US50BUS80_ICE.xlsx

XLSX spreadsheet 35 KB Posted

Attached to
US 50/BUS 80 Community Connectivity Project
Solicitation number
25-053-RFP
Issued by
Yolo County, California

About this file

This is a cost estimate spreadsheet for the US 50/BUS 80 Community Connectivity Project prepared by the City of West Sacramento, containing detailed labor and cost breakdowns for consultant services. The project encompasses four primary task categories: Project Initiation Document and Approvals, Community Participation Plan and engagement activities, Infill and Transit-Oriented Development Feasibility Analysis, and Optional Tasks including supplemental traffic analysis, preliminary engineering, environmental documentation, and CEQA/NEPA analysis. The base scope of work is estimated at $1,619,770, with the addition of optional tasks bringing the total project cost to $2,414,585. The estimate includes staffing matrices detailing hourly labor rates by position (ranging from $125 to $375 per hour) and estimated hours required for each task, with consideration given to Disadvantaged Business Enterprise (DBE) program compliance. A pre-proposal meeting is scheduled for December 18, 2025, with questions due by January 2, 2026, and proposals due February 20, 2026. Interviews for shortlisted proposers are anticipated for the week of March 9, 2026, with City Council award expected April 15, 2026. The initial contract term is up to three years with potential extensions for two additional one-year terms.

The project has a maximum not-to-exceed budget of $1,725,000 for base tasks as established in the RFP, with funding provided through the Sacramento Area Council of Governments (SACOG) Reconnecting Communities & Neighborhoods (RCN) Program. The cost estimate utilizes a cost-plus-fixed-fee payment structure and requires consultants to maintain certified indirect cost rates and demonstrate adequate financial management systems. Consultants must comply with Davis-Bacon prevailing wage laws, Federal Acquisition Regulations, Title VI non-discrimination provisions, and state and federal transportation planning procedures. The spreadsheet includes comparative market analysis referencing similar PID and PSR-PDS projects throughout California, ranging from approximately $190,000 to $1.8 million, to support the reasonableness of the cost estimate. The project is contingent upon recertification of the DBE program, which is currently suspended, and requires proposers to register on SAM.gov and demonstrate relevant expertise in transportation planning and community engagement initiatives.

View the file

Other files

File Type Posted
US_50_BUS_80_Community_Connectivity_Project_(Addendum_#6_Revision).pdf PDF
Updated_Attachment_M_-_Davis_Bacon_CA20260007_Mod_3_1-23-26_(Addendum_#5).pdf PDF
US_50_BUS_80_Community_Connectivity_Project_(Addendum_#2_Revision).pdf PDF
Updated_Attachment_I_-_Insurance_Checklist_-_2Million_4Million_(Addendum_#2).pdf PDF
Updated_Attachment_I_-_Insurance_Checklist_-_2Million_4Million_(Addendum_#2).pdf PDF
US_50_BUS_80_Community_Connectivity_Project.pdf PDF
Newsledger_Email_Proof_Invoice_US50BUS80_RFP.pdf PDF
Newsledger_Email_Proof_Invoice_US50BUS80_RFP.pdf PDF
Newsledger_Email_Proof_Invoice_US50BUS80_RFP.pdf PDF
Davis_Bacon_CA20250007_Mod_18_12-5-25.pdf PDF
Davis_Bacon_CA20250007_Mod_18_12-5-25.pdf PDF
US50BUS80_ICE.xlsx XLSX spreadsheet
US50BUS80_ICE.xlsx XLSX spreadsheet
Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx DOCX document
Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx DOCX document
FEDERAL_CONTRACT_FOR_PROFESSIONAL_SERVICES_TEMPLATE_US50BUS80_12.8.25_CLEAN.docx DOCX document
FEDERAL_CONTRACT_FOR_PROFESSIONAL_SERVICES_TEMPLATE_US50BUS80_12.8.25_CLEAN.docx DOCX document
Federal_Award_Requirements_Appendix_II_to_Part_200_Contract_Provision_Language.docx DOCX document
Insurance_Checklist_2023.pdf PDF
FEDERAL_CONTRACT_FOR_PROFESSIONAL_SERVICES_TEMPLATE_US50BUS80_12.8.25_CLEAN.docx DOCX document
Sample_Cost_Proposal_Cost_Plus_Fixed_Fee.pdf PDF
Sample_Cost_Proposal_Cost_Plus_Fixed_Fee.pdf PDF
Sample_Cost_Proposal_Cost_Plus_Fixed_Fee.pdf PDF
IG_Certification_Indirect_Costs_Financial_Management_System_v2.pdf PDF
California_Safe_Harbor_Rate_Form.pdf PDF
California_Safe_Harbor_Rate_Form.pdf PDF
California_Safe_Harbor_Rate_Form.pdf PDF
IG_Certification_Indirect_Costs_Financial_Management_System_v2.pdf PDF
IG_Certification_Indirect_Costs_Financial_Management_System_v2.pdf PDF
NAE_FY23_FHWA_-_General_Terms_and_Conditions_Apr_2024.pdf PDF
NAE_FY23_FHWA_-_General_Terms_and_Conditions_-_Oct_2024.docx DOCX document
NAE_FY23_FHWA_-_General_Terms_and_Conditions_-_Oct_2024.docx DOCX document
NAE_FY23_FHWA_-_General_Terms_and_Conditions_-_Oct_2024.docx DOCX document
NAE_FY23_FHWA_-_General_Terms_and_Conditions_Apr_2024.pdf PDF
RCN_Subrecipient_Agreement_-_CT250040_West_Sacramento_US50_BUS80_Community_Connectivity_Project.pdf PDF
RCN_Subrecipient_Agreement_-_CT250040_West_Sacramento_US50_BUS80_Community_Connectivity_Project.pdf PDF
RCN_Subrecipient_Agreement_-_CT250040_West_Sacramento_US50_BUS80_Community_Connectivity_Project.pdf PDF
NAE_FY23_FHWA_-_General_Terms_and_Conditions_Apr_2024.pdf PDF
2008_Project_Study_Report.pdf PDF
Grand_Gateway_Zoning_District_-_Zoning_Code.pdf PDF
US_50_BUS_80_USDOT_RCP_Program_Projects_Map.png PNG image
2008_Project_Study_Report.pdf PDF
2008_Project_Study_Report.pdf PDF
Grand_Gateway_Zoning_District_-_Zoning_Code.pdf PDF
US_50_BUS_80_USDOT_RCP_Program_Projects_Map.png PNG image
Grand_Gateway_Zoning_District_-_Zoning_Code.pdf PDF
US_50_BUS_80_USDOT_RCP_Program_Projects_Map.png PNG image
Show all 47

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PID Studies

AgencyProjectCostSourcesNotes
Caltrans Estimate of PID Work - completed in-house by Caltrans - $450,000 without additional transit/rail analysis.
City of AlamedaOakland‐Alameda Bicycle/Pedestrian Bridge ProjectProject Initiation Document (PID) Phase Services for $1.5Mhttps://www.alamedaca.gov/files/assets/public/v/1/departments/alameda/transportation/bike-ped-bridge/ala_trans_bridgeflyer_aug2022.pdf

https://alameda.legistar.com/LegislationDetail.aspx?ID=6410813&GUID=D8854D0E-9368-4451-86EC-906FFBD1AD8B&Options=&Search=&FullText=1 City of Alameda Central Avenue Safety Improvement Project PID $557,000 https://alamedamgr.wordpress.com/wp-content/uploads/2021/04/2021-04-21-presentation.pdf https://www.alamedaca.gov/files/assets/public/v/1/departments/alameda/transportation/central-ave/file_2023-3162_epa_waterquality_july5_2023_citycouncilstaffreport.pdf County of Yuba East Wheatland Expressway Project This contract is not to exceed $2,454,562, of which $574,725 is for the PSR-PDS services and $1,879,837 is for the PA&ED services. https://www.yuba.gov/departments/community_development/east_wheatland_expressway.php https://cms7files.revize.com/yubaca/Yuba%20County/Community%20Development/SYTIA/08%2002%202022%20Agenda%20and%20Background.pdf

City of LathropRoth Road and I-5 Interchange ProjectPID $330,889https://www.ci.lathrop.ca.us/sites/default/files/fileattachments/city_council/meeting/25876/2023-11-13_item_4.11_approve_professional_consulting_services_agreement_with_dokken_engineering.pdf
City of MenifeeGarbani Road / I-215 InterchangePID $570,264.16https://cityofmenifee.primegov.com/meeting/document/621.pdf?name=Staff%20Report
SBCTAMount Vernon Avenue between East Valley Boulevard and
south of the Interstate 10 (I-10)PID $539,000https://www.gosbcta.com/wp-content/uploads/2024/12/2025-06-04-Board-of-Directors-Full-Agenda-2122.pdf
City of HaywardState Route 92/Clawiter-Whitesell Interchange - Phase 2PID $565,751https://www.hayward-ca.gov/your-government/departments/engineering-division/route-92-clawiter-whitesell-street-interchange-project

https://www.hayward-ca.gov/your-government/city-council

City of Santa MariaUS 101/MAIN STREET INTERCHANGE PROJECT STUDY REPORTPID $550,045.24https://pub-santamaria.escribemeetings.com/Meeting.aspx?Id=2809a2e8-70ea-4ebd-95ee-0eb34b6f6669&Agenda=Agenda&lang=English8/15/23 Council
City of Santa MariaUS 101/BETTERAVIA ROAD INTERCHANGE PROJECT STUDY REPORTPID $483,922.00https://pub-santamaria.escribemeetings.com/Meeting.aspx?Id=2809a2e8-70ea-4ebd-95ee-0eb34b6f6669&Agenda=Agenda&lang=English8/15/23 Council
OCTAProject Study Report/Project Development Support for Interstate 5 from Avenida Pico to San Diego County LinePSR $518,482https://octa.legistar.com/View.ashx?M=F&ID=11011603&GUID=08430848-D9AC-42C9-9BAC-4D3FA145ECD9
OCTAState Route 57 Northbound between Lambert Road and Tonner Canyon RoadPSR/PDS - $750,000https://octa.legistar.com/LegislationDetail.aspx?ID=5707984&GUID=1EB23A2D-6D13-4981-8503-D380F4801591&Options=&Search=

https://octa.net/pdf/FY2022-23_Approved_Services_Book.pdf 0017-7519-FG105-0KR

MetroALAMEDA STREET MOBILITY PROJECT STUDY REPORT/PROJECT DEVELOPMENT SUPPORT$1,119,015.68.https://metro.legistar.com/LegislationDetail.aspx?ID=5384341&GUID=20BC5640-6A6A-4EAA-A1DD-F9BE9CDBCAAA
City of AtwaterBellevue Road Reconstruction/Realignment Project Study ReportProject Development Support$190,091.16https://www.atwater.org/wp-content/uploads/2022/08/CC-8.22.22-Agenda-1.pdfThis project is just a collector roadway project - reopening a roadway that has been closed to the public under a CUP. This isn't very similar to other PSR-PDS and the scope is significantly less than WSAC's project.
City of South San FranciscoJunipero Serra Boulevard & I-280 Westborough Boulevard Pedestrian and Bicycle Connectivity & Safety ProjectPID Phase was awarded an amount of $459,000 while the PAED Phase was awarded an amount of $978,000.https://ci-ssf-ca.legistar.com/LegislationDetail.aspx?ID=7409594&GUID=A8167502-11FF-4D35-8FA6-FB525409EE5E&FullText=1
Riverside County Transportation CommissionWildomar Trail Interchange improvement$851,324, plus a contingency amount of $85,132, for a total amount not to exceed $936,456https://rctc.org/wp-content/uploads/2024/10/October-Commission-Agenda.pdf
Riverside County Transportation CommissionBundy Canyon Road Interchange$750,163, plus a contingency amount of $75,016, for a total amount not to exceed $825,179https://rctc.org/wp-content/uploads/2024/10/October-Commission-Agenda.pdf
County of San MateoMoss Beach SR‐1 Congestion & Safety Improvements$1,270,000https://www.smcta.com/media/20082/download

https://www.smcgov.org/planning/moss-beach-sr-1 City of Modesto SR99 Briggsmore Avenue/Carpenter Road Interchange Improvements Project $1,252,219 (Project Management) + 1,806,320 (PSR-PDS) + $2,550,751 (Project Report) + $1,228,089 (CEQA/NEPA) https://www.briggsmore-carpenter.com/

Modesto City Council May 2, 2023 AECOM Agreement for Briggsmore Avenue at State Route 99 Interchange Improvement Project https://metro.legistar.com/LegislationDetail.aspx?ID=5384341&GUID=20BC5640-6A6A-4EAA-A1DD-F9BE9CDBCAAAhttps://ci-ssf-ca.legistar.com/LegislationDetail.aspx?ID=7409594&GUID=A8167502-11FF-4D35-8FA6-FB525409EE5E&FullText=1 Land Use Studies

AgencyProjectCostSourcesNotes
City of La MesaSpring Street and Amaya Drive Light Rail Transit Stations Transit-Oriented Development Feasibility Study$149,517
Placer CountyPlacer County Mobility and Infill Acceleration Study$365,009
Signal HillPROFESSIONAL SERVICES AGREEMENT WITH PLACEWORKS TO PREPARE AN ECONOMIC ANALYSIS AND LAND USE STUDY FOR OPPORTUNITY STUDY AREAS$300,000https://cityofsignalhill.legistar.com/LegislationDetail.aspx?ID=7015309&GUID=5DEC9755-7729-4C55-A8A2-B3D59FD1D767
AnaheimBrookhurst Corridor Master Plan$199,500Some minor elements are similar
Alameda CountyIndustrial Land Use Analysis and Implementation Toolkit$138,865https://www.acgov.org/board/bos_calendar/documents/DocsAgendaReg_10_18_22/GENERAL%20ADMINISTRATION/Regular%20Calendar/CAO_GSA_339239.pdf

ICE

TaskDetailed Description of TasksEstimated CostPrincipalProject ManagerQA/QC ManagerSenior Engineer / PlannerEngineer / PlannerAssistant Engineer / PlannerSurveyorGIS TechTechnical SupportOffice Admin / Project Coordinator
$ 375.00$ 300.00$ 250.00$ 235.00$ 175.00$ 135.00$ 185.00$ 150.00$ 160.00$ 125.00Grant EstimateHourly Rate CalcHourly Rate Rounded for DBEHours of LaborCost Rounded for DBE
1 Project Initiation Document and ApprovalsPlanning, design, engineering and environmental services for completing the Project Initiation Document (PID). A consultant will serve as the City’s implementation and delivery team by providing technical and engineering services, including but not limited to, project management; preliminary environmental, multi-modal traffic, and structural analyses; right-of-way data; and other support services as required.1Project Management - project schedule, project administration, progress reports, etc.$ 117,5604080120404040161640120$ 212.97$ 213.00552$ 117,576.00
2Existing Conditions, Purpose & Need, Project Scoping$ 41,660481640200$ 155.45$ 155.00268$ 41,540.00
3Alternatives Screening, Development, and Analysis$ 60,200162440808080$ 188.13$ 188.00320$ 60,160.00
4Supporting PID Scoping Tools and Technical Analysis (Life Cycle, Constructabilty, Preliminary Environmental Analysis Report, Design Standards, Risk Assessment, Structures, Utility, Railroad, Local and Regional Planning, Complete Streets, etc)$ 359,3005612422044076040160240$ 176.13$ 176.002040$ 359,040.00
4aSupporting PID Scoping Tools and Technical Analysis Analysis - DBE (Traffic Engineering Perfromance Assessment, Stormwater, Right-of-Way, etc.)$ 147,900202080160200120240$ 176.07$ 176.00840$ 147,840.00
5Cost Estimates$ 61,65016404080150$ 189.11$ 189.00326$ 61,614.00
6Project Initation Document - Anticipated PSR-PDS$ 135,000404080240160160$ 187.50$ 188.00720$ 135,360.00
Subtotal$ 923,270192336120516108015901761767601201,000,000$ 182.25$ 182.005066$ 923,130.00
2 Community Participation Plan, Community Advisory Committee, and Community EngagementDevelopment of a Community Participation Plan (CPC) to guide the community engagement effort. Development and distribution of outreach material, survey(s), Community Advisory Committee (CAC) application, stipends, meeting facility rental, charrettes, virtual outreach activities and on-line meetings, equipment, interpretation and translation, or other application community engagement activities identified in the CPC.1Project Management - project schedule, project administration, progress reports, etc.$ 91,400401208040120$ 228.50$ 229.00400$ 91,600.00
2Community Participation Plan$ 29,000816404040$ 201.39$ 201.00144$ 28,944.00
3Outreach (Workshops, Community Meetings, Survey, Pop-Ups, Technical Advisory Meetings, etc.)$ 145,3004012042080160$ 177.20$ 177.00820$ 145,140.00
4Materials/Collateral/Postage/Travel/Rentals/Stipends/Misc$ 30,000LUMPSUM EXPENSE$ 30,000.00
Subtotal$ 295,7008825680400500080200120$325,000$ 216.79$ 217.001364$ 295,684.00
3 US50/BUS80 Infill and Transit Oriented Development Feasibility AnalysisConduct analysis of vacant and underutilized parcels in the US50/BUS80 Community Connectivity project area to identify a range of potential barriers to infill housing and transit-oriented development (i.e., lack of infrastructure, small parcel sizes, insufficient density, or zoning allowances) and identify strategies to address those barriers. This analysis should consider the viable alternative(s) identified through the PID and how the potential alignments may affect opportunities and constraints. This may include the graphic illustrations or 3D representation of select locations to illustrate potential development.1Project Management - project schedule, project administration, progress reports, etc.$ 48,40040801640$ 275.00$ 275.00176$ 48,400.00
2Plans Review and Existing Conditions Analysis (Land Use, Development, Circulation, Demographic, Economics)$ 76,4008128012080120$ 181.90$ 182.00420$ 76,440.00
3Market and Financial Feasibility Analysis$ 177,7004080160200300160$ 189.04$ 189.00940$ 177,660.00
4Plans and Policies Update Recommendations$ 98,300204080160200$ 196.60$ 197.00500$ 98,500.00
Subtotal$ 400,80010821216320480420004800$400,000$ 196.86$ 197.002036$ 401,000.00
4 Optional TasksSupplemental work or advancement of PID to PR or Environmental1Supplemental Traffic Analysis and Studies - Additional data collection, forecasting, traffic operations analysis, interchange area safety assessment, multimodal assessment, etc.$ 167,400840120600120$ 188.51$ 189.00888$ 167,832.00
2Supplemental Suveys and Mapping - Additional topopgraphic surveys, base maping, right-ofway-engineering, right-of-way data sheets, etc$ 106,4002080240120120$ 183.45$ 183.00580$ 106,140.00
3Supplemental Preliminary Engineering - Additional conceptual cross sections, design memos, schematic/preliminary designs and estimates, base mapping, constructability, etc$ 114,2008024012080$ 219.62$ 220.00520$ 114,400.00
4Supplemental Environmental Analysis and Other Technical Studies - water/drainage/stormwater/sewer analysis, Phase I ESA, Phase II ESA, UPRR Coordination, value engineering, aesthetics, staging, analysis studies, noise, geological, culutral resources, biological, air quality, etc.$ 166,80080120360240120$ 181.30$ 181.00920$ 166,520.00
5Supplemental Community and Stakeholder Outreach for PA&ED$ 31,20020404080$ 173.33$ 173.00180$ 31,140.00
6Project Report - Draft and Final Project Report in accordance with Caltrans requirements$ 71,800408080200$ 179.50$ 180.00400$ 72,000.00
7Funding Strategy and Phasing Plan$ 65,2004040808040$ 232.86$ 233.00280$ 65,240.00
8CEQA/NEPA Documentation - Draft and Final document$ 71,800408080200$ 179.50$ 180.00400$ 72,000.00
Subtotal$ 794,80048360080013607202401205200$ 190.69$ 191.004168$ 795,272.00
Total of Base Tasks$ 1,619,770$1,725,000
Total w/ Optional Tasks$ 2,414,585$ 2,415,086.00