This is a Lead-Based Paint Inspection Report prepared by Itech Environmental Services, Inc. for the City of Waxahachie, Texas, documenting findings from inspections conducted on November 7-8, 2024, at commercial structures located at 401 S. Rogers Street. The inspection evaluated two buildings: a North structure constructed in 1914 and a Center structure constructed in 1950, with a third South structure built in 2000 excluded from testing scope. The assessment utilized X-ray fluorescence (XRF) testing methodology to identify lead-based paint on accessible interior and exterior painted surfaces, including walls, windows, door frames, trim, metal railings, and structural components. The inspection was conducted by Tom Jankowiak, a Texas Department of Safety and Health Services (TDSHS) Certified Lead-Based Paint Inspector/Risk Assessor (License #2070745, expiration 01/27/2026), using an RMD LPA-1 XRF analyzer. The limited inspection was designed as a screening to determine the presence of lead-based painted surfaces prior to potential renovation or demolition activities, utilizing general HUD sampling strategies and screening protocols rather than comprehensive HUD or Texas Environmental Lead Reduction Rules (TELRR) compliance.
The inspection identified numerous components with lead concentrations at or exceeding the EPA, HUD, and State of Texas standard threshold of 1.0 milligram per square centimeter (mg/cm²), with many components registering greater than 9.9 mg/cm². In the North Building (1914), 72 test locations yielded positive results for lead-based paint across plaster walls, concrete surfaces, wood components, and metal railings and stairs, with readings ranging from 1.3 mg/cm² to greater than 9.9 mg/cm². The Center Building (1950) identified four components with elevated lead readings: window frames and walls with readings of 4.1 to greater than 9.9 mg/cm². The report emphasizes that while no regulations mandate removal prior to demolition or renovation, OSHA Construction Standard 29 CFR 1926.62 applies if these coatings are disturbed, requiring contractors to implement training, compliance programs, exposure assessments, engineering controls, and specified work practices. Additionally, any waste generated from disturbing these materials must be characterized through TCLP testing before off-site disposal to determine whether it qualifies as hazardous waste (above 5 ppm) or construction debris (below 5 ppm). The report recommends providing copies to contractors to ensure compliance with all OSHA lead regulations.
View the file
Other files
Show all 43
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITECH
ENVIRONMENTAL SERVICES
Itech Environmental Serv ices 2121 Grandview Dr Fort Worth, Texas 76112
Main: (817) 715-4454 Fax: (817)457-3160
November 19, 2024
Attn: Mr. Dale Sigler
Re: Lead-Based Paint Inspection Commercial Structures North Building-1914
Center Building-1950 401 S. Rogers Waxahachie, Texas 76010
IES Project No. IT-4679
Dear Mr. Sigler:
Enclosed please find a copy of the Lead-Based Paint Inspection/Risk Assessment conducted by Itech Environmental Services, Inc. (IES) at the above referenced location. IES inspectors conducted the Inspection/Risk Assessment on November 7, 2024 and November 8, 2024.
IES appreciates this opportunity to provide these services to the City of Waxahachie on this project and we look forward to working with you on future projects. If we can be of further assistance to you, or if you have any questions regarding this report, please feel free to contact us at (817) 715- 4454.
Sincerely:
Tom Jankowiak Project Manager TDSHS Lead Risk Assessor License No. 2070745
LIMITED LEAD-BASED PAINT INSPECTION
For the
COMMERCIAL STRUCTURES
401 S. ROGERS
WAXAHACHIE, TEXAS 75165
Prepared for
MR. DALE SIGLER
CITY OF WAXAHACHIE
Prepared by
Itech Environmental Services, Inc.
2121 Grandview Drive
Fort Worth, Texas 76112 Telephone (817) 715-4454
ITECH PROJECT NUMBER IT-4679
November 19, 2024
Prepared by:
Tom Jankowiak DSHS Lead Risk Assessor License No.: 2070745
Lead-Based Paint Inspection
Itech Environmental Services Project No. IT-4679 i
TABLE OF CONTENTS
1.0 Executive Summary
2.0 Introduction
2.1 Scope of Services
2.2 Authorization
2.3 Purpose
2.4 Limitations
3.0 Methodology
3.1 Inspection Methodology
4.0 Findings
4.1 Findings
4.2 Regulatory Review/ Recommendations
Appendix A - Paint Testing Data Table
Appendix B - Sample Location Diagrams
Appendix C - Photographs
Appendix D - Inspector/Risk Assessor Certifications
1.0 EXECUTIVE SUMMARY
IES was retained by the City of Waxahachie to conduct a Limited Lead-Based Paint Inspection at the referenced commercial structures located in Waxahachie, Texas. The two structures tested included a North structure reportedly constructed in 1914 and a Center structure reportedly constructed in 1950. There was an additional South structure reportedly constructed in 2000 that was not part of the testing scope of work. The Lead-Based Paint Inspection included testing of painted components of the interior and exterior of the structure prior to upcoming potential renovation or demolition activities.
The Lead-Based Paint Inspection was conducted as a screening to determine the presence of lead-based painted surfaces which were accessible and/or exposed. The evaluation was not designed for the specific purpose of meeting General US Department of Housing and Urban Development HUD guidelines or Texas Environmental Lead Reduction Rules (TELRR); however, HUD methodologies were used in the sampling strategies.
The lead-based paint inspection was performed on November 7, 2024 and November 8, 2024 by Thomas Jankowiak, Texas Department of Safety and Health Services (TDSHS) Certified Lead-based paint Inspector/Risk Assessor (License #2070745, Expiration 01/27/2026). XRF testing was performed using a RMD LPA-1, Serial # 2593, X-Ray fluorescence (XRF) lead paint analyzer to sample painted and/or finished components. Radiation safety procedures as required by the U.S.
Nuclear Regulatory Commission and applicable State and Local regulations were followed when using the XRF instrument.
Building components tested during this inspection included accessible interior and exterior walls, windows, door components, associated trims and other components as listed in the data tables in Appendix A.
Prior to testing, an initial walk-through was conducted to determine the presence of paint films, which were accessible and/or exposed in the structure. Coatings that were similar in general appearance and which appeared to have a similar painting history and substrate were grouped together for testing. No previous lead-based paint inspection reports were presented to IES for our review prior to this inspection.
Following the walk-through, the inspector performed screening utilizing x-ray fluorescence (XRF). According to the EPA, HUD, and State of Texas Guidelines, paint is considered to be “lead-based” if its lead concentration is 1.0 milligram per square centimeter (mg/cm2) or higher.
OSHA does not define lead paint based on content. Below is a listing of the components with a concentration equal to or in excess of 1.0 mg/cm 2:
Center Building 1950
XRF
Test
Room Name Wall Building Component
XRF
mg/cm²
Color Substrate Intact/Det
462 Room 2 E Window Frame >9.9 Gray Wood Deteriorated
496 Room 6 W Wall >9.9 Gray Wood Deteriorated
502 Electrical Closet W Wall 4.1 White Plaster Deteriorated
503 Electrical Closet W Window Frame 4.6 Beige Plaster Deteriorated
North Building 1914
Test
Room Name Wall Building Component
XRF
mg/cm²
Color Substrate Intact/Det
108 Room 18 W Wall >9.9 White Concrete Intact 113 Room 18 N Wall >9.9 White Concrete Intact 117 Room 18 N Window Frame >9.9 White Wood Deteriorated 122 Room 18 S Wall >9.9 White Plaster Intact 127 Room 18 W Stair Rail 1.8 White Metal Intact 128 Room 18 W Rail Post 1.3 White Metal Intact 129 Room 18 W Post Cap 1.8 White Metal Intact 130 Room 18 W Stair Base >9.9 White Concrete Intact 131 Room 18 W Step Riser 1.4 White Metal Intact 132 Room 18 W Stair Rail Panel 3.6 White Metal Intact 133 Room 18 W Stair Rail Panel 3.2 Beige Concrete Intact 134 Room 18 S Ceiling 4.6 Brown Wood Intact 135 Room 19 N Wall >9.9 Beige Plaster Intact 139 Room 19 N Window Frame 3.6 Beige Wood Intact
141 Room 19 E Door Frame >9.9 Beige Wood Intact
143 Room 19 E D Mantle 6.0 Beige Wood Intact
145 Room 19 S Column >9.9 Beige Plaster Intact
146 Room 19 S Ceiling >9.9 Beige Plaster Intact
147 Room 20 N Wall >9.9 Beige Plaster Intact
148 Room 20 N Wall >9.9 Green Plaster Intact
Room Name Wall Building Component
XRF
mg/cm²
Color Substrate Intact/Det
153 Room 20 E Wall >9.9 Beige Plaster Intact
158 Room 20 W Wall 1.9 Beige Plaster Intact
160 Room 20 W Ceiling >9.9 Beige Plaster Intact
168 Room 21 S Center Column 2.1 White Plaster Intact
169 Room 21 S S Column 1.7 White Plaster Intact
170 Room 21 W Wall >9.9 White Plaster Intact
174 Room 21 W Window Frame >9.9 White Concrete Intact
178 Room 21 W Window Frame >9.9 White Concrete Intact
179 Room 21 W Window Upper Trim >9.9 White Concrete Intact
180 Room 21 W Decorative Trim >9.9 White Concrete Intact
182 Room 22 E Wall >9.9 White Plaster Intact
200 Room 23 E Wall >9.9 Gray Plaster Intact
222 Room 24 E Wall >9.9 Beige Plaster Intact
255 Room 27 E Wall >9.9 Beige Plaster Intact
256 Room 27 W Wall >9.9 Beige Plaster Intact
257 Room 27 W Stair Base >9.9 Gray Metal Deteriorated
258 Room 27 W Stair Step >9.9 Gray Metal Deteriorated
259 Room 27 W Step Riser >9.9 Gray Metal Deteriorated
261 Room 28 E Wall >9.9 Gray Plaster Intact
300 Room 32 W Wall >9.9 Beige Plaster Intact
310 Room 33 W Wall >9.9 Green Plaster Intact
314 Room 33 W Window Frame >9.9 White Concrete Intact
329 Room 35 N Wall >9.9 White Plaster Intact
332 Room 35 E Wall >9.9 White Plaster Deteriorated
336 Room 35 S Wall >9.9 White Plaster Intact
340 Room 35 W Wall >9.9 White Plaster Intact
345 Room 35 W Ceiling >9.9 White Plaster Intact
346 Room 36 N Wall >9.9 Gray Plaster Intact
347 Room 36 N Ladder 3.6 White Metal Intact
348 Room 36 N Hatch >9.9 White Metal Intact
366 Room 37 S Wall >9.9 White Plaster Intact
371 Room 37 W Wall >9.9 White Plaster Intact
Room Name Wall Building Component
XRF
mg/cm²
Color Substrate Intact/Det
374 Room 37 W Ceiling >9.9 White Plaster Deteriorated
378 Room 38 HVAC E Wall >9.9 Beige Plaster Intact
379 Room 38 HVAC S Wall >9.9 Beige Plaster Intact
384 Room 38 HVAC W Ceiling >9.9 Beige Plaster Intact
385 Room 39 N Wall >9.9 Gray Plaster Intact
390 Room 39 E Wall >9.9 Gray Plaster Intact
393 Room 39 E Closet Wall >9.9 Beige Plaster Intact
394 Room 39 S Wall >9.9 Gray Plaster Intact
400 Room 39 S Rail 2.6 White Metal Intact
401 Room 39 S Step Riser 2.6 White Metal Intact
402 Room 39 S Step Base 2.2 White Concrete Intact
403 Room 39 S Post 1.9 White Metal Deteriorated
404 Room 39 S Post Cap 1.3 White Metal Deteriorated
405 Room 39 S Ceiling >9.9 White Plaster Intact
406 Room 39 S Ladder 3.1 White Metal Intact
407 Room 39 S Hatch 4.5 White Metal Intact
408 Room 40 N Wall >9.9 Beige Plaster Intact
417 Room 40 S Wall >9.9 Beige Plaster Intact
418 Room 40 W Wall >9.9 Beige Plaster Intact
423 Room 40 W Ceiling >9.9 Beige Plaster Intact
424 Room 41 N Wall >9.9 Beige Plaster Intact
428 Room 41 E Wall >9.9 Beige Plaster Intact
430 Room 41 S Wall >9.9 Beige Plaster Intact
431 Room 41 W Wall >9.9 Beige Plaster Intact
432 Room 42 N Wall >9.9 Beige Plaster Intact
438 Room 42 E Wall >9.9 Beige Plaster Intact
442 Room 42 S Wall >9.9 Beige Plaster Intact
443 Room 42 W Wall >9.9 Beige Plaster Intact
444 Room 42 W Ceiling >9.9 Beige Plaster Intact
557 Exterior N bldg.. W X Pattern Window 4.2 White Concrete Intact See Appendix A for a complete list of readings.
2.0 INTRODUCTION
2.1 SCOPE OF SERVICES
Itech Environmental Services, Inc. (IES) has conducted Limited Lead-Based Paint Inspection at the above referenced commercial structures located in Waxahachie, Texas. The visual inspection and XRF testing were conducted to determine the presence of lead-based painted surfaces which were accessible and/or exposed prior to renovation or demolition activities. This report has been prepared for the exclusive use of the City of Waxahachie and their agents.
2.2 AUTHORIZATION
Authorization to perform this evaluation was given by Mr. Dale Sigler with the City of Waxahachie in an email notice notice to proceed.
2.3 PURPOSE
The purpose of the evaluation for lead in paint was to provide general information regarding lead-based paint in the structures to individuals and companies working at the facility so that they may be informed to comply with the OSHA Lead in Construction Standards (29 CFR 1926.62) when performing renovation or demolition activities.
2.4 LIMITATIONS
The field and laboratory results reported herein are considered sufficient in detail and scope to determine the presence of accessible and/or suspect lead-based painted surfaces in the facility.
The findings contained herein have been prepared in general accordance with accepted professional practices at the time of its preparation as applied by professionals in the community.
Changes in the state of the art or in applicable regulations cannot be anticipated and have not been addressed in this report.
The survey and analytical methods have been used to provide the client with information regarding the presence of accessible and/or exposed suspect lead-based paint existing in the facility at the time of the inspection. Test results are valid only for the material tested. There is a distinct possibility that conditions may exist which could not be identified within the scope of the study or which were not apparent during the site visit. This inspection covered only those areas, which were exposed and/or physically accessible to the Inspector. The study is also limited to the information available from the client at the time it was conducted.
3.0 METHODOLOGY
3.1 INSPECTION
The scope of services for this project was based on a screening protocol while utilizing general HUD sampling strategies. This included the performance of painted surface testing, and the preparation of a report detailing where and at what concentrations lead was found.
An initial walk-through was conducted to determine the presence of paint films, which were accessible and/or exposed in the facility. One sample per test combination was taken except for walls per HUD protocol. Following the walk-through, the inspector performed XRF testing of each test combination. For this survey, XRF test results from a specific location are correlated to a testing combination that consists of substrate and building component, and room equivalent. A component is defined as a particular item within a building, such as doors, radiators, walls, etc.
The substrate is the material from which the component is fabricated, for example, concrete or wood.
4.0 FINDINGS
4.1 FINDINGS
According to the EPA, HUD and State of Texas Guidelines, paint is considered to be “lead-based” if its lead concentration is 1.0 milligram per square centimeter (mg/cm2) or higher. OSHA does not define lead paint based on content. Any detectable lead in a coating makes it lead-containing paint for purposes of complying with OSHA to determine worker exposure.
The inspection results indicate that there are numerous components tested above the EPA level of
1.0 mg/cm² and components with detectable amounts of lead for OSHA compliance and worker exposure. A full list of tested components and readings is available in Appendix A.
4.2 REGULATORY REVIEW/ RECOMMENDATIONS
Lead is regulated in his facility by the EPA and OSHA. The EPA regulates lead use and removal, while OSHA regulates lead exposure to workers. The EPA guidelines define a lead-based paint as paint, varnish, stain, or other applied coating that contains lead equal to or greater than 1.0 mg/cm2, or 0.5% by dry weight as determined by laboratory analysis. OSHA does not define lead paint based on content.
The OSHA requirements, as promulgated in 29 CFR 1926.62 (Lead Standard for the Construction Industry), considers any amount of lead as lead containing paint for the purposes of determining worker exposure.
Although there are no regulations that require the removal of the lead coatings prior to demolition or renovation activities, if these coatings are disturbed during renovation or demolition activities the workers are subject to the requirements in OSHA Construction Standard for Lead (CFR 1926.62). The OSHA Lead Regulations include provisions for training; written compliance programs; exposure assessments; notifications; engineering controls; and specified work practices depending on the work activity selected by the contractor.
In addition to OSHA worker protection requirements any waste generated by the operations that would disturb these materials should be considered potentially hazardous and waste characterization (including TCLP testing) should be performed prior to off-site waste shipment, to determine the proper disposal requirements. If the results of the TCLP testing indicate above 5 ppm – hazardous waste. If below 5 ppm -construction debris.
A copy of this report should be provided to the contractor and ensure they are notified that they must comply with all aspects of 29 CFR 1926.62.
APPENDIX A
PAINT TESTING DATA
Paint Testing Data Table Inspector: Tom Jankowiak
XRF # 2593
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
1 11/7/2024 Calibration Standard Pos 0.9
2 11/7/2024 Calibration Standard Pos 1.0
3 11/7/2024 Calibration Standard Pos 1.0
4 11/7/2024 Bldg 1914 1st Interior Room 1 N Wall Gray Drywall Intact Intact Neg -0.1
5 11/7/2024 Bldg 1914 1st Interior Room 1 E Wall Gray Wood Intact Intact Neg -0.3
6 11/7/2024 Bldg 1914 1st Interior Room 1 E Door Frame White Metal Intact Intact Neg -0.1
7 11/7/2024 Bldg 1914 1st Interior Room 1 E Door Panel Brown Wood Intact Intact Neg -0.2
8 11/7/2024 Bldg 1914 1st Interior Room 1 S Wall White Drywall Intact Intact Neg -0.2
9 11/7/2024 Bldg 1914 1st Interior Room 1 W Wall White Drywall Intact Intact Neg -0.1
10 11/7/2024 Bldg 1914 1st Interior Room 2 E Wall White Wood Intact Intact Neg 0.0
11 11/7/2024 Bldg 1914 1st Interior Room 2 E Door Frame White Wood Intact Intact Neg -0.1
12 11/7/2024 Bldg 1914 1st Interior Room 2 E Window Frame White Wood Intact Intact Neg 0.0
13 11/7/2024 Bldg 1914 1st Interior Room 2 E Window Frame White Metal Intact Intact Neg -0.3
14 11/7/2024 Bldg 1914 1st Interior Room 2 S Wall Gray Drywall Intact Intact Neg -0.2
15 11/7/2024 Bldg 1914 1st Interior Room 2 W Wall Gray Plaster Intact Intact Neg 0.2
16 11/7/2024 Bldg 1914 1st Interior Room 2 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.2
17 11/7/2024 Bldg 1914 1st Interior Room 3 N Door Frame Gray Metal Intact Intact Neg -0.2
18 11/7/2024 Bldg 1914 1st Interior Room 3 S Wall Gray Plaster Intact Intact Neg 0.0
19 11/7/2024 Bldg 1914 1st Interior Room 3 S Wall Gray Plaster Intact Intact Neg -0.2
20 11/7/2024 Bldg 1914 1st Interior Room 3 S Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.1
21 11/7/2024 Bldg 1914 1st Interior Room 4 N Wall Gray Drywall Intact Intact Neg -0.1
22 11/7/2024 Bldg 1914 1st Interior Room 4 S Door Frame Gray Wood Intact Intact Neg -0.4
23 11/7/2024 Bldg 1914 1st Interior Room 4 W Wall Gray Plaster Intact Intact Neg 0.1
24 11/7/2024 Bldg 1914 1st Interior Room 4 W Ceiling Beige Concrete Deteriorated Peeling Neg 0.0
25 11/7/2024 Bldg 1914 1st Interior Room 4 W Beam Beige Concrete Deteriorated Peeling Neg 0.0
26 11/7/2024 Bldg 1914 1st Interior Room 5 N Wall Gray Drywall Intact Intact Neg -0.2
27 11/7/2024 Bldg 1914 1st Interior Room 5 E Wall Gray Drywall Intact Intact Neg -0.1
28 11/7/2024 Bldg 1914 1st Interior Room 5 S Wall Gray Drywall Intact Intact Neg -0.2
29 11/7/2024 Bldg 1914 1st Interior Room 5 S Door Frame White Wood Intact Intact Neg -0.3
30 11/7/2024 Bldg 1914 1st Interior Room 5 S Door Panel Brown Wood Intact Intact Neg -0.1
31 11/7/2024 Bldg 1914 1st Interior Room 5 W Wall Gray Drywall Intact Intact Neg -0.3
32 11/7/2024 Bldg 1914 1st Interior Room 5 W Ceiling White Drywall Deteriorated Peeling Neg -0.2
33 11/7/2024 Bldg 1914 1st Interior Room 5 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.0
34 11/7/2024 Bldg 1914 1st Interior Room 5 W Ceiling Beige Concrete Deteriorated Peeling Neg 0.1
35 11/7/2024 Bldg 1914 1st Interior Room 5 W Beam Beige Concrete Deteriorated Peeling Neg -0.2
36 11/7/2024 Bldg 1914 1st Interior Room 6 N Wall Gray Drywall Intact Intact Neg 0.0
37 11/7/2024 Bldg 1914 1st Interior Room 6 E Wall Gray Drywall Intact Intact Neg -0.5
38 11/7/2024 Bldg 1914 1st Interior Room 6 S Wall Gray Drywall Intact Intact Neg -0.2
39 11/7/2024 Bldg 1914 1st Interior Room 6 W Wall Gray Drywall Intact Intact Neg -0.3
40 11/7/2024 Bldg 1914 1st Interior Room 6 W Window Frame White Metal Intact Intact Neg -0.2
41 11/7/2024 Bldg 1914 1st Interior Room 6 W Ceiling Beige Concrete Deteriorated Peeling Neg -0.4
42 11/7/2024 Bldg 1914 1st Interior Room 7 N Wall Gray Drywall Intact Intact Neg -0.2
43 11/7/2024 Bldg 1914 1st Interior Room 7 E Wall Gray Drywall Intact Intact Neg -0.1
44 11/7/2024 Bldg 1914 1st Interior Room 7 E Door Frame White Metal Intact Intact Neg 0.0
45 11/7/2024 Bldg 1914 1st Interior Room 7 E Door Panel Brown Wood Intact Intact Neg -0.4
46 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC W Deck Black Concrete Intact Intact Neg -0.2
47 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC W Floor Beige Concrete Intact Intact Neg -0.1
48 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC S Door Frame White Metal Intact Intact Neg 0.0
49 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC S Door Panel Brown Wood Intact Intact Neg -0.3
50 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC W Wall Gray Drywall Intact Intact Neg -0.2
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
51 11/7/2024 Bldg 1914 1st Interior Room 8 HVAC W Ceiling Deck Beige Concrete Deteriorated Peeling Neg -0.1
52 11/7/2024 Bldg 1914 1st Interior Room 9 N Wall Beige Drywall Intact Intact Neg -0.1
53 11/7/2024 Bldg 1914 1st Interior Room 9 E Wall Beige Drywall Intact Intact Neg -0.1
54 11/7/2024 Bldg 1914 1st Interior Room 9 S Wall Beige Drywall Intact Intact Neg -0.3
55 11/7/2024 Bldg 1914 1st Interior Room 9 W Wall Beige Drywall Intact Intact Neg -0.2
56 11/7/2024 Bldg 1914 1st Interior Room 9 W Door Frame White Metal Intact Intact Neg -0.4
57 11/7/2024 Bldg 1914 1st Interior Room 9 W Door Panel Brown Wood Intact Intact Neg -0.1
58 11/7/2024 Bldg 1914 1st Interior Room 10 N Wall Beige Drywall Intact Intact Neg -0.2
59 11/7/2024 Bldg 1914 1st Interior Room 10 W Wall White Wood Intact Intact Neg -0.2
60 11/7/2024 Bldg 1914 1st Interior Room 10 W Door Frame White Wood Intact Intact Neg -0.3
61 11/7/2024 Bldg 1914 1st Interior Room 10 W Door Panel White Wood Intact Intact Neg 0.0
62 11/7/2024 Bldg 1914 1st Interior Room 10 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg -0.3
63 11/7/2024 Bldg 1914 1st Interior Room 10 W Beam Beige Concrete Deteriorated Peeling Neg 0.0
64 11/7/2024 Bldg 1914 1st Interior Room 11 N Wall Gray Drywall intact Intact Neg -0.1
65 11/7/2024 Bldg 1914 1st Interior Room 11 N Door Frame White Metal Intact Intact Neg -0.3
66 11/7/2024 Bldg 1914 1st Interior Room 11 E Wall Gray Drywall Intact Intact Neg -0.1
67 11/7/2024 Bldg 1914 1st Interior Room 11 E Exit Door Frame White Metal Intact Intact Neg -0.4
68 11/7/2024 Bldg 1914 1st Interior Room 11 S Wall Gray Drywall Intact Intact Neg -0.2
69 11/7/2024 Bldg 1914 1st Interior Room 11 S Door Frame White Metal Intact Intact Neg 0.0
70 11/7/2024 Bldg 1914 1st Interior Room 11 S Door Panel Brown Wood Intact Intact Neg -0.2
71 11/7/2024 Bldg 1914 1st Interior Room 11 W Wall Gray Drywall Intact Intact Neg 0.0
72 11/7/2024 Bldg 1914 1st Interior Room 11 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.2
73 11/7/2024 Bldg 1914 1st Interior Room 11 W Beam Beige Concrete Deteriorated Peeling Neg 0.0
74 11/7/2024 Bldg 1914 1st Interior Room 12 N Wall Gray Drywall Intact Intact Neg 0.0
75 11/7/2024 Bldg 1914 1st Interior Room 12 E Wall Gray Drywall Intact Intact Neg -0.2
76 11/7/2024 Bldg 1914 1st Interior Room 12 S Wall Gray Drywall Intact Intact Neg -0.2
77 11/7/2024 Bldg 1914 1st Interior Room 12 W Wall Gray Drywall Intact Intact Neg -0.4
78 11/7/2024 Bldg 1914 1st Interior Room 12 W Door Frame White Metal Intact Intact Neg 0.0
79 11/7/2024 Bldg 1914 1st Interior Room 12 W Door Panel Brown Wood Intact Intact Neg -0.1
80 11/7/2024 Bldg 1914 1st Interior Room 13 N Wall Gray Drywall Intact Intact Neg -0.3
81 11/7/2024 Bldg 1914 1st Interior Room 13 E Wall Gray Drywall Intact Intact Neg -0.2
82 11/7/2024 Bldg 1914 1st Interior Room 13 S Wall Gray Drywall Intact Intact Neg -0.2
83 11/7/2024 Bldg 1914 1st Interior Room 13 W Wall Gray Drywall Intact Intact Neg -0.3
84 11/7/2024 Bldg 1914 1st Interior Room 13 W Door Frame White Metal Intact Intact Neg -0.2
85 11/7/2024 Bldg 1914 1st Interior Room 13 W Door Panel Brown Wood Intact Intact Neg -0.4
86 11/7/2024 Bldg 1914 1st Interior Room 14 N Wall Beige Drywall Intact Intact Neg -0.1
87 11/7/2024 Bldg 1914 1st Interior Room 14 E Wall Beige Drywall Intact Intact Neg -0.1
88 11/7/2024 Bldg 1914 1st Interior Room 14 W Wall Beige Drywall Intact Intact Neg -0.1
89 11/7/2024 Bldg 1914 1st Interior Room 14 W Deck Beige Concrete Intact Intact Neg -0.1
90 11/7/2024 Bldg 1914 1st Interior Room 14 W Beam Beige Concrete Deteriorated Peeling Neg 0.0
91 11/7/2024 Bldg 1914 1st Interior Room 15 N Wall Gray Drywall Intact Intact Neg -0.2
92 11/7/2024 Bldg 1914 1st Interior Room 15 S Wall Gray Drywall Intact Intact Neg -0.2
93 11/7/2024 Bldg 1914 1st Interior Room 15 W Wall Gray Drywall Intact Intact Neg 0.0
94 11/7/2024 Bldg 1914 1st Interior Room 15 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.3
95 11/7/2024 Bldg 1914 1st Interior Room 16 N Wall Gray Drywall Intact Intact Neg -0.1
96 11/7/2024 Bldg 1914 1st Interior Room 16 S Wall Gray Drywall Intact Intact Neg -0.4
97 11/7/2024 Bldg 1914 1st Interior Room 16 W Wall Gray Drywall Intact Intact Neg -0.1
98 11/7/2024 Bldg 1914 1st Interior Room 16 W Ceiling Deck Beige Concrete Deteriorated Peeling Neg 0.1
99 11/7/2024 Bldg 1914 1st Interior Room 17 Stair N Wall Gray Drywall Intact Intact Neg -0.2
100 11/7/2024 Bldg 1914 1st Interior Room 17 Stair N Chair Rail Gray Wood Intact Intact Neg -0.2
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
101 11/7/2024 Bldg 1914 1st Interior Room 17 Stair E Wall Gray Drywall Intact Intact Neg -0.3
102 11/7/2024 Bldg 1914 1st Interior Room 17 Stair E Door Frame White Metal Intact Intact Neg -0.1
103 11/7/2024 Bldg 1914 1st Interior Room 17 Stair E Door Panel Brown Wood Intact Intact Neg -0.3
104 11/7/2024 Bldg 1914 1st Interior Room 17 Stair S Wall Gray Drywall Intact Intact Neg -0.1
105 11/7/2024 Bldg 1914 1st Interior Room 17 Stair S Ceiling Deck Beige Concrete Deteriorated Peeling Neg -0.2
106 11/7/2024 Bldg 1914 1st Interior Room 17 Stair N Upper N Wall Beige Plaster Intact Intact Neg -0.2
107 11/7/2024 Bldg 1914 1st Interior Room 17 Stair S Beam Beige Concrete Deteriorated Peeling Neg 0.1
108 11/7/2024 Bldg 1914 2nd Interior Room 18 W Wall White Concrete Intact Intact Pos >9.9
109 11/7/2024 Bldg 1914 2nd Interior Room 18 W Stair Base White Concrete Intact Intact Neg 0.3
110 11/7/2024 Bldg 1914 2nd Interior Room 18 W Window Frame Brown Wood Deteriorated Peeling Neg 0 111 11/7/2024 Bldg 1914 2nd Interior Room 18 W Window Sash Brown Wood Deteriorated Peeling Neg 0 112 11/7/2024 Bldg 1914 2nd Interior Room 18 W Windowsill Brown Wood Deteriorated Peeling Neg -0.3 113 11/7/2024 Bldg 1914 2nd Interior Room 18 N Wall White Concrete Intact Intact Pos >9.9
114 11/7/2024 Bldg 1914 2nd Interior Room 18 N Window Frame Brown Wood Deteriorated Peeling Neg -0.4 115 11/7/2024 Bldg 1914 2nd Interior Room 18 N Windowsill Brown Wood Deteriorated Peeling Neg -0.2 116 11/7/2024 Bldg 1914 2nd Interior Room 18 N Window Sash Brown Wood Deteriorated Peeling Neg 0 117 11/7/2024 Bldg 1914 2nd Interior Room 18 N Window Frame White Wood Deteriorated Peeling Pos >9.9
118 11/7/2024 Bldg 1914 2nd Interior Room 18 E Wall Beige Drywall Intact Intact Neg 0 119 11/7/2024 Bldg 1914 2nd Interior Room 18 E Door Frame Brown Wood Intact Intact Neg -0.4 120 11/7/2024 Bldg 1914 2nd Interior Room 18 E Door Panel Brown Wood Intact Intact Neg -0.2 121 11/7/2024 Bldg 1914 2nd Interior Room 18 S Wall Beige Drywall Intact Intact Neg 0 122 11/7/2024 Bldg 1914 2nd Interior Room 18 S Wall White Plaster Intact Intact Pos >9.9
123 11/7/2024 Bldg 1914 2nd Interior Room 18 W Window Frame Brown Wood Deteriorated Peeling Neg -0.2 124 11/7/2024 Bldg 1914 2nd Interior Room 18 W Windowsill Brown Wood Deteriorated Peeling Neg -0.4 125 11/7/2024 Bldg 1914 2nd Interior Room 18 W Window Sash Brown Wood Deteriorated Peeling Neg -0.4 126 11/7/2024 Bldg 1914 2nd Interior Room 18 W Window Frame White Wood Intact Intact Neg -0.1 127 11/7/2024 Bldg 1914 2nd Interior Room 18 W Stair Rail White Metal Intact Intact Pos 1.8
128 11/7/2024 Bldg 1914 2nd Interior Room 18 W Rail Post White Metal Intact Intact Pos 1.3
129 11/7/2024 Bldg 1914 2nd Interior Room 18 W Post Cap White Metal Intact Intact Pos 1.8
130 11/7/2024 Bldg 1914 2nd Interior Room 18 W Stair Base White Concrete Intact Intact Pos >9.9
131 11/7/2024 Bldg 1914 2nd Interior Room 18 W Step Riser White Metal Intact Intact Pos 1.4
132 11/7/2024 Bldg 1914 2nd Interior Room 18 W Stair Rail Panel White Metal Intact Intact Pos 3.6
133 11/7/2024 Bldg 1914 2nd Interior Room 18 W Stair Rail Panel Beige Concrete Intact Intact Pos 3.2
134 11/7/2024 Bldg 1914 2nd Interior Room 18 S Ceiling Brown Wood Intact Intact Pos 4.6
135 11/7/2024 Bldg 1914 2nd Interior Room 19 N Wall Beige Plaster Intact Intact Pos >9.9
136 11/7/2024 Bldg 1914 2nd Interior Room 19 N Window Frame Brown Wood Deteriorated Peeling Neg -0.1 137 11/7/2024 Bldg 1914 2nd Interior Room 19 N Windowsill Brown Wood Deteriorated Peeling Neg -0.3 138 11/7/2024 Bldg 1914 2nd Interior Room 19 N Window Sash Brown Wood Deteriorated Peeling Neg -0.2 139 11/7/2024 Bldg 1914 2nd Interior Room 19 N Window Frame Beige Wood Intact Intact Pos 3.6
140 11/7/2024 Bldg 1914 2nd Interior Room 19 E Wall Beige Drywall Intact Intact Neg -0.3 141 11/7/2024 Bldg 1914 2nd Interior Room 19 E Door Frame Beige Wood Intact Intact Pos >9.9
142 11/7/2024 Bldg 1914 2nd Interior Room 19 E Door Panel Brown Wood Intact Intact Neg -0.1 143 11/7/2024 Bldg 1914 2nd Interior Room 19 E D Mantle Beige Wood Intact Intact Pos 6.0
144 11/7/2024 Bldg 1914 2nd Interior Room 19 S Wall Beige Drywall Intact Intact Neg 0.0
145 11/7/2024 Bldg 1914 2nd Interior Room 19 S Column Beige Plaster Intact Intact Pos >9.9
146 11/7/2024 Bldg 1914 2nd Interior Room 19 S Ceiling Beige Plaster Intact Intact Pos >9.9
147 11/7/2024 Bldg 1914 2nd Interior Room 20 N Wall Beige Plaster Intact Intact Pos >9.9
148 11/7/2024 Bldg 1914 2nd Interior Room 20 N Wall Green Plaster Intact Intact Pos >9.9
149 11/7/2024 Bldg 1914 2nd Interior Room 20 N Chair Rail Brown Wood Intact Intact Neg -0.2 150 11/7/2024 Bldg 1914 2nd Interior Room 20 N Window Frame Brown Wood Intact Intact Neg -0.2
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
151 11/7/2024 Bldg 1914 2nd Interior Room 20 N Windowsill Brown Wood Intact Intact Neg -0.3 152 11/7/2024 Bldg 1914 2nd Interior Room 20 N Window Sash Brown Wood Intact Intact Neg -0.1 153 11/7/2024 Bldg 1914 2nd Interior Room 20 E Wall Beige Plaster Intact Intact Pos >9.9
154 11/7/2024 Bldg 1914 2nd Interior Room 20 E Window Frame Brown Wood Intact Intact Neg -0.2
155 11/7/2024 Bldg 1914 2nd Interior Room 20 E Windowsill Brown Wood Intact Intact Neg -0.2
156 11/7/2024 Bldg 1914 2nd Interior Room 20 E Window Sash Brown Wood Intact Intact Neg -0.3
157 11/7/2024 Bldg 1914 2nd Interior Room 20 S Wall Green Drywall Intact Intact Neg -0.1
158 11/7/2024 Bldg 1914 2nd Interior Room 20 W Wall Beige Plaster Intact Intact Pos 1.9
159 11/7/2024 Bldg 1914 2nd Interior Room 20 W Hall Wall Gray Drywall Intact Intact Neg 0.0
160 11/7/2024 Bldg 1914 2nd Interior Room 20 W Ceiling Beige Plaster Intact Intact Pos >9.9
161 11/7/2024 Bldg 1914 2nd Interior Room 21 N Wall White Drywall Intact Intact Neg -0.2
162 11/7/2024 Bldg 1914 2nd Interior Room 21 N Door Frame Brown Wood Intact Intact Neg -0.1
163 11/7/2024 Bldg 1914 2nd Interior Room 21 N Door Panel Brown Wood Intact Intact Neg -0.1
164 11/7/2024 Bldg 1914 2nd Interior Room 21 E Wall White Wood Intact Intact Neg -0.1
165 11/7/2024 Bldg 1914 2nd Interior Room 21 S Wall White Wood Intact Intact Neg 0.0
166 11/7/2024 Bldg 1914 2nd Interior Room 21 S Door Frame White Metal Intact Intact Neg -0.4
167 11/7/2024 Bldg 1914 2nd Interior Room 21 S Door Panel Brown Wood Intact Intact Neg 0.0
168 11/7/2024 Bldg 1914 2nd Interior Room 21 S Center Column White Plaster Intact Intact Pos 2.1
169 11/7/2024 Bldg 1914 2nd Interior Room 21 S S Column White Plaster Intact Intact Pos 1.7
170 11/7/2024 Bldg 1914 2nd Interior Room 21 W Wall White Plaster Intact Intact Pos >9.9
171 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Frame Brown Wood Deteriorated Peeling Neg -0.1
172 11/7/2024 Bldg 1914 2nd Interior Room 21 W Windowsill Brown Wood Deteriorated Peeling Neg -0.1
173 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Sash Brown Wood Deteriorated Peeling Neg -0.2
174 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Frame White Concrete Intact Intact Pos >9.9
175 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Frame Brown Wood Deteriorated Peeling Neg -0.2
176 11/7/2024 Bldg 1914 2nd Interior Room 21 W Windowsill Brown Wood Deteriorated Peeling Neg -0.1
177 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Sash Brown Wood Deteriorated Peeling Neg 0.0
178 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Frame White Concrete Intact Intact Pos >9.9
179 11/7/2024 Bldg 1914 2nd Interior Room 21 W Window Upper Trim White Concrete Intact Intact Pos >9.9
180 11/7/2024 Bldg 1914 2nd Interior Room 21 W Decorative Trim White Concrete Intact Intact Pos >9.9
181 11/7/2024 Bldg 1914 2nd Interior Room 22 N Wall White Drywall Intact Intact Neg 0.0
182 11/7/2024 Bldg 1914 2nd Interior Room 22 E Wall White Plaster Intact Intact Pos >9.9
183 11/7/2024 Bldg 1914 2nd Interior Room 22 E Crown Trim White Wood Intact Intact Neg -0.2
184 11/7/2024 Bldg 1914 2nd Interior Room 22 E Wall White Wood Intact Intact Neg -0.2
185 11/7/2024 Bldg 1914 2nd Interior Room 22 E Baseboard White Wood Intact Intact Neg -0.3
186 11/7/2024 Bldg 1914 2nd Interior Room 22 E Window Frame White Wood Intact Intact Neg -0.3
187 11/7/2024 Bldg 1914 2nd Interior Room 22 E Windwosill White Wood Intact Intact Neg -0.2
188 11/7/2024 Bldg 1914 2nd Interior Room 22 E Window Sash White Metal Intact Intact Neg -0.3
189 11/7/2024 Bldg 1914 2nd Interior Room 22 E Upper Window Frame White Wood Deteriorated Peeling Neg 0.0
190 11/7/2024 Bldg 1914 2nd Interior Room 22 E Windowsill White Wood Deteriorated Peeling Neg -0.1
191 11/7/2024 Bldg 1914 2nd Interior Room 22 E Window Sash White Metal Deteriorated Peeling Neg -0.2
192 11/7/2024 Bldg 1914 2nd Interior Room 22 E Upper Window Frame White Wood Deteriorated Peeling Neg -0.1
193 11/7/2024 Bldg 1914 2nd Interior Room 22 E Windowsill White Wood Deteriorated Peeling Neg -0.1
194 11/7/2024 Bldg 1914 2nd Interior Room 22 E Window Sash White Metal Deteriorated Peeling Neg -0.3
195 11/7/2024 Bldg 1914 2nd Interior Room 22 S Wall Gray Drywall Intact Intact Neg -0.1
196 11/7/2024 Bldg 1914 2nd Interior Room 22 S Door Frame White Metal Intact Intact Neg -0.4
197 11/7/2024 Bldg 1914 2nd Interior Room 22 S Door Panel Brown Wood Intact Intact Neg -0.2
198 11/7/2024 Bldg 1914 2nd Interior Room 22 W Wall Gray Drywall Intact Intact Neg -0.3
199 11/7/2024 Bldg 1914 2nd Interior Room 23 N Wall Gray Drywall Intact Intact Neg -0.3
200 11/7/2024 Bldg 1914 2nd Interior Room 23 E Wall Gray Plaster Intact Intact Pos >9.9
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
201 11/7/2024 Bldg 1914 2nd Interior Room 23 E Crown Trim White Wood Intact Intact Neg -0.1
202 11/7/2024 Bldg 1914 2nd Interior Room 23 E Wall Gray Wood Deteriorated Peeling Neg -0.3
203 11/7/2024 Bldg 1914 2nd Interior Room 23 E Baseboard Gray Wood Intact Intact Neg -0.4
204 11/7/2024 Bldg 1914 2nd Interior Room 23 E Window Frame White Wood Deteriorated Peeling Neg 0.0
205 11/7/2024 Bldg 1914 2nd Interior Room 23 E Windwosill White Wood Deteriorated Peeling Neg -0.3
206 11/7/2024 Bldg 1914 2nd Interior Room 23 E Window Sash White Metal Deteriorated Peeling Neg -0.3
207 11/7/2024 Bldg 1914 2nd Interior Room 23 E Upper Window Frame White Wood Deteriorated Peeling Neg -0.4
208 11/7/2024 Bldg 1914 2nd Interior Room 23 E Windowsill White Wood Deteriorated Peeling Neg 0.0
209 11/7/2024 Bldg 1914 2nd Interior Room 23 E Window Sash White Metal Deteriorated Peeling Neg -0.2
210 11/7/2024 Bldg 1914 2nd Interior Room 23 E Upper Window Frame White Wood Deteriorated Peeling Neg -0.1
211 11/7/2024 Bldg 1914 2nd Interior Room 23 E Windowsill White Wood Deteriorated Peeling Neg -0.1
212 11/7/2024 Bldg 1914 2nd Interior Room 23 E Window Sash White Metal Deteriorated Peeling Neg -0.2
213 11/7/2024 Bldg 1914 2nd Interior Room 23 S Wall White Wood Intact Intact Neg -0.4
214 11/7/2024 Bldg 1914 2nd Interior Room 23 S Door Frame White Metal Intact Intact Neg -0.1
215 11/7/2024 Bldg 1914 2nd Interior Room 23 S Door Panel Brown Wood Intact Intact Neg -0.3
216 11/7/2024 Bldg 1914 2nd Interior Room 23 W Wall Gray Drywall Intact Intact Neg -0.2
217 11/7/2024 Bldg 1914 2nd Interior Room 24 N Wall Beige Drywall Intact Intact Neg -0.2
218 11/7/2024 Bldg 1914 2nd Interior Room 24 N Baseboard Blue Wood Intact Intact Neg -0.2
219 11/7/2024 Bldg 1914 2nd Interior Room 24 N Crown Trim Blue Wood Intact Intact Neg -0.4
220 11/7/2024 Bldg 1914 2nd Interior Room 24 N Door Frame White Wood Intact Intact Neg -0.1
221 11/7/2024 Bldg 1914 2nd Interior Room 24 N Door Panel White Wood Intact Intact Neg -0.2
222 11/7/2024 Bldg 1914 2nd Interior Room 24 E Wall Beige Plaster Intact Intact Pos >9.9
223 11/7/2024 Bldg 1914 2nd Interior Room 24 E Wall Beige Wood Intact Intact Neg -0.2
224 11/7/2024 Bldg 1914 2nd Interior Room 24 E Window Frame Blue Wood Deteriorated Peeling Neg -0.3
225 11/7/2024 Bldg 1914 2nd Interior Room 24 E Windwosill Blue Wood Deteriorated Peeling Neg -0.2
226 11/7/2024 Bldg 1914 2nd Interior Room 24 E Window Sash Blue Metal Deteriorated Peeling Neg 0.0
227 11/7/2024 Bldg 1914 2nd Interior Room 24 E Upper Window Frame Blue Wood Deteriorated Peeling Neg -0.2
228 11/7/2024 Bldg 1914 2nd Interior Room 24 E Windowsill Blue Wood Deteriorated Peeling Neg -0.4
229 11/7/2024 Bldg 1914 2nd Interior Room 24 E Window Sash Blue Metal Deteriorated Peeling Neg -0.3
230 11/7/2024 Bldg 1914 2nd Interior Room 24 E Upper Window Frame Blue Wood Deteriorated Peeling Neg -0.2
231 11/7/2024 Bldg 1914 2nd Interior Room 24 E Windowsill Blue Wood Deteriorated Peeling Neg -0.3
232 11/7/2024 Bldg 1914 2nd Interior Room 24 E Window Sash Blue Metal Deteriorated Peeling Neg -0.2
233 11/7/2024 Bldg 1914 2nd Interior Room 24 S Wall Beige Drywall Intact Intact Neg 0.0
234 11/7/2024 Bldg 1914 2nd Interior Room 24 W Wall Beige Drywall Intact Intact Neg -0.2
235 11/7/2024 Bldg 1914 2nd Interior Room 25 N Wall Gray Wood Intact Intact Neg -0.4
236 11/7/2024 Bldg 1914 2nd Interior Room 25 N Wall White Wood Intact Intact Neg -0.1
237 11/7/2024 Bldg 1914 2nd Interior Room 25 N Door Frame White Metal Intact Intact Neg -0.2
238 11/7/2024 Bldg 1914 2nd Interior Room 25 N Door Panel Brown Wood Intact Intact Neg -0.2
239 11/7/2024 Bldg 1914 2nd Interior Room 25 E Wall White Wood Intact Intact Neg -0.3
240 11/7/2024 Bldg 1914 2nd Interior Room 25 S Wall White Wood Intact Intact Neg -0.1
241 11/7/2024 Bldg 1914 2nd Interior Room 25 W Wall White Wood Intact Intact Neg -0.3
242 11/7/2024 Bldg 1914 2nd Interior Room 25 W Entry Door Frame White Wood Deteriorated Peeling Neg -0.1
243 11/7/2024 Bldg 1914 2nd Interior Room 25 W Door Panel Brown Wood Intact Intact Neg -0.1
244 11/7/2024 Bldg 1914 2nd Interior Room 25 W Door Panel White Metal Intact Intact Neg 0.0
245 11/7/2024 Bldg 1914 2nd Interior Room 25 E Column White Concrete Intact Intact Neg -0.2
246 11/7/2024 Bldg 1914 2nd Interior Room 26 N Wall Gray Drywall Intact Intact Neg -0.1
247 11/7/2024 Bldg 1914 2nd Interior Room 26 N Door Frame Gray Metal Intact Intact Neg -0.2
248 11/7/2024 Bldg 1914 2nd Interior Room 26 N Door Panel Brown Wood Intact Intact Neg -0.1
249 11/7/2024 Bldg 1914 2nd Interior Room 26 E Wall White Wood Intact Intact Neg -0.1
250 11/7/2024 Bldg 1914 2nd Interior Room 26 S Wall White Wood Intact Intact Neg 0.0
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
251 11/7/2024 Bldg 1914 2nd Interior Room 26 W Wall White Wood Intact Intact Neg 0.0
252 11/7/2024 Calibration Standard Pos 0.9
253 11/7/2024 Calibration Standard Pos 0.9
254 11/7/2024 Calibration Standard Pos 1.0
255 11/7/2024 Bldg 1914 2nd Interior Room 27 E Wall Beige Plaster Intact Intact Pos >9.9
256 11/7/2024 Bldg 1914 2nd Interior Room 27 W Wall Beige Plaster Intact Intact Pos >9.9
257 11/7/2024 Bldg 1914 2nd Interior Room 27 W Stair Base Gray Metal Deteriorated Peeling Pos >9.9
258 11/7/2024 Bldg 1914 2nd Interior Room 27 W Stair Step Gray Metal Deteriorated Peeling Pos >9.9
259 11/7/2024 Bldg 1914 2nd Interior Room 27 W Step Riser Gray Metal Deteriorated Peeling Pos >9.9
260 11/7/2024 Bldg 1914 2nd Interior Room 28 N Wall Gray Drywall Intact Intact Neg -0.2
261 11/7/2024 Bldg 1914 2nd Interior Room 28 E Wall Gray Plaster Intact Intact Pos >9.9
262 11/7/2024 Bldg 1914 2nd Interior Room 28 E Door Frame Gray Wood Deteriorated Peeling Neg 0.0
263 11/7/2024 Bldg 1914 2nd Interior Room 28 E Door Panel Brown Wood Intact Intact Neg -0.2
264 11/7/2024 Bldg 1914 2nd Interior Room 28 E Wall Gray Drywall Intact Intact Neg -0.2
265 11/7/2024 Bldg 1914 2nd Interior Room 28 S Wall Gray Drywall Intact Intact Neg -0.1
266 11/7/2024 Bldg 1914 2nd Interior Room 28 W Wall Gray Drywall Intact Intact Neg -0.3
267 11/7/2024 Bldg 1914 2nd Interior Room 28 W Door Frame White Wood Deteriorated Chipped Neg -0.3
268 11/7/2024 Bldg 1914 2nd Interior Room 29 N Wall White Drywall Intact Intact Neg -0.3
269 11/7/2024 Bldg 1914 2nd Interior Room 29 N Wall Gray Tile Intact Intact Neg -0.2
270 11/7/2024 Bldg 1914 2nd Interior Room 29 E Wall White Drywall Intact Intact Neg -0.1
271 11/7/2024 Bldg 1914 2nd Interior Room 29 E Door Frame White Metal Intact Intact Neg -0.4
272 11/7/2024 Bldg 1914 2nd Interior Room 29 E Door Panel Brown Wood Intact Intact Neg -0.4
273 11/7/2024 Bldg 1914 2nd Interior Room 29 S Wall White Drywall Intact Intact Neg -0.1
274 11/7/2024 Bldg 1914 2nd Interior Room 29 W Wall White Drywall Intact Intact Neg 0.0
275 11/7/2024 Bldg 1914 2nd Interior Room 29 W Ceiling White Drywall Intact Intact Neg -0.3
276 11/7/2024 Bldg 1914 2nd Interior Room 30 N Wall White Drywall Intact Intact Neg -0.2
277 11/7/2024 Bldg 1914 2nd Interior Room 30 N Wall Gray Tile Intact Intact Neg -0.3
278 11/7/2024 Bldg 1914 2nd Interior Room 30 E Wall White Drywall Intact Intact Neg -0.4
279 11/7/2024 Bldg 1914 2nd Interior Room 30 E Door Frame White Metal Intact Intact Neg -0.1
280 11/7/2024 Bldg 1914 2nd Interior Room 30 E Door Panel Brown Wood Intact Intact Neg -0.3
281 11/7/2024 Bldg 1914 2nd Interior Room 30 S Wall White Drywall Intact Intact Neg -0.1
282 11/7/2024 Bldg 1914 2nd Interior Room 30 W Wall White Drywall Intact Intact Neg -0.1
283 11/7/2024 Bldg 1914 2nd Interior Room 30 W Ceiling White Drywall Intact Intact Neg -0.2
284 11/7/2024 Bldg 1914 2nd Interior Room 31 N Wall Gray Drywall Intact Intact Neg -0.4
285 11/7/2024 Bldg 1914 2nd Interior Room 31 N Door Frame White Wood Intact Intact Neg 0.0
286 11/7/2024 Bldg 1914 2nd Interior Room 31 N Door Panel White Wood Intact Intact Neg 0.0
287 11/7/2024 Bldg 1914 2nd Interior Room 31 S Wall Gray Plaster Intact Intact Neg 0.0
288 11/7/2024 Bldg 1914 2nd Interior Room 31 S Window Frame Brown Metal Intact Intact Neg 0.0
289 11/7/2024 Bldg 1914 2nd Interior Room 31 S Windwosill Brown Wood Intact Intact Neg -0.4
290 11/7/2024 Bldg 1914 2nd Interior Room 31 S Window Sash Brown Wood Intact Intact Neg -0.2
291 11/7/2024 Bldg 1914 2nd Interior Room 31 W Wall Gray Plaster Intact Intact Neg -0.1
292 11/7/2024 Bldg 1914 2nd Interior Room 31 W Window Frame Brown Metal Intact Intact Neg -0.4
293 11/7/2024 Bldg 1914 2nd Interior Room 31 W Windwosill Brown Wood Intact Intact Neg -0.1
294 11/7/2024 Bldg 1914 2nd Interior Room 31 W Window Sash Brown Wood Intact Intact Neg 0.0
295 11/7/2024 Bldg 1914 2nd Interior Room 32 N Wall Beige Drywall Intact Intact Neg -0.1
296 11/7/2024 Bldg 1914 2nd Interior Room 32 E Wall Beige Drywall Intact Intact Neg 0.0
297 11/7/2024 Bldg 1914 2nd Interior Room 32 E Door Frame White Metal Intact Intact Neg -0.2
298 11/7/2024 Bldg 1914 2nd Interior Room 32 E Door Panel Brown Wood Intact Intact Neg -0.3
299 11/7/2024 Bldg 1914 2nd Interior Room 32 S Wall Beige Plaster Intact Intact Neg -0.4
300 11/7/2024 Bldg 1914 2nd Interior Room 32 W Wall Beige Plaster Intact Intact Pos >9.9
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
301 11/7/2024 Bldg 1914 2nd Interior Room 32 W Window Frame Brown Wood Deteriorated Peeling Neg 0.0
302 11/7/2024 Bldg 1914 2nd Interior Room 32 W Windowsill Brown Wood Deteriorated Peeling Neg -0.4
303 11/7/2024 Bldg 1914 2nd Interior Room 32 W Window Sash Brown Wood Deteriorated Peeling Neg -0.1
304 11/7/2024 Bldg 1914 2nd Interior Room 32 W Window Frame White Concrete Intact Intact Neg 0.0
305 11/7/2024 Bldg 1914 2nd Interior Room 33 N Wall Green Drywall Intact Intact Neg -0.4
306 11/7/2024 Bldg 1914 2nd Interior Room 33 N Door Frame White Metal Intact Intact Neg -0.2
307 11/7/2024 Bldg 1914 2nd Interior Room 33 N Door Panel Brown Wood Intact Intact Neg -0.4
308 11/7/2024 Bldg 1914 2nd Interior Room 33 E Wall Green Drywall Intact Intact Neg 0.0
309 11/7/2024 Bldg 1914 2nd Interior Room 33 S Wall Green Drywall Intact Intact Neg -0.3
310 11/7/2024 Bldg 1914 2nd Interior Room 33 W Wall Green Plaster Intact Intact Pos >9.9
311 11/7/2024 Bldg 1914 2nd Interior Room 33 W Window Frame Brown Wood Deteriorated Peeling Neg -0.2
312 11/7/2024 Bldg 1914 2nd Interior Room 33 W Windowsill Brown Wood Deteriorated Peeling Neg -0.1
313 11/7/2024 Bldg 1914 2nd Interior Room 33 W Window Sash Brown Wood Deteriorated Peeling Neg -0.3
314 11/7/2024 Bldg 1914 2nd Interior Room 33 W Window Frame White Concrete Intact Intact Pos >9.9
315 11/7/2024 Bldg 1914 2nd Interior Room 34 N Wall Gray Drywall Intact Intact Neg -0.2
316 11/7/2024 Bldg 1914 2nd Interior Room 34 E Wall Gray Drywall Intact Intact Neg -0.1
317 11/7/2024 Bldg 1914 2nd Interior Room 34 E Door Frame White Metal Intact Intact Neg -0.1
318 11/7/2024 Bldg 1914 2nd Interior Room 34 E Door Panel Brown Wood Intact Intact Neg -0.3
319 11/7/2024 Bldg 1914 2nd Interior Room 34 E Column Gray Drywall Intact Intact Neg -0.2
320 11/7/2024 Bldg 1914 2nd Interior Room 34 S Wall Gray Drywall Intact Intact Neg 0.0
321 11/7/2024 Bldg 1914 2nd Interior Room 34 W Wall Gray Drywall Intact Intact Neg -0.1
322 11/7/2024 Bldg 1914 2nd Interior Room 34 W Column Gray Plaster Intact Intact Neg -0.3
323 11/7/2024 Calibration Standard Pos 1.0
324 11/7/2024 Calibration Standard Pos 0.9
325 11/7/2024 Calibration Standard Pos 1.0
326 11/8/2024 Calibration Standard Pos 1.0
327 11/8/2024 Calibration Standard Pos 0.9
328 11/8/2024 Calibration Standard Pos 0.9
329 11/8/2024 Bldg 1914 3rd Interior Room 35 N Wall White Plaster Intact Intact Pos >9.9
330 11/8/2024 Bldg 1914 3rd Interior Room 35 N Chair Rail Brown Wood Intact Intact Neg -0.2
331 11/8/2024 Bldg 1914 3rd Interior Room 35 N Baseboard Brown Wood Intact Intact Neg -0.4
332 11/8/2024 Bldg 1914 3rd Interior Room 35 E Wall White Plaster Deteriorated Peeling Pos >9.9
333 11/8/2024 Bldg 1914 3rd Interior Room 35 E Window Frame Brown Wood Deteriorated Peeling Neg -0.2
334 11/8/2024 Bldg 1914 3rd Interior Room 35 E Windowsill Brown Wood Deteriorated Peeling Neg 0.0
335 11/8/2024 Bldg 1914 3rd Interior Room 35 E Window Sash Brown Wood Deteriorated Peeling Neg -0.2
336 11/8/2024 Bldg 1914 3rd Interior Room 35 S Wall White Plaster Intact Intact Pos >9.9
337 11/8/2024 Bldg 1914 3rd Interior Room 35 S Window Frame Brown Wood Deteriorated Peeling Neg -0.3
338 11/8/2024 Bldg 1914 3rd Interior Room 35 S Windowsill Brown Wood Deteriorated Peeling Neg -0.3
339 11/8/2024 Bldg 1914 3rd Interior Room 35 S Window Sash Brown Wood Deteriorated Peeling Neg -0.3
340 11/8/2024 Bldg 1914 3rd Interior Room 35 W Wall White Plaster Intact Intact Pos >9.9
341 11/8/2024 Bldg 1914 3rd Interior Room 35 W Door Frame Brown Wood Deteriorated Peeling Neg 0.0
342 11/8/2024 Bldg 1914 3rd Interior Room 35 W Door Frame White Wood Deteriorated Peeling Neg 0.0
343 11/8/2024 Bldg 1914 3rd Interior Room 35 W Door Panel White Wood Deteriorated Peeling Neg -0.1
344 11/8/2024 Bldg 1914 3rd Interior Room 35 W Floor Brown Wood Intact Intact Neg -0.2
345 11/8/2024 Bldg 1914 3rd Interior Room 35 W Ceiling White Plaster Intact Intact Pos >9.9
346 11/8/2024 Bldg 1914 3rd Interior Room 36 N Wall Gray Plaster Intact Intact Pos >9.9
347 11/8/2024 Bldg 1914 3rd Interior Room 36 N Ladder White Metal Intact Intact Pos 3.6
348 11/8/2024 Bldg 1914 3rd Interior Room 36 N Hatch White Metal Intact Intact Pos >9.9
349 11/8/2024 Bldg 1914 3rd Interior Room 36 E Wall Gray Drywall Intact Intact Neg 0.0
350 11/8/2024 Bldg 1914 3rd Interior Room 36 E Door Frame White Wood Intact Intact Neg -0.1
Project No.: 11/7-8/24
Address: 401 S Rogers Client: City of Waxahachie
XRF
mg/cm
ConditionIntact/PoorInt/Ext
XRF
Test # Date Location Room Pos/NegWall Building Component Color Substrate
351 11/8/2024 Bldg 1914 3rd Interior Room 36 E Door Panel White Wood Intact Intact Neg -0.2
352 11/8/2024 Bldg 1914 3rd Interior Room 36 E Window Frame White Wood Deteriorated Peeling Neg -0.1
353 11/8/2024 Bldg 1914 3rd Interior Room 36 E Windowsill White Wood Deteriorated Peeling Neg -0.3
354 11/8/2024 Bldg 1914 3rd Interior Room 36 E Window Sash White Wood Deteriorated Peeling Neg -0.4
355 11/8/2024 Bldg 1914 3rd Interior Room 36 S Wall Gray Drywall Intact Intact Neg -0.1
356 11/8/2024 Bldg 1914 3rd Interior Room 36 S Door Frame White Wood Intact Intact Neg 0.0
357 11/8/2024 Bldg 1914 3rd Interior Room 36 S Door Panel White Wood Intact Intact Neg -0.3
358 11/8/2024 Bldg 1914 3rd Interior Room 37 N Wall White Drywall Intact Intact Neg 0.0
359 11/8/2024 Bldg 1914 3rd Interior Room 37 N Baseboard White Wood Intact Intact Neg -0.2
360 11/8/2024 Bldg 1914 3rd Interior Room 37 N Chair Rail White Wood Intact Intact Neg -0.3
361 11/8/2024 Bldg 1914 3rd Interior Room 37 N Window Frame White Wood Intact Intact Neg -0.1
362 11/8/2024 Bldg 1914 3rd Interior Room 37 N Window Panel White Wood Intact Intact Neg -0.3
363 11/8/2024 Bldg 1914 3rd Interior Room 37 E Wall White Drywall Intact Intact Neg -0.2
364 11/8/2024 Bldg 1914 3rd Interior Room 37 E Door Frame White Wood Deteriorated Peeling Neg -0.1
365 11/8/2024 Bldg 1914 3rd Interior Room 37 E Door Panel White Wood Deteriorated Peeling Neg 0.0
366 11/8/2024 Bldg 1914 3rd Interior Room 37 S Wall White Plaster Intact Intact Pos >9.9
367 11/8/2024 Bldg 1914 3rd Interior Room 37 S Baseboard White Wood Intact Intact Neg 0.0
368 11/8/2024 Bldg 1914 3rd Interior Room 37 S Window Frame White Wood Deteriorated Peeling Neg 0.0
369 11/8/2024 Bldg 1914 3rd Interior Room 37 S Windowsill White Wood Deteriorated Peeling Neg -0.1
370 11/8/2024 Bldg 1914 3rd Interior Room 37 S Window Sash White Wood Deteriorated Peeling Neg -0.1
371 11/8/2024 Bldg 1914 3rd Interior Room 37 W Wall White Plaster Intact Intact Pos >9.9
372 11/8/2024 Bldg 1914 3rd Interior Room 37 W Window Frame White Wood Deteriorated Peeling Neg -0.2
373 11/8/2024 Bldg 1914 3rd Interior Room 37 W Windowsill White Wood Deteriorated Peeling Neg -0.1
374 11/8/2024 Bldg 1914 3rd Interior Room 37 W Ceiling White Plaster Deteriorated Peeling Pos >9.9
375 11/8/2024 Bldg 1914 3rd Interior Room 38 HVAC N Wall White Drywall Intact Intact Neg 0.0
376 11/8/2024 Bldg 1914 3rd Interior Room 38 HVAC N Door Frame White Wood Deteriorated Peeling Neg -0.2
377 11/8/2024 Bldg 1914 3rd Interior Room 38 HVAC N Door Panel White Wood Deteriorated Peeling Neg -0.2
378 11/8/2024 Bldg…