLLERS for specifications.
B. The combination of controller and motor shall be provided by the respective pump manufacturer, and shall be rated for 100 percent output performance. Multiple units of the same class of equipment, i.e. pumps, shall be product of a single manufacturer.
C. Motors shall be premium efficient type, “invertor duty”, and be approved by the motor controller manufacturer. The controller-motor combination shall be guaranteed to provide full motor nameplate horsepower in variable frequency operation. Both driving and driven motor sheaves shall be fixed pitch.
D. Controller shall not add any current or voltage transients to the input
AC power distribution system, DDC controls, sensitive medical equipment, etc., nor shall be affected from other devices on the AC power system.
2.8 EQUIPMENT AND MATERIALS IDENTIFICATION
A. Use symbols, nomenclature and equipment numbers specified, shown on the drawings, or shown in the maintenance manuals. Coordinate equipment and valve identification with local VAMC shops. In addition, provide bar code identification nameplate for all equipment which will allow the equipment identification code to be scanned into the system for maintenance and inventory tracking. Identification for piping is specified in Section 09 91 00, PAINTING.
B. Interior (Indoor) Equipment: Engraved nameplates, with letters not less than 7 mm (3/16 inch) high of brass with black-filled letters, or rigid black plastic with white letters specified in Section 09 91 00, PAINTING shall be permanently fastened to the equipment. Unit components such as water heaters, tanks, coils, filters, etc. shall be identified.
C. Exterior (Outdoor) Equipment: Brass nameplates, with engraved black filled letters, not less than 7 mm (3/16 inch) high riveted or bolted to the equipment.
22 05 11 - 17
Miramar National Cemetery – Phase 2 Development Project No. 892PC2037.23 22 February 2021
D. Control Items: All temperature, pressure, and controllers shall be labeled and the component’s function identified. Identify and label each item as they appear on the control diagrams.
E. Valve Tags and Lists:
1. Plumbing: All valves shall be provided with valve tags and listed on a valve list (Fixture stops not included).
2. Valve tags: Engraved black filled numbers and letters not less than
15 mm (1/2 inch) high for number designation, and not less than 8 mm
(1/4 inch) for service…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .