ExhibitA-DD1423.pdf

PDF 4 MB Posted

Attached to
RFP Amendment - Undersea Warfare Training Range(USWTR) Increment II & III Federal contract opportunity
Solicitation number
N6134021R0006
Issued by
Department of the Navy Naval Air Systems Command

About this file

This document provides details for a federal solicitation seeking proposals to redevelop and modernize six undersea warfare training ranges for the Department of the Navy. Products and services required include upgrades to four existing deep water ranges at Barking Sands Tactical Underwater Range, Barking Sands Undersea Range Expansion, and the Atlantic Undersea Test and Evaluation Center. Additionally, the solicitation requires development of two new shallow water ranges off the coast of California. The anticipated award date is June 1, 2021. The NAICS code is 334511 and the size standard is 1,250 employees. The solicitation advises interested small businesses on recent changes to the limitations on subcontracting clause. Questions should be directed to the named Contract Specialist.

View the file

Other files for this federal contract opportunity

Other files attached to RFP Amendment - Undersea Warfare Training Range(USWTR) Increment II & III, newest first.
File Type Posted
USWTR Inc II III RFP Questions (Updated 12212020).xlsx XLSX spreadsheet
USWTR Inc II III RFP Questions (Updated 12152020).xlsx XLSX spreadsheet
RFP Amendment - USWTR Inc. II & III.docx DOCX document
J-1-SOW (Updated 12082020).docx DOCX document
L-4-Vol3-CE-Tables.xlsx XLSX spreadsheet
USWTR Inc II III RFP Questions.xlsx XLSX spreadsheet
J-6-GFI-List (Updated 12082020).xlsx XLSX spreadsheet
J-1-SOW.docx DOCX document
L-2-Vol1-CA-Tables.xlsx XLSX spreadsheet
L-4-Vol3-CE-Tables.xlsx XLSX spreadsheet
L-B-DD2345.pdf PDF
USWTR Inc II III PSC Questions Final.pdf PDF
L-1-Vol1-SBPCD.docx DOCX document
L-6-Vol4-CPFF.xlsx XLSX spreadsheet
L-A-GFIandNDA.docx DOCX document
L-3-Vol2-CRM.xlsx XLSX spreadsheet
USWTR Inc. II & III RFP.pdf PDF
J-5-GFP.docx DOCX document
USWTR Inc. II&III Virtual Pre Sol Attendance 29 Sept 2020.pdf PDF
DD1423_Addendum.docx DOCX document
J-4-DD_254.pdf PDF
J-6-GFI-List.xlsx XLSX spreadsheet
L-5-Vol4-PrimeCostPrice.xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___MGMT_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM:

Management Plan

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-80004A

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 9: See CDRL addendum BLK 10: Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the management plan is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via tracked changes.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __1__ of _68 Pages

21 Oct 2020 lynn.o'quinn Inserted Text All documents signed 21 Oct 2020, digital signature also shows date in "Approved By" Block I.

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER____MGMT______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM:

Integrated Program Management Report

3. SUBTITLE

Integrated Master Schedule (IMS)

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-81861B

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMNT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT D See Block 16 See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A 0 N/A Reg Repro

16. REMARKS See Block 16 0 1 0

BLK 9: See CDRL addendum BLK 4: Only sections 2.4 (all subsections) and 2.5.2.2 (all subsections) of the DID DI- MGMT-81861B are applicable. Section 2.4.2.21 SRA is required on a semi-annual basis.

The IMS shall be created using Microsoft project and shall be delivered in digital format.

Earned Value Management is not required.

BLK 10: Monthly (estimate 12 per year) BLK 12: 10 days after end of the full first accounting period after contract award.

BLK 13: 10 days after each accounting period. The Government will review and make comments on the semi-annual SRA within 15 calendar days after receipt of data item.

Resubmissions shall be delivered 15 calendar days after receipt of Government comments.

BLK 14: Distribution/delivery shall be electronic format in Microsoft Project digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __2__ of _ 68 Pages

21 Oct 2020

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___MGMT_____X_________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006N61340-21-R-

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM:

Contractor’s Risk Management Plan

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-81808

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 9: See CDRL addendum BLK 10: Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the plan is identified by the contractor, an updated plan shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via tracked changes.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __3__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER____MGMT______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM:

Contract Status Report

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-81991

5. CONTRACT REFERENCE

SOW TASK 4.1.1, 5.0

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final N/A 0 See Block 16 Reg Repro

16. REMARKS See Block 16 0 1 0

BLK 9: See CDRL addendum BLK 4: Earned value cost reporting is not required.

BLK 10: Monthly (estimate 12 per year) BLK 12: 10 days after end of the full first accounting period after contract award.

BLK 13: 10 days after each accounting period.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __4__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER____FNCL_____X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A005

2. TITLE OF DATA ITEM:

Funds and Man-Hours Expenditure Report

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-FNCL-80331A

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

B See Block 16 b. COPIES

8. APP CODE SEE BLOCK 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final N/A 0 See Block 16 Reg Repro

16. REMARKS See Block 16 0 1 0

BLKs 2 and 4: format 1. Report all WBS elements at level 5 or higher identified in CWBS CDRL. Format 3 and 4, Enter periodic time increments (following the 6 month forecast) at the end of next quarter, end of the Government fiscal year, end of the next Government fiscal year and then at completion.

BLK 9: See CDRL addendum BLK 4: Earned value cost reporting is not required.

BLK 10: monthly (estimate 12 per year) BLK 12: 10 days after end of the full first accounting period after contract award.

BLK 13: 10 days after each accounting period.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __5__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905, 0301, 0302, 0401, 0402

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER_____ADMN_____X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A006

2. TITLE OF DATA ITEM:

Report, Record of Meeting Minutes

3. SUBTITLE

See Block 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-ADMN-81505

5. CONTRACT REFERENCE

SOW TASK:

4.1.2,4.1.4,4.2.13,4.2.15,4.2.16,4.2.19, 4.31,4.2,4.25,4.32,4.3,4.59,4.62,4.46,4.5, 4.54,4.63

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMNT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT D ASREQ See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft Final

N/A N/A N/A Reg Repro

16. REMARKS See Block 16 0 1 0 BLK 3: Sub-titled per system/meeting purpose BLK 4: record and track action items in excel BLK 9: See CDRL addendum BLK 10: Estimate 20 per year.

BLK 12: 5 business days after completion of meeting.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __6__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___ADMN_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A007

2. TITLE OF DATA ITEM:

Presentation Material

3. SUBTITLE

See Block 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-ADMN-81373 NOT 1

5. CONTRACT REFERENCE

SOW TASK

4.1.2,4.2.16,4.2.19

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 3: Sub-titled per system/meeting purpose BLK 4: All submissions shall be in Microsoft PowerPoint and Adobe formats.

BLK 9: See CDRL addendum BLK 10: Estimate 10 per year BLK 12, and 13: SETR events 30 days prior to the event. TIMs and PMRs 15 days prior to the event. The Government will provide comments 20 calendar days after receipt of the data item, except for deliverables due 15 days prior to the event. For deliverables due 15 days prior to the event, the Government will provide comments 7 days after receipt of the item. Re-submittal shall be delivered to the Government 10 calendar days after receipt of the Government comments, except for deliverables due 15 days prior to the event. For deliverables due 15 days prior to an event, re-submittals are not required.

BLK 14: Distribution/delivery shall be electronic format in Microsoft PowerPoint or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __7__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___ADMN______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A008

2. TITLE OF DATA ITEM:

Conference Agenda

3. SUBTITLE

See Block 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-ADMN-81249B

5. CONTRACT REFERENCE

SOW TASK

4.1.2,4.1.4,4.2.13,,4.2.16,4.2.19

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 3: Sub-titled per system/purpose BLK 9: See CDRL addendum BLK 10: Estimate 10 per year BLK 12, and 13: SETR events 45 days prior to the event. TIMs and PMRs 30 days prior to the event. Teleconferences, Audits and iPRRs 10 days prior to the event. The Government will provide comments 20 calendar days after receipt of the data item, except for deliverables due 30 days prior to the event. For deliverables due 30 days prior to the event, the Government will provide comments 7 days after receipt of the item. For deliverables due 10 days prior to the event, the Government will provide comments 3 days after receipt of the item. Re-submittal shall be delivered to the Government 5 calendar days after receipt of the Government comments.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __8__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER________________

D. SYSTEM/ITEM E. CONTRACT / PR NO. F. CONTRACTOR

1. DATA ITEM NO.

A009

2. TITLE OF DATA ITEM:

Intentionally left blank

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMNT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final

Reg Repro

16. REMARKS

15. TOTAL

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __9__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___QCIC_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM:

Quality Assessment Report

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-QCIC-81187 NOT 1

5. CONTRACT REFERENCE

SOW TASK 4.2.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 9: See CDRL addendum BLK 10 & 12: The first submission is due 90 days prior to CDR. Subsequent submissions shall be quarterly.

BLK 13: The Government will provide comments 30 days after receipt of the report.

The contractor shall deliver a revised report 15 days after Government comments are received.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __10__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___MGMT______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00B

2. TITLE OF DATA ITEM:

Contract Work Breakdown Structure

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-81334D NOT 1

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0

BLK 9: See CDRL addendum BLK 4: Earned value management reporting is not required.

BLK 10: Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the management plan is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via tracked changes.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __11__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___FNCL_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00C

2. TITLE OF DATA ITEM:

Cost Breakdown Structure Summary Report

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-FNCL-80165A

5. CONTRACT REFERENCE

SOW TASK 4.1.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

B See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final N/A See Block 16 See Block 16 Reg Repro

16. REMARKS See Block 16 0 1 0 BLKs 2 and 4: format 1. Report all WBS elements at level 5 or higher identified in CWBS CDRL. Format 3 and 4, Enter periodic time increments (following the 6 month forecast) at the end of next quarter, end of the Government fiscal year, end of the next Government fiscal year and then at completion.

BLK 4: Earned value management reporting is not required.

BLK 9: See CDRL addendum BLK 10: Monthly (estimate 12 per year) BLK 12: 10 days after end of the full first accounting period after contract award.

BLK 13: 10 days after each accounting period.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe digital format. If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __12__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___MGMT_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00D

2. TITLE OF DATA ITEM:

Manufacturing Plan

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-MGMT-81889A

5. CONTRACT REFERENCE

SOW TASK 4.2.19

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 4: Section 3.6.7: Manpower loading data shall be provide in hours and full time equivalents.

BLK 9: See CDRL addendum BLK 10: ASREQ. Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the management plan is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

Subsequent submissions shall use track changes and show mark-ups. The final submission shall accept all changes.

15. TOTAL

______> 1 1 0

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __13__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___SESS_______X_______

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00E

2. TITLE OF DATA ITEM:

Systems Engineering Management Plan (SEMP)

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-SESS-81785A

5. CONTRACT REFERENCE

SOW TASK 4.2.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 9: See CDRL addendum BLK 10: Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the management plan is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via tracked changes.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __14__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___QCIC_____X_________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00F

2. TITLE OF DATA ITEM:

Quality Assurance Program Plan

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-QCIC-81794A

5. CONTRACT REFERENCE

SOW TASK 4.2.1

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0

BLK 9: See CDRL addendum BLK 10: Estimate 10 submittals BLK 12: The first submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the plan throughout the life of the contract. If an update to the management plan is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via change bars.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __15__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___EMCS______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00G

2. TITLE OF DATA ITEM:

Electromagnetic Environmental Effects (E3) Integration and Analysis Report (E31AR)

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-EMCS-81540B NOT 2

5. CONTRACT REFERENCE

SOW TASK 4.2.8

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0

BLK 9: See CDRL addendum BLK 10: Estimated number of submission is eight (original plus seven updates).

BLK 12: The initial submission shall occur NLT 90 days prior to PDR.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the report throughout the life of the contract. If an update to the report is identified by the contractor, an updated report with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received. The contractor shall annotate changed material via tracked changes.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __16__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___SESS______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00H

2. TITLE OF DATA ITEM:

Request For Variance (RFV)

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-SESS-80640E

5. CONTRACT REFERENCE

SOW TASK 4.1.3

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

AREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 0 1 0 BLK 4: The RFV shall be prepared on a DD FORM 1694 and shall include the content requirements of the DID and the requirements of the form.

BLK 9: See CDRL addendum BLK 10, 12, and 13: The contractor shall submit a RFV as per the SOW requirements.

Resubmittal, if required, shall be delivered NLT 30 calendar days after receipt of Government contracts.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

15. TOTAL

______> 0 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __17__ of _68 Pages

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0201, 0202, 0203, 0204, 0205, B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___ILSS______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00J

2. TITLE OF DATA ITEM:

Maintenance Support Plan

3. SUBTITLE

N/A

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-ILSS-81225 NOT 1

5. CONTRACT REFERENCE

SOW TASK 4.13,4.15,4.17,4.5,4.39,4.41

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

ASREQ/See Block

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0

BLK 9: See CDRL addendum BLK 10: Estimated number of submission is eight (original plus seven updates).

BLK 12: The initial submission shall occur NLT 90 days prior to CDR.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item. Resubmissions shall be delivered 30 calendar days after receipt of Government comments. The contractor shall maintain and update the report throughout the life of the contract. If an update to the report is identified by the contractor, an updated management plan with Government approved updates shall be submitted to the Government NLT 30 calendar days after Government authorization for the update has been received.

BLK 14: Distribution/delivery shall be electronic format in Microsoft application or Adobe.

If applicable, classified deliverable shall be sent via secure internet protocol network (SIPRNET) email. See CDRL Addendum for details on addresses.

Subsequent submissions shall use track changes and show mark-ups. The final submission shall accept all changes.

15. TOTAL

______> 1 1

G. PREPARED BY: H. DATE I. APPROVED BY J. DATE

DD Form 1423-1, Feb 2001 Previous Edition May be Used Page __18__ of _68 Pages

OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Service, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704- 0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

0001, 0106, 0207, 0306, 0406, 0503, 0604, 0704, 0806, 0905

B. EXHIBIT C. CATEGORY

TDP_________ TM___________ OTHER___IPSC______X________

D. SYSTEM/ITEM

USWTR Increment II_III and AUTEC

E. CONTRACT / PR NO.

N61340-21-R-0006

F. CONTRACTOR

1. DATA ITEM NO.

A00K

2. TITLE OF DATA ITEM:

System/Subsystem Specification (SSS)

3. SUBTITLE

See Block 16

17. PRICE GROUP

4. AUTHORITY (Date Acquisition Document No.)

DI-IPSC-81431A NOT 1

5. CONTRACT REFERENCE

SOW TASK 4.2.3

6. REQUIRING OFFICE

PMA205

18. ESTIMATED

TOTAL PRICE

7. DD 250 REQ

LT

9. DIST STATEMNT

REQUIRED

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

D See Block 16 b. COPIES

8. APP CODE See Block 16 11. AS OF DATE 13. DATE OF SUBSEQNT

SUBMISSION

a. ADDRESSEE Draft

Final A N/A See Block 16 Reg Repro

16. REMARKS See Block 16 1 1 0 BLK 3: Subtitle by system/subsystem.

BLK 9: See CDRL addendum BLK 10: Estimated number of submission is eight (original plus seven updates).

BLK 12: The initial submission is due 45 DACA.

BLK 13: The Government will review and make comments within 30 calendar days after receipt of data item.