UES_-_Concrete_Compression_Test_07-18-2025.pdf

PDF 10 KB Posted

Attached to
Interior Demolition & Abatement Project - 401 S Rogers St
Solicitation number
ITB-2026-3-1
Issued by
Ellis County, Texas

About this file

This is a Concrete Compression Test Report prepared by UES Professional Solutions for the City of Waxahachie, Texas Utilities Department documenting concrete testing results for the Waxahachie City Hall Renovation project located at 401 South Rogers Street. The report documents cylinder compression testing conducted on concrete samples placed on July 18, 2025, at 7:20 a.m. from Martin Marietta concrete supplier (Plant 240, Delivery Ticket No. 9107933). Testing was performed in accordance with ASTM C-31 curing specifications and ASTM C-231 compression test standards. Five concrete cylinders were cast and tested at various intervals, with four cylinders tested at 28 days after placement (August 15, 2025) and one cylinder held in reserve. The cylinders were sampled from a location 10 feet south and 20 feet east from the northwest corner of the parking lot, and the concrete was cured using initial protection with a covered lid followed by final curing in a moist room environment.

The concrete demonstrated compliance with project specifications, achieving an average 28-day compressive strength of 4,150 PSI against the specified strength requirement of 4,000 PSI. Individual 28-day test results ranged from 4,110 to 4,180 PSI across the four tested cylinders (Lab Nos. 21-24), with each specimen exhibiting the required 12.56 square inch cross-sectional area and 8.00-inch average height. The report was issued on August 15, 2025, by Mark Wolf, PE, and confirms that the concrete paving materials meet all applicable technical standards for the renovation project. The testing was conducted under ambient conditions and documented all relevant field data including concrete temperature, slump measurements, unit weight, and air content in accordance with ASTM standards.

View the file

Other files

File Type Posted
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St_(Addendum_#1_Revision).pdf PDF
Pre-BID_Sign_in_Sheets_-_April_7th.pdf PDF
Pre-BID_Sign_in_Sheets_-_April_7th.pdf PDF
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St.pdf PDF
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf PDF
401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf PDF
401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
UES_-_Concrete_Compression_Test_07-18-2025.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
UES_-_Concrete_Compression_Test_07-18-2025.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Concrete Compression Test Report

5058 Brush Creek Rd Fort Worth, TX 76119 817-496-5600

UES Professional Solutions 44, LLC

TBPELS #813 / TBPG #50341

FIELD DATA

Placement Location: PAVING

Project Desc: WAXAHACHIE CITY HALL RENOVATION

401 SOUTH ROGERS STREET

Our Report #: F250489-1664930-S2

CITY OF WAXAHACHIE - UTILITIES DEPARTMENT

PO BOX 757

WAXAHACHIE, TX 75168

DNC MICHAEL SCOTTATTN:

Date Placed: 7/18/2025 Time Placed: 7:20 AM

5.00 5.0

Date Received: N/A

Concrete Supplier: MARTIN MARIETTA

Submitted By: Bruner, Yusuf

Plant Number: 240 Delivery Ticket No.: 9107933

Batch Time: 6:48:00 AM

Tested For:

Lab No.:

Cure Type:

Date Tested:

Age (Days):

Max Load:

Area:

Sq. In. PSI:

Cap Spec:

CYLINDER COMPRESSION TEST RESULTS

(ASTM C-231)

Avg.

Length

Avg.

Width

Avg Depth/ Diameter

Cast By: UES

Cured Specification: ASTM C-31

Mix ID: R3141K24

Break Type:

Sample Location: 10'S 20'E FROM NW CORNER OF PARKING LOT

PM: MARK WOLF

Date Issued: 08/15/2025

Specified Strength: 4000

Result

Air Content:

Ambient Temp (F):

Concrete Temp (F):

Unit Weight:

Slump (ASTM C-143):

Weather:

Wind:

N/A

Initial Curing Method: Protected Area, Covered with Lid Final Curing Method: Moist Room

Truck Number: N/A

21 7/25/2025 7 4822012.56 3840LAB C-1231 8.00 N/A 4.002

22 8/15/2025 28 5236012.56 4170LAB C-1231 8.00 N/A 4.002

23 8/15/2025 28 5168012.56 4110LAB C-1231 8.00 N/A 4.002

24 8/15/2025 28 5255012.56 4180LAB C-1231 8.00 N/A 4.003

25 HOLD HOLD 012.56 0LAB C-1231 8.00 N/A 4.00

Average 28-day Compressive Strength is compliant with project specifications

CC:

Respectfully Submitted By:__________________________________________________________ of UES

Geotechnical Engineering * Construction Materials Testing * Environmental Engineering * Consulting 650602

Break Types: 1: Cone 2: Cone and Split 3: Columnar 4: Diagonal 5: Single Sided Fracture 6: Double Sided Fracture * = Specification out of spec This report is in general compliance with one or more of the following technical standards:

ASTM C31, C39, C78, C109, C138, C143, C172, C173, C231, C193, C617, C780, C1064, C1019, and/or C1231 Test results and reports apply only to the samples tested and/or observed, and are not indicative of the qualities of apparently identical or similar specimens.

This report shall not be reproduced except in full, without the prior written approval of UES.

File details come from the government source that posted it. Updated .