This document is a Bid Opening results file for a Federal Highway Administration project for Landslide Repairs in the West Region C1. The solicitation (No. 693C73-25-B-000009) involves repairing landslide and hurricane damage on multiple highways in Puerto Rico, with bids opened on June 24, 2025. Two bidders submitted proposals: LPC Contractors, Inc. and Maglez Engineerings & Contractors Corp, with total project prices of $36,055,955.00 and $20,160,481.00 respectively. The Engineer's Estimate was $17,215,000.00.

The project includes multiple work schedules (A, B, C, D) with varying performance periods, ranging from 895 to 1365 calendar days depending on the contract award configuration. The scope encompasses embankment reconstruction, reinforced soil slope systems, gabion walls, retaining walls, drainage systems, pavement work, guardrail replacement, signage, and temporary traffic control. The project is restricted to Small Business Concerns and involves repairs to highways damaged by Hurricanes Irma and Maria in municipalities including Las Marias, Mayaguez, Quebradillas, and San Sebastian, Puerto Rico.

View the file

Other files

File Type Posted
Amendment 0004 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0002 - PR ER DOT PRMNE RPR(25).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(25).pdf PDF
State Historic Preservation Office Report - Cult_Assess_Report_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-80.pdf PDF
PRHTAs Project Special Provisions with Index.pdf PDF
VETS-4212 Form.pdf PDF
Geotechnical Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-21.pdf PDF
Asbestos Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-922579_HWY-21.pdf PDF
IFB Solicitation - PR ER DOT PRMNT RPR(25).pdf PDF
PRHTAs Standard Drawings_Revised GABI Drawings_GABI 9-10.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-924579_Hwy-105.pdf PDF
Categorical Exclusion Form (NEPA) - AC-883579_HWY-369.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-845579_HWY-362.pdf PDF
Categorical Exclusion Form (NEPA) - AC-924579_HWY-105.pdf PDF
Utility Status Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report - AC-814579_HWY-73_03.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-922579_Hwy-21_80.pdf PDF
Asbestos and Lead Report - AC-924579_HWY-105.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_02.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-369.pdf PDF
Technical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-347.pdf PDF
Technical Report Addendum -AC-883579_HWY-347.pdf PDF
Asbestos Report - AC-883579_HWY-369.pdf PDF
Asbestos and Lead Certification - AC-922579_HWY-80.pdf PDF
Lead Report - AC-922579_HWY-21.pdf PDF
Geotechnical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_01.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-883579_HWY-369.pdf PDF
Utility Status Report - AC-883579_HWY-347.pdf PDF
Geotechnical Report - AC-830579_HWY-105.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-80.pdf PDF
Lead Report - AC-883579_HWY-369.pdf PDF
Geotechnical Report - AC-883579_HWY-369.pdf PDF
Asbestos Report - AC-883579_HWY-347.pdf PDF
Technical Report - AC-922579_HWY-105.pdf PDF
Asbestos and Lead Certification - AC-883579_HWY-369.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-814579_Hwy-73.pdf PDF
Technical Report - AC-922579_HWY-80.pdf PDF
Categorical Exclusion Form (NEPA) - AC-922579_HWY-80.pdf PDF
State Historic Preservation Office Report - Concurrence_Sites_347_361.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Geotechnical Report Addendum - AC-922579_HWY-21.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration

Eastern Federal Lands Highway Division

Bid Opening for

Landslide Repairs in the West Region C1

PROJECT: PR ER DOT PRMNT RPR(25)

SOLICITATION NO. 693C73-25-B-000009

June 24, 2025 at 2:00 p.m. EDT

Ashburn, Virginia

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-25-B-000009

Project: PR ER DOT PRMNT RPR(25)

June 24, 2025, 2:00 p.m. EDT

BIDDERS BID TOTALS TOTAL PRICE

LPC Contractors, Inc. SCHEDULE A

$24,252,910.00

SCHEDULE B

$891,705.00

SCHEDULE C

$7,222,025.00

SCHEDULE D

$3,689,315.00

SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3

= $36,055,955.00

Maglez Engineerings & Contractors Corp SCHEDULE A

$8,495,025.00

SCHEDULE B

$2,872,422.50

SCHEDULE C

$4,654,150.00

SCHEDULE D

$4,138,883.50

SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3

= $20,160,481.00

If the Government awards the Contract as Schedules A + B + C + D, the performance period to complete all contract work will be 1365 calendar days. If separate: Schedules A + B + D will be 1185 calendar days; Schedule A will be 895 calendar days; Schedule B will not extend the contract and the work will be simultaneous with the performance of the executed contract; Schedule C will extend the contract 180 calendar days; and Schedule D will extend the contract 290 calendar days.

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-25-B-000009

Project: PR ER DOT PRMNT RPR(25)

June 24, 2025, 2:00 p.m. EDT

BIDDERS BID TOTALS TOTAL PRICE

Engineer’s Estimate SCHEDULE A

$7,730,000.00

SCHEDULE B

$1,165,000.00

SCHEDULE C

$4,065,000.00

SCHEDULE D

$4,255,000.00

SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3

= $17,215,000.00

If the Government awards the Contract as Schedules A + B + C + D, the performance period to complete all contract work will be 1365 calendar days. If separate: Schedules A + B + D will be 1185 calendar days; Schedule A will be 895 calendar days; Schedule B will not extend the contract and the work will be simultaneous with the performance of the executed contract; Schedule C will extend the contract 180 calendar days; and Schedule D will extend the contract 290 calendar days.

Slide 1
Slide 2: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000009 Project: PR ER DOT PRMNT RPR(25) June 24, 2025, 2:00 p.m. EDT
Slide 3: FEDERAL HIGHWAY ADMINISTRATION EASTERN FEDERAL LANDS HIGHWAY DIVISION BID OPENING for SOLICITATION NO. 693C73-25-B-000009 Project: PR ER DOT PRMNT RPR(25) June 24, 2025, 2:00 p.m. EDT