ITB Summary: RV Medeia Shipyard Services
This Invitation to Bid (ITB 2027-1100-0088) is issued by the State of Alaska, Department of Fish and Game, Division of Commercial Fisheries, seeking qualified shipyards to conduct maintenance, repairs, and upgrades to the Research Vessel (RV) Medeia, a 110-foot fisheries research and management support vessel operated in Southeast Alaska. The scope of work encompasses 16 primary work items and one contingent item, including dry docking, hull power washing, sea chest and valve servicing, installation of 46 replacement hull zincs, rudder removal and bearing replacement, comprehensive painting of multiple vessel surfaces (totaling approximately 6,664 square feet), propeller and tailshaft inspection and replacement, keel cooler replacement, shell plate replacement, marine sanitation device servicing, ultrasonic thickness testing, crane static load and torque testing, clad welding of diminished shell plate areas, and main engine keel cooler conversion preparation for future repower. The contingent item is a stability test and updated stability report. Bids must be received by 2:00 PM Alaska Standard Time on November 23, 2026, with contract issuance expected December 2, 2026. All work must be performed by qualified journeymen to American Bureau of Shipping standards, and the contractor assumes full responsibility for vessel security, hazardous materials disposal, and confined space work costs.
The State will evaluate bids using an inter-port differential calculation based on round-trip vessel operational costs from Juneau, Alaska at $24.27 per mile. The ITB indicates regional funds from the Division of Commercial Fisheries, Southeast Region, will fund the services; no specific budget amount is disclosed in the solicitation. The contractor must be a full-service shipyard facility performing the work directly, with no brokerage or third-party arrangements permitted. Bidders must hold or obtain a valid Alaska business license to receive Alaska Bidder Preference. Alaska preferences available include Alaska Bidder Preference, Alaska Veteran Preference, Alaska Military Skills Program Preference, Local Forest Products Preference, Local Agricultural and Fisheries Product Preference, Alaska Product Preference, Employment Program Preference, and Alaskans with Disabilities Preference. All work is priced as fixed-cost line items, with separate pricing for the contingent stability test item. Email submission is the preferred bid method, with hard copy mailing as an alternative.
View the file
Other files
Show all 49
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF ALASKA
INVITATION TO BID (ITB)
FY27 RV MEDEIA SHIPYARD SERVICES
ITB # 2027-1100-0088
ISSUED NOVEMBER 2, 2026
ADF&G IS SEEKING QUALIFIED SHIPYARDS TO CONDUCT THE NECESSARY SHIPYARD SERVICES NEEDED FOR THE RESEARCH
VESSEL (RV) MEDEIA IN FY27.
IMPORTANT NOTICE: If you received this solicitation from the State of Alaska’s “Online Public Notice” web site, you must register with the procurement officer listed below if you desire to receive notification of subsequent amendments to the solicitation.
BIDDER'S NOTICE: By signature on this form, the bidder certifies that they comply with the following:
(1) the bidder has a valid Alaska business license or will obtain one prior to award of any contract resulting from this ITB. If the bidder possesses a valid
Alaska business license, the license number must be written below or one the following forms of evidence must be submitted with the bid:
• a canceled check for the business license fee;
• a copy of the business license application with a receipt date stamp from the State's business license office;
• a receipt from the State’s business license office for the license fee;
• a copy of the bidder’s valid business license;
• a sworn notarized affidavit that the bidder has applied and paid for a business license;
(2) the price(s) submitted was arrived at independently and without collusion, under penalty of perjury, and that the bidder is complying with:
• the laws of the State of Alaska;
• the applicable portion of the Federal Civil Rights Act of 1964;
• the Equal Employment Opportunity Act and the regulations issued thereunder by the state and federal government;
• the Americans with Disabilities Act of 1990 and the regulations issued thereunder by the state and federal government;
• the bid will remain open and valid for at least 90 days;
• all terms and conditions set out in this Invitation to Bid (ITB).
If a bidder does not hold an Alaska Business License (1) at the time designated in the ITB for opening the state will disallow the Alaska Bidder Preference.
Bids must also be submitted under the name as appearing on the bidder’s current Alaska business license in order to receive the Alaska Bidder Preference.
If a bidder fails to comply with (2) of this paragraph, the state may reject the bid, terminate the contract, or consider the contractor in default.
DEPARTMENT OF FISH AND GAME
DIVISION OF ADMINISTRATIVE SERVICES COMPANY SUBMITTING BID
AUTHORIZED SIGNATURE
PROCUREMENT OFFICER:
ERIC VERRELLI PRINTED NAME
PHONE: (907) 465-6871
EMAIL: eric.verrelli@alaska.gov DATE mailto:eric.verrelli@alaska.gov
STATE OF ALASKA – INVITATION TO BID ITB 2027-1100-0088
RV MEDEIA SHIPYARD SERVICES FY27
{ITB-3/v1/10.16.24} Page 2 of 63
TABLE OF CONTENTS
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE ITB
SEC. 1.02 BUDGET
SEC. 1.03 DEADLINE FOR RECEIPT OF BIDS
SEC. 1.04 PRIOR EXPERIENCE
SEC. 1.05 REQUIRED REVIEW
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF BIDS
SEC. 1.07 SITE INSPECTION
SEC. 1.08 RETURN INSTRUCTIONS
SEC. 1.09 ASSISTANCE TO BIDDERS WITH A DISABILITY
SEC. 1.10 AMENDMENTS TO BIDS
SEC. 1.11 AMENDMENTS TO THE ITB
SEC. 1.12 ITB SCHEDULE
SEC. 1.13 PRE-BID CONFERENCE/TELECONFERENCE
SEC. 1.14 ALTERNATE BIDS
SEC. 1.15 SUPPORTING INFORMATION
SEC. 1.16 FIRM, UNQUALIFIED, AND UNCONDITIONAL OFFER
SECTION 2. SCOPE OF WORK AND CONTRACT INFORMATION
SEC. 2.01 SCOPE OF WORK
SEC. 2.02 CONTRACT TERM
SEC. 2.03 CONTRACT TYPE
SEC. 2.04 PAYMENT FOR STATE PURCHASES
SEC. 2.05 ELECTRONIC PAYMENTS
SEC. 2.06 PROMPT PAYMENT FOR STATE PURCHASES
SEC. 2.07 CONTRACT ADMINISTRATION
SEC. 2.08 CONTRACT PRICE ADJUSTMENTS
SEC. 2.09 CONTRACT PERFORMANCE LOCATION
SEC. 2.10 THIRD-PARTY FINANCING AGREEMENTS NOT ALLOWED
SEC. 2.11 SUBCONTRACTORS
SEC. 2.12 JOINT VENTURES
SEC. 2.13 RIGHT TO INSPECT PLACE OF BUSINESS
SEC. 2.14 F.O.B. POINT
SEC. 2.15 INSPECTION & MODIFICATION - REIMBURSEMENT FOR UNACCEPTABLE DELIVERABLES
SEC. 2.16 EQUIPMENT INSPECTION
SEC. 2.17 NEW EQUIPMENT
SEC. 2.18 REMANUFACTURED/RECONDITIONED EQUIPMENT
SEC. 2.19 LEMON CLAUSE
SEC. 2.20 DISCONTINUED ITEMS
SEC. 2.21 LIQUIDATED DAMAGES
SEC. 2.22 SHIPPING DAMAGE
SEC. 2.23 CONTRACT CHANGES – UNANTICIPATED AMENDMENTS
SEC. 2.24 CONTINUING OBLIGATION OF CONTRACTOR
SEC. 2.25 BILLING INSTRUCTIONS
SEC. 2.26 ESTIMATED QUANTITIES
SEC. 2.27 WARRANTY
SEC. 2.28 NONDISCLOSURE AND CONFIDENTIALITY
SEC. 2.29 INDEMNIFICATION
SEC. 2.30 INSURANCE
SECTION 3. BID FORMAT AND CONTENT
SEC. 3.01 BID FORMS
SEC. 3.02 BID BOND – PERFORMANCE BOND – SURETY DEPOSIT
SEC. 3.03 PRICES
SECTION 4. EVALUATION AND CONTRACTOR SELECTION
SEC. 4.01 EVALUATION OF BIDS
SEC. 4.02 APPLICATION OF PREFERENCES
SEC. 4.03 ALASKA BIDDER PREFERENCE
SEC. 4.04 ALASKA VETERAN PREFERENCE
SEC. 4.05 ALASKA MILITARY SKILLS PROGRAM PREFERENCE
SEC. 4.06 USE OF LOCAL FOREST PRODUCTS
{ITB-3/v1/10.16.24} Page 3 of 63
SEC. 4.07 LOCAL AGRICULTURAL AND FISHERIES PRODUCT PREFERENCE
SEC. 4.08 ALASKA PRODUCT PREFERENCE
SEC. 4.09 EMPLOYMENT PROGRAM PREFERENCE
SEC. 4.10 ALASKANS WITH DISABILITIES PREFERENCE
SEC. 4.11 PREFERENCE QUALIFICATION LETTER
SEC. 4.12 EXTENSION OF PRICES
SEC. 4.13 METHOD OF AWARD
SEC. 4.14 CONTRACTOR SELECTION PROCESS
SEC. 4.15 NOTICE OF INTENT TO AWARD
SECTION 5. GENERAL PROCESS AND LEGAL INFORMATION
SEC. 5.01 INFORMAL DEBRIEFING
SEC. 5.02 ALASKA BUSINESS LICENSE AND OTHER REQUIRED LICENSES
SEC. 5.03 AUTHORITY
SEC. 5.04 COMPLIANCE
SEC. 5.05 SUITABLE MATERIALS, ETC
SEC. 5.06 SPECIFICATIONS
SEC. 5.07 BRAND SPECIFIC
SEC. 5.08 ITEM UPGRADES
SEC. 5.09 WORKMANSHIP AND MATERIALS
SEC. 5.10 CONTRACTOR SITE INSPECTION
SEC. 5.11 ORDER DOCUMENTS
SEC. 5.12 HUMAN TRAFFICKING
SEC. 5.13 RIGHT OF REJECTION
SEC. 5.14 STATE NOT RESPONSIBLE FOR PREPARATION COSTS
SEC. 5.15 DISCLOSURE OF BID CONTENTS
SEC. 5.16 ASSIGNMENTS
SEC. 5.17 FORCE MAJEURE (IMPOSSIBILITY TO PERFORM)
SEC. 5.18 DEFAULT
SEC. 5.19 DISPUTES
SEC. 5.20 SEVERABILITY
SEC. 5.21 CONTRACT CANCELLATION
SEC. 5.22 GOVERNING LAW; FORUM SELECTION
SEC. 5.23 QUALIFIED BIDDERS
SEC. 5.24 FEDERALLY IMPOSED TARIFFS
SEC. 5.25 PROTEST
SECTION 6. ATTACHMENTS
SEC. 6.01 ATTACHMENTS
{ITB-3/v1/10.16.24} Page 4 of 63
SECTION 1. INTRODUCTION & INSTRUCTIONS
SEC. 1.01 PURPOSE OF THE ITB
The Department of Fish and Game, Division of Commercial Fisheries, is soliciting bids for maintenance, repairs, and upgrades to the RV Medeia, a fisheries research and management support vessel operated in Southeast Alaska. The routine maintenance was last conducted 3 years ago, which is the typical schedule for this vessel.
R/V Medeia Vessel Description The Research Vessel (R/V) Medeia is owned and operated by the State of Alaska, Department of Fish and Game, Southeast Region and is engaged in the support of scientific commercial fisheries research within Southeast Alaska. The vessel is versatile and adaptable to accommodate a wide variety of deck equipment and machinery in various configurations.
Official Number: 653322 Vessel Name: R/V Medeia Dimensions:
Length Overall 110’ Length Waterline 97’
Breadth 26’3” Depth 9’6”
Tonnage
Gross Tons 304.96 Net Tons 76.24
Builder Universal Iron Works, Houma, LA, U.S.A.
Area of Operation Southeast Alaska-Inland, Near Coastal and Ocean Waters Machinery
Engine type Twin Detroit Diesel 16V92, Starboard Main – model 8163-7000, s/n 16FF1025 installed 3/15/01, current hours: 15,056 Port Main – model V1692, s/n unknown, Installed 1/13/19, current hours: 2332
Reduction Gears Twin Disc Model MG-530, Port - Serial No 3P3461, BOM No. 37408 with a reduction ratio of 4.04:1. Starboard - Serial No. 3K5848, BOM No. 35978 with a reduction ratio of 4.04:1.
Type of Proplution Twin 600 HP Diesel Engines Electrical System 200 amp,208 V; 30 amp, 480v
Propeller information 62” Bronze Etc.
Etc.
Electrical
{ITB-3/v1/10.16.24} Page 5 of 63
Power Port Auxillary-Lugger M99C2 99kw, model 6068TF275, s/n PE 6068T896349 Installed 1/13/19, current hours: 5608 Starboard Auxillary – Lugger MP 99C 99kw, model 6068TF250, s/n PE6068T089280, rebuilt 2/2022, current hours: 25995 (350 hrs after rebuild) Hydraulic Auxillary – Lugger LT1066T, model 6068TF275, s/n
PE6068T754315
Shore tie adapter Hubble 5100P9W 100 A 120/208VAC 3ø 15HP Tank Capacities
Diesel Oil 20000 gal Fresh Water 8000 gal
Hydraulic Oil. 400 gal Lube Oil 400 gal
SEC. 1.02 BUDGET
Regional funds allocated to the Division of Commercial Fisheries, Southeast Region, will be used to fund services under this ITB.
SEC. 1.03 DEADLINE FOR RECEIPT OF BIDS
Bids must be received no later than 2:00 PM Alaska Time on November 23, 2026, at which time they will be publicly opened. Late bids or amendments will be considered non-responsive and will not be opened or accepted for evaluation.
SEC. 1.04 PRIOR EXPERIENCE
No specific minimums have been set for this ITB. The State intends to contract directly with a full-service shipyard facility to complete the project. Bids which offer other arrangements or brokerage services through a 3rd party shall be rejected as non-responsive.
SEC. 1.05 REQUIRED REVIEW
Bidders shall carefully review this ITB for defects and questionable or objectionable material. Comments concerning defects and questionable or objectionable material in the ITB should be made in writing and received by the procurement officer at least ten days before the deadline for receipt of bids. This will allow time for an amendment to be issued if one is required. It will also help prevent the opening of a defective bid, upon which award cannot be made, and the resultant exposure of bidders' prices.
{ITB-3/v1/10.16.24} Page 6 of 63
SEC. 1.06 QUESTIONS PRIOR TO DEADLINE FOR RECEIPT OF BIDS
All questions must be in writing and directed to the procurement officer. The interested party must confirm telephone conversations in writing. Two types of questions generally arise. One may be answered by directing the questioner to a specific section of the ITB. These questions may be answered over the telephone. Other questions may be more complex and may require a written amendment to the ITB. The procurement officer will make that decision.
SEC. 1.07 SITE INSPECTION
Reserved.
SEC. 1.08 RETURN INSTRUCTIONS
Email bid submission is the preferred method of submission. The entire bid may be emailed to dfg.contracting@alaska.gov and must contain the ITB number in the subject line of the email. The maximum size of a single email (including all text and attachments) that can be received by the state is 20mb (megabytes). If the email containing the bid exceeds this size, the bid must be sent in multiple emails that are each less than 20 megabytes and each email must comply with the requirements described above.
Please note that email transmission is not instantaneous. Like sending a hard copy bid, if you are emailing your bid, the state recommends sending it enough ahead of time to ensure the email is delivered by the deadline for receipt of bids.
It is the bidder’s responsibility to contact the issuing agency at 907-465-6178 to confirm that the entire bid has been received. The state is not responsible for unreadable, corrupt, or missing attachments.
Bidders may mail in bids as well. If mailing, Bidders must submit one hard copy of their entire bid, in writing, to the procurement officer in a sealed package. The sealed bid package must be addressed as follows:
Department of Fish and Game Division of Administrative Services
Attention: Eric Verrelli Invitation to Bid (ITB) Number: 2027-1100-0088
ITB Title: FY27 RV Medeia Shipyard Services PO Box 115526
Juneau, AK 99811-5526
If using U.S. mail, please use the following address:
PO Box 115526 Juneau, AK 99811-5526
If using a delivery service, please use the following address:
mailto:dfg.contracting@alaska.gov
{ITB-3/v1/10.16.24} Page 7 of 63
1255 W 8th STREET Juneau, AK 99801
SEC. 1.09 ASSISTANCE TO BIDDERS WITH A DISABILITY
The State of Alaska complies with Title II of the Americans with Disabilities Act of 1990. Individuals with disabilities who may need auxiliary aids, services, and/or special modifications to submit a bid should contact the Procurement Officer no later than ten days prior to the closing of the bid to make any necessary arrangements.
SEC. 1.10 AMENDMENTS TO BIDS
Amendments to or withdrawals of bids will only be allowed if acceptable requests are received prior to the deadline that is set for receipt of bids, in accordance with 2 AAC 12.140. No amendments or withdrawals will be accepted after the deadline unless the delay is due to an error of the contracting agency, in accordance with 2
AAC 12.160.
SEC. 1.11 AMENDMENTS TO THE ITB
If an amendment is issued before the deadline for receipt of bids, the amendment will be posted on the State of Alaska Online Public Notice (OPN) website. The link to the posting of the amendment will be provided to all who were notified of the ITB and to those who have registered with the procurement officer after receiving the ITB from the OPN.
SEC. 1.12 ITB SCHEDULE
The ITB schedule below represents the State of Alaska’s best estimate of the schedule that will be followed. If a component of this schedule, such as the deadline for receipt of bids, is delayed, the rest of the schedule may be shifted accordingly. All times are Alaska Standard Time (AST).
ACTIVITY TIME DATE
Issue Date / ITB Released 11/2/2026 Deadline for Receipt of Bids / Bid Due Date 2:00 pm AKST 11/23/2026 Bid Evaluations Complete 11/23/2026 Notice of Intent to Award 11/23/2026 Contract Issued 12/2/2026
This ITB does not, by itself, obligate the state. The state's obligation will commence when the contract is approved by the Commissioner of the Department of Fish and Game, or the Commissioner's designee. Upon written notice to the contractor, the state may set a different starting date for the contract. The state will not be responsible for any work done by the contractor, even work done in good faith, if it occurs prior to the contract start date set by the state.
{ITB-3/v1/10.16.24} Page 8 of 63
SEC. 1.13 PRE-BID Conference/Teleconference There will be no pre-bid conference.
SEC. 1.14 ALTERNATE BIDS
Bidders may only submit one bid for evaluation. In accordance with 2 AAC 12.830 alternate bids (bids that offer something different than what is asked for) will be rejected.
SEC. 1.15 SUPPORTING INFORMATION
Provided a bid meets the requirements for a definite, firm, unqualified, and unconditional offer, the state reserves the right to request supplemental information from the bidder, after the bids have been opened, to ensure that the products or services offered completely meet the ITB requirements. The requirement for such supplemental information will be at the reasonable discretion of the state and may include the requirement that a bidder will provide a sample product(s) so that the state can make a first-hand examination and determination.
A bidder's failure to provide this supplemental information or the product sample(s), within the time set by the state, may cause the state to consider the offer non-responsive and reject the bid.
SEC. 1.16 FIRM, UNQUALIFIED, AND UNCONDITIONAL OFFER
To be responsive a bid must constitute a definite, firm, unqualified and unconditional offer to meet all the material terms of the ITB. Material terms are those that could affect the price, quantity, quality, or delivery. Also included as material terms are those which are clearly identified in the ITB, and which must be complied with at risk of bid rejection for non-responsiveness.
{ITB-3/v1/10.16.24} Page 9 of 63
SECTION 2. SCOPE OF WORK AND CONTRACT INFORMATION
SEC. 2.01 SCOPE OF WORK
General Terms and Conditions
The Contractor shall supply all necessary manpower, labor, supervision, expendable supplies, materials, equipment, and expertise necessary to successfully and safely perform the work defined in each of the Work Items. The Contractor’s responsibility shall include mobilization, all necessary environmental and personnel safeguards, and cleanup of the site (leaving the vessel in better shape than before the work). During the work period, the Contractor shall allow for ADF&G and regulatory agencies to inspect all work, without claiming for delay or impact.
The Contractor shall provide all necessary services to complete all items as set forth in the specifications. These services include, but are not limited to: all necessary rolling stock including cranes, man-lifts, fork-lifts, trucks; all necessary staging, ventilation, and lighting; all necessary power and hand tools including expendable supplies for such tools, all necessary safety equipment and testing including maintaining safe for entry certificates (Confined Space), and all environmental equipment, testing, and safeguards.
Work Standards
All work is to be performed by qualified journeymen. Bidders are presumed to warranty that all work will be of sufficiently high quality to meet standards of the American Bureau of Shipping or other recognized classification societies. Owner Representative will inspect all work items for approval upon completion. The Owner Representative may, at their sole discretion, obtain ABS inspections for any Work Item(s).
Security It is understood that the selected bidder will be responsible for any damage to the vessel, direct or collateral, that may occur pursuant to this work. Contractor shall have care, custody and control of the vessel throughout the contract performance period. Vessel security shall be provided to protect the vessel from damage, fire, theft or vandalism
Hazardous Materials and Confined Space Work:
It should be anticipated that due to the nature of this project there will be hazardous materials to be disposed of. The State will not be responsible for any costs associated with the collection or disposal of any hazardous materials generated by this project.
It should be anticipated that due to the nature of this project there will be work in confined spaces. The State will not be responsible for any additional cost associated with this confined space work.
Inter-Port Differential
{ITB-3/v1/10.16.24} Page 10 of 63
For the purposes of evaluating the Bid Proposals, the Owner will consider the differences in all roundtrip vessel operational costs from Juneau, Alaska to the responding Bidder’s locations. This shall be factored into each Bid Proposal total amount. The Inter-Port Differential shall be calculated in accordance with Alaska Statute. For this bid the operational cost is $24.27 per mile, travel cost based on each bidder’s location will be calculated and added during bid evaluation.
Work Item List
1. Dry Docking
2. Power Wash Hull
3. Sea Chest, Strainer, and Valves
4. Zincs
– Install (27) Z-22 Hull Zincs
– Install (12) Z-19 Zincs
– Install (2) Z-4 Zincs
– Install (1) KK-2 Keel Cooler Zinc
– Install (4) Rudder Zincs
5. Rudder Removal, Inspection, Stocks and Flanges
– Remove, Inspect, Re-install Rudder Stocks and Flanges
– Replace Lower Bearing on Port Rudder Stock with New
– Replace Upper Bearing on Port Rudder Stock with New
– Replace Lower Bearing on Starboard Rudder Stock with New
6. Paint
– Keel to Waterline
– Waterline to Freeboard Outside Profile
– Mast
– Main Deck Aft True Deck
– Shaft Tubes
– Stuffing Boxes
– Rudder Post Tubes
– Tiller Arms
– Vessel's Markings
– Bait Freezer Hatches
7. Propeller, Tail Shafts, Bearings and Glands Inspection
– Propeller Removal, Inspection
– Fit and Installation of New Propellers to Tailshafts
{ITB-3/v1/10.16.24} Page 11 of 63
– Tailshaft Removal, Inspection, Installation
– Replace Starboard Stern Tube Cutlass Bearing with New
8. Replace Walter Keel Cooler
9. Replace Shell Plate in Starboard Cofferdam
10. Service MSDS
11. Ultrasonic Thickness Testing
12. Crane Static Load Test and Torque Test
– Static Load Test
– Torque Test Pedestal and Turret Cap Screws
13. Clad Weld
14. Main Engine Keel Cooler Conversion (Repower Preparation)
– Remove Aft Sections of Keel Channel Coolers, Cap Retained Sections, and Repair
Bottom Shell
– Install New Keel Coolers (Owner Supplied)
– Fabricate and Install Keel Cooler Guards
– Engine Room Piping, Expansion Tanks, and Low-Level Alarms
– Flush, Fill, Pressure Test, and Trials
15. Megger Test
16. Inspect Ballast Tanks
17. Install Cadyma Knife Cutters
Contingent Items (priced separately; not part of the base bid; added to the contract only by written change order at the Owner's option):
• C-1. Stability Test (Inclining Experiment) and Updated Stability Report Work Item Detail
The Contractor shall provide a fixed cost for all labor, material, and equipment to accomplish each of the following work items:
1: Dry Docking
1.1 Scope
Contractor shall dry-dock the Medeia to complete the work items detailed in ITB 2027-xxxx-xxxx.
Contractor shall also provide power and gangway access to the Medeia while in dry-dock and dockside.
1.2 References
Drawings:
• 1-1 Medeia Docking Plan
{ITB-3/v1/10.16.24} Page 12 of 63
• 1-2 Medeia Electrical Service – Shore Tie
Photos:
• 1-1, 1-2, 1-3 Medeia Underwater
• 1-4, 1-5 Shore Power Adapter
1.3 Requirements
The Contractor shall provide a fixed cost for all labor, material, and equipment, for dry-docking and un-docking the vessel to accomplish all work described herein. The Contractor is responsible for all docking, un-docking, and mooring activities. The vessel shall be docked or lifted in accordance with the attached Docking Plan.
A dry-dock meeting shall take place prior to the vessel being dry-docked. At this time the Dock-Master will present his blocking plan, pressure calculations, describe his plan for docking the vessel to include schedule of events for rough weather, the use of engines, tugs, communication with ADF&G, and other relevant items. The Contractor shall notify ADF&G Representative a minimum of 48 hours prior to dry-docking and un-docking the vessel. The Contractor shall not initiate docking activities without the express permission of ADF&G Representative. Dry docking shall occur within 3 days of contract commencement.
Blocking in way of keel channel coolers. The attached Docking Plan (Drawing 1-1) shows keel blocks bearing on the port and starboard main engine keel channel coolers at several locations. The aft sections of those channels (approximately 18 feet per side) are being removed under Work Item 14, and new keel coolers and guards are being installed in the cleared footprint; the forward sections of the channels remain in place. The Contractor's blocking plan shall account for this: blocks shall be arranged so that the aft channel sections can be cut off, the bottom shell repaired, and the new coolers and guards installed without re-docking the vessel. Where blocks must be placed on the aft channel sections for the initial docking, the Contractor shall include in this work item all block shifts, re-shimming, and temporary supports needed to clear those sections and complete the Work Item 14 hull work. Blocks may bear on the retained forward sections of the channels. The Dock-Master shall present the blocking arrangement and the sequence of any block shifts at the dry-dock meeting, with the supporting pressure calculations, and shall provide a copy to the Owner Representative before the vessel is docked. The Contractor is solely responsible for the adequacy of the blocking throughout the dry-dock period, including during and after removal of the aft channel sections.
During the entire contract period while dockside and ashore (dry-docked), the vessel shall be supplied with 240-volt, three phase, 100-amp service converted to 208V 3-phase through the vessel isolation transformer. Assume a 50-amp continuous draw for the power. Owner will supply a 200-amp to 100-amp plug adapter to make it easier to tie into ship's 200-amp service cable. (See Photos 1-4 and 1-5 Shore Power Adapter)
Contractor will provide a gangway for access from the dry-dock or ground to the vessel's main deck with adequate safety netting and lighting.
{ITB-3/v1/10.16.24} Page 13 of 63
Provide a safe lay berth at the Contractor's facility throughout the contract performance period.
Contractor to ensure suitable mooring lines are available and tended while the vessel is pier-side and that all necessary safety precautions are taken.
2: Power Wash Hull
2.1 Scope
The Contractor shall provide a fixed cost for all labor, material, and equipment to scrape (from waterline to bottom of keel) and pressure wash the entire exterior of the vessel from keel, including the inside of the sea chest, to the top of the wheelhouse.
2.2 References
Drawing:
• 2-1 Medeia Outboard Profile
2.3 Requirements
Use of fresh water and no less than 3000psi to remove marine growth and dilapidated or failing coatings (hand scrape as needed) to include the inside of the sea chest, sea chest grates and sonar tube. Please note protection of exposed ends of the stern tube, sonar tube, fathometer transducer, and other sensitive areas are required. Proper disposal of all wastewater, particulates and residues are the contractor's responsibility.
3: Sea Chest, Strainer, and Valves
3.1 Scope
Disassemble and inspect the main sea chest valve (NIBCO 3" O.S.Y. valve). Replace: valve stem packing, disc rubbers, and all gaskets associated with valve.
Valve interior should be painted with AP epoxy paint, or other marine epoxy coating approved by Owner Representative, and spindle greased before reassembling.
Remove and replace the two (2) smaller bronze gate valves and hex nipples attached to sea chest (serving sanitation system supply and spare) with new contractor supplied marine rated gate valves and nipples. These consist of one (1) 1¼" valve and hex nipple, and one (1) 1½" valve and hex nipple.
Provide Owner Representative with a written report on the condition of the Sea Chest and Valves and any deficiencies noted.
3.2 References
Drawing:
• 3-1 Medeia Bilge and Ballast Piping
Photos:
• 3-1 Sea Chest
• 3-2 Sea Chest Outboard Interior
{ITB-3/v1/10.16.24} Page 14 of 63
• 3-3, 3-4 Sea Chest Inboard
• 3-5 Sea Chest 3 Inch Gate Valve
• 3-6 1.5 Inch Gate Valve
• 3-7 1.25 Inch Gate Valve
4: Zincs
4.1 Scope
The Contractor shall provide a fixed cost for all labor, material, and equipment to remove, inspect and/or replace all anodes and issue a written report to ADF&G Representative identifying zincs that are reduced more than 50%. Owner Representative will make final determination of hull zincs to be replaced.
4.2 References
Drawings:
• 4-1, 4-2 Medeia Zinc Locations and Types
Photos:
• 4-3 through 4-19 Underwater Hull (Work Item 4 Underwater Hull folder)
4.3 Requirements
Contractor shall ensure zincs are firmly secured to the hull and zincs have a positive bonding connection established. Deteriorated or missing shot studs will be replaced under a separate change order. All zincs shall be masked off to prevent them from being painted.
For the purpose of this Bid, Contractor shall provide Work Item Bids for replacement of ALL zincs, as indicated below. Contractor shall provide a credit on Bid Items for any zincs not requiring replacement.
NOTE: Owner Representative will provide all zincs on this list. Anodes for the new main engine keel coolers and cooler guards are covered under Work Item 14 and are not part of this work item.
4.3.1 Install (27) Z-22 Hull Zincs
Contractor shall remove old zincs and install 27 new Z-22 Hull zincs. Contractor shall ensure zincs are firmly secured to the hull and have a positive bonding connection established.
4.3.2 Install (12) Z-19 Zincs
Contractor shall remove old zincs and install 12 new Z-19 Hull zincs.
4.3.3 Install (2) Z-4 Zincs
Contractor shall remove old zincs and install two (2) new Z-4 zincs: one (1) in the sea chest and one (1) on the hull, next to the forward end of the keel cooler.
{ITB-3/v1/10.16.24} Page 15 of 63
4.3.4 Install (1) KK-2 Keel Cooler Zinc
Contractor shall remove old zinc and replace with new, one (1) KK-2 Keel Cooler zinc, on the aft end of the keel cooler.
4.3.5 Install (4) Rudder Zincs
Contractor shall remove and replace with new, four (4) Z-22 Rudder zincs.
5: Rudder Removal, Inspection, Stocks and Flanges
5.1 Scope
This work item describes the requirements for the contractor to remove, inspect, and reassemble rudders and rudder shoes, including replacement of specified rudder stock bearings and testing of the Steering System.
5.2 References
Drawings:
• 5-1, 5-2 Medeia Rudder Fabrication
Photos:
• Photo 5-1 Port Rudder Collar
• Photo 5-2 Port Rudder Shoe Flange
• Photo 5-3, 5-4 Rudder Shoe Attachment
• Photo 5-5, 5-6 Rudder Shoe Shaft 1, 2
• Photo 5-7 Rudder Upper Collar Rudder Bearing Specifications (one each per rudder):
• Upper Support Bearing – 6-1/8" OD x 5" ID x 8" LG
• Intermediate Bearing – 6-1/8" OD x 5" ID x 6" LG
• Shoe Support Bearing Housing – 8" OD x 6-7/8" ID x 3" LG
5.3 Requirements
5.3.1 Remove, Inspect, and Re-install Rudder Stocks and Flanges
The Contractor shall remove both rudders. The bolted-on rudder shoes will have to be removed for full access to the rudders and propellers. There is a welded locking bar on these bolts that will need to be cut off and replaced when completed. These bolts are also encased with epoxy which will have to be removed to access. Clean all parts as necessary, and perform a general inspection of rudders, integral stock, flanges, pintles and shoes.
The contractor shall remove and inspect the rudder upper stocks, tiller arms and carrier washers, and inspect the rudder tubes. Inside and outside diameters (ID's) and (OD's) of all rudder bearings shall be measured. Measurements shall occur in two directions, port/starboard and forward/aft. Bearings and
{ITB-3/v1/10.16.24} Page 16 of 63 shaft areas longer than 6" shall be measured in two locations at the top and bottom of contact areas.
Provide ADF&G's Representative with a written report detailing the examination and findings.
5.3.2 Replace Lower Bearing on Port Rudder Stock with New
The Contractor shall replace the lower bearing on the Port Rudder Stock with a new contractor-supplied bearing of identical dimensions and material type. Work shall include removal of the old bearing, cleaning and inspection of the bearing housing and rudder stock surface, verification of measurements, and installation of the new bearing as recommended by bearing manufacturer. Contractor shall verify correct seating of bearing in housing, correct clearance between bearing and rudder stock, and smooth and unrestricted movement of the rudder stock following installation. Contractor shall provide a written report summarizing pre- and post-installation measurements and any material defects found.
5.3.3 Replace Upper Bearing on Port Rudder Stock with New
The Contractor shall replace the upper bearing on the Port Rudder Stock with a new contractor-supplied bearing of identical dimensions and material type. All work shall be performed in accordance with the requirements described in 5.3.2. Contractor shall coordinate installation with Work Item 5.3.5 (Reassembly and Installation of Rudders and Rudder Shoes).
5.3.4 Replace Lower Bearing on Starboard Rudder Stock with New
The Contractor shall replace the lower bearing on the Starboard Rudder Stock with a new contractor-supplied bearing of identical dimensions and material type. All work shall be performed in accordance with the requirements described in 5.3.2.
5.3.5 Reassemble and Install Rudders and Rudder Shoes
Contractor shall reassemble all components, the rudder, and rudder shoes with the bolt on/off rudder shoes. Re-installation shall not occur until 24 hours after the painting of the inside of the rudder tubes is completed. Contractor will prepare and paint all disturbed painted steel work surfaces with anti-corrosion primer and appropriate finish paints. The rudder and rudder shoe bolts will be coated with an epoxy based coating to prevent the bolts from loosening and preventing line or netting from catching on the bolts or bolt heads.
5.3.6 Test Steering System
The vessel shall not undock, or operate, under its own power until dockside trials are complete. With Owner Representative present, test steering system (both ends) full over to full over. Record the time required to perform this from an average of three (3) tests. Ensure that rudder angle indicators properly display actual rudder position throughout the full range of rudder travel. Provide written findings to ADF&G Representative. Contractor will be present for in-water sea trials to verify repairs made and proper underway operation of the steering system.
6: Paint
6.1 Scope
The Contractor shall provide a fixed cost for all labor, material, and equipment to prepare and paint all specified areas of the vessel in accordance with R/V Medeia Paint Specifications. Surface preparation
{ITB-3/v1/10.16.24} Page 17 of 63 shall comply with SSPC standards. All coatings shall be applied per manufacturer's guidelines and documented with temperature and film thickness records provided to Owner Representative within 24 hours of each coating event.
6.2 References
Drawing:
• 2-1 Medeia Outboard Profile
References:
• Reference 6-1 R/V Medeia Paint Specification
6.3 Requirements
6.3.1 Keel to Waterline
Provide a fixed cost for all labor, material, and equipment to prepare and paint the underwater portion of the vessel from the boot strip/waterline to the bottom of the keel as specified by R/V Medeia Paint Specifications. The underwater coatings of the hull presently have several small areas of wear to bare metal from mooring and scientific equipment retrieval. The bare areas of the underwater hull and new metal works will be coated with 3 coatings of anti-corrosive coating to 6 mils dft. The total underwater hull will be finished with two coats anti-fouling paint to 4 mils dft. Square footage is approximately 2,264 square feet. Bottom shell areas disturbed by the removal of the aft sections of the main engine keel channel coolers and installation of the new keel coolers and guards (Work Item 14) are prepared and coated under Work Item 14; the finish anti-fouling coats over those areas are included in this work item.
6.3.2 D-Rail / Waterline to The Top of The Freeboard, Outboard and Inboard Profile Preparation and Coating.
The stern quarters, trawl ramp, and starboard side will require additional preparation for priming. The exterior and interior freeboard are to be painted. The exterior and interior starboard freeboard will require additional preparation for priming.
D-rail, above water hull painting
The Contractor will prepare the steel and paint all disturbed and undisturbed steel work surfaces with anti-corrosion primer and appropriate finish topcoats paints to appropriate thicknesses.
The Contractor shall provide a fixed cost for all labor, material, and equipment to prepare and paint the above water portion of the vessel hull to the top of the rail and both sides of the freeboard as follows and in accordance with all requirements set forth. The area included in this Work Item is the exterior hull and interior freeboard, from the waterline up to, including the upper rail, both port and starboard sides, from the bow to the stern including the trawl ramp.
Final determination of surfaces to be prepared and painted shall be designated by the Owner Representative and are estimated to be as indicated below.
D-rail, above water hull prime painting.
{ITB-3/v1/10.16.24} Page 18 of 63
Contractor shall spot prime paint all the areas having undergone the surface preparation work described above (an estimated 20% of the total work area), applying coatings of Amercoat 235 primer to reach 6.0 MDFT to all areas.
D-rail, above water hull topcoat painting.
After all the free boards have been primed the entire work area shall be painted with two (2) full coats of PPG, Protective and Marine Coating, PSX 700 at 2.0 MDFT for each coat. Primary Color for the topcoat is, Cobalt Blue, group 2fd for the hull, Black for rails, group1fd and Safety Yellow, group 2fd for boot stripes.
This Work Item paint area consists of all exterior hull /freeboard and interior freeboard surfaces, from the bow to the stern, for the port, starboard sides, of the vessel. The total estimated square footage area applicable to this Work Item is estimated at 2,800 square feet.
6.3.3 MastPrepare and paint the mast, including the crosstrees, platforms, ladder rungs, and light brackets. Remove all loosely adhering material, spot power tool clean all damaged or corroded areas to SSPC-SP15, and feather edges of sound coating. Apply anti-corrosion primer and appropriate finish topcoats to specified thicknesses per paint specifications. Total square footage of mast approximately 200 square feet.
The mast carries the vessel’s navigation lights, the weather station sensors, and their associated cabling, brackets, and junction boxes. Before surface preparation begins, the Contractor shall remove all navigation light fixtures, weather station sensors, and their mounting brackets from the mast, and shall disconnect and remove the associated wiring back to the nearest junction box or deck penetration so that no fixture, sensor, or cable remains on the mast surfaces to be prepared and painted. Prior to removal, the Contractor shall photograph each fixture and sensor in place, label every cable and conductor at both ends with its circuit and fixture, and record the mounting location and orientation of each item. Removed fixtures, sensors, and brackets shall be stored in a dry, protected location aboard or in the Contractor’s shop, and shall be protected from damage, moisture, and paint.
Antennas, radar, and other electronic equipment on the mast that are not removed shall be fully masked and protected from surface preparation and overspray. Cable penetrations into the mast and junction boxes shall be sealed during preparation and painting to keep out water, grit, and paint.
Upon completion of painting, the Contractor shall reinstall all navigation lights, weather station sensors, and brackets in their original locations and orientations, reconnect all wiring using the labels and photographs taken at removal, and replace any cable glands, gaskets, or fasteners that are deteriorated or damaged with new of the same type. All connections shall be made watertight.
Fasteners shall be stainless steel with dielectric isolation from the painted steel where dissimilar metals are in contact. The Contractor shall then test each navigation light for proper operation and correct sector from the pilothouse switches, and shall verify the weather station is reporting wind speed, wind direction, and all other sensor outputs at the pilothouse display, with the Owner Representative present. Any fixture, sensor, or cable found damaged after reinstallation that was serviceable before
{ITB-3/v1/10.16.24} Page 19 of 63 removal shall be repaired or replaced by the Contractor at no cost to the Owner. Provide the Owner Representative a written list of items removed and reinstalled, with the removal photographs.
6.3.4 Main Deck Aft True Deck
Prepare and paint the main deck aft true deck. Surface preparation shall comply with SSPC standards.
Apply anti-corrosion primer and topcoat as appropriate to the area. Final color and paint system to be Cobalt Blue. An estimated 20% of the area will require spot preparation. Aft deck has wood false deck panels that will need to be removed by Contractor to complete this section. Contractor is to replace all false deck panels after painting is complete. Total square footage of main deck aft true deck approximately 1,400 square feet.
6.3.5 Shaft Tubes
Prepare and paint shaft tubes. Apply 1 coat of Amerlock Sealer followed by 2 coats of Ameron 235 primer coatings to manufacturer-recommended thicknesses, alternating colors between coats, followed by 1 coat of Amercoat anti-fouling topcoat. Protect sensitive shaft and bearing surfaces from contamination during surface preparation and coating operations. Total square footage of both shaft tubes approximately 100 square feet.
6.3.6 Stuffing Boxes
Prepare and paint all stuffing box areas disturbed during shaft and propeller removal and reinstallation.
Apply 1 coat of Amerlock Sealer, followed by 2 coats of anti-corrosion primer and appropriate topcoat per paint specifications. Total square footage of stuffing boxes approximately 8 square feet each.
6.3.7 Rudder Post Tubes
Prepare and paint the interior of rudder post tubes following removal of rudder stocks. Apply 1 full coat of Amerlock Sealer, followed by 2 coats of Amercoat compatible anti-fouling paint to a dried thickness of 4 mils. Re-installation of rudder stocks shall not occur until 24 hours after painting is complete. Total square footage of both rudder post tubes approximately 24 square feet.
6.3.8 Tiller Arms
Prepare and paint all tiller arm surfaces disturbed during rudder and steering system inspection and reassembly. Apply anti-corrosion primer and appropriate finish topcoat per paint specifications. Total square footage of both tiller arms approximately 20 square feet.
6.3.9 Vessel's Markings
Vessel name on both sides of the bow, the vessel name and hailing port on the stern, and all draft marks. All lettering and numbering shall then be painted with two (2) full coats of PPG, Protective and Marine Coating, PSX 700 topcoat at 2.0 MDFT for each coat. Colors for the topcoat, PPG Protective and Marine Coating, PSX 700 are Safety Yellow, group 2fd, and White, group 1fd.
{ITB-3/v1/10.16.24} Page 20 of 63
6.3.10 Bait Freezer Hatches
Prepare and paint the two (2) bait freezer hatches, port and starboard, steel dogged hatches with coamings, approximately 62" x 47" each. The hatches and coamings are showing corrosion and shall be spot prepared: remove all loosely adhering coating and rust, power tool clean all corroded areas to SSPC-SP15, and feather edges of sound coating. Spot prime prepared areas with Amercoat 235 to 6.0 MDFT, then apply two (2) full coats of PPG PSX 700 topcoat at 2.0 MDFT per coat to all exterior surfaces of each hatch cover and coaming, color to match the surrounding deck. Hatch gaskets shall be masked and protected during preparation and coating. Dogs, dog wedges, and hinges shall be cleaned, freed up, and greased, and masked from paint on bearing surfaces; hatches shall be verified to open, close, and dog tight on completion. Assume approximately 25% of the hatch and coaming area will require spot preparation. Total square footage approximately 40 square feet per hatch, cover and coaming.
7: Propeller, Tail Shafts, Bearings and Glands Inspection
7.1 Scope
This work item describes the requirements for the contractor to remove, inspect, and reassemble propellers, tail shafts, bearings, and glands, including replacement of the Starboard Stern Tube Cutlass Bearing.
7.2 References
Drawings:
• 7-1 Medeia Shafting Installation
• 7-2 Medeia Propeller Shaft Specs
Photos:
• 7-1 Stbd Stuffing Box
• 7-2 Port Stuffing Box
• 7-3 Stbd Prop
• 7-4 Removable Rudder
• 7-5 Shaft Coupler
• 7-6 Packing Gland
• 7-7 Shaft Removal
• 7-8 Shaft Install
7.3 Requirements
7.3.1 Propeller Removal, Inspection
Remove two 60" propellers and deliver to a qualified propeller shop for inspection. Provide a written report on condition, pitch, and balance. Consult with Owner Representative regarding required repairs.
Any additional repairs will be added as a change order.
{ITB-3/v1/10.16.24} Page 21 of 63
7.3.2 Fit and Installation of New Propellers to Tailshafts
Owner will provide two new propellers to replace the old propellers. Test fit propellers on the port and starboard tail shafts, record and report contact area to Owner Representative. Reinstall propellers with failsafe locking device. The vessel shall not undock or operate under its own power until dockside trials are complete. Old propellers shall be crated and delivered back to vessel after shop inspection and possible repairs. The crates from the new propellers may be used for the old propellers.
7.3.3 Tailshaft Removal, Inspection, Installation
Open stuffing boxes, measure and record tail shaft positions, and remove tail shaft tapered couplings.
Remove propeller shafts, with or without propellers fitted, from stern tubes. Clean, inspect, measure, and record exposed strut and stern tube bearings. Prepare clearance chart and provide report to Owner Representative. Clean and inspect tail shafts in lathe; inspect keys, keyways, and stress areas with dye penetrant. Inspect stuffing boxes, glands, and gland studs. Re-install both tail shafts in stern tubes;
secure couplings with failsafe locking device; fit new 1-1/8" packing and adjust glands. Provide a spare set of packing rings for each tail shaft to be stowed in the vicinity of the packing gland.
7.3.4 Replace Starboard Stern Tube Cutlass Bearing with New
The Contractor shall remove the existing Starboard Stern Tube Cutlass Bearing and install a new contractor-supplied bearing of identical dimensions and material type. Inspect the stern tube bearing housing for wear or damage. Install new bearing according to manufacturer's recommendations. Verify correct seating and alignment of the new bearing. Provide Owner Representative with a written report of pre- and post-installation condition findings.
7.3.5 In-Water Sea Trials
Vessel shall not undock, or operate, under its own power until dockside trials are complete. Contractor shall conduct both dock and sea trials of both shaft, propeller, and reduction gear systems to prove and verify that the systems are working correctly. Trials shall occur under the supervision of the vessel's Master and Contractor's appointed qualified marine mechanic. Sea trials will consist of a minimum of 4 hours of full speed operation during which time Contractor will monitor and record packing gland temperatures. Main engine jacket water temperatures shall be recorded during the same sea trial as required under Work Item 14.3.5. Sea trial data shall be delivered to Owner's Representative after trials.
8: Replace Walter Keel Cooler
8.1 Scope
The Contractor shall remove and replace the Walter Keel Cooler on the R/V Medeia. The replacement keel cooler is identical and will be supplied by the Owner.
8.2 References
Drawings:
• 8-1 Medeia Keel Cooler Arrangements
{ITB-3/v1/10.16.24} Page 22 of 63
• 3-1 Medeia Bilge and Ballast Piping
8.3 Requirements
The Contractor shall provide a fixed cost for all labor, material, and equipment to remove the existing Walter Keel Cooler and install the new, Owner supplied replacement unit, model 1-¼"E 4T 1 1-1/2TT-
56. New keel cooler shall be installed in accordance with manufacturer specifications.
All piping connections shall be inspected for condition. Deteriorated or corroded fittings and sections shall be replaced. Upon installation, the system shall be pressure tested and leak-checked in the presence of ADF&G Representative. Coolant removed during the process shall be properly handled and disposed of by the Contractor in compliance with applicable environmental regulations. Note:
Current cooler is filled with a water/Power Cool 2000 mix with NO antifreeze.
All disturbed hull and structural areas shall be prepared and painted per Medeia Paint Specifications.
9: Replace Shell Plate in Starboard Cofferdam
9.1 Scope
The Contractor shall remove and replace the deteriorated or diminished shell plate in the Starboard Cofferdam. All associated welding, surface preparation, and painting shall be performed in accordance with applicable ABS standards and R/V Medeia Paint Specifications. The area to be replaced is located in the engine room starboard side, stuffing box, from frame 41 to 42 on scantling baseline.
9.2 References
Photos:
• 7-1 Stbd Stuffing Box
• 9-2 Keel Channel
• 9-3 Keel Channel Plugs
• 9-4 Port Keel Channel Work
Drawings:
• 8-1 Medeia Keel Cooler Arrangements
• 9-1 General Scantling
• 9-2 Trans. Frs & Long'l Section
• 14-1 Fresh Water Cooling System Modifications (Elliott Bay Design Group 26075-256-2)
9.3 Requirements
The Contractor shall ultrasound the general area to determine total area needed to be replaced. For bidding purposes, assume approximate area to replace is 42" x 22". Once diminished area is determined, remove the diminished shell plate in the Starboard Cofferdam. Contractor shall install fire blankets or shields to protect adjacent equipment and piping; provide appropriate fire watch personnel during all hot work; and ensure fire extinguishers and other firefighting equipment are readily available.
{ITB-3/v1/10.16.24} Page 23 of 63
New plate material shall be of equivalent or superior grade to the original. All welds shall be performed by qualified welders in accordance with ABS requirements. Upon completion of all welding, Contractor shall perform a leak test of the cofferdam and any adjacent compartments to verify watertight integrity.
This section of hull is over the top of the existing starboard main engine keel channel cooler. The aft section of that channel, including the portion under this plate, is being removed under Work Item 14.
Contractor shall sequence the work so that the starboard keel channel cooler is drained and removed from the bottom shell (Work Item 14.3.1) before the shell plate in this work item is cut out, so that the new plate is fitted and welded with the keel channel already gone. No keel channel removal, replacement, flushing, or coolant refill is included in this work item.
NOTE: Similar shell plate work has been done on the Port Cofferdam in the past. See Photo 9-4 Port Keel Channel Work to see the section that was removed and replaced in the past for reference.
However, that section was slightly further outboard than the Starboard section to be replaced, and it was done with the keel channel in place; that keel channel work is not representative of this work item.
10: Service MSDS
10.1 Scope
The Contractor shall service the existing Marine Sanitation Device System (MSDS) aboard the R/V Medeia. Work includes inspection, cleaning, component servicing, and verification of proper operation in compliance with applicable USCG regulations, and manufacturer's recommendations.
10.2 References
Drawings:
• 10-1 TW-200LP Steel 4 View Drawing
References:
• Reference 10-1 MSD Instruction Manual Photos:
• 10-1 MSD Area
• 10-2 MSD Top
10.3 Requirements
The Contractor shall inspect all components of the existing MSDS (Headhunter TidalWave TW-200LP Steel), including the treatment unit, pump(s), associated piping, valves, and discharge plumbing.
Contractor shall clean all accessible components; replace worn gaskets, seals, and any components identified as degraded or non-functional; and verify…