Ultrasonic Report 2011.pdf

PDF 701 KB Posted

Attached to
ADF&G ITB # 2027-1100-0088 - RV Medeia Shipyard Services FY27
Solicitation number
ADF&G ITB # 2027-1100-0088 - RV Medeia Shipyard Services FY27
Issued by
Alaska

About this file

This is an ultrasonic testing inspection report prepared by Elander Inspection Ltd., a certified nondestructive testing and marine inspection organization, for Allied Shipbuilders Ltd. regarding the R.V. Medeia vessel. The inspection was conducted on March 17, 2011, in North Vancouver, British Columbia, with the report dated March 18, 2011. The scope of work encompassed ultrasonic thickness measurement (UTM) of various piping systems and components aboard the vessel, including engine room salt water ballast manifolds and associated piping, sea chest piping, bilge pump piping, bow salt water ballast tank intake and discharge pipes, four-inch Schedule 80 salt water toilet discharge pipes, three engine room through-hull penetration pipes, four void room through-hull penetration pipes, and two engine room air receivers. The inspection utilized PANAMETRICS EPOCH II and EPOCH XT equipment with multiple frequency transducers and followed CSA W59 Section 11 and ASTM E 797 standards for manual ultrasonic pulse-echo contact method thickness measurement.

The report documents that original pipe thicknesses were unknown for all tested areas at the time of inspection, and in some instances, the pipe schedules appeared to be incorrect or not as constructed. The inspection was performed by Allan Elander, Manager of Elander Inspection Ltd., who holds CGSB Level II UT certification (Cert. No. 1136). The report includes detailed photographic documentation of tested locations and comprehensive data sheets with thickness measurement results. The report recommends confirmation of all original thicknesses prior to utilizing any diminution calculations in the data report to ensure accuracy of findings and subsequent maintenance or repair decisions.

View the file

Other files

File Type Posted
Drawing 8-1 Medeia Keel Cooler Arrangements Drawing.pdf PDF
Drawing 17 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 4 -2 Medeia Zinc Location & Types -starboard.jpg JPG image
RV_Medeia_Paint_Specification.docx DOCX document
Drawing 12-3 Crane Specs.pdf PDF
Drawing 17-2 Hold Plan.PDF PDF
Elander 2006-4.jpg JPG image
Elander2014-6.jpg JPG image
Ultrasonic Testing Findings 2023.docx DOCX document
Drawing 12-2 Crane Diagram.pdf PDF
Elander2006 UltraSonic Test.jpg JPG image
Drawing 13-1 General Arrangement for Clad Welding.PDF PDF
Drawing 12-1 Medeia Crane Load Chart.pdf PDF
Medeia Megger Report 2023.pdf PDF
Drawing 2-1 Medeia Outboard Profile.pdf PDF
Elander2014-3.jpg JPG image
Elander2014-2.jpg JPG image
Elander2014-8.jpg JPG image
Ultrasonic Thickness Measurements 2011.pdf PDF
Elander 2006-5.jpg JPG image
Elander2014-7.jpg JPG image
Drawing 9-2 Trans. Frs & Long'L Section.PDF PDF
Elander2006-8.jpg JPG image
Elander KeelCoolers 2006.jpg JPG image
Drawing 3 -1 Medeia Bilge & Ballast Piping.pdf PDF
Drawing 16-2 Medeia Wiring Schematic.pdf PDF
Elander2006-7.jpg JPG image
Elander2014-4.jpg JPG image
Elander 2006-2.jpg JPG image
Ultrasonic Testing Trouble Spots 2023.docx DOCX document
Elander 2006 Shell Expansion.jpg JPG image
ADFG ITB 2027-1100-0088 - FY27 RV Medeia Shipyard Services.pdf PDF
MSD INSTRUCTION MANUAL.doc DOC document
Drawing 16-5 Medeia 42 Circuit Panel 5.pdf PDF
Elander2014 Ultrasonic Test.jpg JPG image
Drawing 5-2 Medeia Rudder Fabrication -Allied.PDF PDF
Drawing 5-1 Medeia Rudder Fabrication -Allied.PDF PDF
10-1 TW-200LP Steel 4 View Drawing.pdf PDF
Elander 2006-3.jpg JPG image
Drawing 9-1 General Scanting.PDF PDF
Accuren Ultrasonic Testing Report 2020.pdf PDF
Drawing 16-1 Medeia Electrical pilot house panel.PDF PDF
Drawing 4 -1 Medeia Zinc Location & Types -port.jpg JPG image
Elander2006-6.jpg JPG image
Drawing 1-1 Medeia Docking Plan.pdf PDF
Drawing 1-2 Medeia Electrical Service -Shore Tie.jpg JPG image
Drawing 16-3 Medeia 42 Circuit Panels 1 & 2.pdf PDF
Elander2014-5.jpg JPG image
Drawing 16-4 Medeia 42 Circuit Panels 3 & 4.pdf PDF
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 1

C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1

ELANDER INSPECTION LTD.

Suite128 – 11800 River Road, Richmond, B.C. Canada V6X 1Z7 Phone: (604)214-1318 Fax: (604)214-1349 E-mail: Elander@intergate.ca

Web Page: Elanderinspection.ca Nondestructive Testing and Marine Inspection

REPORT OF ULTRASONIC EXAMINATION

CLIENT: Allied Shipbuilders Ltd. PROJECT NO: E11-018-004 1870 Harbour Road REPORT DATE: March 18, 2011 North Vancouver, BC V7H 1A1 TEST DATE: March 17, 2011

P.O. NO: 1953

CLIENT'S NO:

REPORT NO: R01

LOCATION: Same As Above CODE: See below PROJECT: R.V. Medeia – Piping Survey PAGE: 1 of 11

EQUIPMENT: PANAMETRICS EPOCH II EPOCH XT 38 DL+ UNIT BASIC SENSITIVITY: 0.060" (1.2 mm), 60% Full Screen

Standard Step Block Calibration on 2 thicknesses

TRANSDUCER: Angle: 0, Dual FREQUENCY:

.5 Mhz 1 Mhz 10 Mhz

2.25 Mhz 5 Mhz 15 Mhz

CALIBRATION BLOCK:

IIW DSC DAC

Other Std Step Block

COUPLANT:

Cel-Gel Oil Other

INSPECTION TECHNIQUE: CSA W59 Section 8.2 Other ASTM E 797 Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method.

INSPECTION CODE: CSA W59, Section 11 Section 12

Other Transport Canada

MATERIAL: Carbon Steel FORMING PROCESS: Plate SURFACE CONDITION: Clean Painted

DESCRIPTION: UTM of piping as directed on Allied Shipbuilders job procedure Item 17.

Areas Tested: Piping as described below

Nominal thickness was not known at time of testing for all areas. Areas identified with nominal thicknesses are shown in the data sheets.

TEST RESULTS

1. Engine Room salt water ballast manifolds and associated piping. The Suction and discharge manifold and first pipe from the manifold was tested. See Figure 1

2. Sea Chest – the sea chest was tested including the middle pipe nozzle going fwd.

3. Bilge pump and associated piping in the area was tested. See Figure 2.

4. Bow salt water ballast tank intake/discharge pipe from the engine room salt water ballast manifold to the bow ballast tank. The pipe goes through 3 fuel tanks.

5. Testing of 4” Sch. 80 pipe identified as salt water toilet discharge pipe from the Port and Starboard heads to the void room Starboard side overboard discharge valve.

6. UTM of 3 – Engine room through-hull penetration pipes.

7. UTM of 4 – Void room through-hull penetration pipes.

8. UTM of 2 – Engine Room air receivers.

See attached photos on tested locations and data sheets for thickness results.

General Comments Original thickness of pipes was unknown for all areas and in some instances the given schedule of pipe appears to be incorrect or not as built. It is recommended that confirmation of all original thicknesses to be done before using the diminution calculations in the data report.

TECHNICIAN: Allan Elander ELANDER INSPECTION LTD.

CGSB Level II UT, Cert. No. 1136

Allan Elander, Manager, NDT

E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 2

C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1

ELANDER INSPECTION LTD.

Suite128 – 11800 River Road, Richmond, B.C. Canada V6X 1Z7 Phone: (604)214-1318 Fax: (604)214-1349 E-mail: Elander@intergate.ca

Web Page: Elanderinspection.ca Nondestructive Testing and Marine Inspection

PHOTO LOG

Figure 1 General view of the Suction and Discharge manifold and associated piping.

Suction and discharge pipes were tested at the same locations.

Figure 2 General view of the bilge pump and associated piping.

P1 P2 P3 P4 P5

P6 P7

P8

S1-P

S2-S S1-S

MEASUREMENT

ON THIS PIPE

MEASUREMENT

ON THIS PIPE

B3

B1

B2

B4

E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 3

C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1

Figure 3 General view of the Fwd. Void Space through-hull penetration, Port Side.

Figure 4 General view of the waste water to tank piping, Stbd. side showing the pipe coming from the Fwd. heads.

OB-1 UTM Fwd of BHD – Pipe not shown.

OB-3

OB-2

E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 4

C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1

Figure 5 General view of the waste water to tank piping, Stbd. side showing the pipe Aft of the valve.

Figure 6 General view of the waste water to tank piping in closet, Stbd. Side

OB-3

OB-4

SD-1

SD-2

SD-3

SD-4

SD-5

SD-6

File details come from the government source that posted it. Updated .