Utility Status Report - AC-883579_HWY-347.pdf

PDF 2 MB Posted

Attached to
Landslide Repairs in The West Region C1
Solicitation number
693C73-25-B-000009
Issued by

About this file

The document appears to be a generic Adobe PDF loading page with instructions for troubleshooting PDF viewer issues, and does not contain substantive contract opportunity information. The actual contract details are provided in the accompanying text description for a Department of Transportation Federal Highway Administration solicitation for landslide repairs in Puerto Rico.

The solicitation (Number 693C73-25-B-000009) is restricted to certified Small Business Concerns for repairing hurricane-damaged highways in multiple Puerto Rican municipalities. The project involves reconstruction and repair work on several highways, including embankment reconstruction, soil slope systems, gabion walls, drainage systems, pavement work, and related infrastructure improvements. The total project cost is estimated between $10-20 million, with bid documents expected to be issued around April 29, 2025. Bidders must be registered in the System for Award Management (SAM) and can access solicitation documents through www.sam.gov.

View the file

Other files

File Type Posted
Results of Bid Opening - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0004 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0003 - PR ER DOT PRMNT RPR(25).pdf PDF
Amendment 0002 - PR ER DOT PRMNE RPR(25).pdf PDF
Amendment 0001 - PR ER DOT PRMNT RPR(25).pdf PDF
State Historic Preservation Office Report - Cult_Assess_Report_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-80.pdf PDF
PRHTAs Project Special Provisions with Index.pdf PDF
VETS-4212 Form.pdf PDF
Geotechnical Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-21.pdf PDF
Asbestos Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-922579_HWY-21.pdf PDF
IFB Solicitation - PR ER DOT PRMNT RPR(25).pdf PDF
PRHTAs Standard Drawings_Revised GABI Drawings_GABI 9-10.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-924579_Hwy-105.pdf PDF
Categorical Exclusion Form (NEPA) - AC-883579_HWY-369.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-845579_HWY-362.pdf PDF
Categorical Exclusion Form (NEPA) - AC-924579_HWY-105.pdf PDF
Utility Status Report - AC-922579_HWY-80.pdf PDF
Geotechnical Report - AC-814579_HWY-73_03.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-922579_Hwy-21_80.pdf PDF
Asbestos and Lead Report - AC-924579_HWY-105.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_02.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-369.pdf PDF
Technical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-883579_HWY-347.pdf PDF
Technical Report Addendum -AC-883579_HWY-347.pdf PDF
Asbestos Report - AC-883579_HWY-369.pdf PDF
Asbestos and Lead Certification - AC-922579_HWY-80.pdf PDF
Lead Report - AC-922579_HWY-21.pdf PDF
Geotechnical Report - AC-883579_HWY-347.pdf PDF
Hydrologic and Hydraulic Analysis Report - AC-922579_HWY-21.pdf PDF
Technical Report - AC-814579_HWY-73.pdf PDF
Geotechnical Report - AC-814579_HWY-73_01.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-883579_HWY-369.pdf PDF
Geotechnical Report - AC-830579_HWY-105.pdf PDF
Geotechnical Report Addendum - 3 AC-922579_HWY-80.pdf PDF
Lead Report - AC-883579_HWY-369.pdf PDF
Geotechnical Report - AC-883579_HWY-369.pdf PDF
Asbestos Report - AC-883579_HWY-347.pdf PDF
Technical Report - AC-922579_HWY-105.pdf PDF
Asbestos and Lead Certification - AC-883579_HWY-369.pdf PDF
Plans - PR ER DOT PRMNT RPR(25) - AC-814579_Hwy-73.pdf PDF
Technical Report - AC-922579_HWY-80.pdf PDF
Categorical Exclusion Form (NEPA) - AC-922579_HWY-80.pdf PDF
State Historic Preservation Office Report - Concurrence_Sites_347_361.pdf PDF
PRHTAs Material Testing Schedule.pdf PDF
Geotechnical Report Addendum - AC-922579_HWY-21.pdf PDF
Show 40 more

Latest 50 of 77 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

C:\Documents and Settings\jedixon.FLHD\My Documents\My Pictures\Panoramic\lbtview4.jpg Utility Status Report

EFL-FM-UTL-01(07)

Page of Review Interval:

Existing utilities [ Project Scope [ Location and Utility Information Design Information Type and/or Size Facility (** See Legend) **P=Pole, T=buried Tel. Cable, TC=Tel Conduit, PD=Pedestal, G=Gas, W=Water, S=Sewer, SS=Storm Sewer, SFM=Sewer Force Main, MH=Manhole, TV=Buried Cable TV, FO=Fiber Optic, UE=Underground Electric, Other=See Remarks 8.2.1.3144.1.471865.466429 are

PrintForm:
CurrentPage:
PageCount:
Project: AC-824544
Date: November 27, 2019
Reviewer: Roberto L. Rexach Cintron
PM: Angel Montalvo, PE
HDM:
ReviewType_Otext:
Preliminary30:
PlanInHand70:
Internal90:
External95:
Final100:
Other:
RBYESUtilities:
RBNOUtilities:
RBUnknownUtilities:
RBUTILONPlans:
RBUtilNOTPlans:
CBUtilINSCR: 0
CBUtilINSCR: 0
CBUtilINSCR: 0
CBNOUtilRelocate: 0
CBUtilDescribed: 1
scope1: 0
scope2: 0
scopeOther: 0
txtOtherScope:
ADDROWButton:
DELETEButton:
RowNum: 1
TFRoadName: PR-339
TFStation: Sta 1+00.00 to Sta 1+72.25
LeftofCL:
RightofCL:
BothLandR:
TFTypeSize: W
TFSizePole:
TFCompany: PRASA
TFContactNameNum: Eng Iris Jusino 787 652-1260
CBUtilityListing: 0
CBAddContact: 0
TFContact2NameNum:
CBPreConMeeting:
TFPCName:
TFPCPhone:
TFPCAddress:
TFPCEmail:
TFDesignResponce: Other (See Remarks)
TFPaymentResponce: FHWA
TFResponceParty: FHWA
DLWorkCompleted: During contract work
NFEstCost: 10000.00000000
DFAgreement:
CheckBox1: 0
TFRemarks: A 4' diameter water line traverses the project area and will be relocated as shown in the design by Roberto Rexach Cintron & Associates.
TFGeneralInfo: No Telecommunication or PREPA utilities are affected.

File details come from the government source that posted it. Updated .