Technical Report - AC-922579_HWY-105.pdf
PDF 30 MB Posted
- Attached to
- Landslide Repairs in The West Region C1
- Solicitation number
- 693C73-25-B-000009
About this file
This technical report details a landslide and road damage evaluation and repair project for PR-124 in Lares, Puerto Rico, prepared by Jose A. Batlle & Asociados following Hurricane Maria damage in September 2017. The report comprehensively evaluates three alternative rehabilitation solutions: a Gabion Retaining Wall, a Reinforced Concrete Retaining Wall, and a Reinforced Soil Slope, with the project spanning approximately 39.83 meters from Km. 2.30 to Km. 2.69.
After detailed analysis, the report recommends Alternative I - Gabion Retaining Wall as the optimal solution, citing advantages such as strong base stability, water velocity reduction, natural environmental integration, and minimal road closure requirements. The estimated construction timeline is two months, with costs expected to be in the higher range of the alternatives. The project involves comprehensive road rehabilitation including excavation, embankment restoration, slope stabilization, erosion control, drainage system construction, pavement reconstruction, and safety barrier reinstallation, with the primary goal of restoring road infrastructure damaged by hurricane-induced landslides.
View the file
Other files
Show 40 more
Latest 50 of 77 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF TRANSPORTATION
AND PUBLIC WORKS
COMMONWEALTH OF PUERTO RICO
TECHNICAL REPORT
LANDSLIDE AND ROAD DAMAGE EVALUATION
AND REPAIR RECOMMENDATIONS FOR
AÑASCO, LARES, LAS MARIAS, MOCA,
SAN JUAN MUNICIPALITIES
AC-809544 / ER-9999 (318)
FEBRUARY 1, 2019
GROUP - B
PROJECT ID# HIGHWAY KILOMETER MUNICIPALITY
ER-HWY-105 PR-124 2.40 Lares
TABLE OF CONTENTS
INTRODUCTION I
DAMAGE ASSESSMENT II
WORK EXECUTED III
• FIELD SURVEY AND TOPOGRAPHY
• GEOTHECNICAL REPORT
TECHNICAL SOLUTION ALTERNATIVES IV
• ALTERNATIVE I
• ALTERNATIVE II
• ALTERNATIVE III
ALTERNATIVE EVALUATION V
ENVIRONMENTAL CONSIDERATIONS VI
CONSTRUCTABILITY VII
CONSTRUCTION COST VIII
• ALTERNATIVE I
• ALTERNATIVE II
• ALTERNATIVE III
CONSTRUCTION TIME IX
SOLUTION COMPLEXITY X
IMPACT ON RIGHT OF WAY ACQUISITION XI
RECOMMENDATIONS XII
TECHNICAL REPORT
INTRODUCTION I
LANDSLIDE AND ROAD DAMAGE EVALUATION GROUP B
AND REPAIR RECOMMENDATIONS FOR AÑASCO, LARES, Project ID#: ER-HWY-105
LAS MARIA, MOCA, SAN JUAN MINICIPALIES (AC-809544) PR-124, km. 2.40 Lares
I. INTRODUCTION
The Puerto Rico Highway and Transportation Authority (PRHTA) contracted José A.
Batlle & Asociados, C.S.P. (JABA), to provide support in their Emergency Relief Program through the Puerto Rico’s Federal Aid Highway System, and other highways and roads under the Department of Transportation and Public Works jurisdiction. This Technical
Report is part of a multiple site assessment project for similar landslide rehabilitation cases related to damages by Hurricane María on September 20, 2017. The project consists of the evaluation and reconstruction of: Landslide, Slope Instability, Washout, Rock fall and Drainage Considerations.
JABA have executed a Site Reconnaissance, Validate Damage, Investigations, Studies, Develop Technical Report and will Prepare Plans, Specifications and Estimate (PS&E).
The proposed design shall facilitate construction, reduce construction cost, avoid problems during construction the stages and have the least interruption to traffic.
The proposed design shall comply with FHWA’s Emergency Relief Program, defined under 23 CFR 668, Parts A and B. Procedures shall meet FHWA’s Emergency Relief
Manual (Federal-Aid Highways) 2009, PRHTA’s Highway Design Manual, the most recent
AASHTO’s manuals including the Roadside Design Guide, and the PRHTA’s Standard
Specifications for Road and Bridge Construction 2005.
DAMAGE
ASSESSMENT II
II. DAMAGE ASSESSMENT
On April 26, 2018 a Site Reconnaissance was performed on Project ID#: ER-HWY-105 located on road PR-124, Km. 2.40, Municipality of Lares, P.R. The landslide occurred on north side of the road.
It is our opinion that the apparent cause of failure is related to the storm sewer pipe that crosses underground perpendicular to the road and discharge water over the ground at the side of the road. The relatively high flow during storm event eroded the existing fill and native clayey silt soils.
There are no anticipated challenges in this project, other than:
• Excavation for Removal of loose soil and foundation leveling.
• Embankment restoration and slope stabilization (Earth retention system and backfill).
• Erosion Control Blanket and slope stabilization on the Cut Side of the Landslide to avoid further washout and promote vegetation growth.
• Runoff management and drainage by the construction of curb and gutter at the side of the road where landslide occurred and construction of drainage system.
• Erosion control measures to avoid further washout, promote vegetation growth and install rip-rap at runoff water discharge points.
• Pavement Reestablishment by the subgrade preparation, aggregate base course, bituminous base course and bituminous surface course.
• Roadside and Safety by the reestablishment of safety barriers, pavement markings, retro-reflective markers and signage.
José A. Batlle & Asociados, CSP
PROJECT ID # ER-HWY-105
PR-124, KM-2.40 - LAS MARIAS, PR
RFP: LANDSLIDE AND ROAD DAMAGE
EVALUATION AND REPAIR RECOMMENDATIONS
DATE: Abril 26, 2018
Topographic map
Project Location Maps
Island map
PR-124, KM-2.40 - LAS MARIAS, PR
RFP: LANDSLIDE AND ROAD DAMAGE
EVALUATION AND REPAIR RECOMMENDATIONS
DATE: Abril 26, 2018
Aerial Photo showing Project Scope of Work Limits
PR-124, KM-2.40 - LAS MARIAS, PR
RFP: LANDSLIDE AND ROAD DAMAGE
EVALUATION AND REPAIR RECOMMENDATIONS
DATE: Abril 26, 2018
Photo no.2
Project Damage Inspection Photos
Photo no.1
PR-124, KM-2.40 - LAS MARIAS, PR
RFP: LANDSLIDE AND ROAD DAMAGE
EVALUATION AND REPAIR RECOMMENDATIONS
DATE: Abril 26, 2018
Photo no.4
Project Damage Inspection Photos
Photo no.3
WORK
EXECUTED III
• FIELD SURVEY AND TOPOGRAPHY
• GEOTHECNICAL REPORT
III. WORK EXECUTED
1. Site Reconnaissance – For a summary of the findings and recommendations (See
Section II)
2. Field Survey and Topography - (See Section III)
3. Geotechnical Report – For a summary of the findings and recommendations (See
Section III)
4. Technical Report which include:
• Schematic Geometric Alignment - (See Section IV)
• Plan and Profile - (See Section IV)
• Plan and Profile Principal Structures - (See Section IV)
• Typical Sections - (See Section IV)
• Cross Sections - (See Section IV)
FIELD SURVEY AND
TOPOGRAPHY
GEOTHECNICAL
REPORT
Geotechnical Report: Site ER HWY 104
Landslide and Road Evaluation and Repair Recommendations PR 124 KM 16.0, Lares, PR
J a c a & S i e r r a E n g i n e e r i n g , P S C
P O B o x 3 6 3 1 1 6 , S a n J u a n , P R 0 0 9 3 6 - 3 1 1 6
R o a d 8 5 0 K m 0 . 2 L a s C u e v a s W a r d , T r u j i l l o A l t o , P R 0 0 9 7 6
T . ( 7 8 7 ) 7 6 1 - 2 5 7 0 w w w . j a c a s i e r r a . c o m
1. Introduction:
The present geotechnical report addresses the geotechnical conditions and recommendations for the road damages at the reference site location. This investigation is prepared based on approved scope of work and economical proposal by
José A. Battle y Asociados, CSP. This report is part of a multiple site assessment project for similar landslide rehabilitation cases related to damages by Hurricane Maria on
September 20, 2017. This report is prepared exclusively for design purposes.
2. Scope of Work:
The scope of work consisted of four (4) test borings to 3.2 to 12.3 mts (10.5 to 40.5 ft) depth. Borings were completed with CME-45 drill rig at accessible locations along the side of the road. Test borings and soil sampling were performed by casing installation in accordance to ASTM D1452 and soil sampling per Standard Penetration Test (SPT) method per ASTM D1586. Refer to enclosed boring location plan for reference on boring location in Appendix A Figure A2.
3. Site Geology
Based on the USGS Geology Map (refer to Appendix A Figure A1) Kc – Concepción
Formation: Chiefly massive dark-green or dark-greenish-gray basaltic lava flows containing phenocrysts of plagioclase and clinopyroxene. Unit weathers readily to a deep-reddish- or yellowish-brown soil that commonly contains spheroidal remnants of fresh rock.
Site ER HWY 104
PR 124 KM 16.0, Lares, PR
P A G E | 2
0 1 / 2 9 / 1 9 Jaca & Sierra Engineering, PSC
t. (787) 761-2570 e. contact@jacasierra.com / www.jacasierra.com
4. Site Stratigraphy
Stratum no. 1: Fill: At the locations of borings B and D, the fill stratum has a thickness of 0.6 mts (2 ft), while at borings A and C, the fill layer extends to 11.9 mts
(39 ft) and 4.3 mts (14 ft), respectively. The fill material consists of sandy silt with some gravel at borings B, C and D, and clayey silt with some sand and traces of gravel at boring A. SPT-N values recorded are varying from 3 to 17 blows/ft.
Moisture contents measured are from 12 to 70 %.
Stratum no. 2: Saprolite to Weathered Rock: Saprolites were found only in borings
B and D, below the fill stratum, composed of sandy silt and silty sand with some weathered rock fragments, respectively. Weathered rock was encountered in all four
(4) borings extending to the end of boreholes at 3.2 to 12.3 mts (10.5 to 40.5 ft) depth, sampled mostly as sandy gravel. SPT-N values registered are ranging from 11 to over 100 blows/ft (recorded as refusal values of 50/X”). Moisture contents obtained are from 2 to 37 %.
4.1. Groundwater
Groundwater level was not detected within the depth range of the test borings.
Temporary localized perched water may occur after prolonged rain events.
5. Geotechnical Recommendations
5.1. Opinion on Probable Causes for Road Damage
It is our opinion that the apparent cause of failure is related to a landslide of fill material and native saprolite to weathered rock occurring by erosion from overland runoff during storm event. This type of slide can be described as a soil washout. Also, runoff could have been infiltrating through the fill material reducing the soil strength over time.
mailto:contact@jacasierra.com
P A G E | 3
0 1 / 2 9 / 1 9
5.2. Slope Rehabilitation Alternatives
Considering the road space available that is currently used for traffic through the area, it is our opinion that the alignment of the road shall be shifted towards the upslope to be able to reduce the height of the slope rehabilitation alternatives. This reduction in height will result in reduction of excavations and construction costs. Also this is required to improve the global stability of the wall system and improve efficiency of the retaining walls. The following slope rehabilitation alternatives already consider the road alignment shift:
5.2.1. Concrete Cantilever Retaining Wall:
This option has the advantage that it can be built right on the edge of the road as a
Jersey barrier extension (typical PRHTA section). The closer the retaining wall is to the roadway edge the less the retaining wall height required. This option shall include leveling the remaining slope to uniform inclination and armoring with turf reinforcement the deep-rooted vegetation such as vetiver. The minimum concrete cantilever wall height at each station is presented in Table 1 below. In order to reduce weight along the portion of the slope downhill from the wall, existing slopes shall be excavated to uniform inclination to the extent that the wall remains embedded at least 1.8 mts (6 ft) below final slope surface as measured from the lower side. This is necessary to mitigate slope failures.
5.2.2. Concrete Gravity Wall:
This option has the advantage of minimizing excavation width at the edge of the road.
The gravity wall can be designed per PRHTA’s standard design section to be verified and adjusted by designer based on the herein provided bearing capacity and earth pressure parameters. Similar to the cantilever wall, it shall be embedded at least 1.8 mts (6 ft) below slope surface as measured from the lower side. The minimum concrete gravity wall height at each station is presented in Table 1 below. These heights consider the
P A G E | 4
0 1 / 2 9 / 1 9 removal of excess of existing soils along the face of the wall to be able to reduce weight along the downslope.
5.2.3. Gabion Wall:
This option will need a retaining wall to be offset from the edge of the road to allow placement of a guard rail or Jersey barrier. The minimum gabion wall height at each station is presented in Table 1 below. These heights consider the removal of excess of existing soils along the face of the wall to be able to reduce weight along the portion of the slope downhill from the wall. Similar to the concrete wall option, the slope excavation shall be made to the extent that the wall remains embedded at least 1.8 mts
(6 ft) below final slope surface as measured from the lower side. This gabion system option will result in a higher wall if compared with the concrete cantilever and gravity walls above because of offset distance off the edge of the road and steep gradient of the slope. The advantage of this option is that it can be installed with less excavations and disturbance to the existing road.
Road Alignment Station Concrete Cantilever and
Gravity Wall Height (mts) Gabion Wall Height (mts)
16+20 3.00 3.65
16+30 6.00 6.34
16+40 3.00 3.65
16+50 1.82 1.81
16+60 1.82 2.72
16+70 3.66 6.34
16+80 4.27 6.34
16+90 4.27 6.34
17+00 4.27 6.34
17+10 4.27 6.34
17+20 1.82 1.81
Table 1: Minimum retaining wall alternative height per station
P A G E | 5
0 1 / 2 9 / 1 9
5.2.4. Anchored Gabion Wall:
Anchored gabion walls are an alternative to reduce the wall width requirements in conventional gabion walls. The anchor can be designed assuming allowable bond strength of 25 psi for non-shrink grout with over 5,000 psi strength. A minimum free length of 10 ft shall be considered. We recommend a minimum of 2 verification tests and proof tests on 5 % of the installed soil nails or anchors. Anchor testing shall be per
Soil Nail Walls Reference Manual FHWA NHI-14-007 February 2015. Similar to the previous explained alternatives, the slopes shall be excavated and leveled to improve their stability to the extent that the toe of the wall remains embedded 1.8 mts (6 ft).
Figure 1: Anchored gabion schematic concept (not to scale)
P A G E | 6
0 1 / 2 9 / 1 9
5.3. Earth Pressure Parameters for Retaining Wall Design
Strength or Earth Pressure Parameters
Engineered
Fill/Retaining Wall
Backfill
In-Situ Soils -
Drained
Parameters
Cohesion, c kN/sq.mt. (psf) 0 0
Angle of internal friction, φ ˚ 32 25
Moist unit weight, γ kN/cu.mt. (pcf) 20.4 (130) 19.6 (125)
Horizontal seismic coefficient, kh - 0.2
Base shear coefficient, * - 0.3
Net allowable bearing capacity for retaining wall over native soil, qa kN/sq.mt. (psf)
- 96 (2,000)
Table 2: Earth pressure parameters for retained soils
*For passive resistance neglect upper 3 ft. Passive side unit weight of backfill shall be assumed as 15.7 kN/cu.mt. (100 pcf).
It is our opinion that the above recommendations will stabilize the slope against global stability concerns. Other options such as soil nailing with shotcrete were discarded due to cost concerns and the fact that the edge of road was lost and a retaining wall is required to allow re-building the road to its original alignment. MSE walls or slopes will not work on this site due to limitations of space and steepness of the slope which will not allow for creating of suitable base and placement of soil reinforcement into the cut without having to excavate almost the entire road width. If any other option is wished to be considered, we should be provided with the information on the alternative to provide specific recommendations for that option.
6. Generalized Recommendations
6.1. Recommended Backfill Material: All engineered fill shall consist of A-2-4 or A-1
AASHTO Classification fill placed and compacted to 95 % of the modified Proctor density. Engineered fill shall be handled and placed per latest applicable PR Highway
Authority Specifications. Engineered fill shall be monitored by soil technician with guidance from a geotechnical engineer.
P A G E | 7
0 1 / 2 9 / 1 9
6.2. Fill Recommendations: Any fill shall be constructed upslope in horizontal layers and benched terraces shall be cut at the interface of fill and natural soils. The benches shall have a minimum width of 0.9 mts (3.0 ft) and shall be made at a maximum vertical distance of 0.9 mts (3.0 ft) as fill progresses upward. Unreinforced engineered fill slopes shall not exceed 2:1 (H:V) inclination.
6.3. Drainage: Road drainage shall be controlled by Jersey barriers, curbs and gutters or storm runoff management devices designed in such way that it prevents any overland water discharge over the project areas. Erosion control measures at discharge locations shall be in accordance to the hydraulic specialist design.
6.4. Slope Erosion Control: Protect all slopes with sodding or turf reinforcement. Deep rooted vegetation such as vetiver and fern (“helecho”) is recommended within any area impacted by the project and particularly the slope extending downslope from the toe of the retaining wall. Bare soils exposed upslope should also be protected with deep rooted vegetation.
6.5. Structure Demolition: The existing damaged and abandoned neighboring residence structure should be completely demolished and removed in order to release the weight over the adjacent slope.
6.6. Differing Site Conditions: These recommendations are based on test borings performed on locations, which are considered as representative of the subsoil conditions within the site, but not all areas of the site could be explored due to limitations of access. Therefore, differing site conditions could occur. In such instances, we shall be notified to proceed with a field visual inspection directed to formulate the corresponding solution.
6.7. Excavation Safety: Contractor is responsible to adjust excavation inclination and provide shoring, where necessary, to ensure safety of working personnel per latest applicable OSHA excavation safety standards. The contractor shall consult with geotechnical engineer or geologist on excavation inclination and shoring requirements.
P A G E | 8
0 1 / 2 9 / 1 9
6.8. Geotechnical Engineer Confirmation: The excavations shall be coordinated with the undersigned to conduct a site visit by a representative from Jaca & Sierra
Engineering, PSC to verify conditions and confirm foundation depth among other geotechnical considerations.
Thanks for the opportunity of providing our field investigation, testing and engineering consulting services. Feel free to contact us for any questions on our report.
Respectfully submitted, JACA & SIERRA ENGINEERING, PSC
Carlos R. Sierra Del Llano, MSCE, PE
Geotechnical Engineer
P A G E | 9
0 1 / 2 9 / 1 9
Appendix A: Geology Map and Boring Location Plan
Figure A1: Site Geology Map – McIntyre, D.H., 1975. Geologic Map of the Maricao Quadrangle, Western
Puerto Rico, Map I-918, Miscellaneous Geologic Investigations, U.S. Geological Survey, Department of the
Interior, Virginia.
SITE
https://ngmdb.usgs.gov/Prodesc/proddesc_1369.htm https://ngmdb.usgs.gov/Prodesc/proddesc_1369.htm
P A G E | 1 0
0 1 / 2 9 / 1 9
Figure A2: Boring Location Plan – Site plan provided by Javier E. Bidot & Associates, PSC
A
B C
D
P A G E | 1 1
0 1 / 2 9 / 1 9
Appendix B: Site Conditions Photographic Images
Figure B1: Existing road conditions
Figure B2: Main damaged road area
P A G E | 1 2
0 1 / 2 9 / 1 9
Figure B3: Main damaged road area
Figure B4: Existing road conditions
P A G E | 1 3
0 1 / 2 9 / 1 9
Figure B5: Damaged neighboring residence
Figure B6: Damaged road area to the north
335.00
334.39
FILL: sandy silt some asphalt debris, yellowish brown
FILL: clayey silt some sand trace gravel, brownish yellow, yellowish red
Do... yellowish brown, moist
S-1
S-2
S-3
S-4
S-5
S-6
S-7
S-8
S-9
S-10
SUBSURFACE EXPLORATION LOG
BORING N0.: A
PROJECT
Landslide and Road Evaluation and Repairs (ER-HWY-104)
JOB
OF
SHEET 1
LOCATION PR-124 Km. 16.0, Lares, PR DRILLER/DRILL RIG: Carlos I. Diaz / CME-45
COORDINATES 244610 N 149463 E DATE HOLE STARTED 1-4-19 COMPLETED 1-4-19
DESCRIPTION BY Rommel Cintron ELEVATION TOP OF HOLE (mts): 335 GROUNDWATER (FT) Initial: Not Found Final: ENGINEER Rommel Cintron DRILLING METHOD: Hollow-Stem Auger 2.25" ID TOTAL DEPTH OF HOLE (ft): 40.5
N W Qu PL+LL
"N" - Number of blows required to drive the sampling spoon a distance of 12 in. with a 140 lbs hammer falling 30 in.
"W" - Natural Moisture Content in percentage of dry weight. Initial G.W. Depth "Qu" - Unconfined Compressive Strength in tons per square foot. Final G.W. Depth "Rc" - Core recovery in percent for each successive run. "Rqd" - Rock quality designation.
"WH" - Sample was recovered by advancing the sampler with the weight of the hammer.
"P" - A "P" in the Unconfined Compressive Strength test indicates the use of the pocket Penetrometer.
Elev.
(mts)
0.00
DEPTH
(feet) DESCRIPTION
L E
G E
N D
S a m p le
N o
T Y
P E
B L
O W
S
SPT
N W Qu RC RQD%
20 40 60 80
1 2 3 4
Qu
N-W
323.11 39 WEATHERED ROCK sampled as sandy gravel, brown, dark gray
S-11
50/4"
50/4" 4
SUBSURFACE EXPLORATION LOG
BORING NUMBER: A
BORING LOG (CONT. SHEET)
PROJECT Landslide and Road Evaluation and Repairs (ER-
HWY-104)
JOB
OF
SHEET 2
N W Qu PL+LL
"N" - Number of blows required to drive the sampling spoon a distance of 12 in. with a 140 lbs hammer falling 30 in.
"W" - Natural Moisture Content in percentage of dry weight. Initial G.W. Depth "Qu" - Unconfined Compressive Strength in tons per square foot. Final G.W. Depth "Rc" - Core recovery in percent for each successive run. "Rqd" - Rock quality designation.
"WH" - Sample was recovered by advancing the sampler with the weight of the hammer.
"P" - A "P" in the Unconfined Compressive Strength test indicates the use of the pocket Penetrometer.
Elev.
(mts)
0.00
DEPTH
(feet) DESCRIPTION
L E
G E
N D
S a m p le
N o
T Y
P E
B L
O W
S
SPT
N W Qu RC RQD%
20 40 60 80
1 2 3 4 Qu
332.00
331.39
330.17
FILL: sandy silt some gravel, yellowish brown, brownish yellow, light gray
SANDY SILT, stiff, yellowish brown, brownish yellow, relic joints
WEATHERED ROCK sampled as sandy gravel, light gray
S-1
S-2
S-3
S-4
S-5
S-6
50/5"
40/1"
40/1"
50/5"
40/1"
40/1"
SUBSURFACE EXPLORATION LOG
BORING N0.: B
PROJECT
Landslide and Road Evaluation and Repairs (ER-HWY-104)
JOB
OF
SHEET 1
LOCATION PR-124 Km. 16.0, Lares, PR DRILLER/DRILL RIG: Carlos I. Diaz / CME-45
COORDINATES 244581 N 149450 E DATE HOLE STARTED 1-8-19 COMPLETED 1-8-19
DESCRIPTION BY Rommel Cintron ELEVATION TOP OF HOLE (mts): 332 GROUNDWATER (FT) Initial: Not Found Final: ENGINEER Rommel Cintron DRILLING METHOD: Hollow-Stem Auger 2.25" ID TOTAL DEPTH OF HOLE (ft): 14.5
N W Qu PL+LL
"N" - Number of blows required to drive the sampling spoon a distance of 12 in. with a 140 lbs hammer falling 30 in.
"W" - Natural Moisture Content in percentage of dry weight. Initial G.W. Depth "Qu" - Unconfined Compressive Strength in tons per square foot. Final G.W. Depth "Rc" - Core recovery in percent for each successive run. "Rqd" - Rock quality designation.
"WH" - Sample was recovered by advancing the sampler with the weight of the hammer.
"P" - A "P" in the Unconfined Compressive Strength test indicates the use of the pocket Penetrometer.
Elev.
(mts)
0.00
DEPTH
(feet) DESCRIPTION
L E
G E
N D
S a m p le
N o
T Y
P E
B L
O W
S
SPT
N W Qu RC RQD%
20 40 60 80
1 2 3 4
Qu
334.00
329.73
FILL: sandy silt some gravel, yellowish brown, dark gray
Do... moist
WEATHERED ROCK sampled as sandy silt with gravel, yellowish brown, dark gray
Do... sampled as silty sand with gravel
S-1
S-2
S-3
S-4
S-5
S-6
S-7
50/6"
50/6"
SUBSURFACE EXPLORATION LOG
BORING N0.: C
PROJECT
Landslide and Road Evaluation and Repairs (ER-HWY-104)
JOB
OF
SHEET 1
LOCATION PR-124 Km. 16.0, Lares, PR DRILLER/DRILL RIG: Carlos I. Diaz / CME-45
COORDINATES 244589 N 149468 E DATE HOLE STARTED 1-4-19 COMPLETED 1-4-19
DESCRIPTION BY Rommel Cintron ELEVATION TOP OF HOLE (mts): 334 GROUNDWATER (FT) Initial: Not Found Final: ENGINEER Rommel Cintron DRILLING METHOD: Hollow-Stem Auger 2.25" ID TOTAL DEPTH OF HOLE (ft): 20.5
N W Qu PL+LL
"N" - Number of blows required to drive the sampling spoon a distance of 12 in. with a 140 lbs hammer falling 30 in.
"W" - Natural Moisture Content in percentage of dry weight. Initial G.W. Depth "Qu" - Unconfined Compressive Strength in tons per square foot. Final G.W. Depth "Rc" - Core recovery in percent for each successive run. "Rqd" - Rock quality designation.
"WH" - Sample was recovered by advancing the sampler with the weight of the hammer.
"P" - A "P" in the Unconfined Compressive Strength test indicates the use of the pocket Penetrometer.
Elev.
(mts)
0.00
DEPTH
(feet) DESCRIPTION
L E
G E
N D
S a m p le
N o
T Y
P E
B L
O W
S
SPT
N W Qu RC RQD%
20 40 60 80
1 2 3 4
Qu
338.00
337.39
336.17
FILL: sandy silt some gravel, yellowish brown, brownish yellow, light gray
SILTY SAND some weathered rock fragments, yellowish brown, brownish yellow, light gray
WEATHERED ROCK sampled as sandy gravel, light gray
S-1
S-2
S-3
S-4
S-5
50/4"
50/5"
50/1"
50/4"
50/5"
50/1"
SUBSURFACE EXPLORATION LOG
BORING N0.: D
PROJECT
Landslide and Road Evaluation and Repairs (ER-HWY-104)
JOB
OF
SHEET 1
LOCATION PR-124 Km. 16.0, Lares, PR DRILLER/DRILL RIG: Carlos I. Diaz / CME-45
COORDINATES 244634 N 149469 E DATE HOLE STARTED 1-8-19 COMPLETED 1-8-19
DESCRIPTION BY Rommel Cintron ELEVATION TOP OF HOLE (mts): 338 GROUNDWATER (FT) Initial: Not Found Final: ENGINEER Rommel Cintron DRILLING METHOD: Hollow-Stem Auger 2.25" ID TOTAL DEPTH OF HOLE (ft): 10.5
N W Qu PL+LL
"N" - Number of blows required to drive the sampling spoon a distance of 12 in. with a 140 lbs hammer falling 30 in.
"W" - Natural Moisture Content in percentage of dry weight. Initial G.W. Depth "Qu" - Unconfined Compressive Strength in tons per square foot. Final G.W. Depth "Rc" - Core recovery in percent for each successive run. "Rqd" - Rock quality designation.
"WH" - Sample was recovered by advancing the sampler with the weight of the hammer.
"P" - A "P" in the Unconfined Compressive Strength test indicates the use of the pocket Penetrometer.
Elev.
(mts)
0.00
DEPTH
(feet) DESCRIPTION
L E
G E
N D
S a m p le
N o
T Y
P E
B L
O W
S
SPT
N W Qu RC RQD%
20 40 60 80
1 2 3 4
Qu
(X=NO)PERCENTFINERSIZE
PASS?SPEC.*PERCENTSIEVE
Project No:
Project:
Client:
Elev./Depth:Location:
Date:Source of Sample:Sample No.:
Remarks
Classification
Coefficients
Atterberg Limits
Material Description
AASHTO=USCS=
Cc=Cu=
D10=D15=D30=
D50=D60=D85=
PI=LL=PL=
Particle Size Distribution Report
P E R C E N T F
IN
E R
100 10 1 0.1 0.01 0.001500
GRAIN SIZE - mm
% +75 MM % GRAVEL % SAND % SILT % CLAY
i n i n i n
-1 /2 i n i n
/4 i n
/2 i n
/8 i n
0.0 7.2 29.2 63.6
Figure7941
Landslide and Road Evaluation and Repairs, Lares, PR (ER-HWY-
104)
Jose A. Batlle y Asociados
2-7.5'Lares, PR
1/23/19Project SiteA
Tested by: N. Rodriguez
Checked by: Rommel Cintron Aponte, MSCE, PE
A-7-6(9)ML
0.710
154328
Sandy silt
(no specification provided)
JACA & SIERRA
TESTING LABORATORIES
San Juan, Puerto Rico
100.0 97.0 95.4 94.9 92.8 90.1 81.2 71.0 63.6
1 in.
.75 in.
.5 in.
.375 in.
#4 #10 #40 #100 #200
(X=NO)PERCENTFINERSIZE
PASS?SPEC.*PERCENTSIEVE
Project No:
Project:
Client:
Elev./Depth:Location:
Date:Source of Sample:Sample No.:
Remarks
Classification
Coefficients
Atterberg Limits
Material Description
AASHTO=USCS=
Cc=Cu=
D10=D15=D30=
D50=D60=D85=
PI=LL=PL=
Particle Size Distribution Report
P E R C E N T F
IN
E R
100 10 1 0.1 0.01 0.001500
GRAIN SIZE - mm
% +75 MM % GRAVEL % SAND % SILT % CLAY
i n i n i n
-1 /2 i n i n
/4 i n
/2 i n
/8 i n
0.0 27.1 32.8 40.1
Figure7941
Landslide and Road Evaluation and Repairs, Lares, PR (ER-HWY-
104)
Jose A. Batlle y Asociados
2-7.5'Lares, PR
1/22/19Project SiteC
Tested by: A. Roman
Checked by: Rommel Cintron Aponte, MSCE, PE
A-4(0)SM
0.1980.65916.5
NPNPNP
Silty sand with gravel
(no specification provided)
JACA & SIERRA
TESTING LABORATORIES
San Juan, Puerto Rico
100.0 88.6 81.4 78.4 72.9 67.3 56.7 47.3 40.1
1 in.
.75 in.
.5 in.
.375 in.
#4 #10 #40 #100 #200
TECHNICAL
SOLUTION
ALTERNATIVES IV
• ALTERNATIVE I
IV. TECHNICAL SOLUTION ALTERNATIVES
The Project ID#: ER-HWY-105 is located on road PR-124, Km. 2.40, Municipality of
Lares, P.R. The construction works on road PR-124 begins on Km. 2.20 and ends on
Km. 2.80. The total length of construction works is 0.06 Km. For the landslide rehabilitation located on the north side of the road, three (3) Slope Rehabilitation
Alternatives where evaluated. All alternatives considered the design of an inlet apron to protect the inlet area of the storm sewer pipe as well as riprap or Reno mattress armoring along the outlet area to control soil erosion from discharge. The remaining slope downhill shall be leveled to uniform inclination and armoring with turf reinforcement the deep-rooted vegetation such as vetiver.
ALTERNATIVE NO. I – GABION RETAINING WALL
For the landslide rehabilitation a Gabion Retaining Wall is proposed from Km. 2.30 to Km.
2.69. The total length of the Gabion Retaining Wall is 39.83 Meters and the wall height varies from 0.91 Meters Min. to 4.55 Meters Max. The construction works includes:
• Gabion Retaining Wall
• Excavation for Structures
• Borrow Class B
• Construction of Concrete Barrier Type C
• Construction of Paved Gutter and Concrete Paved Waterway Type I
• Construction of Concrete Slab
• Construction of Half Pavement Section of Sub-Base Course, Aggregate Base
Course, Bituminous Base Course and Bituminous Surface Course
• Cold Milling
• Removal of Guardrail
• Erosion Control Blanket 24 Months of Longevity with Vetiver Grass at front of the
Proposed Retaining Wall measures to avoid further washout, promote vegetation growth and install rip-rap at runoff water discharge points.
• Singla Face Guardrail
• Pavement markings
• Drainage Considerations:
o Clean and verify slope and conditions of existing 30-inches pipes. An incoming small drainage area contributes to this location.
o Provide adequate erosion control such as rip rap / energy dissipating controls at the exit of existing pipe.
o Cleaning and maintenance of all existing drainage features are recommended.
For Typical Section, Plan, Profile and Cross Sections of this Alternative (See Section IV) and for a Detail Estimate of the Items included in this Alternative (See Section VIII).
ALTERNATIVE NO. II – REINFORCED CONCRETE RETAINING WALL
For the landslide rehabilitation a Reinforced Concrete Retaining Wall is proposed from
Km. 2.30 to Km. 2.69. The total length of the Reinforced Concrete Retaining Wall is 39.83
Meters and the wall height varies from 1.20 Meters Min. to 2.74 Meters Max. The construction works includes:
• Reinforced Concrete Retaining Wall
• Excavation for Structures
• Borrow Class B
• Construction of Concrete Barrier Type C
• Construction of Paved Gutter and Concrete Paved Waterway Type I
• Construction of Half Pavement Section of Sub-Base Course, Aggregate Base
Course, Bituminous Base Course and Bituminous Surface Course
• Cold Milling
• Removal of Guardrail
• Erosion Control Blanket 24 Months of Longevity with Vetiver Grass at front of the
Proposed Retaining Wall measures to avoid further washout, promote vegetation growth and install rip-rap at runoff water discharge points.
• Single Face Guardrail
• Pavement markings
• Drainage Considerations:
incoming small drainage area contributes to this location.
o Provide adequate erosion control such as rip rap / energy dissipating controls at the exit of existing pipe.
o Cleaning and maintenance of all existing drainage features are recommended.
For Typical Section, Plan, Profile and Cross Sections of this Alternative (See Section IV) and for a Detail Estimate of the Items included in this Alternative (See Section VIII).
ALTERNATIVE NO. III – REINFORCED SOIL SLOPE
For the landslide rehabilitation a Reinforced Soil Slope is proposed from Km. 2.30 to Km.
2.69. The total length of the Reinforced Soil Slope is 39.83 Meters and the Slope height varies from 0.79 Meters Min. to 3.84 Meters Max. The construction works includes:
• Reinforced Soil Slope
• Excavation for Structures
• Borrow Class B
• Construction of Single Face Guardrail
• Construction of Curb and Gutter Type F and Concrete Paved Waterway Type I
• Construction of Half Pavement Section of Sub-Base Course, Aggregate Base
Course, Bituminous Base Course and Bituminous Surface Course
• Cold Milling
• Removal of Guardrail
• Erosion Control Blanket Equal or Similar to ECP-2
• Pavement markings
• Drainage Considerations:
incoming small drainage area contributes to this location.
o Provide adequate erosion control such as rip rap / energy dissipating controls at the exit of existing pipe.
o Cleaning and maintenance of all existing drainage features are recommended.
For Typical Section, Plan, Profile and Cross Sections of this Alternative (See Section IV) and for a Detail Estimate of the Items included in this Alternative (See Section VIII).
ALTERNATIVE I
ALTERNATIVE II
ALTERNATIVE III
ALTERNATIVE
EVALUATION V
V. ALTERNATIVE EVALUATION
ALTERNATIVE NO. I – GABION RETAINING WALL
PROS:
• Their strong base prevents them from being dragged away during heavy downpours.
• They help to reduce the velocity of running water, as the rocks dissipate its energy, which helps reduce erosion processes caused by water or excessive seepage on steep or mild slopes.
• As time passes, gaps between the rocks will be filled by vegetation and silt, which will further reinforce the wall.
• Handling and transportation the materials are quite simple, which helps to reduce the time taken to build the Gabions.
• Gaps between the rocks allow water to flow through the structure, helping to maintain a low groundwater level.
• Gabion walls resists breakage and separation, due to the flexibility of the wire mesh construction.
• The gravel and rocks used in gabion construction are natural to the environment and can endure years of wear through water erosion.
• No need for Road Closure during construction. Works can be done in half section of the road.
CONS:
• This option will need a retaining wall to be offset from the edge of the road to allow placement of jersey barrier, as a result the more retaining wall height is required.
• Estimated Construction Cost is the highest in comparison with the other two
Alternatives.
• More impact on Earthwork Cut and Fill.
ALTERNATIVE NO. II – REINFORCED CONCRETE RETAINING WALL
PROS:
• Can be built on the edge of the road as a jersey barrier.
• The closer the retaining wall is to the roadway edge; the less retaining wall height is required.
• Less Impact in Right of Way Area.
• Less Impact on Earthwork Fill.
• Estimated Construction Cost is the second lowest in comparison with the other two
Alternatives.
CONS:
• The required Excavation for Structure will be to an extent requiring closing the road.
ALTERNATIVE NO. III – REINFORCED SOIL SLOPE
PROS:
• Less Impact on Earthwork Cut.
• Estimated Construction Cost is lower in comparison with the other two Alternatives.
CONS:
• Reinforced Soil Slope will not work on this site due to limitations of space and steepness of the slope which will not allow for creating of suitable base and placement of soil reinforcement into the cut without having to excavate almost the entire road width.
• Benching will be required at the contact between fill and in situ soils.
• The slope shall be protected with turf reinforcement and re-vegetation.
• This alternative is vulnerable to erosion processes caused by water or excessive seepage on steep or mild slopes.
• More impact in Right of Way Area.
A Comparative Table of Alternatives I, II and III, with the more relevant data is included in this Section.
ENVIRONMENTAL
CONSIDERATIONS VI
VI. ENVIRONMENTAL CONSIDERATIONS
This project qualifies for Categorical Exclusion (CE) which meet the definition contained in 40 CFR 1508.4, and, based on experience with similar actions, do not involve significant environmental impacts. They are actions which: do not induce significant impacts to planned growth or land use for the area; do not require the relocation of significant numbers of people; do not have a significant impact on any natural, cultural, recreational, historic or other resource; do not involve significant air, noise, or water quality impacts; do not have significant impacts on travel patterns; or do not otherwise, either individually or cumulatively, have any significant environmental impacts.
The project does not individually or cumulatively have a significant impact on the environment as defined by NEPA, or involve unusual circumstances as defined in 23 CFR
771.117 (d)(13) and is therefore excluded from the requirements to prepare an
Environmental Assessment or Environmental Impact Statement. Based on consideration of prior planning studies, appropriate agency solicitation and thorough environmental review, we have determined that this action results in no significant impacts to the human and natural environment, involves no public controversy on environmental grounds, and no inconsistency with any federal, state or local laws, regulations, and administrative determinations relating to the environment.
CONSTRUCTABILITY VII
VII. CONSTRUCTABILITY
ALTERNATIVE NO. I – GABION RETAINING WALL
• Handling and transportation the materials to sites are quite simple, easy to unload and place, which helps to reduce the time taken to build the Gabions.
• The construction will depend on the availability of materials, equipment and manpower.
• If the supplier has baskets and rock in stock, the contractor will be able to erect the gabions as they get everything at the site. If the supplier has to order materials in, the contractor will have to wait until they’ re delivered.
• Filling the baskets with rock is something that is done by hand. If the contractor has the required manpower, the Gabion Retaining Wall can be done faster.
• This alternative is very amenable to non-skilled manpower with the required supervision.
ALTERNATIVE NO. II – REINFORCED CONCRETE RETAINING WALL
• Handling and transportation the materials to sites with heavy equipment has to be considered in areas of difficult access.
• The construction of the Reinforced Concrete Retaining Wall requires a high-skill manpower.
ALTERNATIVE NO. III – REINFORCED SOIL SLOPE
• Handling and transportation the materials to sites with heavy equipment has to be considered in areas of difficult access.
• Most of the construction is done by heavy equipment and skilled manpower.
CONSTRUCTION
COST VIII
• ALTERNATIVE I
VIII. CONSTRUCTION COST
An Estimated Construction Cost including the Item Number, Specification, Class of Work, Quantity, Unit Price and Total Cost for the three (3) Alternatives evaluated is included in this Section.
CONSTRUCTION
TIME IX
IX. CONSTRUCTION TIME
For the Proposed Construction Works alone, we estimated one (1) month to be completed; but due to the following reasons that has to be considered, such as:
• Construction Permits
• Submittals approvals
• Material available by the supplier or it has to be ordered for fabrication
• Weather delays
We recommend two (2) months for the construction of the Proposed Works.
SOLUTION
COMPLEXITY X
X. SOLUTION COMPLEXITY
There is no complexity in the construction of the three (3) alternatives evaluated. These solutions are conventional for a general contractor, since most of these solutions have been implemented by the PRHTA in the rehabilitation of Landslides in Puerto Rico.
IMPACT ON
RIGHT OF WAY
ACQUISITION XI
XI. IMPACT ON RIGHT OF WAY ACQUISITION
A Land Acquisition Plan and Table with the information of Lot Owner, Lot Number, Area for the three (3) Alternatives evaluated is included in this Section.
RECOMMENDATIONS XII
XII. RECOMMENDATIONS
After the evaluation of the three (3) Alternatives presented, we recommend the Alternative
I – Gabion Retaining Wall for the rehabilitation of the Landslide, based on the following reasons:
• Their strong base prevents them from being dragged away during heavy downpours.
• They help to reduce the velocity of running water, as the rocks dissipate its energy, which helps reduce erosion processes caused by water or excessive seepage on steep or mild slopes.
• As time passes, gaps between the rocks will be filled by vegetation and silt, which will further reinforce the wall.
• Handling and transportation the materials are quite simple, which helps to reduce the time taken to build the Gabions.
• Gaps between the rocks allow water to flow through the structure, helping to maintain a low groundwater level.
• Gabion walls resists breakage and separation, due to the flexibility of the wire mesh construction.
• The gravel and rocks used in gabion construction are natural to the environment and can endure years of wear through water erosion.
• Less Impact in Right of Way Area.
• No need for Road Closure during construction. Works can be done in half section of the road.
| CARPETA TECHNICAL REPORT. ER-HWY-105 |
| 01-TABLE OF CONTENT. LANDSLIDE-ER-HWY-105 |
| Geotechnical Report ER HWY 104 PR 124 Lares.pdf |
| xGeotechnical Report ER HWY 104 PR 124 Lares.pdf |
| Boring Logs ER-HWY-104 |
| Soil Classifications ER-HWY-104 |
| ER 104 A.pdf |
| ER 104 C |
File details come from the government source that posted it. Updated .