This is a Nondestructive Examination Report detailing ultrasonic thickness testing services performed by Acuren for Point Hope Maritime on the vessel M.V. Medeia in Victoria, British Columbia on March 4, 2020. The scope of work involved conducting ultrasonic thickness gauging on structural components of the vessel in locations as directed by the owner's representative. The inspection examined multiple areas including wind water plates, keel plates, forepeak bulkhead, three transverse sections, shell plates and stern tubes, engine room bilge, areas adjacent to the sea chest and keel coolers, waterline fire pump and cofferdam hull plates, and areas in way of ballast tank structures. The work was performed using an Olympus Epoch 600 ultrasonic testing instrument with calibration due May 26, 2020, following Acuren's PAC-UT-14T001 procedure (Revision 06/2019) and acceptance standards specified by the client. Technicians Randy Wallin and Teri Hope conducted the testing on carbon steel structural components with coated surfaces at temperatures between 12°C and 15°C.

The report identified localized pitting on the starboard side shell plate at frame 42 and frame 15, as well as under the starboard side stern tubes, with assumed thickness measurements used for diminution calculations based on areas in good condition due to unavailability of original thickness data and ship drawings. The client was required to inspect the deliverable and provide written rejection within 15 business days of receipt or the report would be deemed accepted. Services were governed by Acuren's Master Services Agreement and Standard Service Terms. The report was generated in accordance with form CAN-QUA-02F007 R06 dated May 7, 2018, with Acuren's Richmond, British Columbia office identified as the service provider.

View the file

Other files

File Type Posted
Drawing 8-1 Medeia Keel Cooler Arrangements Drawing.pdf PDF
Drawing 17 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 4 -2 Medeia Zinc Location & Types -starboard.jpg JPG image
RV_Medeia_Paint_Specification.docx DOCX document
Drawing 12-3 Crane Specs.pdf PDF
Drawing 17-2 Hold Plan.PDF PDF
Elander 2006-4.jpg JPG image
Elander2014-6.jpg JPG image
Ultrasonic Testing Findings 2023.docx DOCX document
Ultrasonic Report 2011.pdf PDF
Drawing 12-2 Crane Diagram.pdf PDF
Elander2006 UltraSonic Test.jpg JPG image
Drawing 13-1 General Arrangement for Clad Welding.PDF PDF
Drawing 12-1 Medeia Crane Load Chart.pdf PDF
Medeia Megger Report 2023.pdf PDF
Drawing 2-1 Medeia Outboard Profile.pdf PDF
Elander2014-3.jpg JPG image
Elander2014-2.jpg JPG image
Elander2014-8.jpg JPG image
Ultrasonic Thickness Measurements 2011.pdf PDF
Elander 2006-5.jpg JPG image
Elander2014-7.jpg JPG image
Drawing 9-2 Trans. Frs & Long'L Section.PDF PDF
Elander2006-8.jpg JPG image
Elander KeelCoolers 2006.jpg JPG image
Drawing 3 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 16-2 Medeia Wiring Schematic.pdf PDF
Elander2006-7.jpg JPG image
Elander2014-4.jpg JPG image
Elander 2006-2.jpg JPG image
Ultrasonic Testing Trouble Spots 2023.docx DOCX document
Elander 2006 Shell Expansion.jpg JPG image
ADFG ITB 2027-1100-0088 - FY27 RV Medeia Shipyard Services.pdf PDF
MSD INSTRUCTION MANUAL.doc DOC document
Drawing 16-5 Medeia 42 Circuit Panel 5.pdf PDF
Elander2014 Ultrasonic Test.jpg JPG image
Drawing 5-2 Medeia Rudder Fabrication -Allied.PDF PDF
Drawing 5-1 Medeia Rudder Fabrication -Allied.PDF PDF
10-1 TW-200LP Steel 4 View Drawing.pdf PDF
Elander 2006-3.jpg JPG image
Drawing 9-1 General Scanting.PDF PDF
Drawing 16-1 Medeia Electrical pilot house panel.PDF PDF
Drawing 4 -1 Medeia Zinc Location & Types -port.jpg JPG image
Elander2006-6.jpg JPG image
Drawing 1-1 Medeia Docking Plan.pdf PDF
Drawing 1-2 Medeia Electrical Service -Shore Tie.jpg JPG image
Drawing 16-3 Medeia 42 Circuit Panels 1 & 2.pdf PDF
Elander2014-5.jpg JPG image
Drawing 16-4 Medeia 42 Circuit Panels 3 & 4.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A20-60POI001-6145373-200304-RLW-01.docx

NONDESTRUCTIVE EXAMINATION

CLIENT: POINT HOPE MARITIME

345 Harbour Road Victoria B.C V9A 3S2

PAGE: 1 of 8

DATE: March 4, 2020

ACUREN JOB #: 6145373

REPORT #: 6145373-200304-RLW-01

CONTRACT/PO: WO: N/A

ATTENTION: SAM JOHNSON WORK LOCATION: Victoria BC

PROJECT: M.V. Medeia

ITEM(S) EXAMINED: Structural Components

PART #: N/A MATERIAL: Carbon steel THICKNESS: N/A

SCOPE: Carry out ultrasonic thickness gauging on board the vessel “M.V. Medeia” in locations as directed by the owner’s representative.

TYPE OF INSPECTION: Ultrasonic

TEST DETAILS:

ACCEPTANCE STANDARD: Client's Information REVISION: N/A

PROCEDURE/TECHNIQUE: PAC- UT- 14T001 REVISION: 06 / 2019

TYPE: Thickness Echo to Echo METHOD: Contact

INSTRUMENT: Olympus MODEL: Epoch 600 S/N: 100048111 CAL DUE: May 26, 2020

CAL. BLOCK: Step Block S/N: 07-6664 CABLE-TYPE: Coaxial LENGTH: 5'

CAL. BLOCK: N/A S/N: N/A COUPLANT: Echo Ultrasonics - EchoMix

Probe & Technique Details:

TEST

ANGLE

PROBE

TYPE

CRYSTAL

SIZE

FREQ.

(MHZ)

SERIAL

NUMBER

DAMPING

Ω

TEST

FROM

REFERENCE

REFLECTOR

TRANSFER

VALUE

REFERENCE

SCAN

dB RANGE dB % FSH

1 0 dual .250” 5 02F142 50 One face BWE n/a 54 60 +6 1.0”

TEST SURFACE CONDITION: Coated TEST SURFACE TEMPERATURE: 12°C to 15°C

RESULTS:

Ultrasonic thickness measurements were performed in the following areas:

Wind Water Plates

Keel Plates

Forepeak bulkhead

Three (3) transverse sections

Shell plates und the stern tubes

Engine room bilge

Client acknowledges receipt and custody of the report or other work ("Deliverable"). Client agrees that it is responsible for assuring that acceptance standards, specifications and criteria in the Deliverable and Statement of Work ("SOW") are correct. Client acknowledges that Acuren is providing the Deliverable according to the SOW, and not any other standards. Client acknowledges that it is responsible for the failure of any items inspected to meet standards, and for remediation. Client has 15 business days following the date Acuren provides the Deliverable to inspect it, identify deficiencies in writing, and provide written rejection, or else the Deliverable will be deemed accepted. The Deliverable and other services provided by Acuren are governed by a Master Services Agreement ("MSA"). If the parties have not entered into an MSA, then the Deliverable and services are governed by the SOW and the "Acuren Standard Service Terms" (www.acuren.com/serviceterms) in effect when the services were ordered.

CLIENT: TOTAL HOURS S.T. O.T. SHIFT

CLIENT PRINTED NAME CLIENT SIGNATURE

ACCEPTED & ACKNOWLEDGED BY

ST

TECHNICIAN: See Project -- Day

ACUREN

ND

TECHNICIAN: Timesheet -- -- PM

TECHNICIAN: Randy Wallin Teri Hope KILOMETRES: OTHER CHARGES: YES NO st Technician nd

Technician

(IF YES, SEE DAILY OR PROJECT TIME REPORT)

REVIEWER: (Generated Using: CAN-QUA-02F007 R06 - 05/07/2018)

12271 Horseshoe Way Richmond, BC, Canada V7A 4V4 www.acuren.com

Phone: 604.275.3800 Fax: 604.274.7235 http://www.acuren.com/serviceterms

POINT HOPE MARITIME

M.V. Medeia Page 2 of 8

ACUREN JOB # 6145373

REPORT # 6145373-200304-RLW-01

Areas adjacent to the sea chest, keel coolers and keel cooler penetrations

Waterline fire pump and cofferdam hull plates

Areas in way of the ballast tank structures

Original thickness and original ship drawings were not available prior to inspection. Assumed thickness measurements were used for diminution calculation based on measurements from areas in good condition.

Localized pitting was noted on the starboard side shell plate at frame 42 and frame 15 as well as under the starboard side stern tubes.

See the following details.

M.V. Medeia Page 3 of 8

M.V. Medeia Page 4 of 8

M.V. Medeia Page 5 of 8

M.V. Medeia Page 6 of 8

M.V. Medeia Page 7 of 8

M.V. Medeia Page 8 of 8

File details come from the government source that posted it. Updated .