The Utility Status Report details existing utilities along PR-124 for a landslide repair project across multiple sites (B, C, and D). The report documents utility infrastructure for three specific road segments, identifying water (W) and telephone (T) utilities at different station ranges:

Site B covers stations 2+00 to 3+10.71, with a 2" water line from A.A.A. and a telephone line from P.R.T.C. Site C covers stations 22+00 to 23+00, featuring a 4" water line from A.A.A. and a telephone line from P.R.T.C., plus an electrical pole from P.R.E.P.A. Site D covers stations 23+40 to 24+00, with similar utility configurations including a 2" water line from A.A.A., a telephone line from P.R.T.C., and an electrical pole from P.R.E.P.A. The reports indicate no utilities are proposed for relocation, and all documents are marked as final/certification (100%) stage, dated August 5, 2022.

View the file

Other files

File Type Posted
Results of Bid Opening - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0004 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0002 - PR ER DOT PRMNE RPR(25).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(25).pdf PDF
State Historic Preservation Office Report - Cult_Assess_Report_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-80.pdf PDF
PRHTAs Project Special Provisions with Index.pdf PDF
VETS-4212 Form.pdf PDF
Geotechnical Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-21.pdf PDF
Asbestos Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-922579_HWY-21.pdf PDF
IFB Solicitation - PR ER DOT PRMNT RPR(25).pdf PDF
PRHTAs Standard Drawings_Revised GABI Drawings_GABI 9-10.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-924579_Hwy-105.pdf PDF
Categorical Exclusion Form (NEPA) - AC-883579_HWY-369.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-845579_HWY-362.pdf PDF
Categorical Exclusion Form (NEPA) - AC-924579_HWY-105.pdf PDF
Utility Status Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report - AC-814579_HWY-73_03.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-922579_Hwy-21_80.pdf PDF
Asbestos and Lead Report - AC-924579_HWY-105.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_02.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-369.pdf PDF
Technical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-347.pdf PDF
Technical Report Addendum -AC-883579_HWY-347.pdf PDF
Asbestos Report - AC-883579_HWY-369.pdf PDF
Asbestos and Lead Certification - AC-922579_HWY-80.pdf PDF
Lead Report - AC-922579_HWY-21.pdf PDF
Geotechnical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_01.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-883579_HWY-369.pdf PDF
Utility Status Report - AC-883579_HWY-347.pdf PDF
Geotechnical Report - AC-830579_HWY-105.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-80.pdf PDF
Lead Report - AC-883579_HWY-369.pdf PDF
Geotechnical Report - AC-883579_HWY-369.pdf PDF
Asbestos Report - AC-883579_HWY-347.pdf PDF
Technical Report - AC-922579_HWY-105.pdf PDF
Asbestos and Lead Certification - AC-883579_HWY-369.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-814579_Hwy-73.pdf PDF
Technical Report - AC-922579_HWY-80.pdf PDF
Categorical Exclusion Form (NEPA) - AC-922579_HWY-80.pdf PDF
State Historic Preservation Office Report - Concurrence_Sites_347_361.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Utility Status Report

EFL-FM-UTL-01(07)Page 1 of 2

Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-B Date: Aug 5, 2022

Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :

Review

Interval:

Preliminary (30%)

Plan In Hand (70%)

Internal (90%)

External (95%)

Final / Certification (100%)

Other :

Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN

Existing utilities [ are are not ] identified on the Plans

Utility locating requirements are included in the SCR Sections 107 and/or 645

NO utilities are proposed to be relocated✖

Utility relocation plans are described in detail below

# Location and Utility Information Design Information

Roadway Name:

PR-124

Station / Station Range:

2+00 to 3+10.71

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: W Size/Pole No. 2"φ

Utility Company Name:

A.A.A.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

Roadway Name:

PR-124

Station / Station Range:

2+00 to 3+10.71

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: T Size/Pole No.

Utility Company Name:

P.R.T.C.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

General Information :

Group-B / Site-B PR-124, km 2.4

EFL-FM-UTL-01(07)Page 2 of 2

**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks

Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-C Date: Aug 5, 2022

Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :

Review

Interval:

Preliminary (30%)

Plan In Hand (70%)

Internal (90%)

External (95%)

Final / Certification (100%)

Other :

Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN

Existing utilities [ are are not ] identified on the Plans

Utility locating requirements are included in the SCR Sections 107 and/or 645

NO utilities are proposed to be relocated✖

Utility relocation plans are described in detail below

# Location and Utility Information Design Information

Roadway Name:

PR-124

Station / Station Range:

22+00 to 23+00

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: W Size/Pole No. 4"φ

Utility Company Name:

A.A.A.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

Roadway Name:

PR-124

Station / Station Range:

22+00 to 23+00

Left of CL Right of CL● Both

Type and/or Size Facility (** See Legend)

Type: T Size/Pole No.

Utility Company Name:

P.R.T.C.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

# Location and Utility Information Design Information

Roadway Name:

PR-124

Station / Station Range:

22+00 to 23+00

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: P Size/Pole No.

Utility Company Name:

P.R.E.P.A.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

General Information :

Group-B / Site-C PR-124, km 21.9

**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks

Project : Landslide and Road Damage Evaluation and Repair Recommendations/Group-B/site-D Date: Aug 5, 2022

Preparer : José A. Batlle y Asociados, CSP PM : Jessie Agosto, CSA Group HDM :

Review

Interval:

Preliminary (30%)

Plan In Hand (70%)

Internal (90%)

External (95%)

Final / Certification (100%)

Other :

Utilities EXIST within project limits NO utilities exist within project limits Presence of existing utilities UNKNOWN

Existing utilities [ are are not ] identified on the Plans

Utility locating requirements are included in the SCR Sections 107 and/or 645

NO utilities are proposed to be relocated✖

Utility relocation plans are described in detail below

# Location and Utility Information Design Information

Roadway Name:

PR-124

Station / Station Range:

23+40 to 24+00

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: W Size/Pole No. 2"φ

Utility Company Name:

A.A.A.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

Roadway Name:

PR-124

Station / Station Range:

23+40 to 24+00

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: T Size/Pole No.

Utility Company Name:

P.R.T.C.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

# Location and Utility Information Design Information

Roadway Name:

PR-124

Station / Station Range:

23+40 to 24+00

Left of CL Right of CL Both●

Type and/or Size Facility (** See Legend)

Type: P Size/Pole No.

Utility Company Name:

P.R.E.P.A.

Primary Contact - Name & Number:

Detailed listing of Utilities on Project Plans

Additional Contact Information

Utility to participate in PreCon Meeting

Design Responsibility:

Payment Responsibility:

Responsible Party:

Work Completed:

Cost Estimate:

Date of Contract or Agreement: N/A

Remarks / Description of Relocation:

N/A

General Information :

Group-B / Site-D PR-124, km 23.4

**P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks