USWTR Inc. II & III RFP.pdf
PDF 1 MB Posted
- Attached to
- RFP Amendment - Undersea Warfare Training Range(USWTR) Increment II & III Federal contract opportunity
- Solicitation number
- N6134021R0006
About this file
This document provides details regarding a solicitation for the redevelopment and modernization of four deep water undersea warfare training ranges and the addition of two shallow water ranges. The solicitation seeks to upgrade the Barking Sands Tactical Underwater Range, Barking Sands Undersea Range Expansion, Atlantic Undersea Test and Evaluation Center, and Southern California Anti-Submarine Offshore Range. It will also develop new shallow water ranges at Tanner/Cortes Bank and near San Clemente Island in California. The Naval Air Warfare Center Training Systems Division is the issuing agency. The anticipated award date is June 1, 2021 under NAICS code 334511 and a size standard of 1,250 employees. The document provides contact information for the procuring contracting officer and contract specialist for any questions.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 04:00 PM local t ime 07 Jan 2021
X
A X B X C X D
EX
X
G F 89 - 105
106 - 126 X H 127 - 133
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 133
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N61340 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Section L conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 21
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
22 - 26 27 - 28
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
29 - 33
34 - 42 X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 43 - 48 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 49 - 56 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
57 - 87
PART II - CO NTRACT CLAUSES
NAWCTSD PROCUREMENT GROUP
12211 SCIENCE DRIVE
ORLANDO FL 32826-3224
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
27 Oct 2020
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N6134021R0006
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each Technical Review - Contract Year 1
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications FOB: Destination
NET AMT
0002 1 Each Data
FFP
Data per Exhibit "A" Contract Data Requirements List. See Clause C10 for Data Item Number applicability to CLINs. NOT- SEPARATELY-PRICED
0101 1 Each OPTION Production and Installation Engineering
FFP
In accordance with Attachment 1, Statement of Work, Tasks C, E and F and Attachment 3, Performance Specification
0102 1 Each OPTION BARSTUR Internode Cable
FFP
In accordance with Attachment 1, Statement of Work, Tasks G and H and and Attachment 3, Performance Specification
0103 1 Each OPTION AUTEC Cable
FFP
In accordance with Attachment 1, Statement of Work, Tasks J and K and Attachment 3, Performance Specification
0104 1 Each OPTION BSURE Cable
FFP
In accordance with Attachment 1, Statement of Work, Task L and Attachment 3, Performance Specification
0105 1 Each OPTION AUTEC Production and Installation
FFP
In accordance with Attachment 1, Statement of Work, Task D and Attachment 3, Performance Specification
0106 1 Each OPTION Technical Review - Contract Year 2
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0201 1 Each OPTION BARSTUR Procurement, Production and Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks M and N and Attachment 3, Performance Specification
0202 1 Each OPTION BARSTUR Provisioned Items
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification
0203 1 Each OPTION AUTEC Procurement, Production, & Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks P and Q and Attachment 3, Performance Specification
0204 1 Each OPTION AUTEC Provisioned Items
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification
0205 1 Each OPTION BSURE Procurement, Production, & Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks R and S and Attachment 3, Performance Specification
0206 1 Each OPTION BSURE Provisioned Items
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification
0207 1 Each OPTION Technical Review - Contract Year 3
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0301 Each OPTION BARSTUR IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks T, U and V and Attachment 3, Performance Specification
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
0302 1 Each OPTION BARSTUR Training and BSURE Training
FFP
In accordance with Attachment 1, Statement of Work, Task W and Attachment 3, Performance Specification
0303 Each OPTION AUTEC IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks Y, Z and AA and Attachment 3, Performance Specification
0304 1 Each OPTION AUTEC Training
FFP
In accordance with Attachment 1, Statement of Work, Task BB and Attachment 3, Performance Specification
0305 Each OPTION BSURE IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks DD, EE, FF and Attachment 3, Performance Specification
0306 1 Each OPTION Technical Review - Contract Year 4
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0401 Each OPTION BARTUR/BSURE 1 year tech. suppt.
FFP
In accordance with Attachment 1, Statement of Work, Tasks GG and Attachment 3, Performance Specification
0402 Each OPTION AUTEC 1 year tech. suppt.
FFP
In accordance with Attachment 1, Statement of Work, Tasks HH and Attachment 3, Performance Specification
0403 1 Each OPTION Production Engineering & Verification
FFP
In accordance with Attachment 1, Statement of Work, Tasks JJ and KK and Attachment 2, Performance Specification
0404 1 Each OPTION Tanner Bank Production Internode Cable
FFP
In accordance with Attachment 1, Statement of Work, Task LL and Attachment 2, Performance Specification
0405 1 Each OPTION San Clemente Island Production Cable
FFP
In accordance with Attachment 1, Statement of Work, Task MM and Attachment 2, Performance Specification
0406 1 Each OPTION Technical Review - Contract Year 5
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0501 1 Each OPTION TB/SCI Procurement, Production and Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks NN, PP and QQ and Attachment 2, Performance Specification
0502 1 Each OPTION Tanner Bank Provisioned Items
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 2, Performance Specification
0503 1 Each OPTION Technical Review - Contract Year 6
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0601 1 Each OPTION SCI Procurement, Production & Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks RR and SS and Attachment 2, Performance Specification
0602 1 Each OPTION SCI Provisioned Item Ordering
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 2, Performance Specification
0603 1 Each OPTION SOAR Production Cable
FFP
In accordance with Attachment 1, Statement of Work, Task TT and Attachment 3, Performance Specification
0604 1 Each OPTION Technical Review - Contract Year 7
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0701 1 Each OPTION SOAR Production Engineering Technical
FFP
In accordance with Attachment 1, Statement of Work, Task UU and Attachment 3, Performance Specification
0702 Each OPTION Tanner Bank IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks VV, WW, and XX and Attachment 2, Performance Specification
0703 1 Each OPTION Tanner Bank SWTR Training
FFP
In accordance with Attachment 1, Statement of Work, Task YY and Attachment 2, Performance Specification
0704 1 Each OPTION Technical Review - Contract Year 8
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0801 1 Each OPTION SOAR Procurement, Production and Test
FFP
In accordance with Attachment 1, Statement of Work, Tasks AAA and BBB and Attachment 3, Performance Specification
0802 1 Each OPTION SOAR Provisioned Items
FFP
Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification
0803 Each OPTION TB 1 year tech. suppt.
FFP
In accordance with Attachment 1, Statement of Work, Task CCC and Attachment 2, Performance Specification
0804 Each OPTION SCI IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks DDD, EEE and FFF and Attachment 2, Performance Specification
0805 1 Each OPTION SCI SWTR Training
FFP
In accordance with Attachment 1, Statement of Work, Task GGG and Attachment 2, Performance Specification
0806 1 Each OPTION Technical Review - Contract Year 9
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
0901 Each OPTION SOAR IWS Install and Test
CPFF
In accordance with Attachment 1, Statement of Work, Tasks JJJ, KKK and LLL and Attachment 3, Performance Specification
0902 1 Each OPTION SOAR Training
FFP
In accordance with Attachment 1, Statement of Work, Task MMM and Attachment 3, Performance Specification
0903 Each OPTION SOAR 1 year tech. suppt.
FFP
In accordance with Attachment 1, Statement of Work, Task PPP and Attachment 3, Performance Specification
0904 Each OPTION SCI 1 year tech. suppt.
FFP
In accordance with Attachment 1, Statement of Work, Tasks QQQ and Attachment 2, Performance Specification
0905 1 Each OPTION Technical Review - Contract Year 10
FFP
In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications
Section C - Descriptions and Specifications
CLIN DESCRIPTION
C1. CLINs 0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806 and 0905 The contractor shall perform all duties and functions necessary for the Technical Program Management and System Engineering phases of USWTR Increment II and III in accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications.
C2. CLIN 0002
The contractor shall furnish all data in accordance with the attached Contract Data Requirements List (CDRL). All data requirements shall be traceable to specific tasks in accordance with the SOW and Exhibits listed in Section J.
C3. CLIN 0101
The contractor shall furnish the deliverables and supplies necessary for the Barking Sands Tactical Underwater Range (BARSTUR) and Barking Sands Undersea Range Expansion (BSURE) Production and Installation Engineering, Deep Water Production Engineering Verification and Southern California Offshore Anti-Submarine Range (SOAR) Production and Installation Engineering phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks C, E and F and Attachment 3, Performance Specification.
C4. CLIN 0102
The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Trunk Cable and BARSTUR Internode Cable phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks G and H and Attachment 3, Performance Specification.
C5. CLIN 0103
The contractor shall furnish the deliverables and supplies necessary for the AUTEC Trunk Cable and AUTEC Internode Cable phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks J and K and Attachment 3, Performance Specification.
C6. CLIN 0104
The contractor shall furnish the deliverables and supplies necessary for the BSURE Internode Cable phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task L and Attachment 3, Performance Specification.
C7. CLIN 0105
The contractor shall furnish the deliverables and supplies necessary for the Atlantic Undersea Test and Evaluation Center (AUTEC) Production and Installation Engineering phase of ASRP in accordance with Attachment 1, Statement of Work, Task D and Attachment 3, Performance Specification.
C8. CLIN 0201
The contractor shall furnish the deliverables and supplies necessary for the BARSTUR Procurement, Production and Test Cable Terminations and BARSTUR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks M and N and Attachment 3, Performance Specification.
C9. CLINs 0202, 0204, 0206, 0502, 0602 and 0802 Items provided under this CLIN will be defined prior to option exercise. The contractor shall deliver Provisioned Items Orders issued pursuant to Section H, NAVAIR clause 5252.217-9500 and 5252.217-9506 and Attachments 2 and 3, Performance Specifications.
C10. CLIN 0203
The contractor shall furnish the deliverables and supplies necessary for the AUTEC Procurement, Production and Test Cable Terminations and AUTEC Procurement, Production and Test In-Water Subsystem phases of AUTEC Sensor Replacement Program (ASRP) in accordance with Attachment 1, Statement of Work, Tasks P and Q and Attachment 3, Performance Specification.
C11. CLIN 0205
The contractor shall furnish the deliverables and supplies necessary for the BSURE Procurement, Production and Test Cable Terminations and BSURE Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks R and S and Attachment 3, Performance Specification.
C12. CLIN 0301
The contractor shall perform all duties and functions necessary for the BARSTUR Installation, BARSTUR Installation Tests and BARSTUR Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks T, U and V and Attachment 3, Performance Specification.
C13. CLIN 0302
The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Training phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task W and Attachment 3, Performance Specification.
C14. CLIN 0303
The contractor shall perform all duties and functions necessary for the AUTEC Installation, AUTEC Installation Tests and AUTEC Post Installation Test phases of ASRP in accordance with Attachment 1, Statement of Work, Tasks Y, Z and AA and Attachment 3, Performance Specification.
C15. CLIN 0304
The contractor shall furnish the deliverables and supplies necessary for the AUTEC Training phase of ASRP in accordance with Attachment 1, Statement of Work, Task BB and Attachment 3, Performance Specification.
C16. CLIN 0305
The contractor shall perform all duties and functions necessary for the BSURE Installation, BSURE Installation Tests and BSURE Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks DD, EE and FF and Attachment 3, Performance Specification.
C17. CLIN 0401
The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Corrective Maintenance (1-year technical support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task GG and Attachment 3, Performance Specification.
C18. CLIN 0402
The contractor shall furnish the deliverables and supplies necessary for the AUTEC Corrective Maintenance (1 Year Technical Support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task HH and Attachment 3, Performance Specification.
C19. CLIN 0403
The contractor shall furnish the deliverables and supplies necessary for the West Coast Shallow Water Training Range (WC-SWTR) Production and Installation Engineering and Shallow Water Production Engineering Verification phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks JJ and KK and Attachment 2, Performance Specification.
C20. CLIN 0404
The contractor shall furnish the deliverables and supplies necessary for the Tanner Bank Shallow Water Training Range (TB SWTR) Internode Cable phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task LL and Attachment 2, Performance Specification.
C21. CLIN 0405
The contractor shall furnish the deliverables and supplies necessary for the San Clemente Island Shallow Water Training Range (SCI SWTR) Internode Cable phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task MM and Attachment 2, Performance Specification.
C22. CLIN 0501
The contractor shall furnish the deliverables and supplies necessary for the WC SWTR Trunk Cables, TB SWTR Procurement, Production and Test Cable Termination and TB SWTR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks NN, PP and QQ and Attachment 2, Performance Specification.
C23. CLIN 0601
The contractor shall furnish the deliverables and supplies necessary for the SCI SWTR Procurement, Production and Test Cable Terminations and SCI SWTR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks RR and SS and Attachment 2, Performance Specification.
C24. CLIN 0603
The contractor shall furnish the deliverables and supplies necessary for the SOAR Trunk and Internode Cable phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task TT and Attachment 3, Performance Specification.
C25. CLIN 0701
The contractor shall furnish the deliverables and supplies necessary for the SOAR Production and Installation Engineering Technical Review phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task UU and Attachment 3, Performance Specification.
C26. CLIN 0702
The contractor shall perform all duties and functions necessary for the TB SWTR Installation, TB SWTR Installation Tests and TB SWTR Post Installation Test phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks VV, WW and XX and Attachment 2, Performance Specification.
C27. CLIN 0703
The contractor shall furnish the deliverables and supplies necessary for the TB SWTR Training phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task YY and Attachment 2, Performance Specification.
C28. CLIN 0801
The contractor shall furnish the deliverables and supplies necessary for the SOAR Procurement, Production and Test Cable Terminations and SOAR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks AAA and BBB and Attachment 3, Performance Specification.
C29. CLIN 0803
The contractor shall furnish the deliverables and supplies necessary for the TB SWTR Corrective Maintenance (1-year technical support) phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task CCC and Attachment 2, Performance Specification.
C30. CLIN 0804
The contractor shall perform all duties and functions necessary for the SCI SWTR Installation, SCI SWTR Installation Tests and SCI SWTR Post Installation Test phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks DDD, EEE and FFF and Attachment 2, Performance Specification.
C31. CLIN 0805
The contractor shall furnish the deliverables and supplies necessary for the SCI SWTR Training phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task GGG and Attachment 2, Performance Specification.
C32. CLIN 0901
The contractor shall perform all duties and functions necessary for the SOAR Installation, SOAR Installation Tests and SOAR Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks JJJ, KKK and LLL and Attachment 3, Performance Specification.
C33. CLIN 0902
The contractor shall furnish the deliverables and supplies necessary for the SOAR Training phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task MMM and Attachment 3, Performance Specification.
C34. CLIN 0903
The contractor shall perform all duties and functions necessary for the SOAR Corrective Maintenance (1-year technical support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task PPP and Attachment 3, Performance Specification.
C35. CLIN 0904
The contractor shall perform all duties and functions necessary for the SCI SWTR Corrective Maintenance (1-year technical support) phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task QQQ and Attachment 2, Performance Specification.
CLAUSES INCORPORATED BY REFERENCE
52.242-17 Government Delay Of Work APR 1984
CLAUSES INCORPORATED BY FULL TEXT
5252.211-9509 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL
(NAVAIR)(OCT 2005)
The Contractor's Technical Proposal Number [Enter technical proposal number], dated [Enter document date], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal.
Section D - Packaging and Marking
D1 D1. All clauses within this section apply to each CLIN unless otherwise stated.
5252.247-9502 UNPACKING INSTRUCTIONS: COMPLEX OR DELICATE EQUIPMENT (NAVAIR)
(OCT 1994)
(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked "UNPACKING INFORMATION".
(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled
"CAUTION - THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING
INSTRUCTIONS ARE CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED (state where located)." When practical, this marking will be applied adjacent to the identification marking on the side of the container.
(c) Marking. All shipping containers will be marked in accordance with [specify commercial or approved military standard that applies].
5252.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)
(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.
(b) The contractor shall prominently display on the cover of each report the following information:
(1) Name and business address of contractor.
(2) Contract Number/Delivery/Task order number.
(3) Contract/Delivery/Task order dollar amount.
(4) Whether the contract was competitively or non-competitively awarded.
(5) Name of sponsoring individual.
(6) Name and address of requiring activity.
5252.247-9508 PROHIBITION AND LIMITATIONS FOR PACKAGING MATERIALS
(NAVAIR) (AUG 2019)
The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."
Section E - Inspection and Acceptance
E1 E.1 All clauses within this section apply to each CLIN unless otherwise stated.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0101 Destination Government Destination Government 0102 Destination Government Destination Government 0103 Origin Government Destination Government 0104 Origin Government Destination Government 0105 Destination Government Destination Government 0106 Destination Government Destination Government 0201 Destination Government Destination Government 0202 Destination Government Destination Government 0203 Destination Government Destination Government 0204 Destination Government Destination Government 0205 Destination Government Destination Government 0206 Destination Government Destination Government 0207 Destination Government Destination Government 0301 Destination Government Destination Government 0302 Destination Government Destination Government 0303 Destination Government Destination Government 0304 Destination Government Destination Government 0305 Destination Government Destination Government 0306 Destination Government Destination Government 0401 Destination Government Destination Government 0402 Destination Government Destination Government 0403 Destination Government Destination Government 0404 Origin Government Destination Government 0405 Origin Government Destination Government 0406 Destination Government Destination Government 0501 Destination Government Destination Government 0502 Destination Government Destination Government 0503 Destination Government Destination Government 0601 Destination Government Destination Government 0602 Destination Government Destination Government 0603 Origin Government Destination Government 0604 Destination Government Destination Government 0701 Destination Government Destination Government 0702 Destination Government Destination Government 0703 Destination Government Destination Government 0704 Destination Government Destination Government 0801 Destination Government Destination Government
0802 Destination Government Destination Government 0803 Destination Government Destination Government 0804 Destination Government Destination Government 0805 Destination Government Destination Government 0806 Destination Government Destination Government 0901 Destination Government Destination Government 0902 Destination Government Destination Government 0903 Destination Government Destination Government 0904 Destination Government Destination Government 0905 Destination Government Destination Government
52.246-4 Inspection Of Services--Fixed Price AUG 1996 Applicable CLINs:
0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0903, 0904, 0905
52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 Applicable CLINs:
0301, 0303, 0305, 0702, 0804, 0901
52.246-16 Responsibility For Supplies APR 1984
52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)
(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.
(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.
(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.
(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.
(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.
(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.
(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.
(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.
(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.
(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.
(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.
(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.
(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.
Applicable CLINs: 0002, 0101, 0102, 0103, 0104, 0105, 0201, 0203, 0205, 0302, 0304, 0403, 0404, 0405, 0501, 0601, 0603, 0701, 0703, 0801, 0805, 0902
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard selected below.
ISO 9001:2015 Quality Management Systems
Or
AS9100D Quality Management Systems
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by:
BARTSUR, BSURE, TB SWTR, SCI SWTR, SOAR
Charles Terry Jr.
47123 Buse Road, Building 2272 Suite 345 Patuxent River MD 20670-1547
(240) 298-6279
AUTEC
Russell A. Racette 1176 Howell Street Newport RI 02841-5047
(401) 832-5824
The effort is for the procurement of 6 underwater ranges. It is the Government's intent to perform final inspection/acceptance of the completed ranges, training, technical support, and any delivered provisioned items as outlined below:
BARSTUR: CLINS 0202, 0301, 0302, 0401
BSURE: 0206, 0302, 0305, 0401
AUTEC: 0204, 0303, 0304, 0402
TB SWTR: 0502, 0702, 0703, 0803
SCI SWTR: 0602, 0804, 0805, 0904
SOAR: 0801, 0802, 0901, 0902, 0903
The items associated with the remaining CLINS are intended to be consumed in the performance of the overall effort. Inspection/acceptance of these remaining CLINS will be performed on the associated deliverables outlined in the "Deliverables" portion of the Statement of Work of the task described in Section C "CLIN DESCRIPTION".
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.
5252.246-9513 INSPECTION AND ACCEPTANCE OF TRAINING DEVICES (NAVAIR) (OCT 2007)
Inspection of the following training devices: Barking Sands Tactical Underwater Range (BARSTUR), Barking Sands Undersea Range Expansion (BSURE), Atlantic Undersea Test andEvaluation Center (AUTEC), Southern California Anti-Submarine Warfare Range (SOAR), Tanner Bank Shallow Water Training Range (TB SWTR) and the San Clemente Island Shallow Water Training Range (SCI SWTR) shall be accomplished in accordance with the Specification/Statement of Work entitled [Undersea Warfare Training Range (USWTR) Increment II and III In-Water Subsystem (IWS) and Atlantic Undersea Test and Evaluation Center (AUTEC) Sensor Replacement Program (ASRP) Statement of Work Solicitation Number N61340-21-R-0006 USWTR Increments II and III and ASRP Revision 2], dated [15 October 2020], and the Government approved Contract Data Requirements List (CDRL), DD Form 1423, data item entitled Test Procedures and Test/Inspection Reports (TP and TIR). Any Government inspection/acceptance to be conducted in the contractor's facility, will be performed by the Administrative Contracting Officer's quality assurance representative with support of [NUWC] technical personnel.
Final inspection to be performed at the device delivery site will be directed and witnessed by the technical representative of the Procuring Contracting Officer (PCO). Final acceptance of this Contract Line Item will be evidenced by signature of the PCO or his duly authorized representative on a DD Form 250, Material Inspection and Receiving Report.
5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION
(NAVAIR)(FEB 1995)
Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form]. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.
5252.246-9517 CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999)
For the purpose of FAR Clause 52.232-25, "Prompt Payment", paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the 60th day after the contractor delivered the supplies or performed the services.
Section F - Deliveries or Performance
TIME OF DELIVERY
(a) The Government requires performance and or delivery to be complete in accordance with the schedule below in order to receive payment:
REQUIRED DELIVERY SCHEDULE
CLIN #
QUANTITY
TIME OF DELIVERY AND/OR
PERFORMANCE
EXERCISE BY
0001 1 Award through 31 December 2021 Date of Award 0002 1 Award through 28 June 2032 Date of Award 0101 1 From option exercise through 31 December 2023 2022 JAN 01 0102 1 From option exercise through 31 December 2023 2022 JUNE 30 0103 1 From option exercise through 31 December 2023 2022 JUNE 30 0104 1 From option exercise through 31 December 2023 2022 JUNE 30 0105 1 From option exercise through 31 December 2023 2022 JAN 01 0106 1 From option exercise through 31 December 2022 2022 JAN 01 0201 1 From option exercise through 30 May 2026 2023 JAN 01 0202 1 From option exercise through 30 May 2026 2023 JAN 01 0203 1 From option exercise through 30 May 2026 2023 JAN 01 0204 1 From option exercise through 30 May 2026 2023 JAN 01 0205 1 From option exercise through 30 May 2026 2023 JAN 01 0206 1 From option exercise through 30 May 2026 2023 JAN 01 0207 1 From option exercise through 31 December 2023 2023 JAN 01 0301 1 From option exercise through 30 May 2026 2024 JAN 01 0302 1 From option exercise through 30 May 2026 2024 JAN 01 0303 1 From option exercise through 30 May 2026 2024 JAN 01 0304 1 From option exercise through 30 May 2026 2024 JAN 01 0305 1 From option exercise through 30 May 2026 2024 JAN 01 0306 1 From option exercise through 31 December 2025 2024 JAN 01 0401 1 From option exercise through 1 September 2026 2025 SEPT 01 0402 1 From option exercise through 1 September 2026 2025 SEPT 01 0403 1 From option exercise through 31 December 2026 2025 JAN 01 0404 1 From option exercise through 31 December 2026 2025 JAN 01 0405 1 From option exercise through 31 December 2026 2025 JAN 01 0406 1 From option exercise through 31 December 2025 2025 JAN 01 0501 1 From option exercise through 30 May 2030 2026 JAN 01
0502 1 From option exercise through 30 May 2030 2026 JAN 01
0503 1 From option exercise through 31 December 2026 2026 JAN 01
0601 1 From option exercise through 30 May 2031 2027 JAN 01
0602 1 From option exercise through 30 May 2031 2027 JAN 01
0603 1 From option exercise through 30 December 2028 2027 JAN 01
0604 1 From option exercise through 31 December 2027 2027 JAN 01 0701 1 From option exercise through 31 December 2029 2028 JAN 01 0702 1 From option exercise through 30 May 2030 2028 JAN 01 0703 1 From option exercise through 30 May 2030 2028 JAN 01 0704 1 From option exercise through 31 December 2028 2028 JAN 01 0801 1 From option exercise through 30 May 2032 2029 JAN 01 0802 1 From option exercise through 30 May 2032 2029 JAN 01 0803 1 From option exercise through 29 May 2031 2029 MAY 30 0804 1 From option exercise through 31 May 2031 2029 JAN 01 0805 1 From option exercise through 31 May 2031 2029 JAN 01 0806 1 From option exercise through 31 December 2029 2029 JAN 01 0901 1 From option exercise through 30 May 2032 2030 JAN 01 0902 1 From option exercise through 30 May 2032 2030 JAN 01 0903 1 From option exercise through May 30 May 2031 2030 MAY 30 0904 1 From option exercise through 30 May 2031 2030 MAY 31 0905 1 From option exercise through 31 December 2031 2030 JAN 01
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award adding (i) five days for delivery of the award through the ordinary mails, or (ii) one working day if the solicitation states that the contract or notice of award will be transmitted electronically.
(The term “working day” excludes weekends and U.S. Federal holidays. If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected
F1 F1. All clauses within this section apply to each CLIN unless otherwise stated.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 31-DEC-2021 1 NAVAL AIR SYSTEMS COMMAND
CHARLES TERRY JR.
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
N00421
0002 28-JUN-2032 1 (SAME AS PREVIOUS LOCATION)
0101 29-DEC-2023 1 (SAME AS PREVIOUS LOCATION)
0102 29-DEC-2023 1 (SAME AS PREVIOUS LOCATION)
0103 29-DEC-2023 1 NAVAL UNDERSEA WARFARE CENTER
(NUWC)
RUSSELL A. RACETTE
1176 HOWELL STREET
NEWPORT RI 02841-5047
(401) 832-5824
N66604
0104 29-DEC-2023 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0105 29-DEC-2023 1 NAVAL UNDERSEA WARFARE CENTER
RUSSELL A. RACETTE
1176 HOWELL STREET
NEWPORT RI 02841-5047
(401) 832-5824
0106 30-DEC-2022 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0201 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)
0202 29-MAY-2026 1 PACIFIC MISSILE RANGE FACILITY
JON WINSLEY
MILE MARKER 30 KAUMUALII HWY
KEKAHA HI 96752
808 335 4343
N0534A
0203 29-MAY-2026 1 NAVAL UNDERSEA WARFARE CENTER
RUSSELL A. RACETTE
1176 HOWELL STREET
NEWPORT RI 02841-5047
(401) 832-5824
0204 29-MAY-2026 1 NUWC DET AUTEC
TOM BIDDULPH
COMMANDING OFFICE
NUWC DET AUTEC
ANDROS ISLAND
(561) 671 2606
N63821
0205 29-MAY-2026 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0206 29-MAY-2026 1 PACIFIC MISSILE RANGE FACILITY
MILE MARKER 30 KAUMUALII HWY
KEKAHA HI 96752
808 335 4343
0207 29-DEC-2023 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0301 29-MAY-2026 PACIFIC MISSILE RANGE FACILITY
MILE MARKER 30 KAUMUALII HWY
KEKAHA HI 96752
808 335 4343
0302 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)
0303 29-MAY-2026 NUWC DET AUTEC
TOM BIDDULPH
COMMANDING OFFICE
NUWC DET AUTEC
ANDROS ISLAND
(561) 671 2606
0304 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)
0305 29-MAY-2026 PACIFIC MISSILE RANGE FACILITY
MILE MARKER 30 KAUMUALII HWY
KEKAHA HI 96752
808 335 4343
0306 31-DEC-2025 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0401 01-SEP-2026 (SAME AS PREVIOUS LOCATION)
0402 01-SEP-2026 NAVAL UNDERSEA WARFARE CENTER
RUSSELL A. RACETTE
1176 HOWELL STREET
NEWPORT RI 02841-5047
(401) 832-5824
0403 31-DEC-2026 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0404 31-DEC-2026 1 (SAME AS PREVIOUS LOCATION)
0405 31-DEC-2026 1 (SAME AS PREVIOUS LOCATION)
0406 31-DEC-2025 1 (SAME AS PREVIOUS LOCATION)
0501 30-MAY-2030 1 (SAME AS PREVIOUS LOCATION)
0502 30-MAY-2030 1 NSWC SCORE
JESSE SCHMIDTMANN
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
N4638A
0503 31-DEC-2026 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0601 30-MAY-2031 1 (SAME AS PREVIOUS LOCATION)
0602 30-MAY-2031 1 NSWC SCORE
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
0603 29-DEC-2028 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0604 31-DEC-2027 1 (SAME AS PREVIOUS LOCATION)
0701 31-DEC-2029 1 (SAME AS PREVIOUS LOCATION)
0702 30-MAY-2030 NSWC SCORE
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
0703 30-MAY-2030 1 (SAME AS PREVIOUS LOCATION)
0704 29-DEC-2028 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0801 28-MAY-2032 1 (SAME AS PREVIOUS LOCATION)
0802 28-MAY-2032 1 NSWC SCORE
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
0803 29-MAY-2031 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0804 30-MAY-2031 NSWC SCORE
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
0805 30-MAY-2031 1 (SAME AS PREVIOUS LOCATION)
0806 31-DEC-2029 1 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PATUXENT RIVER MD 20670-1547
(240) 298-6279
0901 28-MAY-2032 NSWC SCORE
NSWC SCORE
BLDG 1479 F RD WEST
NAVAL BASE CORONADO
SAN DIEGO CA 92135
619-313-2371
0902 28-MAY-2032 1 (SAME AS PREVIOUS LOCATION)
0903 30-MAY-2031 NAVAL AIR SYSTEMS COMMAND
47123 BUSE ROAD,
BUILDING 2272 SUITE 345
PA…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .