401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf

PDF 10 MB Posted

Attached to
Interior Demolition & Abatement Project - 401 S Rogers St
Solicitation number
ITB-2026-3-1
Issued by
Ellis County, Texas

About this file

Interior Demolition & Abatement Project - 401 S Rogers Street

This is a demolition construction plan package for the City of Waxahachie, Texas, prepared by RBDR PLLC Architects in partnership with EMA Engineering & Consulting, Inc. The project encompasses comprehensive interior demolition and abatement services for a three-story commercial building (City Hall) located at 401 South Rogers Street, Waxahachie, Texas 75165. The demolition scope includes architectural, mechanical, electrical, plumbing, and technology systems across multiple floor levels, with detailed construction plans showing basement through third-floor demolition requirements, reflected ceiling plans, and M.E.P. demolition drawings. General demolition contractors are required to walk the site with the owner prior to bidding to verify existing job conditions and establish the full scope of work. The project involves coordinated removal of hazardous materials in compliance with federal, state, and local regulations, with the general demolition contractor responsible for procuring a licensed abatement contractor to perform those services.

The demolition package specifies that contractors must carefully remove and salvage certain materials including doors, hardware, fire extinguisher cabinets, and architectural woodwork, with salvaged materials tagged using water-resistant Tyvek labels and documented in an alphanumeric log submitted upon completion. Historic architectural elements including crown molding, ornamental trim, coffered ceiling molding, exterior window casings, and wood transom frames are designated to remain and be protected from damage. All flooring, remnants, and adhesives must be removed down to substrate, with marble and terrazzo cast-in-place flooring, wood flooring, and concrete floors to be prepared for future materials. The contractor must secure all perimeter openings to be weather-tight following demolition, coordinate the removal of all mechanical, electrical, and plumbing fixtures and equipment with corresponding M.E.P. demolition drawings, and dispose of all removed materials off-site in a lawful manner.

View the file

Other files

File Type Posted
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St_(Addendum_#1_Revision).pdf PDF
Pre-BID_Sign_in_Sheets_-_April_7th.pdf PDF
Pre-BID_Sign_in_Sheets_-_April_7th.pdf PDF
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St.pdf PDF
Interior_Demolition_&_Abatement_Project_-_401_S_Rogers_St.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Project_Manual.pdf PDF
401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf PDF
401_S_Rogers_-_Interior_Demolition_Construction_Plans.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_Nov_1st_2021.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Vantage_Environmental_(Asbestos_Survey_Report)_July_17th_2024.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
UES_-_Concrete_Compression_Test_07-18-2025.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
UES_-_Concrete_Compression_Test_07-18-2025.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
ITECH_Environmental_Svcs_LBP_Inspection_Report-FINAL_(Lead-Based_Paint)_Nov_19th_2024.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
UES_-_Concrete_Compression_Test_07-18-2025.pdf PDF
Alpha_Testing_-_Geo_Exploration_Report_-_August_27th_2024.pdf PDF
Famer_Environmental_-_Abatement_&_Lead_Removal_Floor_Plans_-_401_S_Rogers_3-10-25.pdf PDF
Terracon_-_Environmental_Site_Assessment_10-15-2024.pdf PDF
Soil_Removal_-_Turkey_Creek_LF_TC-25-99_CH_Demo_Proj.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Performance_Bond_-_ITB_2026-3-1_.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Payment_Bond_ITB_2026_–_3-1_Interior_Demolition_Project_–_401_S_Rogers_St.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Qualification_Statement_of_Bidder's_Surety.pdf PDF
Show all 43

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESIGN TEAM

rbdr PLLC Waco

Architects Texas

W A

XA

HA

C

HI

E C

ITY

H

A

LL

B

UI

LD

IN

G

D

EM

O

LI

TIO

N

P A

C

KA

G E

REV # DATE REVISION DESCRIPTION

DRAWING INDEX

ARCHTIECT:

RBDR PLLC - ARCHITECTS

913 Franklin Avenue, Suite 100

Waco, TX 76701

P (254)776-8380

M.E.P. CONSULTANT:

EMA Engineering & Consulting, Inc.

328 Broadway Avenue

Tyler, TX 75702

P (903)581-2677

AT

T S

XETE FO

SA

DA

VID E. WRIGHT

16 6 2 1

R

EG

IS

TE

RED ARCHITEC

T

03/23/2026

401 South Rogers Street Waxahachie, Texas 75165

DEMOLITION PACKAGE

CITY HALL BUILDING

ARCHITECTURAL

SECOND FLOOR DEMOLITION PLANA2.2

FIRST FLOOR DEMOLITION PLANA2.1

SECOND FLOOR REFLECTED CEILING

DEMOLITION PLAN

A6.2

THIRD FLOOR DEMOLITION PLANA2.3

MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 1MD1.02

MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 2MD1.04

MECHANICAL / ELECTRICAL / PLUMBING

CITY OF WAXAHACHIE

MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 3MD1.06

ELECTRICAL DEMOLITION SITE PLANEDS1.00

ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 1ED1.02

ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 2ED1.04

MECHANICAL DEMOLITION NOTESMH7.01

ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 3ED1.06

LIGHTING DEMOLITION CEILING PLAN - LEVEL 1ELD1.02

LIGHTING DEMOLITION CEILING PLAN - LEVEL 2ELD1.04

LIGHTING DEMOLITION CEILING PLAN - LEVEL 3ELD1.06

PLUMBING DEMOLITION FLOOR PLAN - LEVEL 1PD1.02

PLUMBING DEMOLITION FLOOR PLAN - LEVEL 2PD1.04

PLUMBING DEMOLITION FLOOR PLAN - LEVEL 3PD1.06

TECHNOLOGY DEMOLITION FLOOR PLAN - LEVEL 1ETD1.02

TECHNOLOGY DEMOLITION FLOOR PLAN - LEVEL 2ETD1.03

MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 4MD1.07

ETD1.04 TECHNOLOGY DEMOLITION FLOOR PLAN - LEVEL 3

PLAN NORTH

TRUE NORTH

1 BASEMENT DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

*NOT ALL KEYED NOTES LISTED BELOW NECESSARILY APPLY TO THIS DRAWING SHEET.

1. REMOVE PORTION OF WALL AS SHOWN.

2. REMOVE PORTION OF WALL TO EDGE OF EXISTING OPENING.

3. REMOVE PORTION OF BRICK MASONRY WALL AS SHOWN.

4. REMOVE PORTION OF PLASTER & LATH WALL AS SHOWN.

5. REMOVE METAL STUD FURRING WALL COMPLETE TO EXTERIOR MASONRY. PROTECT

MASONRY FROM DAMAGE.

6. REMOVE METAL STUD FURRING WALL COMPLETE TO REVEAL EXTERIOR WINDOW.

PROTECT WINDOW FRAME, GLASS, AND STOOL & APRON FROM DAMAGE.

7. REMOVE METAL STUD FURRING WALL AROUND COLUMN COMPLETE. PROTECT

COLUMN FROM DAMAGE.

8. REMOVE DOOR, HARDWARE, & FRAMES COMPLETE.

9. REMOVE MILLWORK & CASEWORK COMPLETE.

10. CAREFULLY REMOVE FIRE EXTINGUISHER CABINET FOR SALVAGE. COORDINATE WITH

OWNER STORAGE LOCATION.

11. REMOVE PLUMBING FIXTURES, GRAB BARS, TOILET PARTITIONS & DOORS, MIRRORS, AND

TOILET ROOM ACCESSORIES COMPLETE. COORDINATE WITH M.E.P. DEMO DRAWINGS.

12. RE: M.E.P. DEMO DRAWINGS FOR ELECTRICAL EQUIPMENT.

13. RE: M.E.P. DEMO DRAWINGS FOR PLUMBING EQUIPMENT.

14. RE: M.E.P. DEMO DRAWINGS FOR MECHANICAL EQUIPMENT.

15. STAIR TO REMAIN AND BE PROTECTED FROM DAMAGE.

16. REMOVE BASE, CHAIR RAIL, AND PICTURE RAIL COMPLETE.

17. REMOVE TILE FLOORING COMPLETE.

18. REMOVE CARPET TILE AND ADHESIVE COMPLETE.

19. REMOVE VCT AND ADHESIVE COMPLETE.

20. REMOVE RESILIENT TILE FLOORING AND ADHESIVE COMPLETE.

21. REMOVE CARPET FROM STAIR COMPLETE. PROTECT SUBSTRATE AND STAIR ASSEMBLY

FROM DAMAGE.

22. WOOD PANELING TO REMAIN AND BE PROTECTED FROM DAMAGE.

23. REMOVE MOP SINK AND WALL FAUCET COMPLETE. RE: PLUMBING DEMO DRAWINGS.

24. REMOVE MISCELLANEOUS WALL MOUNTED FIXTURES.

25. REMOVE WINDOW FRAME, GLASS, AND HARDWARE COMPLETE.

26. LOAD BEARING WALL TO REMAIN AND BE PROTECTED.

27. OVERHEAD BEAM TO REMAIN AND BE PROTECTED.

#KEYED NOTES:

DEMOLITION GENERAL NOTES:

1. SOME ITEMS TO BE REMOVED ARE NOT EXPLICITLY SHOWN. U.NO., GENERALLY;

1.1. ALL EXTERIOR WALLS & EXTERIOR PAINT, AND EXTERIOR WINDOWS & DOORS TO

REMAIN AND BE PROTECTED UNLESS IDENTIFIED BY ABATEMENT CONTRACTOR TO

REMOVE MATERIALS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS.

1.2. STAIRS, LOAD BEARING MASONRY WALLS, MASONRY WALLS & COLUMN WRAPS,

AND ACCESS LADDERS TO REMAIN AND BE PROTECTED.

1.3. ALL EXISTING PROTECTION MATERIAL TO REMAIN IN PLACE WHERE DEMOLITION

WORK IS NOT REQUIRED.

1.4. GENERAL DEMOLITION CONTRACTOR REQUIRED TO WALK THE SITE WITH OWNER

PRIOR TO BIDDING.

2. ABATEMENT OF HAZARDOUS MATERIALS (AS INDICATED IN THE HAZARDOUS MATERIALS

REPORT) ARE TO BE ABATED UNDER THIS DEMOLITION CONTRACT. GENERAL

DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR PROCUREMENT OF A LICENSED

ABATEMENT CONTRACTOR TO PERFORM THAT PORTION OF THE WORK.

2.1. PRIOR TO COMMENCEMENT OF WORK; ABATEMENT CONTRACTOR SHALL WALK

THE SITE WITH GENERAL CONTRACTOR, OWNER, AND ARCHITECT TO ESTABLISH

FULL SCOPE AND STRATEGY OF HAZARDOUS MATERIAL ABATEMENT.

2.2. HAZARDOUS MATERIALS ABATEMENT AND REMEDIATION. THE CONTRACTOR SHALL

PERFORM ALL WORK INVOLVING THE IDENTIFICATION, DISTURBANCE, REMOVAL,

HANDLING, TRANSPORTATION, AND DISPOSAL OF HAZARDOUS MATERIALS IN FULL

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.

3. WHEN ABATEMENT IS REQUIRED ON COMPONENTS THAT WILL REMAIN IN PLACE, THE

CONTRACTOR SHALL:

3.1. ENGAGE LICENSED ABATEMENT PROFESSIONALS TO PERFORM REMOVAL,

ENCAPSULATION, OR ENCLOSURE.

3.2. COORDINATE ABATEMENT SEQUENCING TO AVOID DAMAGE TO RETAINED

MATERIALS AND TO MAINTAIN THE INTEGRITY OF HISTORIC OR ARCHITECTURALLY

SIGNIFICANT ELEMENTS WHERE APPLICABLE.

3.3. PROVIDE TEMPORARY BARRIERS, NEGATIVE AIR CONTAINMENT, AND CLEARANCE

TESTING AS REQUIRED BY REGULATION AND BY THE CONTRACT DOCUMENTS.

4. AS PART OF THE DEMOLITION WORK, ALL PERIMETER OPENINGS MUST BE SECURED AND

WEATHER TIGHT AS RENOVATION WORK MAY NOT IMMEDIATELY FOLLOW.

5. SALVAGED MATERIALS:

5.1. COORDINATE WITH OWNER LOCATION FOR SALVAGED MATERIALS.

5.2. SALVAGED MATERIALS SHALL BE TAGGED WITH 'TYVEK' WATER-RESISTANT LABEL

TAGS USING WATER-RESISTANT, ACID FREE MARKING MEDIUM.

5.3. TAGGING TIE METHOD PREFERABLY TO BE STRING OR ZIP-TIES.

5.4. TAGGING LOCATION TO BE ON NON-DECORATIVE OR CHARACTER DEFINING

FACE; E.G., THE BOTTOM OF A DOOR, BACKSIDE OF MARBLE SLAB, OR BACKSIDE

OF ARCHITECTURAL WOODWORK.

5.5. GENERAL CONTRACTOR TO MAINTAIN SALVAGED MATERIALS LOG TO BE

SUBMITTED AT COMPLETION OF DEMOLITION WORK THAT FEATURES AN

ALPHANUMERIC NAMING SYSTEM, MATERIAL ASSET DESCRIPTION, AND

DIMENSIONS.

6. REMOVAL OF ANY PLUMBING, MECHANICAL, AND ELECTRICAL FIXTURES AND

EQUIPMENT SHALL BE COORDINATED WITH M.E.P. DEMO DRAWINGS.

7. REMOVE ANY AND ALL FLOORING, REMNANTS, AND ADHESIVES (LVT, TILE, CARPET,

TACK STRIPS, RUBBER BASE, REDUCERS & THRESHOLDS, DIVIDERS, ETC.) DOWN TO

SUBSTRATE. NOTE: SOME FLOORING ITEMS WILL BE REMOVED UNDER ABATEMENT

CONTRACT.

7.1. MARBLE & TERRAZZO CAST-IN-PLACE FLOORING TO REMAIN AND BE PROTECTED

FROM DAMAGE. VERIFY EXTENT OF SCOPE ON SITE PRIOR TO BIDDING.

7.2. FLOORING MATERIALS AND ADHESIVES APPLIED TO WOOD FLOORING TO BE

REMOVED ENTIRELY. WOOD FLOORING TO REMAIN AND PREPARED IN A SUITABLE

CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

7.3. FLOORING MATERIALS AND ADHESIVES APPLIED TO CONCRETE FLOOR TO BE

REMOVED ENTIRELY DOWN TO CONCRETE FLOOR. PREPARE CONCRETE TO A

SUITABLE CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

8. ALL MARBLE WAINSCOT, BASE TRIM, WINDOW APRONS & STOOLS TO REMAIN AND BE

PROTECTED, U.N.O.

9. WHERE DOORS & FRAMES ARE TO BE DEMOLISHED; CAREFULLY REMOVE WOOD

DOORS & DOOR HARDWARE FOR SALVAGE. COORDINATE W/ OWNER STORAGE

LOCATION.

10. WHERE DUCTWORK AND M.E.P. FIXTURES AND EQUIPMENT CHASES ARE ENCAPSULATED

WITH GYPSUM WALL BOARD, REMOVE GYPSUM WALL BOARD AND FRAMING

COMPLETE. RE: M.E.P. DEMO DRAWING FOR REMOVAL OF M.E.P. FIXTURES AND

EQUIPMENT.

11. GENERAL CONTRACTOR TO VERIFY EXTENTS OF STRUCTURAL LOAD BEARING WALLS

AND ENCAPSULATED STRUCTURE WITHIN WALLS, CEILINGS, AND FLOORS PRIOR TO

DEMOLITION WORK.

12. GENERAL CONTRACTOR TO CAREFULLY REMOVE ALL REMAINING AND ARCHAIC

FASTENERS, HANGING & SUSPENSION SYSTEMS, AND HARDWARE THAT IS EMBEDDED IN

EXISTING MATERIALS. E.G., ARCHAIC MECHANICAL SYSTEMS HANGERS, CONDUIT

SUPPORTS, CEILING SUPPORTS, LIGHTING SUPPORTS, BOLTS, CLAMPS, HARDWARE, ETC.

PROTECT ALL EXISTING BASE MATERIALS FROM DAMAGE.

13. ALL HISTORIC CROWN MOULDING, ORNAMENTAL MOULDING & PICTURE RAIL, AND

COFFERED CEILING MOULDING TO REMAIN AND BE PROTECTED FROM DAMAGE,

U.N.O. ALL HISTORIC EXTERIOR WINDOW CASINGS, MOULDINGS, AND TRIMS TO REMAIN

AND BE PROTECTED FROM DAMAGE. ALL HIGH HISTORIC WOOD TRANSOM FRAMES,

GLASS & HARDWARE TO REMAIN AND BE PROTECTED FROM DAMAGE.

14. ALL WINDOW COVERINGS & BLINDS TO BE REMOVED COMPLETE. PROTECT WINDOW

FRAMES, TRIM, GLASS, ORNAMENTAL WOODWORK, SILLS AND STOOLS FROM DAMAGE.

15. RE: MEP DEMO DRAWINGS FOR REMOVAL OF LIGHT FIXTURES AND CEILING FIXTURES.

LEGEND:

EXISTING DOOR AND FRAME TO REMAIN AND BE

PROTECTED.

SOLID POCHE ITEMS INDICATE EXISTING CONSTRUCTION TO REMAIN

AND BE PROTECTED.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED OR RELOCATED.

EXISTING DOOR AND FRAME TO BE REMOVED.

DASHED LINES INDICATE ITEMS OVERHEAD. RE: DEMO RCP DRAWINGS.

15 21

12 13 1412 13 14

12 13 14

12 13 14 12 13 14

Drafted By:

Project #:

RE

V

D

A

TE

RE

V

IS

IO

N D

ES

C

RI

PT

IO

N

Dwg Set:

25048

DEMOLITION

D

EM

O

LI

TIO

N

P A

C

KA

G E

FO

R

CI

TY

H

AL

L B

UI

LD

IN

G

SO

UT

H

RO

G

ER

S

ST

RE

ET

W

A

XA

HA

C

HI

E, T

EX

A S

AT

T

S

XETE FO

SA

DA

V ID E. WRIGHT

16 6 2 1

R

EG

IS

TE

RED ARCHITEC

T

03/23/2026

JLE

A2.1

1 SECOND FLOOR DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

*NOT ALL KEYED NOTES LISTED BELOW NECESSARILY APPLY TO THIS DRAWING SHEET.

1. REMOVE PORTION OF WALL AS SHOWN.

2. REMOVE PORTION OF WALL TO EDGE OF EXISTING OPENING.

3. REMOVE PORTION OF BRICK MASONRY WALL AS SHOWN.

4. REMOVE PORTION OF PLASTER & LATH WALL AS SHOWN.

5. REMOVE METAL STUD FURRING WALL COMPLETE TO EXTERIOR MASONRY. PROTECT

MASONRY FROM DAMAGE.

6. REMOVE METAL STUD FURRING WALL COMPLETE TO REVEAL EXTERIOR WINDOW.

PROTECT WINDOW FRAME, GLASS, AND STOOL & APRON FROM DAMAGE.

7. REMOVE METAL STUD FURRING WALL AROUND COLUMN COMPLETE. PROTECT

COLUMN FROM DAMAGE.

8. REMOVE DOOR, HARDWARE, & FRAMES COMPLETE.

9. REMOVE MILLWORK & CASEWORK COMPLETE.

10. CAREFULLY REMOVE FIRE EXTINGUISHER CABINET FOR SALVAGE. COORDINATE WITH

OWNER STORAGE LOCATION.

11. REMOVE PLUMBING FIXTURES, GRAB BARS, TOILET PARTITIONS & DOORS, MIRRORS, AND

TOILET ROOM ACCESSORIES COMPLETE. COORDINATE WITH M.E.P. DEMO DRAWINGS.

12. RE: M.E.P. DEMO DRAWINGS FOR ELECTRICAL EQUIPMENT.

13. RE: M.E.P. DEMO DRAWINGS FOR PLUMBING EQUIPMENT.

14. RE: M.E.P. DEMO DRAWINGS FOR MECHANICAL EQUIPMENT.

15. STAIR TO REMAIN AND BE PROTECTED FROM DAMAGE.

16. REMOVE BASE, CHAIR RAIL, AND PICTURE RAIL COMPLETE.

17. REMOVE TILE FLOORING COMPLETE.

18. REMOVE CARPET TILE AND ADHESIVE COMPLETE.

19. REMOVE VCT AND ADHESIVE COMPLETE.

20. REMOVE RESILIENT TILE FLOORING AND ADHESIVE COMPLETE.

21. REMOVE CARPET FROM STAIR COMPLETE. PROTECT SUBSTRATE AND STAIR ASSEMBLY

FROM DAMAGE.

22. WOOD PANELING TO REMAIN AND BE PROTECTED FROM DAMAGE.

23. REMOVE MOP SINK AND WALL FAUCET COMPLETE. RE: PLUMBING DEMO DRAWINGS.

24. REMOVE MISCELLANEOUS WALL MOUNTED FIXTURES.

25. REMOVE WINDOW FRAME, GLASS, AND HARDWARE COMPLETE.

26. LOAD BEARING WALL TO REMAIN AND BE PROTECTED.

27. OVERHEAD BEAM TO REMAIN AND BE PROTECTED.

#KEYED NOTES:

DEMOLITION GENERAL NOTES:

1. SOME ITEMS TO BE REMOVED ARE NOT EXPLICITLY SHOWN. U.NO., GENERALLY;

1.1. ALL EXTERIOR WALLS & EXTERIOR PAINT, AND EXTERIOR WINDOWS & DOORS TO

REMAIN AND BE PROTECTED UNLESS IDENTIFIED BY ABATEMENT CONTRACTOR TO

REMOVE MATERIALS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS.

1.2. STAIRS, LOAD BEARING MASONRY WALLS, MASONRY WALLS & COLUMN WRAPS,

AND ACCESS LADDERS TO REMAIN AND BE PROTECTED.

1.3. ALL EXISTING PROTECTION MATERIAL TO REMAIN IN PLACE WHERE DEMOLITION

WORK IS NOT REQUIRED.

1.4. GENERAL DEMOLITION CONTRACTOR REQUIRED TO WALK THE SITE WITH OWNER

PRIOR TO BIDDING.

2. ABATEMENT OF HAZARDOUS MATERIALS (AS INDICATED IN THE HAZARDOUS MATERIALS

REPORT) ARE TO BE ABATED UNDER THIS DEMOLITION CONTRACT. GENERAL

DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR PROCUREMENT OF A LICENSED

ABATEMENT CONTRACTOR TO PERFORM THAT PORTION OF THE WORK.

2.1. PRIOR TO COMMENCEMENT OF WORK; ABATEMENT CONTRACTOR SHALL WALK

THE SITE WITH GENERAL CONTRACTOR, OWNER, AND ARCHITECT TO ESTABLISH

FULL SCOPE AND STRATEGY OF HAZARDOUS MATERIAL ABATEMENT.

2.2. HAZARDOUS MATERIALS ABATEMENT AND REMEDIATION. THE CONTRACTOR SHALL

PERFORM ALL WORK INVOLVING THE IDENTIFICATION, DISTURBANCE, REMOVAL,

HANDLING, TRANSPORTATION, AND DISPOSAL OF HAZARDOUS MATERIALS IN FULL

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.

3. WHEN ABATEMENT IS REQUIRED ON COMPONENTS THAT WILL REMAIN IN PLACE, THE

CONTRACTOR SHALL:

3.1. ENGAGE LICENSED ABATEMENT PROFESSIONALS TO PERFORM REMOVAL,

ENCAPSULATION, OR ENCLOSURE.

3.2. COORDINATE ABATEMENT SEQUENCING TO AVOID DAMAGE TO RETAINED

MATERIALS AND TO MAINTAIN THE INTEGRITY OF HISTORIC OR ARCHITECTURALLY

SIGNIFICANT ELEMENTS WHERE APPLICABLE.

3.3. PROVIDE TEMPORARY BARRIERS, NEGATIVE AIR CONTAINMENT, AND CLEARANCE

TESTING AS REQUIRED BY REGULATION AND BY THE CONTRACT DOCUMENTS.

4. AS PART OF THE DEMOLITION WORK, ALL PERIMETER OPENINGS MUST BE SECURED AND

WEATHER TIGHT AS RENOVATION WORK MAY NOT IMMEDIATELY FOLLOW.

5. SALVAGED MATERIALS:

5.1. COORDINATE WITH OWNER LOCATION FOR SALVAGED MATERIALS.

5.2. SALVAGED MATERIALS SHALL BE TAGGED WITH 'TYVEK' WATER-RESISTANT LABEL

TAGS USING WATER-RESISTANT, ACID FREE MARKING MEDIUM.

5.3. TAGGING TIE METHOD PREFERABLY TO BE STRING OR ZIP-TIES.

5.4. TAGGING LOCATION TO BE ON NON-DECORATIVE OR CHARACTER DEFINING

FACE; E.G., THE BOTTOM OF A DOOR, BACKSIDE OF MARBLE SLAB, OR BACKSIDE

OF ARCHITECTURAL WOODWORK.

5.5. GENERAL CONTRACTOR TO MAINTAIN SALVAGED MATERIALS LOG TO BE

SUBMITTED AT COMPLETION OF DEMOLITION WORK THAT FEATURES AN

ALPHANUMERIC NAMING SYSTEM, MATERIAL ASSET DESCRIPTION, AND

DIMENSIONS.

6. REMOVAL OF ANY PLUMBING, MECHANICAL, AND ELECTRICAL FIXTURES AND

EQUIPMENT SHALL BE COORDINATED WITH M.E.P. DEMO DRAWINGS.

7. REMOVE ANY AND ALL FLOORING, REMNANTS, AND ADHESIVES (LVT, TILE, CARPET,

TACK STRIPS, RUBBER BASE, REDUCERS & THRESHOLDS, DIVIDERS, ETC.) DOWN TO

SUBSTRATE. NOTE: SOME FLOORING ITEMS WILL BE REMOVED UNDER ABATEMENT

CONTRACT.

7.1. MARBLE & TERRAZZO CAST-IN-PLACE FLOORING TO REMAIN AND BE PROTECTED

FROM DAMAGE. VERIFY EXTENT OF SCOPE ON SITE PRIOR TO BIDDING.

7.2. FLOORING MATERIALS AND ADHESIVES APPLIED TO WOOD FLOORING TO BE

REMOVED ENTIRELY. WOOD FLOORING TO REMAIN AND PREPARED IN A SUITABLE

CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

7.3. FLOORING MATERIALS AND ADHESIVES APPLIED TO CONCRETE FLOOR TO BE

REMOVED ENTIRELY DOWN TO CONCRETE FLOOR. PREPARE CONCRETE TO A

SUITABLE CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

8. ALL MARBLE WAINSCOT, BASE TRIM, WINDOW APRONS & STOOLS TO REMAIN AND BE

PROTECTED, U.N.O.

9. WHERE DOORS & FRAMES ARE TO BE DEMOLISHED; CAREFULLY REMOVE WOOD

DOORS & DOOR HARDWARE FOR SALVAGE. COORDINATE W/ OWNER STORAGE

LOCATION.

10. WHERE DUCTWORK AND M.E.P. FIXTURES AND EQUIPMENT CHASES ARE ENCAPSULATED

WITH GYPSUM WALL BOARD, REMOVE GYPSUM WALL BOARD AND FRAMING

COMPLETE. RE: M.E.P. DEMO DRAWING FOR REMOVAL OF M.E.P. FIXTURES AND

EQUIPMENT.

11. GENERAL CONTRACTOR TO VERIFY EXTENTS OF STRUCTURAL LOAD BEARING WALLS

AND ENCAPSULATED STRUCTURE WITHIN WALLS, CEILINGS, AND FLOORS PRIOR TO

DEMOLITION WORK.

12. GENERAL CONTRACTOR TO CAREFULLY REMOVE ALL REMAINING AND ARCHAIC

FASTENERS, HANGING & SUSPENSION SYSTEMS, AND HARDWARE THAT IS EMBEDDED IN

EXISTING MATERIALS. E.G., ARCHAIC MECHANICAL SYSTEMS HANGERS, CONDUIT

SUPPORTS, CEILING SUPPORTS, LIGHTING SUPPORTS, BOLTS, CLAMPS, HARDWARE, ETC.

PROTECT ALL EXISTING BASE MATERIALS FROM DAMAGE.

13. ALL HISTORIC CROWN MOULDING, ORNAMENTAL MOULDING & PICTURE RAIL, AND

COFFERED CEILING MOULDING TO REMAIN AND BE PROTECTED FROM DAMAGE,

U.N.O. ALL HISTORIC EXTERIOR WINDOW CASINGS, MOULDINGS, AND TRIMS TO REMAIN

AND BE PROTECTED FROM DAMAGE. ALL HIGH HISTORIC WOOD TRANSOM FRAMES,

GLASS & HARDWARE TO REMAIN AND BE PROTECTED FROM DAMAGE.

14. ALL WINDOW COVERINGS & BLINDS TO BE REMOVED COMPLETE. PROTECT WINDOW

FRAMES, TRIM, GLASS, ORNAMENTAL WOODWORK, SILLS AND STOOLS FROM DAMAGE.

15. RE: MEP DEMO DRAWINGS FOR REMOVAL OF LIGHT FIXTURES AND CEILING FIXTURES.

LEGEND:

EXISTING DOOR AND FRAME TO REMAIN AND BE

PROTECTED.

SOLID POCHE ITEMS INDICATE EXISTING CONSTRUCTION TO REMAIN

AND BE PROTECTED.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED OR RELOCATED.

EXISTING DOOR AND FRAME TO BE REMOVED.

DASHED LINES INDICATE ITEMS OVERHEAD. RE: DEMO RCP DRAWINGS.

3'-4" 3'-4"

5'-2 7/8"

3' -4

7/

3/

4"

9 5/16" 9 5/16"

8' -9

/8

" V

IF

1 1

8 8

8 8

14 15

16 16

22 22 22

27 2727

14 14

14 14 14

Drafted By:

Project #:

RE

V

D

A

TE

RE

V

IS

IO

N D

ES

C

RI

PT

IO

N

Dwg Set:

25048

DEMOLITION

D

EM

O

LI

TIO

N

P A

C

KA

G E

FO

R

C

ITY

H

AL

L B

UI

LD

IN

G

SO

UT

H

RO

G

ER

S

ST

RE

ET

W

A

XA

HA

C

HI

E, T

EX

A S

AT

T

S

XETE FO

SA

D

AV

ID E. WRIGHT

16 6 2 1

R

EG

IS

TE

RED ARCHITEC

T

03/23/2026

A2.2

1 THIRD FLOOR DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

*NOT ALL KEYED NOTES LISTED BELOW NECESSARILY APPLY TO THIS DRAWING SHEET.

1. REMOVE PORTION OF WALL AS SHOWN.

2. REMOVE PORTION OF WALL TO EDGE OF EXISTING OPENING.

3. REMOVE PORTION OF BRICK MASONRY WALL AS SHOWN.

4. REMOVE PORTION OF PLASTER & LATH WALL AS SHOWN.

5. REMOVE METAL STUD FURRING WALL COMPLETE TO EXTERIOR MASONRY. PROTECT

MASONRY FROM DAMAGE.

6. REMOVE METAL STUD FURRING WALL COMPLETE TO REVEAL EXTERIOR WINDOW.

PROTECT WINDOW FRAME, GLASS, AND STOOL & APRON FROM DAMAGE.

7. REMOVE METAL STUD FURRING WALL AROUND COLUMN COMPLETE. PROTECT

COLUMN FROM DAMAGE.

8. REMOVE DOOR, HARDWARE, & FRAMES COMPLETE.

9. REMOVE MILLWORK & CASEWORK COMPLETE.

10. CAREFULLY REMOVE FIRE EXTINGUISHER CABINET FOR SALVAGE. COORDINATE WITH

OWNER STORAGE LOCATION.

11. REMOVE PLUMBING FIXTURES, GRAB BARS, TOILET PARTITIONS & DOORS, MIRRORS, AND

TOILET ROOM ACCESSORIES COMPLETE. COORDINATE WITH M.E.P. DEMO DRAWINGS.

12. RE: M.E.P. DEMO DRAWINGS FOR ELECTRICAL EQUIPMENT.

13. RE: M.E.P. DEMO DRAWINGS FOR PLUMBING EQUIPMENT.

14. RE: M.E.P. DEMO DRAWINGS FOR MECHANICAL EQUIPMENT.

15. STAIR TO REMAIN AND BE PROTECTED FROM DAMAGE.

16. REMOVE BASE, CHAIR RAIL, AND PICTURE RAIL COMPLETE.

17. REMOVE TILE FLOORING COMPLETE.

18. REMOVE CARPET TILE AND ADHESIVE COMPLETE.

19. REMOVE VCT AND ADHESIVE COMPLETE.

20. REMOVE RESILIENT TILE FLOORING AND ADHESIVE COMPLETE.

21. REMOVE CARPET FROM STAIR COMPLETE. PROTECT SUBSTRATE AND STAIR ASSEMBLY

FROM DAMAGE.

22. WOOD PANELING TO REMAIN AND BE PROTECTED FROM DAMAGE.

23. REMOVE MOP SINK AND WALL FAUCET COMPLETE. RE: PLUMBING DEMO DRAWINGS.

24. REMOVE MISCELLANEOUS WALL MOUNTED FIXTURES.

25. REMOVE WINDOW FRAME, GLASS, AND HARDWARE COMPLETE.

26. LOAD BEARING WALL TO REMAIN AND BE PROTECTED.

27. OVERHEAD BEAM TO REMAIN AND BE PROTECTED.

#KEYED NOTES:

DEMOLITION GENERAL NOTES:

1. SOME ITEMS TO BE REMOVED ARE NOT EXPLICITLY SHOWN. U.NO., GENERALLY;

1.1. ALL EXTERIOR WALLS & EXTERIOR PAINT, AND EXTERIOR WINDOWS & DOORS TO

REMAIN AND BE PROTECTED UNLESS IDENTIFIED BY ABATEMENT CONTRACTOR TO

REMOVE MATERIALS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS.

1.2. STAIRS, LOAD BEARING MASONRY WALLS, MASONRY WALLS & COLUMN WRAPS,

AND ACCESS LADDERS TO REMAIN AND BE PROTECTED.

1.3. ALL EXISTING PROTECTION MATERIAL TO REMAIN IN PLACE WHERE DEMOLITION

WORK IS NOT REQUIRED.

1.4. GENERAL DEMOLITION CONTRACTOR REQUIRED TO WALK THE SITE WITH OWNER

PRIOR TO BIDDING.

2. ABATEMENT OF HAZARDOUS MATERIALS (AS INDICATED IN THE HAZARDOUS MATERIALS

REPORT) ARE TO BE ABATED UNDER THIS DEMOLITION CONTRACT. GENERAL

DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR PROCUREMENT OF A LICENSED

ABATEMENT CONTRACTOR TO PERFORM THAT PORTION OF THE WORK.

2.1. PRIOR TO COMMENCEMENT OF WORK; ABATEMENT CONTRACTOR SHALL WALK

THE SITE WITH GENERAL CONTRACTOR, OWNER, AND ARCHITECT TO ESTABLISH

FULL SCOPE AND STRATEGY OF HAZARDOUS MATERIAL ABATEMENT.

2.2. HAZARDOUS MATERIALS ABATEMENT AND REMEDIATION. THE CONTRACTOR SHALL

PERFORM ALL WORK INVOLVING THE IDENTIFICATION, DISTURBANCE, REMOVAL,

HANDLING, TRANSPORTATION, AND DISPOSAL OF HAZARDOUS MATERIALS IN FULL

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.

3. WHEN ABATEMENT IS REQUIRED ON COMPONENTS THAT WILL REMAIN IN PLACE, THE

CONTRACTOR SHALL:

3.1. ENGAGE LICENSED ABATEMENT PROFESSIONALS TO PERFORM REMOVAL,

ENCAPSULATION, OR ENCLOSURE.

3.2. COORDINATE ABATEMENT SEQUENCING TO AVOID DAMAGE TO RETAINED

MATERIALS AND TO MAINTAIN THE INTEGRITY OF HISTORIC OR ARCHITECTURALLY

SIGNIFICANT ELEMENTS WHERE APPLICABLE.

3.3. PROVIDE TEMPORARY BARRIERS, NEGATIVE AIR CONTAINMENT, AND CLEARANCE

TESTING AS REQUIRED BY REGULATION AND BY THE CONTRACT DOCUMENTS.

4. AS PART OF THE DEMOLITION WORK, ALL PERIMETER OPENINGS MUST BE SECURED AND

WEATHER TIGHT AS RENOVATION WORK MAY NOT IMMEDIATELY FOLLOW.

5. SALVAGED MATERIALS:

5.1. COORDINATE WITH OWNER LOCATION FOR SALVAGED MATERIALS.

5.2. SALVAGED MATERIALS SHALL BE TAGGED WITH 'TYVEK' WATER-RESISTANT LABEL

TAGS USING WATER-RESISTANT, ACID FREE MARKING MEDIUM.

5.3. TAGGING TIE METHOD PREFERABLY TO BE STRING OR ZIP-TIES.

5.4. TAGGING LOCATION TO BE ON NON-DECORATIVE OR CHARACTER DEFINING

FACE; E.G., THE BOTTOM OF A DOOR, BACKSIDE OF MARBLE SLAB, OR BACKSIDE

OF ARCHITECTURAL WOODWORK.

5.5. GENERAL CONTRACTOR TO MAINTAIN SALVAGED MATERIALS LOG TO BE

SUBMITTED AT COMPLETION OF DEMOLITION WORK THAT FEATURES AN

ALPHANUMERIC NAMING SYSTEM, MATERIAL ASSET DESCRIPTION, AND

DIMENSIONS.

6. REMOVAL OF ANY PLUMBING, MECHANICAL, AND ELECTRICAL FIXTURES AND

EQUIPMENT SHALL BE COORDINATED WITH M.E.P. DEMO DRAWINGS.

7. REMOVE ANY AND ALL FLOORING, REMNANTS, AND ADHESIVES (LVT, TILE, CARPET,

TACK STRIPS, RUBBER BASE, REDUCERS & THRESHOLDS, DIVIDERS, ETC.) DOWN TO

SUBSTRATE. NOTE: SOME FLOORING ITEMS WILL BE REMOVED UNDER ABATEMENT

CONTRACT.

7.1. MARBLE & TERRAZZO CAST-IN-PLACE FLOORING TO REMAIN AND BE PROTECTED

FROM DAMAGE. VERIFY EXTENT OF SCOPE ON SITE PRIOR TO BIDDING.

7.2. FLOORING MATERIALS AND ADHESIVES APPLIED TO WOOD FLOORING TO BE

REMOVED ENTIRELY. WOOD FLOORING TO REMAIN AND PREPARED IN A SUITABLE

CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

7.3. FLOORING MATERIALS AND ADHESIVES APPLIED TO CONCRETE FLOOR TO BE

REMOVED ENTIRELY DOWN TO CONCRETE FLOOR. PREPARE CONCRETE TO A

SUITABLE CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

8. ALL MARBLE WAINSCOT, BASE TRIM, WINDOW APRONS & STOOLS TO REMAIN AND BE

PROTECTED, U.N.O.

9. WHERE DOORS & FRAMES ARE TO BE DEMOLISHED; CAREFULLY REMOVE WOOD

DOORS & DOOR HARDWARE FOR SALVAGE. COORDINATE W/ OWNER STORAGE

LOCATION.

10. WHERE DUCTWORK AND M.E.P. FIXTURES AND EQUIPMENT CHASES ARE ENCAPSULATED

WITH GYPSUM WALL BOARD, REMOVE GYPSUM WALL BOARD AND FRAMING

COMPLETE. RE: M.E.P. DEMO DRAWING FOR REMOVAL OF M.E.P. FIXTURES AND

EQUIPMENT.

11. GENERAL CONTRACTOR TO VERIFY EXTENTS OF STRUCTURAL LOAD BEARING WALLS

AND ENCAPSULATED STRUCTURE WITHIN WALLS, CEILINGS, AND FLOORS PRIOR TO

DEMOLITION WORK.

12. GENERAL CONTRACTOR TO CAREFULLY REMOVE ALL REMAINING AND ARCHAIC

FASTENERS, HANGING & SUSPENSION SYSTEMS, AND HARDWARE THAT IS EMBEDDED IN

EXISTING MATERIALS. E.G., ARCHAIC MECHANICAL SYSTEMS HANGERS, CONDUIT

SUPPORTS, CEILING SUPPORTS, LIGHTING SUPPORTS, BOLTS, CLAMPS, HARDWARE, ETC.

PROTECT ALL EXISTING BASE MATERIALS FROM DAMAGE.

13. ALL HISTORIC CROWN MOULDING, ORNAMENTAL MOULDING & PICTURE RAIL, AND

COFFERED CEILING MOULDING TO REMAIN AND BE PROTECTED FROM DAMAGE,

U.N.O. ALL HISTORIC EXTERIOR WINDOW CASINGS, MOULDINGS, AND TRIMS TO REMAIN

AND BE PROTECTED FROM DAMAGE. ALL HIGH HISTORIC WOOD TRANSOM FRAMES,

GLASS & HARDWARE TO REMAIN AND BE PROTECTED FROM DAMAGE.

14. ALL WINDOW COVERINGS & BLINDS TO BE REMOVED COMPLETE. PROTECT WINDOW

FRAMES, TRIM, GLASS, ORNAMENTAL WOODWORK, SILLS AND STOOLS FROM DAMAGE.

15. RE: MEP DEMO DRAWINGS FOR REMOVAL OF LIGHT FIXTURES AND CEILING FIXTURES.

LEGEND:

EXISTING DOOR AND FRAME TO REMAIN AND BE

PROTECTED.

SOLID POCHE ITEMS INDICATE EXISTING CONSTRUCTION TO REMAIN

AND BE PROTECTED.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED OR RELOCATED.

EXISTING DOOR AND FRAME TO BE REMOVED.

DASHED LINES INDICATE ITEMS OVERHEAD. RE: DEMO RCP DRAWINGS.

3'-4" 4"

25 25

Drafted By:

Project #:

RE

V

D

A

TE

RE

V

IS

IO

N D

ES

C

RI

PT

IO

N

Dwg Set:

25048

DEMOLITION

D

EM

O

LI

TIO

N

P A

C

KA

G E

FO

R

CI

TY

H

AL

L B

UI

LD

IN

G

SO

UT

H

RO

G

ER

S

ST

RE

ET

W

A

XA

HA

C

HI

E, T

EX

A S

AT

T

S

XETE FO

SA

DA

V ID E. WRIGHT

16 6 2 1

R

EG

IS

TE

RED ARCHITEC

T

03/23/2026

A2.3

1 SECOND FLOOR REFLECTED CEILING DEMOLITION PLAN

SCALE: 1/8" = 1'-0"

*NOT ALL KEYED NOTES LISTED BELOW NECESSARILY APPLY TO THIS DRAWING SHEET.

1. REMOVE WALL FRAMING ALONG SOFFIT COMPLETE.

2. REMOVE WALL MOUNTED LIGHT FIXTURE. RE: M.E.P. DEMO DRAWINGS.

3. REMOVE CEILING FAN & LIGHT-KIT COMPLETE. RE: M.E.P. DEMO DRAWINGS.

4. REMOVE LAY-IN CEILING TILE GRID, SUSPENSION SYSTEM, & FRAMING COMPLETE.

5. REMOVE ARCHAIC CEILING TILE GRID, SUSPENSION SYSTEM & FRAMING COMPLETE.

6. REMOVE TONGUE & GROOVE WOOD CEILING & FRAMING COMPLETE. PROTECT

CEILING STRUCTURE FROM DAMAGE.

7. REMOVE GYPSUM BOARD HARD CEILING, SUSPENSION SYSTEM, & FRAMING COMPLETE.

8. REMOVE GYPSUM BOARD CEILING FURR-DOWN, SUSPENSION SYSTEM, & FRAMING

COMPLETE.

9. REMOVE PLASTER & LATH CEILING AND FRAMING COMPLETE.

10. PLASTER COFFERED CEILING, TRIM, & CROWN MOULDING TO REMAIN AND BE

PROTECTED FROM DAMAGE.

11. 'SCHOOL-HOUSE' STYLE LIGHT FIXTURES TO REMAIN AND BE PROTECTED.

12. HIGH WOOD TRANSOM WINDOWS, FRAMES, GLASS AND HARDWARE TO REMAIN AND

BE PROTECTED FROM DAMAGE.

13. NOTE: LOCATED ABOVE CEILING; REMOVE ARCHAIC REMNANTS OF METAL FRAMING,

PLASTER & LATH, AND SUSPENSION SYSTEM COMPLETE TO PLASTER HIGH CEILING

(UNDERSIDE OF ATTIC). PROTECT PLASTER HIGH CEILING FROM DAMAGE.

14. PLASTER WALL EXTENDING FROM FLOOR TO HIGH CEILING TO REMAIN AND BE

PROTECTED FROM DAMAGE.

15. LOAD BEARING WALL TO REMAIN AND BE PROTECTED.

16. BEAM TO REMAIN AND BE PROTECTED.

#KEYED NOTES:

LEGEND:

SOLID POCHE ITEMS INDICATE EXISTING CONSTRUCTION TO REMAIN AND

BE PROTECTED.

DASHED LINES INDICATE ITEMS TO BE DEMOLISHED OR RELOCATED.

TONGUE & GROOVE WOOD CEILING

PLASTER & LATH CEILING

GYPSUM BOARD SUSPENDED HARD CEILING

LAY-IN ACOUSTICAL TILE AND GRID CEILING

DEMOLITION GENERAL NOTES:

1. SOME ITEMS TO BE REMOVED ARE NOT EXPLICITLY SHOWN. U.NO., GENERALLY;

1.1. ALL EXTERIOR WALLS & EXTERIOR PAINT, AND EXTERIOR WINDOWS & DOORS TO

REMAIN AND BE PROTECTED UNLESS IDENTIFIED BY ABATEMENT CONTRACTOR TO

REMOVE MATERIALS IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, AND

LOCAL REGULATIONS.

1.2. STAIRS, LOAD BEARING MASONRY WALLS, MASONRY WALLS & COLUMN WRAPS,

AND ACCESS LADDERS TO REMAIN AND BE PROTECTED.

1.3. ALL EXISTING PROTECTION MATERIAL TO REMAIN IN PLACE WHERE DEMOLITION

WORK IS NOT REQUIRED.

1.4. GENERAL DEMOLITION CONTRACTOR REQUIRED TO WALK THE SITE WITH OWNER

PRIOR TO BIDDING.

2. ABATEMENT OF HAZARDOUS MATERIALS (AS INDICATED IN THE HAZARDOUS MATERIALS

REPORT) ARE TO BE ABATED UNDER THIS DEMOLITION CONTRACT. GENERAL

DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR PROCUREMENT OF A LICENSED

ABATEMENT CONTRACTOR TO PERFORM THAT PORTION OF THE WORK.

2.1. PRIOR TO COMMENCEMENT OF WORK; ABATEMENT CONTRACTOR SHALL WALK

THE SITE WITH GENERAL CONTRACTOR, OWNER, AND ARCHITECT TO ESTABLISH

FULL SCOPE AND STRATEGY OF HAZARDOUS MATERIAL ABATEMENT.

2.2. HAZARDOUS MATERIALS ABATEMENT AND REMEDIATION. THE CONTRACTOR SHALL

PERFORM ALL WORK INVOLVING THE IDENTIFICATION, DISTURBANCE, REMOVAL,

HANDLING, TRANSPORTATION, AND DISPOSAL OF HAZARDOUS MATERIALS IN FULL

COMPLIANCE WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS.

3. WHEN ABATEMENT IS REQUIRED ON COMPONENTS THAT WILL REMAIN IN PLACE, THE

CONTRACTOR SHALL:

3.1. ENGAGE LICENSED ABATEMENT PROFESSIONALS TO PERFORM REMOVAL,

ENCAPSULATION, OR ENCLOSURE.

3.2. COORDINATE ABATEMENT SEQUENCING TO AVOID DAMAGE TO RETAINED

MATERIALS AND TO MAINTAIN THE INTEGRITY OF HISTORIC OR ARCHITECTURALLY

SIGNIFICANT ELEMENTS WHERE APPLICABLE.

3.3. PROVIDE TEMPORARY BARRIERS, NEGATIVE AIR CONTAINMENT, AND CLEARANCE

TESTING AS REQUIRED BY REGULATION AND BY THE CONTRACT DOCUMENTS.

4. AS PART OF THE DEMOLITION WORK, ALL PERIMETER OPENINGS MUST BE SECURED AND

WEATHER TIGHT AS RENOVATION WORK MAY NOT IMMEDIATELY FOLLOW.

5. SALVAGED MATERIALS:

5.1. COORDINATE WITH OWNER LOCATION FOR SALVAGED MATERIALS.

5.2. SALVAGED MATERIALS SHALL BE TAGGED WITH 'TYVEK' WATER-RESISTANT LABEL

TAGS USING WATER-RESISTANT, ACID FREE MARKING MEDIUM.

5.3. TAGGING TIE METHOD PREFERABLY TO BE STRING OR ZIP-TIES.

5.4. TAGGING LOCATION TO BE ON NON-DECORATIVE OR CHARACTER DEFINING

FACE; E.G., THE BOTTOM OF A DOOR, BACKSIDE OF MARBLE SLAB, OR BACKSIDE

OF ARCHITECTURAL WOODWORK.

5.5. GENERAL CONTRACTOR TO MAINTAIN SALVAGED MATERIALS LOG TO BE

SUBMITTED AT COMPLETION OF DEMOLITION WORK THAT FEATURES AN

ALPHANUMERIC NAMING SYSTEM, MATERIAL ASSET DESCRIPTION, AND

DIMENSIONS.

6. REMOVAL OF ANY PLUMBING, MECHANICAL, AND ELECTRICAL FIXTURES AND

EQUIPMENT SHALL BE COORDINATED WITH M.E.P. DEMO DRAWINGS.

7. REMOVE ANY AND ALL FLOORING, REMNANTS, AND ADHESIVES (LVT, TILE, CARPET,

TACK STRIPS, RUBBER BASE, REDUCERS & THRESHOLDS, DIVIDERS, ETC.) DOWN TO

SUBSTRATE. NOTE: SOME FLOORING ITEMS WILL BE REMOVED UNDER ABATEMENT

CONTRACT.

7.1. MARBLE & TERRAZZO CAST-IN-PLACE FLOORING TO REMAIN AND BE PROTECTED

FROM DAMAGE. VERIFY EXTENT OF SCOPE ON SITE PRIOR TO BIDDING.

7.2. FLOORING MATERIALS AND ADHESIVES APPLIED TO WOOD FLOORING TO BE

REMOVED ENTIRELY. WOOD FLOORING TO REMAIN AND PREPARED IN A SUITABLE

CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

7.3. FLOORING MATERIALS AND ADHESIVES APPLIED TO CONCRETE FLOOR TO BE

REMOVED ENTIRELY DOWN TO CONCRETE FLOOR. PREPARE CONCRETE TO A

SUITABLE CONDITION TO RECEIVE FUTURE MATERIALS AND FINISHES.

8. ALL MARBLE WAINSCOT, BASE TRIM, WINDOW APRONS & STOOLS TO REMAIN AND BE

PROTECTED, U.N.O.

9. WHERE DOORS & FRAMES ARE TO BE DEMOLISHED; CAREFULLY REMOVE WOOD

DOORS & DOOR HARDWARE FOR SALVAGE. COORDINATE W/ OWNER STORAGE

LOCATION.

10. WHERE DUCTWORK AND M.E.P. FIXTURES AND EQUIPMENT CHASES ARE ENCAPSULATED

WITH GYPSUM WALL BOARD, REMOVE GYPSUM WALL BOARD AND FRAMING

COMPLETE. RE: M.E.P. DEMO DRAWING FOR REMOVAL OF M.E.P. FIXTURES AND

EQUIPMENT.

11. GENERAL CONTRACTOR TO VERIFY EXTENTS OF STRUCTURAL LOAD BEARING WALLS

AND ENCAPSULATED STRUCTURE WITHIN WALLS, CEILINGS, AND FLOORS PRIOR TO

DEMOLITION WORK.

12. GENERAL CONTRACTOR TO CAREFULLY REMOVE ALL REMAINING AND ARCHAIC

FASTENERS, HANGING & SUSPENSION SYSTEMS, AND HARDWARE THAT IS EMBEDDED IN

EXISTING MATERIALS. E.G., ARCHAIC MECHANICAL SYSTEMS HANGERS, CONDUIT

SUPPORTS, CEILING SUPPORTS, LIGHTING SUPPORTS, BOLTS, CLAMPS, HARDWARE, ETC.

PROTECT ALL EXISTING BASE MATERIALS FROM DAMAGE.

13. ALL HISTORIC CROWN MOULDING, ORNAMENTAL MOULDING & PICTURE RAIL, AND

COFFERED CEILING MOULDING TO REMAIN AND BE PROTECTED FROM DAMAGE,

U.N.O. ALL HISTORIC EXTERIOR WINDOW CASINGS, MOULDINGS, AND TRIMS TO REMAIN

AND BE PROTECTED FROM DAMAGE. ALL HIGH HISTORIC WOOD TRANSOM FRAMES,

GLASS & HARDWARE TO REMAIN AND BE PROTECTED FROM DAMAGE.

14. ALL WINDOW COVERINGS & BLINDS TO BE REMOVED COMPLETE. PROTECT WINDOW

FRAMES, TRIM, GLASS, ORNAMENTAL WOODWORK, SILLS AND STOOLS FROM DAMAGE.

15. RE: MEP DEMO DRAWINGS FOR REMOVAL OF LIGHT FIXTURES AND CEILING FIXTURES.

5 5

7 7

1111111111

12 12121212

16 1616 16

Drafted By:

Project #:

RE

V

D

A

TE

RE

V

IS

IO

N D

ES

C

RI

PT

IO

N

Dwg Set:

25048

DEMOLITION

D

EM

O

LI

TIO

N

P A

C

KA

G E

FO

R

CI

TY

H

AL

L B

UI

LD

IN

G

SO

UT

H

RO

G

ER

S

ST

RE

ET

W

A

XA

HA

C

HI

E, T

EX

A S

AT

T

S

XETE FO

SA

DA

V ID E. WRIGHT

16 6 2 1

R

EG

IS

TE

RED ARCHITEC

T

03/23/2026

A6.2

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Javier Garcia

118760TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:00:43 PM

MD1.02

CE

DEMOLITION

MECHANICAL GENERAL NOTES

SEE SHEET MH7.01 FOR ALL GENERAL NOTES APPLICABLE TO ENTIRE

DRAWING SET

1/8" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 1

REMOVE AND DISCARD ALL EXISTING

MECHANICAL SYSTEMS INCLUDING, BUT NOT

LIMITED TO: VAV BOXES, CONDENSERS, AIR

HANDLERS, DUCTWORK, GRILLES/DIFFUSERS,

REFRIGERANT PIPING, GAS PIPING,

THERMOSTATS, CEILING FANS, EXHAUST FANS,

UNIT HEATERS, ETC.

03-20-2026

NOT IN

SCOPE OF

WORK

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Javier Garcia

118760TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:00:44 PM

MD1.04

CE

DEMOLITION

MECHANICAL GENERAL NOTES

SEE SHEET MH7.01 FOR ALL GENERAL NOTES APPLICABLE TO ENTIRE

DRAWING SET

1/8" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 2

REMOVE AND DISCARD ALL EXISTING

MECHANICAL SYSTEMS INCLUDING, BUT NOT

LIMITED TO: VAV BOXES, CONDENSERS, AIR

HANDLERS, DUCTWORK, GRILLES/DIFFUSERS,

REFRIGERANT PIPING, GAS PIPING,

THERMOSTATS, CEILING FANS, EXHAUST FANS,

UNIT HEATERS, ETC.

COORDINATE WITH ARCH/OWNER ON

DISCARDING VS. STORING CONDENSING UNITS

AND CORRESPONDING AIR HANDLERS FOR

FUTURE USE.

SCOPE

OF

WORK

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Javier Garcia

118760TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:00:44 PM

MD1.06

CE

DEMOLITION

MECHANICAL GENERAL NOTES

SEE SHEET MH7.01 FOR ALL GENERAL NOTES APPLICABLE TO ENTIRE

DRAWING SET

1/8" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 3

REMOVE AND DISCARD ALL EXISTING

MECHANICAL SYSTEMS INCLUDING, BUT NOT

LIMITED TO: VAV BOXES, CONDENSERS, AIR

HANDLERS, DUCTWORK, GRILLES/DIFFUSERS,

REFRIGERANT PIPING, GAS PIPING,

THERMOSTATS, CEILING FANS, EXHAUST FANS,

UNIT HEATERS, ETC.

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Javier Garcia

118760TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:00:45 PM

MD1.07

CE

DEMOLITION

MECHANICAL GENERAL NOTES

SEE SHEET MH7.01 FOR ALL GENERAL NOTES APPLICABLE TO ENTIRE

DRAWING SET

1/8" = 1'-0"1 MECHANICAL DEMOLITION FLOOR PLAN - LEVEL 4

03-20-2026

EXISTING VAV BOXES AND DUCTWORK IN ATTIC

TO REMAIN.

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Javier Garcia

118760TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:00:45 PM

MH7.01

CE

DEMOLITION

MECHANICAL GENERAL NOTES

1. MECHANICAL CONTRACTOR TO PROVIDE TO THE PLUMBING

CONTRACTOR THE RECOMMENDED AC MANUFACTURER'S DATA FOR

CONDENSATE TRAPS PER EACH TYPE OF UNIT.

2. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

REMOVAL OR ADJUSTMENT OF ALL HOLD DOWN BOLTS ON

COMPRESSORS AT HVAC EQUIPMENT TO ALLOW FOR PROPER

VIBRATION ISOLATION.

3. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR

REMOVAL OF ALL ABANDONED SCREWS, PIPING, TAPE, PAPERS,

PACKING PRODUCTS, ETC.

4. ALL EQUIPMENT SHALL BE PROPERLY LABELED PER

SPECIFICATIONS.

5. CLOSE ALL OUTSIDE AIR DAMPERS UPON INSTALLATION AND KEEP

ALL OUTSIDE AIR DAMPERS CLOSED UNTIL THE "TEST AND BALANCE"

IS PERFORMED.

6. PROVIDE AND INSTALL MANUAL VOLUME CONTROL DAMPERS ON

SUPPLY AND RETURN BRANCH DUCT SERVING A DIFFUSER OR

REGISTER. ALL MANUAL DAMPERS INSTALLED ABOVE HARD CEILINGS

OR AT OTHER INACCESSIBLE AREAS SHALL BE SUPPLIED WITH A

CABLE OPERATED DAMPER EQUAL TO "YOUNG REGULATOR MODEL

830A-CC".

7. DUCT MOUNTED SMOKE DETECTORS SHALL BE FURNISHED BY THE

FIRE ALARM CONTRACTOR, INSTALLED BY THE MECHANICAL

CONTRACTOR, AND FINAL TIE-IN BY THE FIRE ALARM CONTRACTOR.

8. SEAL WITH FIRE RETARDING SEALANT AROUND PIPE THROUGH ANY

PENETRATION OF FIRE WALLS. REFER TO ARCHITECTURAL SHEETS

FOR FIRE WALLS.

9. ALL GRILLES ARE SHOWN IN APPROXIMATE LOCATION. FIELD VERIFY

PLACEMENT WITH CEILING GRID.

10. ALL DIFFUSERS/FLEX CONNECTIONS SHALL HAVE A RIGID METAL

ELBOW UNLESS COMING DIRECTLY DOWN FROM A UNIT OR HEIGHT

OF CEILING IS EXTREME. ALL FLEX DUCT TO HAVE AT LEAST ONE

SUPPORT STRAP.

11. THE SPACE AROUND DUCTS AND PENETRATING ITEMS OF SMOKE

PARTITION WALLS SHALL BE FILLED WITH AN IBC APPROVED

MATERIAL LIMITING THE FREE PASSAGE OF SMOKE.

12. ALL FAN CURBS TO BE INSTALLED LEVEL. PROVIDE SEAL BETWEEN

CURB AND ROOF.

13. COORDINATE WITH THE PLUMBING CONTRACTOR LOCATION OF ALL

SUPPLY FANS WITH PLUMBING VENTS. MAINTAIN 10'-0" MINIMUM

SEPARATION.

14. NO MECHANICAL EQUIPMENT THAT REQUIRES SERVICE (i.e. FANS, ROOFTOP UNITS, CONDENSERS, ETC.) ON ROOF SHALL BE CLOSER

THAN 10'-6" TO EDGE OF BUILDING.

15. THE MECHANICAL CONTRACTOR SHALL NOT INSTALL ANY ROOF

EQUIPMENT CLOSER THAN 5'-0" TO ANY ADJACENT WALLS,

EXPANSION JOINTS, AND/OR PARAPETS.

16. COORDINATE WITH THE PLUMBING CONTRACTOR LOCATION OF ALL

ROOFTOP UNITS WITH ALL PLUMBING VENTS. MAINTAIN 10'-0"

MINIMUM SEPARATION.

17. COORDINATE ALL UNITS, DUCTWORK, GRILLES, REFRIGERANT LINES

WITH ALL TRADES BEFORE INSTALLING.

18. MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE ROOFING

CONTRACTOR ALL COUNTER FLASHING REQUIRED AT ROOF CURBS.

19. MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE STEEL

ERECTOR AND ROOFING CONTRACTOR THE INSTALLATION OF ALL

ROOF MOUNTED EQUIPMENT.

20. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING

SLOPE OF STRUCTURAL STEEL TO ALLOW ROOF CURBS TO BE

INSTALLED LEVEL.

21. ALL ROOFTOP UNITS AND CURBS TO BE INSTALLED LEVEL. ROOFTOP

UNIT MFG. TO PROVIDE SEAL BETWEEN UNIT AND CURB.

22. INSTALL CONDENSERS PER MANUFACTURER CLEARANCES.

23. MECHANICAL CONTRACTOR SHALL SUBMIT TO ARCHITECT /

ENGINEER REFRIGERANT LINE SET DESIGN AND ROUTING PER

MANUFACTURER FOR REVIEW BEFORE INSTALLATION BEGINS.

24. THE MECHANICAL CONTRACTOR SHALL APPLY ULTRA-VIOLET

PROTECTIVE COATING OVER REFRIGERANT INSULATION PER

MANUFACTURER.

25. ALL AIR HANDLERS: NO PIPING, CONDUITS, DUCTS, WIRING,

DISCONNECTS, ETC. WILL BE ALLOWED TO BE INSTALLED CLOSER

THAN 3'-0" (THREE FEET) IN FRONT OF THE SERVICE ACCESS PANEL.

26. CRAWL SPACE FANS ARE TO BE CONTROLLED BY EMCS. REFER TO

SPECS FOR REQUIREMENTS.

THERMOSTAT/SENSOR (PER SPEC.)

CO2 SENSOR

HUMIDISTAT

THERMOSTAT/HUMIDISTAT

CFM (CUBIC FT. PER MIN.)

GRILLE TYPE

DUCT TYPE TAG

DENOTATION

RETURN AIR GRILLE

SUPPLY GRILLE

DUCT DETECTOR WITH CONTROL RELAY

FIRE DAMPER/SMOKE

FIRE DAMPER

MANUAL VOLUME DAMPER

SPIRAL DUCT

BACKDRAFT DAMPER WITH DIRECTIONAL ARROW

MEDIUM PRESSURE DUCT

FLEX DUCT

MECHANICAL SYMBOLS

C2

T

H

TH

XX

D

FD SFD

ROUND

RECTANGULAR

RECTANGULAR

FLAT OVAL

ROUND

XX" x XX"

XX"/XX"

XX"Ø

FD SFD

CAP

MOTORIZED DAMPER M

BDD

EXTERIOR DUCT

INTERNALLY LINED - PAINT GRIP DUCT

NOTE: SOME SYMBOLS MAY NOT BE USED.

FABRIC DUCT

EXPLOSION RESISTANT DUCT

EXISTING THERMOSTAT/SENSOR

CFM (CUBIT FT. PER MIN.)

EXISTING RETURN AIR GRILLE

EXISTING SUPPLY GRILLE

EXISTING DUCT

EXISTING EXHAUST / FAN / RELIEF

CAP

EXISTING UNIT

NOTE: SOME SYMBOLS MAY NOT BE USED.

EXISTING MECHANICAL SYMBOLS

T

MECHANICAL DEMOLITION GENERAL NOTES

1. CONTRACTOR TO VISIT SITE AND BE FAMILIAR WITH BUILDING

MECHANICAL AND ELECTRICAL LAYOUTS.

2. IF ASBESTOS IS FOUND CONTACT OWNER IMMEDIATELY. DO NOT

WORK IN ANY AREA SUSPECTED TO CONTAIN ASBESTOS.

3. ALL EXISTING EQUIPMENT SHOWN IN APPROXIMATE LOCATION.

FIELD VERIFY.

4. DO NOT RELEASE ANY REFRIGERANT TO ATMOSPHERE. DISPOSE OF

IN A LAWFUL MANNER.

5. ALL REUSED EXISTING MECHANICAL EQUIPMENT SHALL BE

INSPECTED AND CLEANED FOR PROPER OPERATION. CHANGE ALL

BELTS.

6. PROVIDE AND INSTALL A FIRE DAMPER WHERE NEW DUCTWORK

CROSSES AN EXISTING FIRE RATED WALL. IF ANY EXISTING

DUCTWORK CROSSES A NEW FIRE RATED WALL A FIRE DAMPER IS

TO BE PROVIDED AND INSTALLED.

7. ALL MATERIAL, EQUIPMENT, DUCTS, PIPE, ETC. TO BE REMOVED

SHALL BE DISPOSED OF OFF SITE IN A LEGAL AND LAWFUL MANNER.

8. ALL EXISTING FIRE DAMPERS OR SMOKE DAMPERS BEING REUSED

SHALL REMAIN IN PLACE AND OPERATIONAL.

9. IF EXISTING CEILING ARE TO REMAIN, REMOVE ONLY CEILING TILE

NECESSARY TO ACCOMPLISH DEMOLITION AND NEW WORK.

REMOVE AND REINSTALL ELECTRICAL, LIGHTING FIXTURES, FIRE

ALARM DEVICES, SPEAKERS, ETC. REPLACE ALL BROKEN TILES WITH

NEW TILES TO MATCH EXISTING WHERE REQUIRED. REUSE EXISTING

TILES.

10. CAP ANY UNUSED PIPE AT FLOOR, WALL, CEILING. REMOVE

MATERIAL NOT BEING REUSED.

11. WHERE REMOVING HVAC AND PIPING, PATCH ALL WALLS WITH 5/8

SHEET ROCK ON EACH SIDE OF WALL, PAINT TO MATCH.

12. LEAVE ANY DOMESTIC WATER HEATER IN PLACE AND OPERATIONAL.

13. LEAVE ALL EXISTING EXHAUST FANS IN PLACE AND OPERATIONAL

UNLESS DRAWINGS SHOW TO REPLACE OR ADD EXHAUST FANS.

14. LEAVE ALL GAS TO EXISTING RTU THAT HAVE GAS IN PLACE AND

OPERATIONAL UNLESS REPLACING UNIT.

15. REMOVE ALL CONDENSATE DRAIN PIPING FROM UNITS THAT ARE TO

BE REPLACED. EACH ROOFTOP UNIT HAS CONDENSATE PIPING.

16. AIR HANDLER(S) BEING REINSTALLED MUST MAINTAIN FILTER

ACCESS. COORDINATE FILTER ACCESS DOORS WITH STRUCTURE,

PIPING, ETC.

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Cody Conder

158547TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:03:53 PM

EDS1.00

Designer

DEMOLITION

ELECTRICAL DEMOLITION PLAN NOTES

ED11 APPROXIMATE LOCATION OF EXISTING UTILITY TRANSFORMER

TO REMAIN IN PLACE AND OPERATIONAL DURING DEMOLTITION.

ED13 APPROXIMATE LOCATION OF EXISTING UTILITY POLE TO REMAIN

IN PLACE AND OPERATIONAL.

ED14 APPROXIMATE LOCATION OF EXISTING OVERHEAD UTILITY

POWER.

ELECTRICAL DEMOLITION GENERAL NOTES

(SOME NOTES MAY NOT BE USED)

1. UNLESS NOTED ON DRAWINGS, ALL LIGHTING, SWITCHES,

RECEPTACLES AND OTHER ELECTRICAL DEVICES ARE TO REMAIN.

2. REFER TO SPECIFICATION SECTION 26 05 05, ELECTRICAL

DEMOLITION REMODELING, FOR GENERAL DEMOLITION

REQUIREMENTS.

3. ALL MATERIAL REMOVED AND NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF OFF SITE IN A LAWFUL MANNER.

4. BEFORE DEMOLISHING PANELS, TRACE ALL BRANCH CIRCUITS TO

CONFIRM THAT EXISTING LOADS HAVE BEEN RELOCATED TO NEW

PANELS. IF A LOAD EXISTS THAT HAS NOT BEEN RELOCATED TO

NEW PANELS, CONTACT THE ENGINEER FOR INSTRUCTIONS.

1/8" = 1'-0"1 ELECTRICAL DEMOLITION SITE PLAN

CONTRACTOR SHALL REMOVE AND DISGARD ALL

EXISTING ELECTRICAL SYSTEMS IN AND ON THE

PROJECT SITE IN THEIR ENTIRETY INCLUDING BUT

NOT LIMITED TO: ALL ELECTRICAL DEVICES

ASSOCIATED ENCLOSURES, CONDUIT AND

CONDUCTORS. COORDINATE REMOVAL OF

SERVICE EQUIPMENT WITH UTILITY PROVIDER.

ALL ROUTING ON PLANS ARE ILLUSTRATIVE ONLY.

COORDINATE EXACT LOCATION OF ALL

UNDERGROUND UTILITIES WITH UTILITY

PROVIDER, OWNER REPRESENTATIVES, AND

OTHER TRADES PRIOR TO COMMENCING WORK.

03-20-2026

AJ

Ed14 ED14ED14ES7 ED14

ED13 ED13 ED13 ED13

OVERHEAD POWER

WAXAHACHIE CIY HALL

ED11

EXISTING

TEMPORARY

SERVCE TO BE

PROTECTED DURING

DEMOLITION.

COORDINATE WITH

UTILITY PROVIDER

FOR MORE

INFORMATION.

ELECTRICAL DEMOLITION SITE PLAN

S ROGER ST

W M

A D

IS

O

N S

T

S COLLEGE ST

ED1 ED1ED1

ED1

ED1

ED1 ED1

ED1 ED1

ED1

ED1ED1

ED1

ED15

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Cody Conder

158547TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:03:55 PM

ED1.02

AJ

DEMOLITION

ELECTRICAL DEMOLITION PLAN NOTES

ED1 REMOVE EXISTING DEVICES IN WALLS TO BE DEMOLISHED.

REMOVE CONDUIT AND WIRING BACK TO SOURCE.

ED15 EXISTING MECHANICAL UNIT TO BE REMOVED. DISCONNECT ALL

EXISTING ELECTRICAL ASSOCIATED BACK TO SOURCE.

1/8" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 1

ELECTRICAL DEMOLITION GENERAL NOTES

(SOME NOTES MAY NOT BE USED)

1. UNLESS NOTED ON DRAWINGS, ALL LIGHTING, SWITCHES,

RECEPTACLES AND OTHER ELECTRICAL DEVICES ARE TO REMAIN.

2. REFER TO SPECIFICATION SECTION 26 05 05, ELECTRICAL

DEMOLITION REMODELING, FOR GENERAL DEMOLITION

REQUIREMENTS.

3. ALL MATERIAL REMOVED AND NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF OFF SITE IN A LAWFUL MANNER.

4. BEFORE DEMOLISHING PANELS, TRACE ALL BRANCH CIRCUITS TO

CONFIRM THAT EXISTING LOADS HAVE BEEN RELOCATED TO NEW

PANELS. IF A LOAD EXISTS THAT HAS NOT BEEN RELOCATED TO

NEW PANELS, CONTACT THE ENGINEER FOR INSTRUCTIONS.

CONTRACTOR SHALL REMOVE AND DISGARD ALL

EXISTING ELECTRICAL SYSTEMS IN AND ON THE

PROJECT SITE IN THEIR ENTIRETY INCLUDING BUT

NOT LIMITED TO: ALL ELECTRICAL DEVICES

ASSOCIATED ENCLOSURES, CONDUIT AND

CONDUCTORS. COORDINATE REMOVAL OF

SERVICE EQUIPMENT WITH UTILITY PROVIDER.

ALL ROUTING ON PLANS ARE ILLUSTRATIVE ONLY.

COORDINATE EXACT LOCATION OF ALL

UNDERGROUND UTILITIES WITH UTILITY

PROVIDER, OWNER REPRESENTATIVES, AND

OTHER TRADES PRIOR TO COMMENCING WORK.

ED1ED2ED1

ED1

ED1

ED1

ED15

ED1 ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1 ED1 ED1 ED1

ED1

ED1

ED1

ED1

ED2

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED1

ED15ED15

ED15

ED15

ED15

ED15ED15

ED15

ED15

ED15

ED15

ED15

ED15 ED15

ED15 ED15

ED15

ED15

H2A X

LC-2

ED5

NOT IN

SCOPE OF

WORK

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Cody Conder

158547TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:03:57 PM

ED1.04

AJ

DEMOLITION

ELECTRICAL DEMOLITION PLAN NOTES

ED1 REMOVE EXISTING DEVICES IN WALLS TO BE DEMOLISHED.

REMOVE CONDUIT AND WIRING BACK TO SOURCE.

ED2 EXISTING RECEPTACLES AND DEVICES TO REMAIN IN PLACE AND

OPERATIONAL.

ED5 EXISTING ELECTRICAL EQUIPMENT TO REMAIN IN PLACE AND

OPERATIONAL.

ED15 EXISTING MECHANICAL UNIT TO BE REMOVED. DISCONNECT ALL

EXISTING ELECTRICAL ASSOCIATED BACK TO SOURCE.

1/8" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 2

ELECTRICAL DEMOLITION GENERAL NOTES

(SOME NOTES MAY NOT BE USED)

1. UNLESS NOTED ON DRAWINGS, ALL LIGHTING, SWITCHES,

RECEPTACLES AND OTHER ELECTRICAL DEVICES ARE TO REMAIN.

2. REFER TO SPECIFICATION SECTION 26 05 05, ELECTRICAL

DEMOLITION REMODELING, FOR GENERAL DEMOLITION

REQUIREMENTS.

3. ALL MATERIAL REMOVED AND NOT RETAINED BY THE OWNER

SHALL BE DISPOSED OF OFF SITE IN A LAWFUL MANNER.

4. BEFORE DEMOLISHING PANELS, TRACE ALL BRANCH CIRCUITS TO

CONFIRM THAT EXISTING LOADS HAVE BEEN RELOCATED TO NEW

PANELS. IF A LOAD EXISTS THAT HAS NOT BEEN RELOCATED TO

NEW PANELS, CONTACT THE ENGINEER FOR INSTRUCTIONS.

CONTRACTOR SHALL REMOVE AND DISGARD ALL

EXISTING ELECTRICAL SYSTEMS IN AND ON THE

PROJECT SITE IN THEIR ENTIRETY INCLUDING BUT

NOT LIMITED TO: ALL ELECTRICAL DEVICES

ASSOCIATED ENCLOSURES, CONDUIT AND

CONDUCTORS. COORDINATE REMOVAL OF

SERVICE EQUIPMENT WITH UTILITY PROVIDER.

ALL ROUTING ON PLANS ARE ILLUSTRATIVE ONLY.

COORDINATE EXACT LOCATION OF ALL

UNDERGROUND UTILITIES WITH UTILITY

PROVIDER, OWNER REPRESENTATIVES, AND

ED2

OPEN TO BELOW

OPEN TO BELOW

OPEN TO BELOW

ED1

ED1 ED1

ED1

NOT IN

SCOPE

OF

WORK

NOT FOR REGULATORY

APPROVAL, PERMITTING,

OR CONSTRUCTION

Engineer:

Date:

License No.:License State:

Tyler | Austin | Houston | El Paso

Texas Firm Registration No. F-893

Louisiana Firm Registration No. EF-5818 www.EMAengineer.com

EMA Engineering & Consulting, Inc.

DFW | San Antonio | Shreveport

SUBMISSION OF BID WILL BE CONSIDERED ACKNOWLEDGMENT THAT THE

CONTRACTOR HAS VISITED THE SITE AND HAS VERIFIED ALL EXISTING JOB

CONDITIONS AND INCLUDED ANY NECESSARY MODIFICATION TO EXISTING

AND NEW WORK REQUIRED FOR INSTALLATION OF A COMPLETE AND

WORKING SYSTEM.

25048

D E M

O

LI

TI

O

N P

A C

K A

G E F

O R

C

IT

Y H

A

LL

B U

IL

D

IN

G

S

O U

TH

R

O G

E R

S S

TR

E E T

W A

X A

H A

C H

IE

TE

X A

S

26-0189

Cody Conder

158547TX

REVIEW ONLY

Drafted By:

Project #:

R E V

D

A

TE

R E V

IS

IO

N D

E S C

R

IP

TI

O

N

Dwg Set:

3/20/2026 12:03:59 PM

ED1.06

AJ

DEMOLITION

ELECTRICAL DEMOLITION PLAN NOTES

ED1 REMOVE EXISTING DEVICES IN WALLS TO BE DEMOLISHED.

REMOVE CONDUIT AND WIRING BACK TO SOURCE.

ED2 EXISTING RECEPTACLES AND DEVICES TO REMAIN IN PLACE AND

OPERATIONAL.

1/8" = 1'-0"1 ELECTRICAL DEMOLITION FLOOR PLAN - LEVEL 3

ELECTRICAL DEMOLITION GENERAL NOTES

(SOME NOTES MAY NOT BE USED)

1. UNLESS NOTED ON DRAWINGS,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .