Solicitation Package Summary
This is a solicitation package for repair services related to Webster Dam's spillway radial gates, located in Kansas under the Bureau of Reclamation's Solomon Division within the Pick-Sloan Missouri Basin Program. The solicitation number is 140R6026R0016, and it represents a competitive procurement for construction and repair services. The primary objective is to restore the operational functionality of the dam's radial gates, which are critical infrastructure components for water management and flood control purposes.
The solicitation package establishes the technical requirements, contract terms, and evaluation criteria for qualified contractors to submit proposals. Prospective bidders are required to provide detailed pricing for the repair work, demonstrate relevant experience with similar dam infrastructure projects, and comply with all federal contracting requirements applicable to Department of the Interior contracts. The procurement follows standard federal acquisition procedures and is open to eligible contractors meeting the technical and administrative qualifications outlined in the solicitation documents. Contractors should carefully review all technical specifications, schedule requirements, and contractual terms included in the complete solicitation package before preparing and submitting their proposals.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
June 2026
Request for Proposal Solicitation No. 140R6026R0016
Webster Dam Spillway Radial Gates Repair
(RAX ACTIVITY NO. 1201)
Webster Unit, Solomon Division, Pick-Sloan Missouri Basin Program, Kansas
U.S. Department of the Interior Bureau of Reclamation Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions Billings, Montana
WEBSTER DAM, SPILLWAY RADIAL GATES REPAIR,
WEBSTER UNIT, SOLOMON DIVISION,
PICK-SLOAN MISSOURI BASIN PROGRAM, KANSAS
FOREWORD
Work is located at Webster Dam, approximately 8 miles west of Stockton, Kansas, in Rooks County.
Work under these specifications includes the rehabilitation of the metalwork coatings for three spillway radial gates and gallery located at the Webster Dam Spillway:
1. External upstream, downstream and edges of gate surfaces, radial arm structural steel members, trunnion assemblies and floatwell covers and frames on the inner piers: removal of existing coating system including handling and disposal; sealing crevasses between structural members; application of new coating system; removal and replacement of bottom and side gate seals.
2. Internal structural steel, skin plates, cover openings surfaces, and gallery: removal of existing coating system including handling and disposal and application of new coating system.
3. Wire Rope and components replacement.
POINT OF CONTACT – The Contract Specialist for this requirement is Terra Warren and the Contracting Officer is Ryan Cope. All questions and correspondence concerning this solicitation shall be directed to Ms. Warren and Mr. Cope via email at terra_warren@ios.doi.gov and ryan_cope@ios.doi.gov, identifying the solicitation number in the subject line. Telephone correspondence concerning this solicitation will not be accepted for recording purposes.
It is incumbent upon offerors to monitor https://sam.gov for the solicitation release and all subsequent amendments.
METHOD OF PROCUREMENT – This requirement is solicited as a Request for Proposal (RFP) using the Federal Acquisition Regulation (FAR) part 15 – Contracting by Negotiation.
ORGANIZED SITE VISIT – An organized site visit has been scheduled for Thursday, August 6, 2026, at 10:00 AM CDT. Prospective offerors are strongly encouraged to attend the pre-proposal site visit to gain a better understanding of the work requirements and site conditions.
Prospective offerors that are interested in attending shall contact the Project Manager, Mark Rouse, at mrouse@usbr.gov.
OFFEROR QUESTIONS – The Government will not address questions received from prospective offerors at the organized site visit for recording purposes. The Government will not address questions received from prospective offerors after 3:00 PM CDT on August 14, 2026.
The Government’s answers to questions received will be addressed in an amendment to the solicitation. Telephone questions will not be accepted for recording purposes.
Foreword mailto:terra_warren@ios.doi.gov https://sam.gov/ mailto:mrouse@usbr.gov
Foreword
RECLAMATION SAFETY AND HEALTH STANDARDS (RSHS) – For information regarding the Bureau of Reclamation’s publication, “Reclamation Safety and Health Standards,” including revisions located at https://www.usbr.gov/safety/rshs/index.html (which is applicable to work under this contract), see the clause at Section I, Paragraph I.15., WBR 1452.223-81 – Safety and Health – Bureau of Reclamation.
SYSTEM FOR AWARD MANAGEMENT (SAM) – Effective October 2018, all contractors interested in doing business with the Federal Government must be registered in the System for Award Management (SAM) database at the time they submit their offer/proposal.
NOTE: Registering in SAM does not constitute an automatic award of any contract or agreement to the registering contractor. SAM is a centralized database for consolidating the Central Contractor Registration (CCR), the Online Representation and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Additionally, the contractor’s business and financial information are required for SAM registration and annual confirmation requirements, which must be accomplished through the SAM website at https://sam.gov/. For assistance with registering in SAM, contact the Federal Service Helpdesk website at https://www.fsd.gov/gsafsd_sp or by telephone at 1-866-606-8220.
NOTE: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications – Commercial Products and Commercial Services. Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
INVOICE PROCESSING PLATFORM (IPP) – Payment requests for the anticipated contract or agreement must be submitted electronically through the U.S. Department of the Treasury’s “Invoice Processing Platform” (IPP) System via the website at https://www.ipp.gov/. Contractors are required to use the IPP website to access and use IPP for submitted requests for payment.
Registration assistance can be obtained by contacting the IPP Customer Support by email at IPPCustomerSupport@fiscal.treasury.gov or by telephone at 1-866-973-3131.
NOTE: Waivers will be on a case-by-case basis and not automatically granted as determined by the Contracting Officer. For more specific information regarding the process for submitting invoices in IPP, please see the clause at Section G, Paragraph G.3., DOI-AAAP-0028 – Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP).
https://www.usbr.gov/safety/rshs/index.html https://sam.gov/ https://www.fsd.gov/gsafsd_sp https://www.ipp.gov/ mailto:IPPCustomerSupport@fiscal.treasury.gov
SECTION A
SOLICITATION, OFFER, AND AWARD
(STANDARD FORM 1442)
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
NEGOTIATED (RFP) REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF
SEALED BID (IFB) INVITATION FOR BID
9. FOR
INFORMATION CALL
PAGES
140R6026R0016
Bureau of Reclamation Missouri Basin Regional Office 2021 4th Avenue North Billings MT 59101
Bureau of Reclamation Attn: MB-5000, Terra Warren 2021 4th Avenue North Billings, MT 59101
0044004421
R60
Terra Warren 0000000000
07/20/2026
08/27/2026
10 355 Paragraph F.1.
Webster Dam, Spillway Radial Gates Repair, Webster Unit, Solomon Division, Pick-Sloan
Missouri Basin Program, Kansas
The magnitude of this project is between $5 Million and $10 Million.
The North American Industry Classification System (NAICS) Code is: 237990, Other Heavy and Civil Engineering Construction.
The Product or Service Code (PSC) is: Z1KA, Maintenance of Dams.
This Request for Proposal (RFP) is issued as a Total Small Business Set-Aside.
Proposals are to be submitted via email to terra_warren@ios.doi.gov and ryan_cope@ios.doi.gov.
Reclamation's email servers limit attachments to 25 MB per email. Therefore, the offeror may need to submit multiple emails to ensure the Government receives the complete proposal (Volumes 1-3).
The Offeror shall fill out the following:
Taxpayer Identification Number (TIN): ________________________
System for Award Management (SAM) Unique Entity Identification (UEI): __________________
Commercial and Government Entity (CAGE) Code: ________________________
1 3
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Continued...
AMENDMENT
NUMBER
DATE.
Bureau of Reclamation Missouri Basin Regional Office 2021 4th Avenue North Billings MT 59101
R60
Ryan Cope
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140R6026R0016
Period of Performance: 11/01/2026 to
10/31/2027
00010 Webster Dam Spillway Gate Rehabilitation
Product/Service Code: Z1KA
Product/Service Description: MAINTENANCE OF
DAMS
See Continuation of Section B - Supplies or
Services and Prices/Costs (CLINs 1-10)
SECTION B
THE SCHEDULE
Webster Dam Spillway Radial Gates Repair
Schedule B - 1
CONTINUATION OF SECTION B – SUPPLIES OR SERVICES AND PRICES
WEBSTER DAM
SPILLWAY RADIAL GATES REPAIR
Pick-Sloan Missouri Basin Program Solomon Division, Kansas
B.1 SCHEDULE
(a) Offers will be considered for award on the following schedule, but no offer will be considered for award on only a part of the schedule.
(b) All offers are subject to the terms and conditions of this solicitation.
(c) See the contract clause at WBR 1452.232-81, Payment for Mobilization and Preparatory Work, for CLIN 1.
(d) Definitions:
(1) CLIN – Contract Line Item Number
SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
1 WBR
1452.232-81
Mobilization and Preparatory Work
For the Lump Sum of $
2 01 55 20 Traffic Control For the Lump Sum of $
02 83 30
Removal and Disposal of Coatings Containing Heavy Metals
For the Lump Sum of $
4 07 92 10 Sealants 800 LF $
5 09 96 20 Application of a New 3- Coat System: Exterior Radial Gates
For the Lump Sum of $
6 09 96 20 Application of a New 3- Coat System: Gallery
For the Lump Sum of $
7 09 96 20 Spot Repair: Interior Radial Gates
750 SF $
8 35 23 51 Spillway Radial Gate Bottom Seal Replacement
For the Lump Sum of $
Spillway Radial Gates Repair
Schedule B - 2
SCHEDULE
CLIN Section Supplies or Services Quantity and Unit
Unit Price
Amount
9 35 23 51 Spillway Radial Gate Side Seal Replacement
For the Lump Sum of $
10 41 22 31 Hoist Refurbishment For the Lump Sum of $
TOTAL FOR SCHEDULE $_________________
END OF SCHEDULE
SECTION C
DESCRIPTION / SPECIFICATIONS
The contractor shall perform and delivery the supplies and services hereunder in accordance with the specifications, drawings, and other attachments listed in Section J - List of Attachments.
SECTION D
PACKAGING AND MARKINGS
NOT USED
SECTION E
INSPECTION AND ACCEPTANCE
Spillway Radial Gates Repair Solicitation No. 140R6026R0016
Section E
SECTION E -- INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION AUG 1996
(a) Definition - "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not -
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before Acceptance:
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may -
Section E
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor;
or
(2) Terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
END OF SECTION E
SECTION F
DELIVERIES OR PERFORMANCE
Section F
SECTION F -- DELIVERIES OR PERFORMANCE
F.1 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS
(DEVIATION)
(JAN 2026)
(a)
(1) Within five days after the work commences on the contract or another period of time determined by the Contracting Officer, the Contractor shall prepare and submit to the Contracting Officer for approval a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the work (including acquiring materials, plant, and equipment).
(2) The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given date during the period.
(3) If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the Contractor submits the required schedule.
(b) The Contractor shall continually update the actual progress in the schedule and shall submit it to the Contracting Officer by the means prescribed in the contract for transmittals or as directed by the Contracting Officer.
(c)
(1) If the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to recover lost time and execute in accordance with the approved schedule, without additional cost to the Government.
(2) Such steps may include increasing the number of shifts, overtime operations, days of work, and/or the amount of construction plant.
(3) The Contractor shall submit, for approval, supplementary schedule(s) that demonstrate how the lost time will be recovered.
(d) If the Contractor does not recover the lost time, the Contracting Officer may determine that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting Officer may terminate the Contractor's right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
F.2 52.242-14 SUSPENSION OF WORK APR 1984
(a) The Contracting Officer may order the Contractor, in writing, to suspend, delay, or interrupt all or any part of the work of this contract for the period of time that the Contracting Officer determines appropriate for the convenience of the Government.
(b) If the performance of all or any part of the work is, for an unreasonable period of time, suspended, delayed, or interrupted
(1) by an act of the Contracting Officer in the administration of this contract, or
Section F
(2) by the Contracting Officer's failure to act within the time specified in this contract (or within a reasonable time if not specified), an adjustment shall be made for any increase in the cost of performance of this contract (excluding profit) necessarily caused by the unreasonable suspension, delay, or interruption, and the contract modified in writing accordingly. However, no adjustment shall be made under this clause for any suspension, delay, or interruption to the extent that performance would have been so suspended, delayed, or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an equitable adjustment is provided for or excluded under any other term or condition of this contract.
(c) A claim under this clause shall not be allowed –
(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved (but this requirement shall not apply as to a claim resulting from a suspension order); and
(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the suspension, delay, or interruption, but not later than the date of final payment under the contract.
END OF SECTION F
SECTION G
CONTRACT ADMINISTRATION DATA
Spillway Radial Gates Repair Solicitation No. 140R6026R0012
Section G
SECTION G -- CONTRACT ADMINISTRATION DATA
G.1 1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award. The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor. Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph (d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
G.2 WBR
1452.201-80
CONTRACTING OFFICER’S REPRESENTATIVE’S
AUTHORITIES AND LIMITATIONS
MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the
COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance.
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of
Section G this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Change’s clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
G.3 DOI-AAAP
ELECTRONIC INVOICING AND PAYMENT
REQUIREMENTS - INVOICE PROCESSING
PLATFORM (IPP)
FEB 2021
Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform System (IPP).
"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract, or the clause 52.212-4 Contract Terms and Conditions - Commercial Items included in commercial item contracts. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
• Construction Invoice
• Monthly Certificate of Labor Conformance
• Subcontractor / Supplier Payment Summary
• Final Payment Only - Release of Claims form (DI-137)
Contractors will be required to submit their proposed invoice documents to Mark Rouse at MRouse@usbr.gov. Once this has been reviewed and approved by the designated COR, the CO/CS will send an approved invoice to the contractor for submission/uploading to IPP.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in SAM) will receive enrollment instructions via email from the Federal Reserve Bank of St. Louis (FRBSTL) within 3 - 5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone
(866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
G.4 DOI-AAAP
NOTICE TO CONTRACTORS - CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING SYSTEM
DEC 2015
1) FAR 42.1502 directs all Federal agencies to collect past performance information on contracts. The
Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2) The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in CPARS for Government use in evaluating past performance as part of a source selection action.
3) We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4) When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5) Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a) Contractor Representatives may then provide comments in response to the evaluation, or return the evaluation without comment.
b) Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.
c) All information provided should be reviewed for accuracy prior to submission.
mailto:IPPCustomerSupport@fiscal.treasury.gov https://www.acquisition.gov/far/part-42#FAR_42_1502 https://www.acquisition.gov/far/subpart-42.15 https://www.acquisition.gov/far/subpart-42.15 https://www.cpars.gov/ https://www.cpars.gov/
d) If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e) Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in CPARS marked as “Pending” with or without comments and whether or not it has been closed.
f) If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6) The following guidelines apply concerning your use of the past performance evaluation:
a) Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
b) Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.
c) Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.
7) If you wish to discuss a past performance evaluation, you should request a meeting in writing to the CO no later than seven days following your receipt of the evaluation. The meeting will be held in person or via telephone or other means during your 60-day review period.
8) A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.
END OF SECTION G
SECTION H
SPECIAL CONTRACT REQUIREMENTS
Section H
SECTION H -- SPECIAL CONTRACT REQUIREMENTS
H.1 MB-1 SCHEDULE OF VALUES JUL 2019
(a) Definitions.
“Schedule of Values” means the clearly definable tasks, and the cost associated with each of those tasks, which comprise the total work effort required to complete a lump sum contract line item.
(b) Except for the Mobilization and Preparatory Work line item, the Contractor shall submit a Schedule of Values for review and acceptance for all lump-sum Contract Line Item Numbers listed in Section B.
The Schedule of Values will be used to assess the intermediate value of work completed for the purpose of making progress payments.
END OF SECTION H
SECTION I
CONTRACT CLAUSES
Section I
SECTION I – CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE FEB 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available.
Also, the full text of a clause may be accessed electronically at the following addresses: FAR Clauses
- https://www.acquisition.gov/far/ and Revolutionary FAR Overhaul (RFO) Clauses - https:// www.acquisition.gov/far-overhaul/far-part-deviation-guide
The following clauses are hereby incorporated by reference:
CLAUSE TITLE DATE
52.202-1 DEFINITIONS JUN 2020
52.203-3 GRATUITIES APR 1984
52.203-5 COVENANT AGAINST CONTINGENT FEES MAY 2014
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT JUN 2020
52.203-7 ANTI-KICKBACK PROCEDURES JUN 2020
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR
ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY MAY 2014
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS JUN 2020
52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT NOV 2021
52.203-16 PREVENTING PERSONAL CONFLICTS OF INTEREST JUN 2020
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS NOV 2023
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS JAN 2017
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER
SUBCONTRACT AWARDS (DEVIATION) MAR 2026
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE(DEVIATION) MAR 2026
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS(DEVIATION) MAR 2026
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND
CERTIFICATIONS(DEVIATION) DEC 2014
52.209-6
PROTECTING THE GOVERNMENT’S INTEREST WHEN
SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR
PROPOSED FOR DEBARMENT (DEVIATION)
MAY 2026
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS(DEVIATION) MAY 2026
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS(DEVIATION) MAY 2026
52.210-1 MARKET RESEARCH(DEVIATION) JUL 2025
52.215-2 AUDIT AND RECORDS – NEGOTIATION JUN 2020
https://www.acquisition.gov/far/
Section I
52.215-8 ORDER OF PRECEDENCE-UNIFORM CONTRACT FORMAT OCT 1997
52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING
DATA – MODIFICATIONS JUN 2020
52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA –
MODIFICATIONS JUN 2020
52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA
OTHER THAN CERTIFIED COST OR PRICING DATA-MODIFICATIONS NOV 2021
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE(DEVIATION) JAN 2026
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS(DEVIATION) JAN 2026
52.219-28 POSTAWARD SMALL BUSINESS PROGRAM
REREPRESENTATION(DEVIATION) JAN 2026
52.222-3 CONVICT LABOR(DEVIATION) MAY 2026
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS -- OVERTIME
COMPENSATION(DEVIATION) MAY 2026
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS(DEVIATION) MAY 2026
52.222-7 WITHHOLDING OF FUNDS(DEVIATION) MAY 2026
52.222-8 PAYROLLS AND BASIC RECORDS(DEVIATION) MAY 2026
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS(DEVIATION) MAY 2026
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (DEVIATION) MAY 2026
52.222-12 CONTRACT TERMINATION-DEBARMENT(DEVIATION) MAY 2026
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS
AND RELATED REGULATIONS(DEVIATION) MAY 2014
52.222-14 DISPUTES CONCERNING LABOR STANDARDS(DEVIATION) MAY 2026
52.222-15 CERTIFICATION OF ELIGIBILITY(DEVIATION) MAY 2014
52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS MAY 2026
52.222-35 EQUAL OPPORTUNITY FOR VETERANS(DEVIATION) MAY 2026
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH
DISABILITIES(DEVIATION) MAY 2026
52.222-37 EMPLOYMENT REPORTS ON VETERANS (DEVIATION) MAY 2026
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT(DEVIATION) MAY 2026
52.222-50 COMBATING TRAFFICKING IN PERSONS(DEVIATION) MAY 2026
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION(DEVIATION) MAY 2026
52.222-55 MINIMUM WAGES FOR CONTRACTOR WORKERS UNDER EXECUTIVE
ORDER 14026(DEVIATION) MAY 2026
52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706(DEVIATION) MAY 2026
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW
INFORMATION(DEVIATION) MAY 2024
52.223-11 Ozone Depleting Substances May 2026
52.226-7 DRUG-FREE WORKPLACE(DEVIATION) MAY 2024
52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING
WHILE DRIVING(DEVIATION) MAY 2024
52.227-1 AUTHORIZATION AND CONSENT JUN 2020
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT JUN 2020
Section I
52.227-4 PATENT INDEMNITY – CONSTRUCTION CONTRACTS DEC 2007
52.228-2 ADDITIONAL BOND SECURITY OCT 1997
52.228-5 INSURANCE – WORK ON A GOVERNMENT INSTALLATION JAN 1997
52.228-11 INDIVIDUAL SURETY – PLEDGES OF ASSETS FEB 2021
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS DEC 2022
52.228-14 IRREVOCABLE LETTER OF CREDIT NOV 2014
52.228-15 PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION JUN 2020
52.229-3 FEDERAL, STATE, AND LOCAL TAXES(DEVIATION) OCT 2025
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS MAY 2014
52.232-17 INTEREST MAY 2014
52.232-23 ASSIGNMENT OF CLAIMS MAY 2014
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS JAN 2017
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT OCT 2018
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS JUN 2013
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS MAR 2023
52.233-1 ALT I DISPUTES – ALTERNATE I DEC 1991
52.233-3 PROTESTS AFTER AWARD AUG 1996
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM OCT 2004
52.236-2 DIFFERING SITE CONDITIONS(DEVIATION) JAN 2026
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE
WORK(DEVIATION) JAN 2026
52.236-5 MATERIAL AND WORKMANSHIP(DEVIATION) JAN 2026
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR(DEVIATION) JAN 2026
52.236-7 PERMITS AND RESPONSIBILITIES(DEVIATION) JAN 2026
52.236-8 OTHER CONTRACTS(DEVIATION) JAN 2026
52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,
UTILITIES, AND IMPROVEMENTS (DEVIATION) JAN 2026
52.236-10 OPERATIONS AND STORAGE AREAS(DEVIATION) JAN 2026
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION(DEVIATION) JAN 2026
52.236-12 CLEANING UP (DEVIATION) JAN 2026
52.236-13 ALT I ACCIDENT PREVENTION – ALTERNATE I(DEVIATION) JAN 2026
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES(DEVIATION) JAN 2026
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION(DEVIATION) JAN 2026
52.242-13 BANKRUPTCY JUL 1995
52.243-4 CHANGES(DEVIATION) OCT 2025
52.243-6 CHANGE ORDER ACCOUNTING(DEVIATION) OCT 2025
52.244-2 SUBCONTRACTS (DEVIATION) MAY 2026
52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
52.248-3 VALUE ENGINEERING – CONSTRUCTION OCT 2025
52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-
PRICE) - ALTERNATE I SEP 1996
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) APR 1984
52.253-1 COMPUTER GENERATED FORMS (DEVIATION) MAY 2026
I.2 52.203-14 DISPLAY OF HOTLINE POSTER(S) NOV 2021
(a) Definition.
United States, as used in this clause, means the 50 States, the District of Columbia, and outlying areas.
(b) Display of fraud hotline poster(s). Except as provided in paragraph (c)—
(1) During contract performance in the United States, the Contractor shall prominently display in common work areas within business segments performing work under this contract and at contract work sites-
(i) Any agency fraud hotline poster or Department of Homeland Security (DHS) fraud hotline poster identified in paragraph (b)(3) of this clause; and
(ii) Any DHS fraud hotline poster subsequently identified by the Contracting Officer.
(2) Additionally, if the Contractor maintains a company website as a method of providing information to employees, the Contractor shall display an electronic version of the poster(s) at the website.
(3) Any required posters may be obtained as follows:
Poster(s) Obtain from Workplace Posters (The “elaws Poster Advisor” can be used to determine which poster(s) employers are required to display at their place(s) of business).
Downloadable hotline poster(s), as well as instructions for obtaining hard copy, are available at https://www.dol.gov/general/topics/posters
(c) If the Contractor has implemented a business ethics and conduct awareness program, including a reporting mechanism, such as a hotline poster, then the Contractor need not display any agency fraud hotline posters as required in paragraph (b) of this clause, other than any required DHS posters.
(d) Subcontracts. The Contractor shall include the substance of this clause, including this paragraph
(d), in all subcontracts that exceed the threshold specified in Federal Acquisition Regulation 3.1004(b)(1) on the date of subcontract award, except when the subcontract—
(1) Is for the acquisition of a commercial product or commercial service; or
(2) Is performed entirely outside the United States.
https://www.dol.gov/general/topics/posters
I.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (DEVIATION) JAN 2026
(a) This clause does not apply to the unrestricted portion of a partial set-aside.
(b) Definition. Similarly situated entity, as used in this clause, means a first-tier subcontractor, including an independent contractor, that—
(1) Has the same small business program status as that which qualified the prime contractor for the award (e.g., for a small business set-aside contract, any small business concern, without regard to its socioeconomic status); and
(2) Is considered small for the size standard under the North American Industry Classification System (NAICS) code the prime contractor assigned to the subcontract.
(c) Applicability. This clause applies only to—
(1) Contracts that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(2) Part or parts of a multiple-award contract that have been set aside for any of the small business concerns identified in 19.000(a)(3);
(3) Contracts that have been awarded on a sole-source basis in accordance with sections 19.105, 19.106, 19.107, and 19.108;
(4) Orders expected to exceed the simplified acquisition threshold and that are set aside for small business concerns under multiple-award contracts, as described in 8.4 and 16.5;
(5) Orders, regardless of dollar value, that are set aside in accordance with sections 19.105, 19.106, 19.107, and 19.108 under multiple-award contracts, as described in 8.4 and 16.5; and
(6) Contracts using the HUBZone price evaluation preference to award to a HUBZone small business concern unless the concern waived the evaluation preference.
(d) Independent contractors. An independent contractor shall be considered a subcontractor.
(e) By submission of an offer and execution of a contract, the Contractor agrees that in performance of a contract assigned a North American Industry Classification System (NAICS) code for—
(1) Services (except construction), it will not pay more than 50 percent of the amount paid by the Government for contract performance to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both services and supplies, the 50 percent limitation shall apply only to the service portion of the contract;
(2) Supplies (other than procurement from a nonmanufacturer of such supplies), it will not pay more than 50 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 50 percent subcontract amount that cannot be exceeded. When a contract includes both supplies and services, the 50 percent limitation shall apply only to the supply portion of the contract;
(3) General construction, it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded; or
(4) Construction by special trade contractors, it will not pay more than 75 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 75 percent subcontract amount that cannot be exceeded.
(f) The Contractor shall comply with the limitations on subcontracting as follows:
(1) For contracts, in accordance with paragraphs (c)(1), (2), (3) and (6) of this clause—
□ By the end of the base term of the contract and then by the end of each subsequent option period; or X - By the end of the performance period for each order issued under the contract.
(2) For orders, in accordance with paragraphs (c)(4) and (5) of this clause, by the end of the performance period for the order.
(g) A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (e) of this clause will be performed by the aggregate of the joint venture participants.
(1) In a joint venture comprised of a small business protégé and its mentor approved by the Small Business Administration, the small business protégé shall perform at least 40 percent of the work performed by the joint venture. Work performed by the small business protégé in the joint venture must be more than administrative functions.
(2) In an 8(a) joint venture, the 8(a) participant(s) shall perform at least 40 percent of the work performed by the joint venture. Work performed by the 8(a) participants in the joint venture must be more than administrative functions.
I.4 52.222-9 APPRENTICES AND TRAINEES (DEVIATION) MAY 2026
(a) Apprentices.
(1) An apprentice will be permitted to work at less than the predetermined rate for the work performed when employed-
(i) Pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS) or with a State Apprenticeship Agency recognized by the OATELS; or
(ii) In the first 90 days of probationary employment as an apprentice in such an apprenticeship program, even though not individually registered in the program, if certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.
(2) The allowable ratio of apprentices to journeymen on the job site in any craft classification must not be greater than the ratio permitted to the Contractor as…