TU-2701 - CCTV Replacement Project - Phase 1 - RFQ Wrapper - Final - 20260730.pdf

PDF 417 KB Posted

Attached to
TU-2701 - CCTV Replacement Project - Phase 1
Solicitation number
BPM058201
Issued by
Maryland

About this file

This is a Request for Quotation (RFQ) issued by Towson University, a Maryland state entity, for Avigilon Cameras and Avigilon Unity Enterprise Camera Licenses for the Operations Fiscal Year 2027 CCTV Replacement Phase I Project. The solicitation requires vendors to submit quotes for specified bill of materials only, excluding labor, wiring, cabling, or associated services. No pre-bid conference or site visit is required. Questions must be submitted by August 5, 2026 at 2:00 pm ET via email to the Procurement Officer, Alex Webb at apwebb@towson.edu. Completed quote responses, utilizing the mandatory "TU-2701 CCTV Replacement Project - Phase 1 - Quote Response Template - Final v3 - 20260805," must be submitted via email to bids@towson.edu by August 11, 2026 at 2:00 pm ET. Towson University intends to issue a purchase order by September 15, 2026, and all responses must remain valid for orders placed on or before that date.

Award will be made to the lowest bidder whose quote is technically acceptable and who is in good standing with the Maryland Department of Assessments and Taxation. All pricing must include shipping, freight, and associated charges necessary to fulfill the order. Towson University is exempt from Maryland sales tax and will provide a tax exemption certificate upon request. Vendors must include a formal quote on company letterhead, a signed copy of the quote response template saved as PDF, the completed Excel file, and a Letter of Authorization to resell Avigilon products. The lowest price technically acceptable bidder will be required to complete Bid/Proposal and Contract Affidavits prior to contract award. Payments will be made no later than 30 days upon completion and acceptance of work. The procurement will be conducted in accordance with the University System of Maryland's Procurement Policies and Procedures.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Quotation (RFQ)

Procurement towson.edu/procurement Page | 1

RFQ ISSUE DATE: July 30, 2026

RFQ TITLE: TU CCTV Replacement Project – Phase 1

RFQ NO.: TU-2701

RFQ DESCRIPTION: Towson University (TU) is requesting quotes for Avigilon Cameras for our OPS FY 27 CCTV Replacement Phase I Project. This solicitation also includes Avigilon Unity Enterprise Camera Licenses. Kindly submit your quotes by the established due date and time.

LOCATION: Towson University (TU)

PRE-BID/SITE VISIT: No pre-bid Conference or site visit required

QUESTIONS DUE DATE AND TIME: August 5, 2026 at 2:00 pm ET – via email to apwebb@towson.edu

RFQ DUE DATE AND TIME: August 11, 2026 at 2:00 pm ET

RFQ SUBMISSION: Quote shall be submitted via email to bids@towson.edu no later than the due date and time indicated in this RFQ.

Quotes that are incomplete or that deviate from the format required or specified may be rejected. Late submissions will not be accepted.

ISSUING OFFICE

Procurement Department Procurement Officer: Alex Webb Email Address: apwebb@towson.edu Phone Number: 410-704-4453 Towson University 8000 York Road Towson, MD 21252

DIRECT QUESTIONS TO: Alex Webb via email at apwebb@towson.edu

PROCUREMENT METHOD: This procurement will be conducted in accordance with the University System of Maryland’s (USM) Procurement Policies and Procedures.

BASIS FOR AWARD: Award will be made to the responsible bidder who submits the responsive quote determined to be most advantageous to the University.

QUOTES: Quote should clearly state the vendor name, quantity, and unit cost for each item, as appropriate.

Payments shall be made no later than 30 days upon completion and acceptance of the work.

TERMS AND CONDITIONS: See Exhibit A – Required Contract Provisions mailto:apwebb@towson.edu mailto:bids@towson.edu towson.edu/procurement Page | 2

RESPONSE REQUIREMENTS:

Interested offerors shall complete TU-2701 TU CCTV Replacement Project – Phase 1 - Quote Response Template and include a completed, signed copy with their submission. The lowest bidder technically acceptable must be in good standing with the Maryland Department of Assessments and Taxation (MDAT) prior to contract award. Offerors shall provide a response for the bill of materials referenced only – do not include labor, wiring, cabling or any services associated with these projects.

Offerors shall only enter information in cells highlighted in ORANGE on both excel tabs "TU-2701 Bid " and "Offeror Bid". All other cells will auto-populate using locked formulas. The University will award a contract to the offer with the lowest cost technically acceptable. Please save the "TU-2701 Bid" sheet as a PDF and sign and return the page with your bid response as well as the full excel file. The University will accept digital signature or a wet (pen & ink) signature scanned and returned.

Please include a formal quote on company letterhead in addition to the submission documents requested above.

All pricing shall include shipping, freight, and other charges necessary to fulfill the order associated with this RFQ.

Towson University is an entity of the State of Maryland and exempt from paying sales tax in the State of Maryland.

Upon request, Towson University will provide a tax exemption certificate to the awarded respondent.

Please include a copy of your Letter of Authorization to resell Avigilon product with your response.

The lowest price technically acceptable will be requested to complete a Bid/Proposal Affidavit and Contract Affidavit prior to contract award.

TOWSON UNIVERSITY INTENDS TO ISSUE A PURCHASE ORDER FOR THIS RFQ BY SEPTEMBER 15, 2026.

ALL REPSONSES MUST BE VALID FOR ORDERS PLACED ON OR BEFORE SEPTEMBER 15, 2026.

Exhibit A Required Contract Provisions

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

The provisions contained in this exhibit will be incorporated and be a part of the contract entered into between Towson University and any contractors as a result of this procurement.

1. Affirmation - Contingent Fees The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding contingent fees in the form required by USM Procurement Policies and Procedures.

2. Affirmation - Debarment The Contractor shall submit with its bid/proposal a Procurement Affirmation in the form required by USM Procurement Policies and Procedures.

3. Affirmation Regarding Debarment of Related Entities The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding debarment of related entities in the form required by USM Procurement Policies and Procedures.

4. Affirmation - Non-Collusion The Contractor shall submit with its bid/proposal a Non- Collusion Affirmation in the form required by USM Procurement Policies and Procedures.

5. Affirmation Regarding Bribery Convictions The offeror warrants that neither it nor any of its officer, directors, or partners not any of its employees who are directly involved in obtaining or performing contracts with any public body has been convicted of bribery, attempted bribery, or conspiracy to bribe under the laws of any state or of the federal government or has engaged in conduct since July 1, 1977, which would constitute bribery, attempted bribery, or conspiracy to bribe under the laws of any state or the federal government.

The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding bribery convictions in the form required by University System of Maryland (USM) Procurement Policies and Procedures.

6. Affirmation Regarding Other Convictions The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding other convictions in the form required by USM Procurement Policies and Procedures.

7. Affirmation Regarding Sub-Contractors The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding debarment of sub-contractors in the form required by USM Procurement Policies and Procedures.

8. Affirmation - Drug and Alcohol Free Workplace The contractor warrants that the contractor shall comply with COMAR 21.11.08 Drug and Alcohol Free Workplace, and that the contractor shall remain in compliance throughout the term of this contract.

9. Certification of Corporation Registration and Tax Payment The Contractor shall submit with its bid/proposal a Procurement Affirmation regarding certification of corporation registration and tax payment in the form required by USM Procurement Policies and Procedures.

10. Affirmation - Financial Disclosure The Contractor shall submit with its bid/proposal a Financial Disclosure Affirmation in the form required by USM Procurement Policies and Procedures.

11. Affirmation - Political Contribution Disclosure The Contractor shall submit with its bid/proposal a Political Contribution Disclosure Affirmation in the form required by USM Procurement Policies and Procedures.

12. Contract Affidavit The successful bidder shall submit, prior to contract award, a Contract Affidavit in the form required by USM Procurement Policies and Procedures.

13. Affirmative Action The Contractor and all subcontractors shall develop and maintain affirmative action plans directed at increasing the utilization of women and members of minority groups on State public works projects, pursuant to the Executive Order 11246 of the President of the United States of America and guidelines on Affirmative Action issued by the Equal Employment Opportunities Commission (EEOC) 29 C.F.R.

part 1608 and the Governor of Maryland's Executive Order 01.01.1993.16.

14. Amendments and Modifications The contract documents, as defined within the contract, constitute the entire agreement between the parties hereto.

All other communications between the parties prior to execution of the contract, whether written or oral, with reference to the subject matter of the contract are superseded by the agreement contained therein. No amendment of this contract shall be binding unless in writing and signed by the parties. Amendments may not significantly change the scope of the contract.

15. Civil Rights Act of 1964 Contractors providing materials, equipment, supplies or services to the State under the contract herewith assure the State that they are conforming to the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1988, the Civil Rights Act of 1991, and Section 202 of Executive Order 11246 of the President of the United States of America as amended by Executive Order 11375, as applicable.

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

16. Compliance with Laws The Contractor hereby represents and warrants that:

a. It is qualified to do business in the State of Maryland, and that it will take such action, as from time to time hereafter, may be necessary to remain so qualified;

b. It is not in arrears with respect to the payment of any monies and owing the State of Maryland, or any department or agency thereof, including but not limited to the payment of taxes and employee benefits, and that it shall not become so in arrears during the term of the contract;

c. It shall comply with all federal, State and local laws, ordinances applicable to its activities and obligations under the contract; and;

d. It shall procure, at its expense, all licenses, permits, insurance and governmental approval, if any, necessary to the performance of its obligations under the contract.

17. Compensation and Method of Payment Contractor agrees to include on the face of all invoices billed to the University, its Taxpayer Identification Number, which is the Social Security Number for individuals and sale proprietors and the Federal Employee Identification Number for all other types of organizations.

18. Confidentiality; dissemination of Information Contractor shall not release any information related to services or performance of the services under this Contract, nor publish any final reports or documents without the prior written approval of the University. Contractor shall indemnify and hold harmless the State and the University, its officers, agents and employees from all harm which may be incurred by reason of dissemination, publication, distribution or circulation, in any manner whatsoever, of any information, data, documents, or materials pertaining in any way to this Contract by Contractor, its agents or employees.

19. Conflict of Interest Law It is unlawful for any State officer, employee, or agent to participate personally in his official capacity through decision, approval, disapproval, recommendation, advice, or investigation in any contract or other matter in which he, his spouse, parent, child, brother, or sister has a financial interest or to which any firm, corporation, association, or other organization in which he has a financial interest or in which he is serving as an officer, director, trustee, partner, or employee, or any person or organization with whom he is negotiating or has any arrangement concerning prospective employment, is a party, unless such officer, employee, or agent has previously complied with the provisions of State Government Article § § 15-501 et seq. of the Annotated Code of Maryland.

20. Contract Modifications and Changes

a. The procurement officer unilaterally may, at any time, without notice to the sureties, if any, by written order designed or indicated to be a change order, make any change in work within the general scope of the contract, including but not limited to changes:

(1) In the specifications (including drawings and designs);

(2) In the method or manner of performance of the work;

(3) In the State-furnished facilities, equipment, materials, services, or site; or

(4) Directing acceleration in the performance of the work.

b. Any other written order or an oral order, including a direction, instruction, interpretation or determination, from the procurement officer that causes any such change, shall be treated as a change order under this clause, provided that the Contractor gives the procurement officer written notice stating the date, circumstances, and source of the order and that the Contractor regards the order as a change order.

c. Except as herein provided, no order, statement, or conduct of the procurement officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment hereunder.

d. Subject to paragraph f., if any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any order, an equitable adjustment shall be made and the contract modified in writing accordingly; provided, however, that except for claims based on defective specifications, no claim for any change under (b.) above shall be allowed for any costs incurred more than 20 days before the Contractor gives written notice as therein required; and provided further, that in the case of defective specifications for which the State is responsible, the equitable adjustment shall include any increased cost reasonably incurred by the Contractor in attempting to comply with such defective specifications.

e. If the Contractor intends to assert a claim for an equitable adjustment under this clause, he shall, within 30 days after receipt of a written change order under a. above or the furnishing or written notice under b. above, submit to the procurement officer a written statement setting forth the general nature and monetary extent of such claim, unless this period is extended by the University. The statement of claim hereunder may be included in the notice under b. above.

f. Each contract modification or change order that affects contract price shall be subject to the prior written approval of the procurement officer and other appropriate authorities and to prior certification of the appropriate fiscal authority of fund availability and the effect of the modification or change order on the project budget or the total construction cost. If, according to the certification of the fiscal authority, the contract modification or change order will cause an increase in cost that will exceed budgeted and available funds, the modification or change order may not be made unless sufficient additional funds are made available or the scope of the project is adjusted to permit its completion within the project budget.

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

g. No claim by the Contractor for an equitable adjustment hereunder shall be allowed if asserted after final payment under the contract.

21. Contractor's On-Site Representative The Contractor is required to maintain on site at all times when the work is in progress on this project an individual who represents the Contractor, is responsible for the entire project, and can communicate in English with the University's representative.

22. Contractor’s Invoices Contractor shall include its Taxpayer Identification Number on the face of each invoice billed to the University. If a Purchase Order document is issued, the Purchase Order Number must be included.

23. Cooperation with University and State Representatives Before any of the work shall begin, the Contractor shall confer with the University's representative at the site and agree on a sequence of procedure, means of access to the premises, space for storage of materials and equipment, use of approaches, use of facilities, etc.

24. Cost and Price Certification The Contractor, by submitting cost or price information certifies that, to the best of its knowledge, the information submitted is accurate, complete, and current as of a mutually determined specified date prior to the conclusion of any price discussions or negotiations for:

a. A negotiated contact, if the total contract price is expected to exceed $100,000 or a smaller amount set by the procurement officer; or

b. A change order or contract modification, expected to exceed $100,000 or a smaller amount set by the procurement officer.

c. The price under this contract and any change order or modification hereunder, including profit or fee, shall be adjusted to exclude any significant price increases occurring because the Contractor furnished cost or price information which, as of the date agreed upon between the parties, was inaccurate, incomplete, or not current.

25. Delays and Extensions of Time The Contractor agrees to prosecute the work continuously and diligently and no charges or claims for damages shall be made by it for any delays or hindrances, from any cause whatsoever during the progress of any portion of the services specified in this contract. Such delays or hindrances, if any, may be compensated for by an extension of time for such reasonable period as the University may decide. Time extensions will be granted only for excusable delays such as delays beyond the control and without the fault or negligence of the Contractor, provided the Contractor shall have given notice in writing of the cause of the delay within five (5) days after the delay begins. Any extension granted shall not require the consent and approval of the Contractor's bondsman or surety.

26. Delivery and Acceptance Delivery shall be made in accordance with the specifications.

The University reserves the right to test any materials, equipment, supplies, or services delivered to determine if the specifications have been met. The materials listed in the specifications shall be delivered FOB the point or points specified prior to or on the date specified in the solicitation.

Any material that is defective or fails to meet the terms of the specifications may be rejected. Rejected materials shall be promptly replaced. The State reserves the right to purchase replacement materials in the open market. Vendors failing to promptly replace materials lawfully rejected shall be liable for any excess price paid for the replacement, plus applicable expenses, if any.

27. Disputes

a. This contract is subject to the USM Procurement Policies and Procedures.

b. Except as otherwise may be provided by law, all disputes arising under or as a result of a breach of this contract that are not disposed of by mutual agreement shall be resolved in accordance with this clause.

c. As used herein, “claim” means a written demand or assertion by one of the parties seeking, as a legal right, the payment of money, adjustment or interpretation of contract terms, or other relief, arising under or relating to this contract.

A voucher, invoice, or request for payment that is not in dispute when submitted is not a claim under this clause.

However, if the submission subsequently is not acted upon in a reasonable time, or is disputed as to liability or amount, it may be converted to a claim for the purpose of this clause.

d. A claim shall be made in writing and submitted to the procurement officer for decision in consultation with the Office of the attorney general within thirty days of when the basis of the claim was known or should have been known, whichever is earlier.

e. When a claim cannot be resolved by mutual agreement, the contractor shall submit a written request for final decision to the procurement officer. The written request shall set forth all the facts surrounding the controversy.

f. The contractor, at the discretion of the procurement officer, may be afforded an opportunity to be heard and to offer evidence in support of his claim.

g. The procurement officer shall render a written decision on all claims within 180 days of receipt of the contractor’s written claim, unless the procurement officer determines that a longer period is necessary to resolve the claim. If a decision is not issued within 180 days, the procurement officer shall notify the contractor of the time within which a decision shall be rendered and for the reasons of such time extension. The decision shall be furnished to the contractor, by certified mail, return receipt requested, or by any other method that

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement provides evidence of receipt. The procurement officer’s decision shall be deemed the final action of the University.

h. The procurement officer’s decision shall be final and conclusive unless the contractor mails or otherwise files a written appeal with the Maryland State Board of Contract Appeals within 30 days of receipt of the decision.

i. Pending resolution of a claim, the contractor shall proceed diligently with the performance of the contract in accordance with procurement officer’s decision.

28. EPA Compliance Materials, supplies, equipment and services shall comply in all respects with the federal Noise Control Act of 1972, where applicable. Power equipment, to the greatest extent possible, shall be the quietest available. Equipment certified by the US EPA as a Low Noise Emission Product pursuant to the Federal Noise Control Act of 1972 shall be considered to meet the intent of the regulation.

The Contractor must supply and have immediately available to their employees spill containment equipment/supplies necessary to contain any hazards it may introduce to the job site. The Contractor is responsible for any and all costs incurred by the University in remediating spills or releases of materials introduced onto the job site.

Depending on the nature of the contract, the additional environmental and safety provisions contained in Exhibit A- 1 may also be required

29. FERPA

The Parties agree to maintain the privacy and security of personally identifiable educational records and health information and to prevent disclosure in compliance with Federal laws.

30. Gramm-Leach-Bliley Act of 1999 The Contractor agrees that in performing its obligations under this contract, the Contractor shall comply with all requirements of a non-affiliated third-party who receives a financial institution’s consumer or customer information, under the Gramm-Leach-Bliley Act of 1999 and applicable regulations thereto (the “GLB Act”) and other applicable federal and state consumer privacy acts, rules and regulations. Nonpublic personal information shall have the same meaning as that term is defined in the GLB Act.

a. The Contractor agrees to disclose such nonpublic personal information for the sole purpose of facilitating the Contractor’s performance of its duties and obligations under the contract and will not disclose such nonpublic personal information to any other party unless such disclosure is (i) allowed by the GLB Act and consented to by the University, or (ii) compelled by law, in which case the Contractor will provide notice of such disclosure to the University.

b. The Contractor represents and warrants that it will, for so long as it retains nonpublic personal information, implement and maintain in place the necessary information security policies and procedures for (i) protecting the confidentiality of such nonpublic personal information, (ii) protecting against any anticipated threats or hazards to the security or integrity of such nonpublic personal information, and (iii) protecting against the unauthorized access to or use of such nonpublic personal information. These terms apply to all subcontractors employed by the Contractor who perform work under the scope of the agreement.

If the Contractor’s price includes the cost of Contractor furnishing any other material, equipment, supplies, or other items in connection with the Contract, the Contractor shall pay the Maryland sales tax.

31. Inspection by the University The University may provide for inspection, at any time, of any part of the Contractor's work, and of any of the materials, supplies or equipment which the Contractor may have on hand or in the building. The Contractor shall provide adequate cooperation with any inspector assigned by the University to permit the inspector to determine the Contractor's conformity with these specifications and the adequacy of the work being performed.

32. Intellectual Property Contractor agrees to indemnify and save harmless the University, its officers, agents and employees with respect to any claim, action, cost or judgment for patent infringement, or trademark or copyright violation arising out of purchase or use of materials, supplies, equipment or services covered by the contract.

33. Indemnification The University shall not assume any obligation to indemnify, hold harmless, or pay attorneys' fees that may arise from or in any way be associated with the performance or operation of this agreement.

34. Insurance and Indemnification Provisions

a. The Contractor shall defend, indemnify and save harmless the University System of Maryland, its officers, employees and agents, from any and all claims, liability, losses and causes of actions which may arise out of the performance by the Contractor, employees or agents, of the work covered by the contract.

b. The Contractor shall secure, pay the premiums for, and keep in force until the expirations of the contract, and any renewal thereof, adequate insurance as provided below, such insurance to specifically include liability assumed by the Contractor under the contract.

(1) Commercial General Liability Insurance including all extensions $2,000,000 each occurrence;

$2,000,000 personal injury;

$2,000,000 products/completed operations;

$2,000,000 general aggregate

(2) Workmen’s Compensation Insurance and Unemployment Insurance as required by the laws of the State of Maryland.

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

(4) If automotive equipment is used in the operation, automobile liability insurance of $1,000,000 combined single limit, each accident.

(5) If food products are used in the operation, food products liability insurance, if not included in the Comprehensive, with limits of not less than $1,000,000 for each person and $2,000,000 for each accident.

c. Each policy for liability protection, bodily injury or property damage must specifically name, on its face, Towson University, as an additional named insured as respects operations under the contract and premises occupied by the Contractor provided, however, with respect to the Contractor’s liability for bodily injury or property damage under items b(1)-b(5) above, such insurance shall cover and not exclude Contractor’s liability for injury to the property of the University System and to the persons or property of employees, students, faculty members, agents, officers, regents, invitees or guests of the University System.

d. Each insurance policy shall contain the following endorsements: “It is understood and agreed that the Insurance Company shall notify in writing procurement officer forty-five (45) days in advance of the effective date of any reduction in or cancellation of this policy.” A certificate of each policy of insurance shall be furnished to the procurement officer. With the exception of Workmen’s Compensation, upon the request of the procurement officer, a certified true copy of each policy of insurance, including the above endorsement, manually countersigned by an authorized representative of the insurance company, shall be furnished to the procurement officer. A certificate of insurance for Workmen’s Compensation together with a properly executed endorsement for cancellation notice shall also be furnished. Following the notice of contract award, the requested certificates and policies shall be delivered as directed by the procurement officer. Notices of policy changes shall be furnished to the procurement officer.

e. All required insurance coverages must be acquired from insurers authorized to do business in the State of Maryland and acceptable to the University. The insurers must have a policyholders’ rating of “A-” or better, and a financial size of “Class VII” or better in the latest edition of Best’s Insurance Reports.

35. I-9 Requirement Contractor warrants and represents that it is currently in compliance, and that during the term of the contract it will remain in compliance, with the Immigration Reform and Control Act of 1986, and that it will obtain original valid employment verification documentation from all its employees on a timely basis as required by law and regulation. This requirement also applies to all subcontractors hired by Contractor.

36. Local Conditions Covering Work The Contractor shall cooperate with those in authority on the premises to prevent the entrance and exit of all workmen and/or others whose presence is forbidden or undesirable and in bringing, storing or removal of all materials and equipment, to observe all rules and regulations in force on the grounds, to avoid unnecessary dust or accumulated debris or the undue interference with the convenience, sanitation or routine of the University and to prevent the loss of, or damage to the property of the University and/or its employees. The Contractor shall repair any and all damage he may cause to the building or property, to the full satisfaction of the University.

37. Mandated Contractor Reporting of Suspected Child Abuse & Neglect Maryland law contains mandatory reporting requirements for all individuals who suspect child abuse or neglect.

Contractors performing work on campus also must comply with USM Board of Regents (BOR) VI-1.50 – Policy on the Reporting of Suspected Child Abuse & Neglect, as well as the University Procedures for Reporting Suspected Child Abuse and Neglect. The above-referenced USM/University Policy and Procedures are available in full at the following link:

https://www.towson.edu/about/administration/policies/docu ments/polices/06-01-50-policy-on-the-reporting-of-suspected-child-abuse-and-neglect.pdf, and are incorporated herein. The University reserves the right to terminate the contract if Contractor fails to comply with the above-referenced policy or procedures, or if, in the judgment of the University, termination is necessary to protect the safety and welfare of children who come into contact with the University community.

38. Maryland Law Prevails The contract shall be governed by the laws of the State of Maryland. The parties agree that exclusive jurisdiction shall reside with the state and federal courts in the State of Maryland.

39. Non-Hiring of Employees No employee of the State of Maryland, or any department, commission, agency or branch thereof whose duties as such employee include matters relating to or affecting the subject matter of the contract, shall, while so employed, become or be an employee of the party or parties hereby contracting with the State or any department, commission, agency or branch thereof.

40. Non-Discrimination The Contractor will comply with all applicable Federal and State laws, rules and regulations involving non-discrimination on the basis of race, color, creed, religion, national origin, age, sex, political affiliation, marital status, veteran status, condition of disability, or other non-merit factor. In addition, Towson University’s policies, programs, and activities comply with federal and state laws and University System of Maryland regulations prohibiting discrimination on the basis of race, color, religion, age, national origin, sex, disability, and sexual orientation.

Provisions for reasonable accommodations shall be made by the Contractor for handicapped applicants and qualified handicapped individuals.

https://www.towson.edu/about/administration/policies/documents/polices/06-01-50-policy-on-the-reporting-of-suspected-child-abuse-and-neglect.pdf https://www.towson.edu/about/administration/policies/documents/polices/06-01-50-policy-on-the-reporting-of-suspected-child-abuse-and-neglect.pdf https://www.towson.edu/about/administration/policies/documents/polices/06-01-50-policy-on-the-reporting-of-suspected-child-abuse-and-neglect.pdf

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

41. Non-Visual Access The bidder or offeror warrants that the information technology offered under this bid or proposal (1) provides equivalent access for effective use by both visual and nonvisual means; (2) will present information, including prompts used for interactive communications, in formats intended for both visual and nonvisual use; (3) if intended for use in a network, can be integrated into networks for obtaining, retrieving, and disseminating information used by individuals who are not blind or visually impaired; and (4) is available, whenever possible, without modification for compatibility with software and hardware for nonvisual access. The bidder or offeror further warrants that the costs, if any, of modifying the information technology for compatibility with software and hardware used for nonvisual access will not increase the cost of the information technology by more than 5 percent.

For purposes of this section, the phrase “equivalent access” means that the ability to receive, use and manipulate information and operate controls necessary to access and use information technology by nonvisual means. Examples of equivalent access include keyboard controls used for input and synthesized speech, Braille, or other audible or tactile means used for output.

42. Ownership of Documents and Materials The Contractor agrees that all documents and materials including, but not limited to, reports, drawings, studies, specifications, estimates, maps, photographs, designs, graphics, mechanical, artwork, and computations prepared by or for it under the terms of the contract shall at anytime during the performance of the services be made available to the University upon request by the University and shall become and remain the exclusive property of the University upon termination or completion of the services. The University shall have the right to use same without restriction or limitation and without compensation to the Contractor other than that provided by the contract. The University shall be the owner for purposes of copyright, patent or trademark registration.

43. Patents, Copyrights and Trade Secrets

a. If the Contractor furnishes any design, device, material, process or other item which is covered by a patent or copyright or which is proprietary to or a trade secret of another, Contractor shall obtain the necessary permission or license to use such item.

b. Contractor will defend or settle, at its own expense, any claim or suit against the State alleging that any such item furnished by Contractor infringes any patent, trademark, copyright, or trade secret. Contractor also will pay all damages and costs that by final judgment may be assessed against the State due to such infringement and all attorneys’ fees and litigation expenses reasonably incurred by the State to defend against such a claim or suit. The obligations of this paragraph are in addition to those stated in paragraph c.

c. If any products furnished by Contractor become, or in Contractor's opinion are likely to become, the subject of a claim of infringement, Contractor will, at its option: (1) procure for the State the right to continue using the applicable item; (2) replace the product with a non-infringing product substantially complying with the item's specifications; or (3) modify the item so it becomes non-infringing and performs in a substantially similar manner to the original item.

44. Payment of State Obligations Payments to the Contractor pursuant to this contract shall be made no later than 30 days after the University's receipt of a proper invoice from the Contractor. Charges of late payment of invoices, other than as prescribed by Title 15, subtitle 1, of the State Finance and Procurement Article, Annotated Code of Maryland, or by the Public Service Commission of Maryland with respect to regulated public utilities, as applicable, are prohibited.

45. Policies and Procedures The USM Procurement Policies and Procedures in effect on the date of execution of this Contract are applicable to this Contract.

46. Responsibility of Contractor

a. The Contractor shall perform the services with that standard of care, skill, and diligence normally provided by a Contractor in the performance of services similar to the services hereunder.

b. Notwithstanding any review, approval, acceptance or payment for the services by the University, the Contractor shall be responsible for professional and technical accuracy of its work, design drawings, specifications and other materials furnished by the Contractor under the contract.

47. Responsibility for Claims and Liability The Contractor shall be responsible for all damage to life and property due to its activities or those of its agents or employees, in connection with the services required under the contract. Further, it is expressly understood that the Contractor shall indemnify and save harmless the University, its officers, agents, and employees from and against all claims, suits, judgments, expenses, actions, damages and costs of every name and description, including reasonable attorney's fees and litigation expenses arising out of or resulting from the negligent performance of the services of the Contractor under the contract.

48. Responsibility for Damage

a. The Contractor shall repair and restore to its original condition any equipment, materials or surfaces damaged by its operations.

b. The Contractor shall be entirely responsible for any loss or damage to its own materials, supplies, and equipment, and to the personal property of its employees while they are in the building.

c. The Contractor shall be solely responsible for any damage to the building or its contents for any loss or damage to any property belonging to the University or the University

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement employees when such loss or damage may be attributable to their actions or negligence or the actions or negligence of their employees.

49. Retention of Records The Contractor shall retain and maintain all records and documents relating to the contract for a minimum period of four years after payment by the University of the final invoice and shall make them available for inspection and audit by the State of Maryland.

50. Set-Off The University may deduct from and set off against any amounts due and payable to the Contractor any back-charges or damages sustained by the University by virtue of any breach of the contract by the Contractor or by virtue of the failure or refusal of the Contractor to perform the services or any part of the services in a satisfactory manner. Nothing herein shall be construed to relieve the Contractor of liability for additional costs resulting from a failure to satisfactorily perform the services.

51. Software Contracts:

As specifically provided by § 21-104, Commercial Law Article, Annotated Code of Maryland, the parties agree that this Agreement shall not be governed by the Uniform Computer Information Transactions Act (UCITA), Title 22 of the Commercial Law Article of the Annotated Code of Maryland, as amended from time to time. This Agreement shall be governed by the common law of Maryland relating to written agreements, as well as other statutory provisions, other than UCITA, which may apply, and shall be interpreted and enforced as if UCITA had never been adopted in Maryland.

Contractor agrees that as delivered to buyer, the software does not contain any program code, virus, worm, trap door, back door, timer or clock that would erase data or programming or otherwise cause the software to become inoperable, inaccessible, or incapable of being used in accordance with its user manuals, either automatically upon the occurrence of selected conditions, or manually on command of Contractor.

52. Specifications All materials, equipment, supplies or services shall conform to Federal and State laws and regulations and to the specifications contained in the solicitation. No asbestos, lead, or PCB-containing materials (0%) are to be utilized/installed on campus unless prior written approval has been received from the University's Department of Environmental Health & Safety (410-704-2949).

53. Subcontracting or Assignment The benefits and obligations hereunder shall take effect and be binding upon the parties hereto and neither the contract nor the services to be performed thereunder shall be subcontracted, or assigned or otherwise disposed of, either in whole or in part, except with the prior written consent of the University.

54. Suspension of Work The procurement officer unilaterally may order the Contractor in writing to suspend, delay, or interrupt all or any part of the work for such period of time as he may determine to be appropriate for the convenience of the University.

55. Tax Exemption The State is generally exempt from federal excise taxes, Maryland sales and use taxes, District of Columbia sales taxes, and transportation taxes. Exemption certificates shall be provided upon request. Where a Contractor is required to furnish and install material in the construction of improvement to real property in performance of the Contract, the Contractor shall pay the Maryland sales tax and the exemption does not apply.

56. Termination of Contract for Convenience The performance of work under the contract may be terminated by the University in accordance with this clause in whole, or from time to time in part, whenever the University shall determine that such termination is in the best interest of the University. The University will pay all reasonable costs associated with the contract that the Contractor has incurred up to the date of termination and all reasonable costs associated with termination of the contract.

However, the Contractor shall not be reimbursed for any anticipatory profits which have not been earned up to the date of termination. Termination hereunder, including the determination of the rights and obligations of the parties, shall be governed by the provisions of USM Procurement Policies and Procedures.

57. Termination of Contract for Default If the Contractor fails to fulfill its obligation under the contract properly and on time, or otherwise violates any provision of the contract, the University may terminate the contract by written notice to the Contractor. The notice shall specify the acts or omissions relied on as cause for termination. All finished or unfinished services provided by the Contractor shall, at the University's option, become the University's property. The University shall pay the Contractor fair and equitable compensation for satisfactory performance prior to receipt of notice of termination, less the amount of damages caused by the Contractor's breach. If the damages are more than the compensation payable to the Contractor, the Contractor will remain liable after termination and the University can affirmatively collect damages. The term "damages" as used in this paragraph may include attorney's fees and litigation costs. Termination hereunder, including the determination of the rights and obligations of the parties, shall be governed by the provisions of USM Procurement Policies and Procedures.

58. Termination of Multi-Year Contracts If the General Assembly fails to appropriate funds or if funds are not otherwise made available for continued performance for any fiscal period of the contract succeeding the first fiscal period, the contract shall be canceled automatically as of the

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement beginning of the fiscal year for which funds were not appropriated or otherwise made available; provided, however, that this will not affect either the State's rights or the Contractor's rights under any termination clause in the contract. The effect of termination of the contract hereunder will be to discharge both the Contractor and the State from future performance of the contract, but not from their rights and obligations existing at the time of termination. The Contractor shall be reimbursed for the reasonable value of any non-recurring costs incurred but not amortized in the price of the contract. The State will notify the Contractor as soon as it has knowledge that funds may not be available for the continuation of the contract for each succeeding fiscal period beyond the first

59. Use of Contractor's Forms Not Binding on State

a. Except as provided in b., the use or execution by the State of any forms, orders, agreements, or other documents of any kind, other than the contract documents, used pursuant to or in the administration of any contract awarded by the State to Contractor, shall not bind the State to any of the terms and conditions contained therein except those provisions:

(1) generally describing, for the purposes of ordering:

Equipment or services to be provided, locations, quantities, delivery or installation dates, and, to the extent consistent with the contract documents, prices; and

(2) not otherwise inconsistent with the contract documents.

b. Any such form, order, agreement or other document shall not vary, modify, or amend the terms and provisions of the contract documents, notwithstanding any provision to the contrary in such document, unless all of the following conditions are met:

(1) the document expressly refers to the particular document and provision of the contract documents being modified and plainly and conspicuously identifies any modification thereto as a modification:

(2) the document is executed on behalf of the State by the procurement officer; and

(3) execution of the document is approved by the procurement authority whose approval is required by law.

Exhibit B Bid/Proposal Affidavit

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

A. AUTHORITY

I HEREBY AFFIRM THAT:

I am the (title) ______________________________________________ and the duly authorized representative of

(business) __________________________________________________ and that I possess the legal authority to make this Affidavit on behalf of myself and the business for which I am acting.

B. AFFIRMATION REGARDING BRIBERY CONVICTIONS

I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business

(as is defined in Section 16-101(b) of the State Finance and Procurement Article of the Annotated Code of Maryland), or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies has been convicted of, or has had probation before judgment imposed pursuant to Criminal Procedure Article, §6-220, Annotated Code of

Maryland, or has pleaded nolo contendere to a charge of, bribery, attempted bribery, or conspiracy to bribe in violation of Maryland law, or of the law of any other state or federal law, except as follows (indicate the reasons why the affirmation cannot be given and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of person(s) involved, and current positions and responsibilities with the business):

C. AFFIRMATION REGARDING OTHER CONVICTIONS RETAINED

I FURTHER AFFIRM THAT: Neither I, nor to the best of my knowledge, information, and belief, the above business, or any of its officers, directors, partners, controlling stockholders, or any of its employees directly involved in the business's contracting activities including obtaining or performing contracts with public bodies, has:

(1) Been convicted under state or federal statute of:

(a) A criminal offense incident to obtaining, attempting to obtain, or performing a public or private contract;

or

(b) Fraud, embezzlement, theft, forgery, falsification or destruction of records or receiving stolen property;

(2) Been convicted of any criminal violation of a state or federal antitrust statute;

(3) Been convicted under the provisions of Title 18 of the United States Code for violation of the Racketeer

Influenced and Corrupt Organization Act, 18 U.S.C. §1961 et seq., or the Mail Fraud Act, 18 U.S.C. §1341 et seq., for acts in connection with the submission of bids or proposals for a public or private contract;

Rev. 8-30-24

Procurement Towson University - 8000 York Rd, Towson MD 21252 - 410-704-2171 - towson.edu/procurement

(4) Been convicted of a violation of the State Minority Business Enterprise Law, §14-308 of the State Finance and

Procurement Article of the Annotated Code of Maryland;

(5) Been convicted of a violation of §11-205.1 of the State Finance and Procurement Article of the Annotated Code of Maryland;

(6) Been convicted of conspiracy to commit any act or omission that would constitute grounds for conviction or liability under any law or statute described in subsections (1) - (5) above;

(7) Been found civilly liable under a state or federal antitrust statute for acts or omissions in connection with the submission of bids or proposals for a public or private contract;

(8) Been found in a final adjudicated decision to have violated the Commercial Nondiscrimination Policy under

Title 19 of the State Finance and Procurement Article of the Annotated Code of Maryland with regard to a public or private contract; or

(9) Admitted in writing or under oath, during the course of an official investigation or other proceedings, acts or omissions that would constitute grounds for conviction or liability under any law or statute described in §§B and C and subsections D(1)—(8) above, except as follows (indicate reasons why the affirmations cannot be given, and list any conviction, plea, or imposition of probation before judgment with the date, court, official or administrative body, the sentence or disposition, the name(s) of the person(s) involved and their current positions and responsibilities with the business, and the status of any debarment):

D. AFFIRMATION REGARDING DEBARMENT

I FURTHER AFFIRM…