This is an ultrasonic testing inspection report prepared by Elander Inspection Ltd., a certified nondestructive testing and marine inspection organization, for Allied Shipbuilders Ltd. regarding the R.V. Medeia vessel. The inspection was conducted on March 17, 2011, in North Vancouver, British Columbia, with the report dated March 18, 2011. The scope of work encompassed ultrasonic thickness measurement (UTM) of various piping systems and components aboard the vessel, including engine room salt water ballast manifolds and associated piping, sea chest piping, bilge pump piping, bow salt water ballast tank intake and discharge pipes, four-inch Schedule 80 salt water toilet discharge pipes, three engine room through-hull penetration pipes, four void room through-hull penetration pipes, and two engine room air receivers. The inspection utilized PANAMETRICS EPOCH II and EPOCH XT equipment with multiple frequency transducers and followed CSA W59 Section 11 and ASTM E 797 standards for manual ultrasonic pulse-echo contact method thickness measurement.
The report documents that original pipe thicknesses were unknown for all tested areas at the time of inspection, and in some instances, the pipe schedules appeared to be incorrect or not as constructed. The inspection was performed by Allan Elander, Manager of Elander Inspection Ltd., who holds CGSB Level II UT certification (Cert. No. 1136). The report includes detailed photographic documentation of tested locations and comprehensive data sheets with thickness measurement results. The report recommends confirmation of all original thicknesses prior to utilizing any diminution calculations in the data report to ensure accuracy of findings and subsequent maintenance or repair decisions.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 1
C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1
ELANDER INSPECTION LTD.
Suite128 – 11800 River Road, Richmond, B.C. Canada V6X 1Z7 Phone: (604)214-1318 Fax: (604)214-1349 E-mail: Elander@intergate.ca
Web Page: Elanderinspection.ca Nondestructive Testing and Marine Inspection
REPORT OF ULTRASONIC EXAMINATION
CLIENT: Allied Shipbuilders Ltd. PROJECT NO: E11-018-004 1870 Harbour Road REPORT DATE: March 18, 2011 North Vancouver, BC V7H 1A1 TEST DATE: March 17, 2011
P.O. NO: 1953
CLIENT'S NO:
REPORT NO: R01
LOCATION: Same As Above CODE: See below PROJECT: R.V. Medeia – Piping Survey PAGE: 1 of 11
EQUIPMENT: PANAMETRICS EPOCH II EPOCH XT 38 DL+ UNIT BASIC SENSITIVITY: 0.060" (1.2 mm), 60% Full Screen
Standard Step Block Calibration on 2 thicknesses
TRANSDUCER: Angle: 0, Dual FREQUENCY:
.5 Mhz 1 Mhz 10 Mhz
2.25 Mhz 5 Mhz 15 Mhz
CALIBRATION BLOCK:
IIW DSC DAC
Other Std Step Block
COUPLANT:
Cel-Gel Oil Other
INSPECTION TECHNIQUE: CSA W59 Section 8.2 Other ASTM E 797 Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method.
INSPECTION CODE: CSA W59, Section 11 Section 12
Other Transport Canada
MATERIAL: Carbon Steel FORMING PROCESS: Plate SURFACE CONDITION: Clean Painted
DESCRIPTION: UTM of piping as directed on Allied Shipbuilders job procedure Item 17.
Areas Tested: Piping as described below
Nominal thickness was not known at time of testing for all areas. Areas identified with nominal thicknesses are shown in the data sheets.
TEST RESULTS
1. Engine Room salt water ballast manifolds and associated piping. The Suction and discharge manifold and first pipe from the manifold was tested. See Figure 1
2. Sea Chest – the sea chest was tested including the middle pipe nozzle going fwd.
3. Bilge pump and associated piping in the area was tested. See Figure 2.
4. Bow salt water ballast tank intake/discharge pipe from the engine room salt water ballast manifold to the bow ballast tank. The pipe goes through 3 fuel tanks.
5. Testing of 4” Sch. 80 pipe identified as salt water toilet discharge pipe from the Port and Starboard heads to the void room Starboard side overboard discharge valve.
6. UTM of 3 – Engine room through-hull penetration pipes.
7. UTM of 4 – Void room through-hull penetration pipes.
8. UTM of 2 – Engine Room air receivers.
See attached photos on tested locations and data sheets for thickness results.
General Comments Original thickness of pipes was unknown for all areas and in some instances the given schedule of pipe appears to be incorrect or not as built. It is recommended that confirmation of all original thicknesses to be done before using the diminution calculations in the data report.
TECHNICIAN: Allan Elander ELANDER INSPECTION LTD.
CGSB Level II UT, Cert. No. 1136
Allan Elander, Manager, NDT
E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 2
C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1
ELANDER INSPECTION LTD.
Suite128 – 11800 River Road, Richmond, B.C. Canada V6X 1Z7 Phone: (604)214-1318 Fax: (604)214-1349 E-mail: Elander@intergate.ca
Web Page: Elanderinspection.ca Nondestructive Testing and Marine Inspection
PHOTO LOG
Figure 1 General view of the Suction and Discharge manifold and associated piping.
Suction and discharge pipes were tested at the same locations.
Figure 2 General view of the bilge pump and associated piping.
P1 P2 P3 P4 P5
P6 P7
P8
S1-P
S2-S S1-S
MEASUREMENT
ON THIS PIPE
MEASUREMENT
ON THIS PIPE
B3
B1
B2
B4
E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 3
C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1
Figure 3 General view of the Fwd. Void Space through-hull penetration, Port Side.
Figure 4 General view of the waste water to tank piping, Stbd. side showing the pipe coming from the Fwd. heads.
OB-1 UTM Fwd of BHD – Pipe not shown.
OB-3
OB-2
E 1 1 - 0 1 8 - 0 0 4 R 0 1 P O 1 9 5 3 U T M – R V M e d e i a , P i p i n g M a r c h 1 7 , 2 0 1 1 P a g e 4
C E R T I F I E D W E L D I N G I N S P E C T I O N O R G A N I Z A T I O N - C S A W 1 7 8 . 1
Figure 5 General view of the waste water to tank piping, Stbd. side showing the pipe Aft of the valve.
Figure 6 General view of the waste water to tank piping in closet, Stbd. Side
OB-3
OB-4
SD-1
SD-2
SD-3
SD-4
SD-5
SD-6