USWTR Inc. II & III RFP.pdf

PDF 1 MB Posted

Attached to
RFP Amendment - Undersea Warfare Training Range(USWTR) Increment II & III Federal contract opportunity
Solicitation number
N6134021R0006
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document provides details regarding a solicitation for the redevelopment and modernization of four deep water undersea warfare training ranges and the addition of two shallow water ranges. The solicitation seeks to upgrade the Barking Sands Tactical Underwater Range, Barking Sands Undersea Range Expansion, Atlantic Undersea Test and Evaluation Center, and Southern California Anti-Submarine Offshore Range. It will also develop new shallow water ranges at Tanner/Cortes Bank and near San Clemente Island in California. The Naval Air Warfare Center Training Systems Division is the issuing agency. The anticipated award date is June 1, 2021 under NAICS code 334511 and a size standard of 1,250 employees. The document provides contact information for the procuring contracting officer and contract specialist for any questions.

View the file

Other files for this federal contract opportunity

Other files attached to RFP Amendment - Undersea Warfare Training Range(USWTR) Increment II & III, newest first.
File Type Posted
USWTR Inc II III RFP Questions (Updated 12212020).xlsx XLSX spreadsheet
USWTR Inc II III RFP Questions (Updated 12152020).xlsx XLSX spreadsheet
USWTR Inc II III RFP Questions.xlsx XLSX spreadsheet
J-6-GFI-List (Updated 12082020).xlsx XLSX spreadsheet
L-4-Vol3-CE-Tables.xlsx XLSX spreadsheet
RFP Amendment - USWTR Inc. II & III.docx DOCX document
J-1-SOW (Updated 12082020).docx DOCX document
ExhibitA-DD1423.pdf PDF
DD1423_Addendum.docx DOCX document
J-4-DD_254.pdf PDF
J-6-GFI-List.xlsx XLSX spreadsheet
L-5-Vol4-PrimeCostPrice.xlsx XLSX spreadsheet
J-5-GFP.docx DOCX document
USWTR Inc. II&III Virtual Pre Sol Attendance 29 Sept 2020.pdf PDF
J-1-SOW.docx DOCX document
L-2-Vol1-CA-Tables.xlsx XLSX spreadsheet
L-4-Vol3-CE-Tables.xlsx XLSX spreadsheet
L-B-DD2345.pdf PDF
USWTR Inc II III PSC Questions Final.pdf PDF
L-1-Vol1-SBPCD.docx DOCX document
L-6-Vol4-CPFF.xlsx XLSX spreadsheet
L-A-GFIandNDA.docx DOCX document
L-3-Vol2-CRM.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 04:00 PM local t ime 07 Jan 2021

X

A X B X C X D

EX

X

G F 89 - 105

106 - 126 X H 127 - 133

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 133

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N61340 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 0 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

See Section L conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 21

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

22 - 26 27 - 28

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

29 - 33

34 - 42 X K REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 43 - 48 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 49 - 56 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

57 - 87

PART II - CO NTRACT CLAUSES

NAWCTSD PROCUREMENT GROUP

12211 SCIENCE DRIVE

ORLANDO FL 32826-3224

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

27 Oct 2020

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N6134021R0006

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each Technical Review - Contract Year 1

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications FOB: Destination

NET AMT

0002 1 Each Data

FFP

Data per Exhibit "A" Contract Data Requirements List. See Clause C10 for Data Item Number applicability to CLINs. NOT- SEPARATELY-PRICED

0101 1 Each OPTION Production and Installation Engineering

FFP

In accordance with Attachment 1, Statement of Work, Tasks C, E and F and Attachment 3, Performance Specification

0102 1 Each OPTION BARSTUR Internode Cable

FFP

In accordance with Attachment 1, Statement of Work, Tasks G and H and and Attachment 3, Performance Specification

0103 1 Each OPTION AUTEC Cable

FFP

In accordance with Attachment 1, Statement of Work, Tasks J and K and Attachment 3, Performance Specification

0104 1 Each OPTION BSURE Cable

FFP

In accordance with Attachment 1, Statement of Work, Task L and Attachment 3, Performance Specification

0105 1 Each OPTION AUTEC Production and Installation

FFP

In accordance with Attachment 1, Statement of Work, Task D and Attachment 3, Performance Specification

0106 1 Each OPTION Technical Review - Contract Year 2

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0201 1 Each OPTION BARSTUR Procurement, Production and Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks M and N and Attachment 3, Performance Specification

0202 1 Each OPTION BARSTUR Provisioned Items

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification

0203 1 Each OPTION AUTEC Procurement, Production, & Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks P and Q and Attachment 3, Performance Specification

0204 1 Each OPTION AUTEC Provisioned Items

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification

0205 1 Each OPTION BSURE Procurement, Production, & Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks R and S and Attachment 3, Performance Specification

0206 1 Each OPTION BSURE Provisioned Items

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification

0207 1 Each OPTION Technical Review - Contract Year 3

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0301 Each OPTION BARSTUR IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks T, U and V and Attachment 3, Performance Specification

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

0302 1 Each OPTION BARSTUR Training and BSURE Training

FFP

In accordance with Attachment 1, Statement of Work, Task W and Attachment 3, Performance Specification

0303 Each OPTION AUTEC IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks Y, Z and AA and Attachment 3, Performance Specification

0304 1 Each OPTION AUTEC Training

FFP

In accordance with Attachment 1, Statement of Work, Task BB and Attachment 3, Performance Specification

0305 Each OPTION BSURE IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks DD, EE, FF and Attachment 3, Performance Specification

0306 1 Each OPTION Technical Review - Contract Year 4

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0401 Each OPTION BARTUR/BSURE 1 year tech. suppt.

FFP

In accordance with Attachment 1, Statement of Work, Tasks GG and Attachment 3, Performance Specification

0402 Each OPTION AUTEC 1 year tech. suppt.

FFP

In accordance with Attachment 1, Statement of Work, Tasks HH and Attachment 3, Performance Specification

0403 1 Each OPTION Production Engineering & Verification

FFP

In accordance with Attachment 1, Statement of Work, Tasks JJ and KK and Attachment 2, Performance Specification

0404 1 Each OPTION Tanner Bank Production Internode Cable

FFP

In accordance with Attachment 1, Statement of Work, Task LL and Attachment 2, Performance Specification

0405 1 Each OPTION San Clemente Island Production Cable

FFP

In accordance with Attachment 1, Statement of Work, Task MM and Attachment 2, Performance Specification

0406 1 Each OPTION Technical Review - Contract Year 5

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0501 1 Each OPTION TB/SCI Procurement, Production and Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks NN, PP and QQ and Attachment 2, Performance Specification

0502 1 Each OPTION Tanner Bank Provisioned Items

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 2, Performance Specification

0503 1 Each OPTION Technical Review - Contract Year 6

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0601 1 Each OPTION SCI Procurement, Production & Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks RR and SS and Attachment 2, Performance Specification

0602 1 Each OPTION SCI Provisioned Item Ordering

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 2, Performance Specification

0603 1 Each OPTION SOAR Production Cable

FFP

In accordance with Attachment 1, Statement of Work, Task TT and Attachment 3, Performance Specification

0604 1 Each OPTION Technical Review - Contract Year 7

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0701 1 Each OPTION SOAR Production Engineering Technical

FFP

In accordance with Attachment 1, Statement of Work, Task UU and Attachment 3, Performance Specification

0702 Each OPTION Tanner Bank IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks VV, WW, and XX and Attachment 2, Performance Specification

0703 1 Each OPTION Tanner Bank SWTR Training

FFP

In accordance with Attachment 1, Statement of Work, Task YY and Attachment 2, Performance Specification

0704 1 Each OPTION Technical Review - Contract Year 8

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0801 1 Each OPTION SOAR Procurement, Production and Test

FFP

In accordance with Attachment 1, Statement of Work, Tasks AAA and BBB and Attachment 3, Performance Specification

0802 1 Each OPTION SOAR Provisioned Items

FFP

Provisioned Item Ordering Per Clause 5252.217-9500 & 5252.217-9506 and Attachment 3, Performance Specification

0803 Each OPTION TB 1 year tech. suppt.

FFP

In accordance with Attachment 1, Statement of Work, Task CCC and Attachment 2, Performance Specification

0804 Each OPTION SCI IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks DDD, EEE and FFF and Attachment 2, Performance Specification

0805 1 Each OPTION SCI SWTR Training

FFP

In accordance with Attachment 1, Statement of Work, Task GGG and Attachment 2, Performance Specification

0806 1 Each OPTION Technical Review - Contract Year 9

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

0901 Each OPTION SOAR IWS Install and Test

CPFF

In accordance with Attachment 1, Statement of Work, Tasks JJJ, KKK and LLL and Attachment 3, Performance Specification

0902 1 Each OPTION SOAR Training

FFP

In accordance with Attachment 1, Statement of Work, Task MMM and Attachment 3, Performance Specification

0903 Each OPTION SOAR 1 year tech. suppt.

FFP

In accordance with Attachment 1, Statement of Work, Task PPP and Attachment 3, Performance Specification

0904 Each OPTION SCI 1 year tech. suppt.

FFP

In accordance with Attachment 1, Statement of Work, Tasks QQQ and Attachment 2, Performance Specification

0905 1 Each OPTION Technical Review - Contract Year 10

FFP

In accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications

Section C - Descriptions and Specifications

CLIN DESCRIPTION

C1. CLINs 0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806 and 0905 The contractor shall perform all duties and functions necessary for the Technical Program Management and System Engineering phases of USWTR Increment II and III in accordance with Attachment 1, Statement of Work, Tasks A and B and Attachments 2 and 3, Performance Specifications.

C2. CLIN 0002

The contractor shall furnish all data in accordance with the attached Contract Data Requirements List (CDRL). All data requirements shall be traceable to specific tasks in accordance with the SOW and Exhibits listed in Section J.

C3. CLIN 0101

The contractor shall furnish the deliverables and supplies necessary for the Barking Sands Tactical Underwater Range (BARSTUR) and Barking Sands Undersea Range Expansion (BSURE) Production and Installation Engineering, Deep Water Production Engineering Verification and Southern California Offshore Anti-Submarine Range (SOAR) Production and Installation Engineering phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks C, E and F and Attachment 3, Performance Specification.

C4. CLIN 0102

The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Trunk Cable and BARSTUR Internode Cable phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks G and H and Attachment 3, Performance Specification.

C5. CLIN 0103

The contractor shall furnish the deliverables and supplies necessary for the AUTEC Trunk Cable and AUTEC Internode Cable phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks J and K and Attachment 3, Performance Specification.

C6. CLIN 0104

The contractor shall furnish the deliverables and supplies necessary for the BSURE Internode Cable phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task L and Attachment 3, Performance Specification.

C7. CLIN 0105

The contractor shall furnish the deliverables and supplies necessary for the Atlantic Undersea Test and Evaluation Center (AUTEC) Production and Installation Engineering phase of ASRP in accordance with Attachment 1, Statement of Work, Task D and Attachment 3, Performance Specification.

C8. CLIN 0201

The contractor shall furnish the deliverables and supplies necessary for the BARSTUR Procurement, Production and Test Cable Terminations and BARSTUR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks M and N and Attachment 3, Performance Specification.

C9. CLINs 0202, 0204, 0206, 0502, 0602 and 0802 Items provided under this CLIN will be defined prior to option exercise. The contractor shall deliver Provisioned Items Orders issued pursuant to Section H, NAVAIR clause 5252.217-9500 and 5252.217-9506 and Attachments 2 and 3, Performance Specifications.

C10. CLIN 0203

The contractor shall furnish the deliverables and supplies necessary for the AUTEC Procurement, Production and Test Cable Terminations and AUTEC Procurement, Production and Test In-Water Subsystem phases of AUTEC Sensor Replacement Program (ASRP) in accordance with Attachment 1, Statement of Work, Tasks P and Q and Attachment 3, Performance Specification.

C11. CLIN 0205

The contractor shall furnish the deliverables and supplies necessary for the BSURE Procurement, Production and Test Cable Terminations and BSURE Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks R and S and Attachment 3, Performance Specification.

C12. CLIN 0301

The contractor shall perform all duties and functions necessary for the BARSTUR Installation, BARSTUR Installation Tests and BARSTUR Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks T, U and V and Attachment 3, Performance Specification.

C13. CLIN 0302

The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Training phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task W and Attachment 3, Performance Specification.

C14. CLIN 0303

The contractor shall perform all duties and functions necessary for the AUTEC Installation, AUTEC Installation Tests and AUTEC Post Installation Test phases of ASRP in accordance with Attachment 1, Statement of Work, Tasks Y, Z and AA and Attachment 3, Performance Specification.

C15. CLIN 0304

The contractor shall furnish the deliverables and supplies necessary for the AUTEC Training phase of ASRP in accordance with Attachment 1, Statement of Work, Task BB and Attachment 3, Performance Specification.

C16. CLIN 0305

The contractor shall perform all duties and functions necessary for the BSURE Installation, BSURE Installation Tests and BSURE Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks DD, EE and FF and Attachment 3, Performance Specification.

C17. CLIN 0401

The contractor shall furnish the deliverables and supplies necessary for the BARSTUR and BSURE Corrective Maintenance (1-year technical support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task GG and Attachment 3, Performance Specification.

C18. CLIN 0402

The contractor shall furnish the deliverables and supplies necessary for the AUTEC Corrective Maintenance (1 Year Technical Support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task HH and Attachment 3, Performance Specification.

C19. CLIN 0403

The contractor shall furnish the deliverables and supplies necessary for the West Coast Shallow Water Training Range (WC-SWTR) Production and Installation Engineering and Shallow Water Production Engineering Verification phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks JJ and KK and Attachment 2, Performance Specification.

C20. CLIN 0404

The contractor shall furnish the deliverables and supplies necessary for the Tanner Bank Shallow Water Training Range (TB SWTR) Internode Cable phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task LL and Attachment 2, Performance Specification.

C21. CLIN 0405

The contractor shall furnish the deliverables and supplies necessary for the San Clemente Island Shallow Water Training Range (SCI SWTR) Internode Cable phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task MM and Attachment 2, Performance Specification.

C22. CLIN 0501

The contractor shall furnish the deliverables and supplies necessary for the WC SWTR Trunk Cables, TB SWTR Procurement, Production and Test Cable Termination and TB SWTR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks NN, PP and QQ and Attachment 2, Performance Specification.

C23. CLIN 0601

The contractor shall furnish the deliverables and supplies necessary for the SCI SWTR Procurement, Production and Test Cable Terminations and SCI SWTR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks RR and SS and Attachment 2, Performance Specification.

C24. CLIN 0603

The contractor shall furnish the deliverables and supplies necessary for the SOAR Trunk and Internode Cable phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task TT and Attachment 3, Performance Specification.

C25. CLIN 0701

The contractor shall furnish the deliverables and supplies necessary for the SOAR Production and Installation Engineering Technical Review phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task UU and Attachment 3, Performance Specification.

C26. CLIN 0702

The contractor shall perform all duties and functions necessary for the TB SWTR Installation, TB SWTR Installation Tests and TB SWTR Post Installation Test phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks VV, WW and XX and Attachment 2, Performance Specification.

C27. CLIN 0703

The contractor shall furnish the deliverables and supplies necessary for the TB SWTR Training phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task YY and Attachment 2, Performance Specification.

C28. CLIN 0801

The contractor shall furnish the deliverables and supplies necessary for the SOAR Procurement, Production and Test Cable Terminations and SOAR Procurement, Production and Test In-Water Subsystem phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks AAA and BBB and Attachment 3, Performance Specification.

C29. CLIN 0803

The contractor shall furnish the deliverables and supplies necessary for the TB SWTR Corrective Maintenance (1-year technical support) phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task CCC and Attachment 2, Performance Specification.

C30. CLIN 0804

The contractor shall perform all duties and functions necessary for the SCI SWTR Installation, SCI SWTR Installation Tests and SCI SWTR Post Installation Test phases of USWTR Increment II in accordance with Attachment 1, Statement of Work, Tasks DDD, EEE and FFF and Attachment 2, Performance Specification.

C31. CLIN 0805

The contractor shall furnish the deliverables and supplies necessary for the SCI SWTR Training phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task GGG and Attachment 2, Performance Specification.

C32. CLIN 0901

The contractor shall perform all duties and functions necessary for the SOAR Installation, SOAR Installation Tests and SOAR Post Installation Test phases of USWTR Increment III in accordance with Attachment 1, Statement of Work, Tasks JJJ, KKK and LLL and Attachment 3, Performance Specification.

C33. CLIN 0902

The contractor shall furnish the deliverables and supplies necessary for the SOAR Training phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task MMM and Attachment 3, Performance Specification.

C34. CLIN 0903

The contractor shall perform all duties and functions necessary for the SOAR Corrective Maintenance (1-year technical support) phase of USWTR Increment III in accordance with Attachment 1, Statement of Work, Task PPP and Attachment 3, Performance Specification.

C35. CLIN 0904

The contractor shall perform all duties and functions necessary for the SCI SWTR Corrective Maintenance (1-year technical support) phase of USWTR Increment II in accordance with Attachment 1, Statement of Work, Task QQQ and Attachment 2, Performance Specification.

CLAUSES INCORPORATED BY REFERENCE

52.242-17 Government Delay Of Work APR 1984

CLAUSES INCORPORATED BY FULL TEXT

5252.211-9509 INCORPORATION OF THE CONTRACTOR'S TECHNICAL PROPOSAL

(NAVAIR)(OCT 2005)

The Contractor's Technical Proposal Number [Enter technical proposal number], dated [Enter document date], and any amendments/addendums thereof, is incorporated herein by reference, unless otherwise specified, with the same force and effect as if set forth in full text. Nothing in the Contractor's proposal shall constitute a waiver of any of the provisions of the contract, including the Statement(s) of Work and Specification. For purposes of FAR Clause 52.215-8, “Order of Precedence”, the Contractor's technical proposal shall be considered a "Specification" but the Government's Specification shall take precedence over the Contractor's technical proposal.

Section D - Packaging and Marking

D1 D1. All clauses within this section apply to each CLIN unless otherwise stated.

5252.247-9502 UNPACKING INSTRUCTIONS: COMPLEX OR DELICATE EQUIPMENT (NAVAIR)

(OCT 1994)

(a) Location on Container. When practical, one set of the unpacking instructions will be placed in a heavy water-proof envelope prominently marked "UNPACKING INFORMATION" and firmly affixed to the outside of the shipping container in a protected location, preferably between the cleats on the end of the container adjacent to the identification marking. If the instructions cover a set of equipment packed in multiple containers, the instructions will be affixed to the number one container of the set. When the unpacking instructions are too voluminous to be affixed to the exterior of the container, they will be placed inside and directions for locating them will be provided in the envelope marked "UNPACKING INFORMATION".

(b) Marking Containers. When unpacking instructions are provided, shipping containers will be stenciled

"CAUTION - THIS EQUIPMENT MAY BE SERIOUSLY DAMAGED UNLESS UNPACKING

INSTRUCTIONS ARE CAREFULLY FOLLOWED. UNPACKING INSTRUCTIONS ARE LOCATED (state where located)." When practical, this marking will be applied adjacent to the identification marking on the side of the container.

(c) Marking. All shipping containers will be marked in accordance with [specify commercial or approved military standard that applies].

5252.247-9507 PACKAGING AND MARKING OF REPORTS (NAVAIR)(OCT 2005)

(a) All unclassified data shall be prepared for shipment in accordance with best commercial practice. Classified reports, data and documentation, if any, shall be prepared for shipment in accordance with the National Industry Security Program Operating Manual, DoD 5220.22-M.

(b) The contractor shall prominently display on the cover of each report the following information:

(1) Name and business address of contractor.

(2) Contract Number/Delivery/Task order number.

(3) Contract/Delivery/Task order dollar amount.

(4) Whether the contract was competitively or non-competitively awarded.

(5) Name of sponsoring individual.

(6) Name and address of requiring activity.

5252.247-9508 PROHIBITION AND LIMITATIONS FOR PACKAGING MATERIALS

(NAVAIR) (AUG 2019)

The use of loose fill materials, asbestos, excelsior, newspaper and shredded paper (all types) are prohibited. In addition, all Wood Packaging Materials (WPM) shall be heat treated or chemically treated in accordance with the requirements of the International Standards for Phytosanitary Measures (ISPM) 15:2009, "Regulation of Wood Packaging Material in International Trade."

Section E - Inspection and Acceptance

E1 E.1 All clauses within this section apply to each CLIN unless otherwise stated.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0101 Destination Government Destination Government 0102 Destination Government Destination Government 0103 Origin Government Destination Government 0104 Origin Government Destination Government 0105 Destination Government Destination Government 0106 Destination Government Destination Government 0201 Destination Government Destination Government 0202 Destination Government Destination Government 0203 Destination Government Destination Government 0204 Destination Government Destination Government 0205 Destination Government Destination Government 0206 Destination Government Destination Government 0207 Destination Government Destination Government 0301 Destination Government Destination Government 0302 Destination Government Destination Government 0303 Destination Government Destination Government 0304 Destination Government Destination Government 0305 Destination Government Destination Government 0306 Destination Government Destination Government 0401 Destination Government Destination Government 0402 Destination Government Destination Government 0403 Destination Government Destination Government 0404 Origin Government Destination Government 0405 Origin Government Destination Government 0406 Destination Government Destination Government 0501 Destination Government Destination Government 0502 Destination Government Destination Government 0503 Destination Government Destination Government 0601 Destination Government Destination Government 0602 Destination Government Destination Government 0603 Origin Government Destination Government 0604 Destination Government Destination Government 0701 Destination Government Destination Government 0702 Destination Government Destination Government 0703 Destination Government Destination Government 0704 Destination Government Destination Government 0801 Destination Government Destination Government

0802 Destination Government Destination Government 0803 Destination Government Destination Government 0804 Destination Government Destination Government 0805 Destination Government Destination Government 0806 Destination Government Destination Government 0901 Destination Government Destination Government 0902 Destination Government Destination Government 0903 Destination Government Destination Government 0904 Destination Government Destination Government 0905 Destination Government Destination Government

52.246-4 Inspection Of Services--Fixed Price AUG 1996 Applicable CLINs:

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0903, 0904, 0905

52.246-5 Inspection Of Services Cost-Reimbursement APR 1984 Applicable CLINs:

0301, 0303, 0305, 0702, 0804, 0901

52.246-16 Responsibility For Supplies APR 1984

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)

(a) Definition. "Supplies," as used in this clause, includes but is not limited to raw materials, components, intermediate assemblies, end products, and lots of supplies.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering supplies under this contract and shall tender to the Government for acceptance only supplies that have been inspected in accordance with the inspection system and have been found by the Contractor to be in conformity with contract requirements. As part of the system, the Contractor shall prepare records evidencing all inspections made under the system and the outcome. These records shall be kept complete and made available to the Government during contract performance and for as long afterwards as the contract requires. The Government may perform reviews and evaluations as reasonably necessary to ascertain compliance with this paragraph. These reviews and evaluations shall be conducted in a manner that will not unduly delay the contract work. The right of review, whether exercised or not, does not relieve the Contractor of the obligations under the contract.

(c) The Government has the right to inspect and test all supplies called for by the contract, to the extent practicable, at all places and times, including the period of manufacture, and in any event before acceptance. The Government shall perform inspections and tests in a manner that will not unduly delay the work. The Government assumes no contractual obligation to perform any inspection and test for the benefit of the Contractor unless specifically set forth elsewhere in this contract.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties. Except as otherwise provided in the contract, the Government shall bear the expense of Government inspections or tests made at other than the Contractor's or subcontractor's premises; provided, that in case of rejection, the Government shall not be liable for any reduction in the value of inspection or test samples.

(e)(1) When supplies are not ready at the time specified by the Contractor for inspection or test, the Contracting Officer may charge to the Contractor the additional cost of inspection or test.

(2) The Contracting Officer may also charge the Contractor for any additional cost of inspection or test when prior rejection makes reinspection or retest necessary.

(f) The Government has the right either to reject or to require correction of nonconforming supplies. Supplies are nonconforming when they are defective in material or workmanship or are otherwise not in conformity with contract requirements. The Government may reject nonconforming supplies with or without disposition instructions.

(g) The Contractor shall remove supplies rejected or required to be corrected. However, the Contracting Officer may require or permit correction in place, promptly after notice, by and at the expense of the Contractor. The Contractor shall not tender for acceptance corrected or rejected supplies without disclosing the former rejection or requirement for correction, and, when required, shall disclose the corrective action taken.

(h) If the Contractor fails to promptly remove, replace, or correct rejected supplies that are required to be removed or to be replaced or corrected, the Government may either (1) by contract or otherwise, remove, replace, or correct the supplies and charge the cost to the Contractor or (2) terminate the contract for default. Unless the Contractor corrects or replaces the supplies within the delivery schedule, the Contracting Officer may require their delivery and make an equitable price reduction. Failure to agree to a price reduction shall be a dispute.

(i)(1) If this contract provides for the performance of Government quality assurance at source, and if requested by the Government, the Contractor shall furnish advance notification of the time (i) when Contractor inspection or tests will be performed in accordance with the terms and conditions of the contract and (ii) when the supplies will be ready for Government inspection.

(2) The Government's request shall specify the period and method of the advance notification and the Government representative to whom it shall be furnished. Requests shall not require more than 2 workdays of advance notification if the Government representative is in residence in the Contractor's plant, nor more than 7 workdays in other instances.

(j) The Government shall accept or reject supplies as promptly as practicable after delivery, unless otherwise provided in the contract. Government failure to inspect and accept or reject the supplies shall not relieve the Contractor from responsibility, nor impose liability on the Government, for nonconforming supplies.

(k) Inspections and tests by the Government do not relieve the Contractor of responsibility for defects or other failures to meet contract requirements discovered before acceptance. Acceptance shall be conclusive, except for latent defects, fraud, gross mistakes amounting to fraud, or as otherwise provided in the contract.

(l) If acceptance is not conclusive for any of the reasons in paragraph (k) hereof, the Government, in addition to any other rights and remedies provided by law, or under other provisions of this contract, shall have the right to require the Contractor (1) at no increase in contract price, to correct or replace the defective or nonconforming supplies at the original point of delivery or at the Contractor's plant at the Contracting Officer's election, and in accordance with a reasonable delivery schedule as may be agreed upon between the Contractor and the Contracting Officer; provided, that the Contracting Officer may require a reduction in contract price if the Contractor fails to meet such delivery schedule, or (2) within a reasonable time after receipt by the Contractor of notice of defects or nonconformance, to repay such portion of the contract as is equitable under the circumstances if the Contracting Officer elects not to require correction or replacement. When supplies are returned to the Contractor, the Contractor shall bear the transportation cost from the original point of delivery to the Contractor's plant and return to the original point when that point is not the Contractor's plant. If the Contractor fails to perform or act as required in (1) or (2) above and does not cure such failure within a period of 10 days (or such longer period as the Contracting Officer may authorize in writing) after receipt of notice from the Contracting Officer specifying such failure, the Government shall have the right by contract or otherwise to replace or correct such supplies and charge to the Contractor the cost occasioned the Government thereby.

Applicable CLINs: 0002, 0101, 0102, 0103, 0104, 0105, 0201, 0203, 0205, 0302, 0304, 0403, 0404, 0405, 0501, 0601, 0603, 0701, 0703, 0801, 0805, 0902

52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard selected below.

ISO 9001:2015 Quality Management Systems

Or

AS9100D Quality Management Systems

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph

(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require-- (i) Control of such things as design, work operations, in-process control, testing, and inspection; or (ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)

(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by:

BARTSUR, BSURE, TB SWTR, SCI SWTR, SOAR

Charles Terry Jr.

47123 Buse Road, Building 2272 Suite 345 Patuxent River MD 20670-1547

(240) 298-6279

AUTEC

Russell A. Racette 1176 Howell Street Newport RI 02841-5047

(401) 832-5824

The effort is for the procurement of 6 underwater ranges. It is the Government's intent to perform final inspection/acceptance of the completed ranges, training, technical support, and any delivered provisioned items as outlined below:

BARSTUR: CLINS 0202, 0301, 0302, 0401

BSURE: 0206, 0302, 0305, 0401

AUTEC: 0204, 0303, 0304, 0402

TB SWTR: 0502, 0702, 0703, 0803

SCI SWTR: 0602, 0804, 0805, 0904

SOAR: 0801, 0802, 0901, 0902, 0903

The items associated with the remaining CLINS are intended to be consumed in the performance of the overall effort. Inspection/acceptance of these remaining CLINS will be performed on the associated deliverables outlined in the "Deliverables" portion of the Statement of Work of the task described in Section C "CLIN DESCRIPTION".

(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements.

5252.246-9513 INSPECTION AND ACCEPTANCE OF TRAINING DEVICES (NAVAIR) (OCT 2007)

Inspection of the following training devices: Barking Sands Tactical Underwater Range (BARSTUR), Barking Sands Undersea Range Expansion (BSURE), Atlantic Undersea Test andEvaluation Center (AUTEC), Southern California Anti-Submarine Warfare Range (SOAR), Tanner Bank Shallow Water Training Range (TB SWTR) and the San Clemente Island Shallow Water Training Range (SCI SWTR) shall be accomplished in accordance with the Specification/Statement of Work entitled [Undersea Warfare Training Range (USWTR) Increment II and III In-Water Subsystem (IWS) and Atlantic Undersea Test and Evaluation Center (AUTEC) Sensor Replacement Program (ASRP) Statement of Work Solicitation Number N61340-21-R-0006 USWTR Increments II and III and ASRP Revision 2], dated [15 October 2020], and the Government approved Contract Data Requirements List (CDRL), DD Form 1423, data item entitled Test Procedures and Test/Inspection Reports (TP and TIR). Any Government inspection/acceptance to be conducted in the contractor's facility, will be performed by the Administrative Contracting Officer's quality assurance representative with support of [NUWC] technical personnel.

Final inspection to be performed at the device delivery site will be directed and witnessed by the technical representative of the Procuring Contracting Officer (PCO). Final acceptance of this Contract Line Item will be evidenced by signature of the PCO or his duly authorized representative on a DD Form 250, Material Inspection and Receiving Report.

5252.246-9514 INSPECTION AND ACCEPTANCE OF TECHNICAL DATA AND INFORMATION

(NAVAIR)(FEB 1995)

Inspection and acceptance of technical data and information will be performed by the Procuring Contracting Officer (PCO) or his duly authorized representative. Inspection of technical data and information will be performed by ensuring successful completion of the requirements set forth in the DD Form 1423, Contract Data Requirements List (CDRL) and incorporation/resolution of Government review comments on the data items. Acceptance will be evidenced by execution of an unconditional DD Form 250, Material Inspection and Receiving Report, as appropriate, and/or upon receipt of a second endorsement acceptance by the PCO on the attachment to this contract entitled [NAWCTSD 4330/60 Data Item Transmittal/Acceptance/ Rejection Form]. The attached form will not be used for high cost data such as drawings, specifications, and technical manuals.

5252.246-9517 CONSTRUCTIVE ACCEPTANCE PERIOD (NAVAIR) (MAR 1999)

For the purpose of FAR Clause 52.232-25, "Prompt Payment", paragraph (a)(5)(i), Government acceptance shall be deemed to have occurred constructively on the 60th day after the contractor delivered the supplies or performed the services.

Section F - Deliveries or Performance

TIME OF DELIVERY

(a) The Government requires performance and or delivery to be complete in accordance with the schedule below in order to receive payment:

REQUIRED DELIVERY SCHEDULE

CLIN #

QUANTITY

TIME OF DELIVERY AND/OR

PERFORMANCE

EXERCISE BY

0001 1 Award through 31 December 2021 Date of Award 0002 1 Award through 28 June 2032 Date of Award 0101 1 From option exercise through 31 December 2023 2022 JAN 01 0102 1 From option exercise through 31 December 2023 2022 JUNE 30 0103 1 From option exercise through 31 December 2023 2022 JUNE 30 0104 1 From option exercise through 31 December 2023 2022 JUNE 30 0105 1 From option exercise through 31 December 2023 2022 JAN 01 0106 1 From option exercise through 31 December 2022 2022 JAN 01 0201 1 From option exercise through 30 May 2026 2023 JAN 01 0202 1 From option exercise through 30 May 2026 2023 JAN 01 0203 1 From option exercise through 30 May 2026 2023 JAN 01 0204 1 From option exercise through 30 May 2026 2023 JAN 01 0205 1 From option exercise through 30 May 2026 2023 JAN 01 0206 1 From option exercise through 30 May 2026 2023 JAN 01 0207 1 From option exercise through 31 December 2023 2023 JAN 01 0301 1 From option exercise through 30 May 2026 2024 JAN 01 0302 1 From option exercise through 30 May 2026 2024 JAN 01 0303 1 From option exercise through 30 May 2026 2024 JAN 01 0304 1 From option exercise through 30 May 2026 2024 JAN 01 0305 1 From option exercise through 30 May 2026 2024 JAN 01 0306 1 From option exercise through 31 December 2025 2024 JAN 01 0401 1 From option exercise through 1 September 2026 2025 SEPT 01 0402 1 From option exercise through 1 September 2026 2025 SEPT 01 0403 1 From option exercise through 31 December 2026 2025 JAN 01 0404 1 From option exercise through 31 December 2026 2025 JAN 01 0405 1 From option exercise through 31 December 2026 2025 JAN 01 0406 1 From option exercise through 31 December 2025 2025 JAN 01 0501 1 From option exercise through 30 May 2030 2026 JAN 01

0502 1 From option exercise through 30 May 2030 2026 JAN 01

0503 1 From option exercise through 31 December 2026 2026 JAN 01

0601 1 From option exercise through 30 May 2031 2027 JAN 01

0602 1 From option exercise through 30 May 2031 2027 JAN 01

0603 1 From option exercise through 30 December 2028 2027 JAN 01

0604 1 From option exercise through 31 December 2027 2027 JAN 01 0701 1 From option exercise through 31 December 2029 2028 JAN 01 0702 1 From option exercise through 30 May 2030 2028 JAN 01 0703 1 From option exercise through 30 May 2030 2028 JAN 01 0704 1 From option exercise through 31 December 2028 2028 JAN 01 0801 1 From option exercise through 30 May 2032 2029 JAN 01 0802 1 From option exercise through 30 May 2032 2029 JAN 01 0803 1 From option exercise through 29 May 2031 2029 MAY 30 0804 1 From option exercise through 31 May 2031 2029 JAN 01 0805 1 From option exercise through 31 May 2031 2029 JAN 01 0806 1 From option exercise through 31 December 2029 2029 JAN 01 0901 1 From option exercise through 30 May 2032 2030 JAN 01 0902 1 From option exercise through 30 May 2032 2030 JAN 01 0903 1 From option exercise through May 30 May 2031 2030 MAY 30 0904 1 From option exercise through 30 May 2031 2030 MAY 31 0905 1 From option exercise through 31 December 2031 2030 JAN 01

(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award adding (i) five days for delivery of the award through the ordinary mails, or (ii) one working day if the solicitation states that the contract or notice of award will be transmitted electronically.

(The term “working day” excludes weekends and U.S. Federal holidays. If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered nonresponsive and rejected

F1 F1. All clauses within this section apply to each CLIN unless otherwise stated.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 31-DEC-2021 1 NAVAL AIR SYSTEMS COMMAND

CHARLES TERRY JR.

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

N00421

0002 28-JUN-2032 1 (SAME AS PREVIOUS LOCATION)

0101 29-DEC-2023 1 (SAME AS PREVIOUS LOCATION)

0102 29-DEC-2023 1 (SAME AS PREVIOUS LOCATION)

0103 29-DEC-2023 1 NAVAL UNDERSEA WARFARE CENTER

(NUWC)

RUSSELL A. RACETTE

1176 HOWELL STREET

NEWPORT RI 02841-5047

(401) 832-5824

N66604

0104 29-DEC-2023 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0105 29-DEC-2023 1 NAVAL UNDERSEA WARFARE CENTER

RUSSELL A. RACETTE

1176 HOWELL STREET

NEWPORT RI 02841-5047

(401) 832-5824

0106 30-DEC-2022 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0201 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)

0202 29-MAY-2026 1 PACIFIC MISSILE RANGE FACILITY

JON WINSLEY

MILE MARKER 30 KAUMUALII HWY

KEKAHA HI 96752

808 335 4343

N0534A

0203 29-MAY-2026 1 NAVAL UNDERSEA WARFARE CENTER

RUSSELL A. RACETTE

1176 HOWELL STREET

NEWPORT RI 02841-5047

(401) 832-5824

0204 29-MAY-2026 1 NUWC DET AUTEC

TOM BIDDULPH

COMMANDING OFFICE

NUWC DET AUTEC

ANDROS ISLAND

(561) 671 2606

N63821

0205 29-MAY-2026 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0206 29-MAY-2026 1 PACIFIC MISSILE RANGE FACILITY

MILE MARKER 30 KAUMUALII HWY

KEKAHA HI 96752

808 335 4343

0207 29-DEC-2023 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0301 29-MAY-2026 PACIFIC MISSILE RANGE FACILITY

MILE MARKER 30 KAUMUALII HWY

KEKAHA HI 96752

808 335 4343

0302 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)

0303 29-MAY-2026 NUWC DET AUTEC

TOM BIDDULPH

COMMANDING OFFICE

NUWC DET AUTEC

ANDROS ISLAND

(561) 671 2606

0304 29-MAY-2026 1 (SAME AS PREVIOUS LOCATION)

0305 29-MAY-2026 PACIFIC MISSILE RANGE FACILITY

MILE MARKER 30 KAUMUALII HWY

KEKAHA HI 96752

808 335 4343

0306 31-DEC-2025 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0401 01-SEP-2026 (SAME AS PREVIOUS LOCATION)

0402 01-SEP-2026 NAVAL UNDERSEA WARFARE CENTER

RUSSELL A. RACETTE

1176 HOWELL STREET

NEWPORT RI 02841-5047

(401) 832-5824

0403 31-DEC-2026 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0404 31-DEC-2026 1 (SAME AS PREVIOUS LOCATION)

0405 31-DEC-2026 1 (SAME AS PREVIOUS LOCATION)

0406 31-DEC-2025 1 (SAME AS PREVIOUS LOCATION)

0501 30-MAY-2030 1 (SAME AS PREVIOUS LOCATION)

0502 30-MAY-2030 1 NSWC SCORE

JESSE SCHMIDTMANN

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

N4638A

0503 31-DEC-2026 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0601 30-MAY-2031 1 (SAME AS PREVIOUS LOCATION)

0602 30-MAY-2031 1 NSWC SCORE

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

0603 29-DEC-2028 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0604 31-DEC-2027 1 (SAME AS PREVIOUS LOCATION)

0701 31-DEC-2029 1 (SAME AS PREVIOUS LOCATION)

0702 30-MAY-2030 NSWC SCORE

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

0703 30-MAY-2030 1 (SAME AS PREVIOUS LOCATION)

0704 29-DEC-2028 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0801 28-MAY-2032 1 (SAME AS PREVIOUS LOCATION)

0802 28-MAY-2032 1 NSWC SCORE

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

0803 29-MAY-2031 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0804 30-MAY-2031 NSWC SCORE

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

0805 30-MAY-2031 1 (SAME AS PREVIOUS LOCATION)

0806 31-DEC-2029 1 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PATUXENT RIVER MD 20670-1547

(240) 298-6279

0901 28-MAY-2032 NSWC SCORE

NSWC SCORE

BLDG 1479 F RD WEST

NAVAL BASE CORONADO

SAN DIEGO CA 92135

619-313-2371

0902 28-MAY-2032 1 (SAME AS PREVIOUS LOCATION)

0903 30-MAY-2031 NAVAL AIR SYSTEMS COMMAND

47123 BUSE ROAD,

BUILDING 2272 SUITE 345

PA…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .