Ultrasonic Testing Findings 2023.docx
DOCX document 14 KB Posted
- Solicitation number
- ADF&G ITB # 2027-1100-0088 - RV Medeia Shipyard Services FY27
- Issued by
- Alaska
About this file
This is an Ultrasonic Testing Report documenting structural findings at Medeia Shipyard for 2023. The report presents detailed thickness measurements and wear assessments across multiple vessel sections, including coffir dams, stern tubes, bow areas near anchor, transverse belt frame 42, exterior hull, bilge pump outlet pipe, head pump and freshwater pump areas, and reefer compressor shell plating. The assessment identifies specific problem areas requiring attention: port side coffir dam showing wear beneath the shaft drip zone, starboard side coffir dam displaying general wear on the uphill section with thickness readings of .265", .287", and .263", stern tubes exhibiting slight diminution on sides and bottom surfaces, and frame 42 transverse band vertical panels showing minor wear with lowest reading of .298". Additional areas of concern include slight diminution in the bilge pump outlet pipe and superficial paint chipping and minor corrosion on bottom hull plates beneath head and freshwater pumps.
The report recommends maintenance actions including consideration of painting trouble spots and installing a panel underneath the shaft drip zone on the port side coffir dam, needle gunning and prepping affected areas with paint 88 application to prevent further corrosion spreading on bottom hull plates, and continued monitoring of areas showing slight wear but not requiring immediate intervention. The overall assessment indicates that thickness measurements throughout the vessel remain generally adequate, with most identified areas representing maintenance concerns rather than critical structural failures. The 2020 shell plating repairs in the reefer compressor area were noted as having good integrity with only minor areas of slight diminution requiring monitoring.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Medeia Shipyard 2023 Ultrasonic Testing Reports/Findings/Trouble Areas
· Coffir dams: Port side underneath drip zone on shaft couplers showing wear. New plating installed 2020 Shipyard. Considering painting trouble spots and installing a panel underneath drip zone. Stbd side showing consistent wear on outboard side (3/8” thickness) w/ readings of .265, .287, and .263” on the uphill side of the coffir dam.
· Stern tubes: Port side showing minor diminution on sides and bottom. Top of stern tube showing little wear. Stbd side more consistent overall, but still minor wear on sides and bottom of stern tube.
· Bow area near anchor: Showing some diminution around anchor pulpit and surrounding areas, but nothing too alarming. Remaining areas in anchor winch area fairly consistent with good integrity.
· Transverse belt frame 42: Showing wear on port side vertical panels, lowest reading .298 with surrounding areas around .308, .312.
· Exterior Hull: On the stbd side, fore of the stabilizer it looks like the stabilizer used to continue approx. 10-12 feet farther than existing. Where stabi was removed, along the weld line there is some deep gouging from removing the stabilizer. Something to keep note of, paint seems to be doing its job and no signs of corrosion in gouged areas.
· Bilge Pump under fiddly stairs: Slight diminution in outlet pipe coming from pump. No real concern, but good to keep an eye on.
· Areas underneath Head pumps/Freshwater pumps: There are a couple trouble spots on the bottom hull plates, mainly superficial/paint chipping/minor corrosion. Need to needle gun/prep 88/paint to prevent further corrosion spreading.
· Area underneath reefer compressors: Areas of concern were around shell plating repair done in 2020, areas looked good. Slight areas of diminution inboard of plate repair, just aft of BH Frame 41. Nothing of great concern, worth keeping an eye on.
· SUMMARY: Overall, thicknesses were great. Problem areas were port side coffir dam under the shaft drip zone. Stbd side coffir dam showing general wear on the uphill section (3/8” thickness). Stern tubes are showing slight diminution on the sides and bottom of tube. Frame 42 on the transverse band, vertical panels showing slight wear. Outlet pipe for bilge pump underneath stairs showing slight wear.