TO 00-5-15.pdf
PDF 3 MB Posted
- Attached to
- 10th Logistics Readiness Squadron Services Federal contract opportunity
- Solicitation number
- FA700023R0013
About this file
This solicitation is for logistics readiness services at the 10th Logistics Readiness Squadron at the Air Force Academy. Required services include supply chain management, transportation, and vehicle management. The period of performance is one base year with four one-year options. The total estimated value is $5 million. The solicitation was issued on July 1, 2023 with proposals due by July 22. The source selection and award is estimated for September 2023. The solicitation is set aside for small businesses. The federal agency is the Department of the Air Force Headquarters at the Air Force Academy. The incumbent contractor was not identified.
View the file
Other files for this federal contract opportunity
Show all 31
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TO 00-5-15
TECHNICAL MANUAL
AIR FORCE
TIME COMPLIANCE TECHNICAL ORDER
PROCESS
This manual supersedes TO 00-5-15 dated 22 September 2014, Change 1 dated 14 February 2016.
DISTRIBUTION STATEMENT A - Approved for public release; distribution is unlimited. Headquarters (HQ) AFMC/PA Certificate Number AFMC 04-320. Submit recommended changes or problems with this Technical Order to Robins AFLCMC/EZGTP, Robins AFB, GA 31098. Questions concerning technical content shall be referred to AFMC/A4F.
Published Under Authority of the Secretary of the Air Force
29 SEPTEMBER 2017
Dates of issue for original and changed pages are:
Original. . . . . . . .0 . . .29 September 2017
TOTAL NUMBER OF PAGES IN THIS PUBLICATION IS 194, CONSISTING OF THE FOLLOWING:
Page *Change No. No.
Page *Change No. No.
Page *Change No. No.
Title A i - xxv xxvi Blank 1-1 - 1-5 1-6 Blank 2-1 - 2-12 3-1 - 3-67 3-68 Blank 4-1 - 4-5 4-6 Blank 5-1 - 5-11 5-12 Blank 6-1 - 6-14 7-1 - 7-9 7-10 Blank 8-1 - 8-4 9-1 - 9-12 10-1 - 10-5 10-6 Blank A-1 - A-5 A-6 Blank B-1 - B-2 Glossary 1 - Glossary 8
TO 00-5-15
LIST OF EFFECTIVE PAGES
INSERT LATEST CHANGED PAGES. DESTROY SUPERSEDED PAGES.
NOTE The portion of the text affected by the changes is indicated by a vertical line in the outer margins of the page. Changes to illustrations are indicated by shaded or screened areas, or by miniature pointing hands.
* Zero in this column indicates an original page.
A USAF
TABLE OF CONTENTS
Chapter Page
LIST OF ILLUSTRATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
LIST OF TABLES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ix
INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . xi
1 POLICY, RESPONSIBILITIES, MODIFICATION AND FUNDING OVERVIEW . . . . . . . . . . . . . . . . 1-1
1.1 TIME COMPLIANCE TECHNICAL ORDER (TCTO) POLICY OVERVIEW . . . . . . . . . . . 1-1
1.1.1 Enhanced Technical Information Management System (ETIMS) . . . . . . . . . . . . . . . . . . . . . 1-1
1.1.2 TCTO Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.1.3 TCTO Software Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.1.4 Applicability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1.1.5 Program Management Directive . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.1.6 Exceptions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2 RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2.1 Program Manager (PM). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2.2 Chief Engineer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1.2.3 Production Management Activity (e.g., Equipment Specialist [ES], Engineer, TO Manager, Pro-duction Management Specialist) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2.4 Technical Content Manager/Equipment Specialist (TCM/ES). . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2.5 TO Manager . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2.6 Air Force Life Cycle Management Center (AFLCMC) Technical Order Offices . . . . . . . . . . . 1-3
1.2.7 Air Force Nuclear Weapons Center (AFNWC) Nuclear Logistics Division
(AFNWC/NCL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.2.8 eTCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.3 MODIFICATION DOCUMENTATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.3.1 Submitting Proposed Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-3
1.3.2 Implementing Modifications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.4 DISTRIBUTION STATEMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5 TCTO, TCTO KIT AND TO UPDATE FUNDING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.1 Funding Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.2 Coverage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.3 TO Updates. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.4 TCTO Loading and Processing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.5 Local One Time Inspection (OTI) TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.5.6 Inspection TCTO Funding . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.6 REPORTING DEFICIENCIES IN TCTO INSTRUCTIONS OR KITS . . . . . . . . . . . . . . . . . 1-4
1.6.1 TCTO Document Deficiencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.6.2 TCTO Kit Deficiencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-4
1.6.3 TCTO Kit Technical Instruction Deficiencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.6.4 TCTO Kit Shortages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.7 PRELIMINARY TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.7.1 Authorizing Use of Preliminary TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1.7.2 Preliminary Depot-Level TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
2 MODIFICATION TYPES, PRIORITIES, AND TCTO FORMAT . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1 MODIFICATION TYPES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1.1 Permanent Modification. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1.2 Temporary Modification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1.2.1 Temporary T-1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
2.1.2.2 Temporary T-2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1 i
2.1.3 Modifications Affecting Emergency Rescue Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.2 TCTO TYPES, PRIORITIES, AND LEVELS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.2.1 Modification TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.2.2 Inspection TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.2.3 Commodity TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-2
2.2.4 Companion TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
2.2.5 TCTO Supplements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-3
2.2.6 Record TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
2.2.7 Safety TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.3 TCTO PRIORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.3.1 Immediate Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
2.3.2 Urgent Action TCTO Priority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.3.3 Routine Action TCTO Priority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.4 DESIGNATED LEVEL OF ACCOMPLISHMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.4.1 Organizational or Intermediate Level Accomplishment . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2.4.2 Depot-Level Accomplishment. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.4.3 On-Equipment vs. Off-Equipment TCTO Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.5 SPECIAL CONDITION TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.5.1 TCTOs on Special Federal Supply Group (FSG) Items. . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.5.2 TCTOs on Radar Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.5.3 TCTOs Applicable to Security Assistance Program (SAP)/Foreign Military Sales (FMS) . . . . . 2-7
2.5.4 Electronic Warfare (EW) Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-7
2.6 MODIFICATIONS TO COMMERCIAL-DERIVATIVE AIRCRAFT . . . . . . . . . . . . . . . . . . 2-8
2.7 COMMERCIAL AND OTHER-DOD-COMPONENT MODIFICATION INSTRUCTIONS . . . 2-8
2.7.1 Commercial Publications Directing Modifications to Systems or End Items . . . . . . . . . . . . . . 2-8
2.7.2 Commercial Manuals and Associated TCTOs Distribution . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.8 SPECIAL TCTO TYPES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.8.1 Category 2 TCTO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.8.2 Single System or End Item TCTO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.8.3 Corrective Action TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.8.4 TCTOs Affecting Flight Manual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.9 INTERIM TCTO (ITCTO). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2.10 NON-TCTO MODIFICATION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.10.1 Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.11 EXCEPTION: IMPLEMENTING AND MONITORING SERVICE BULLETIN AND RE-
CALL COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.12 RETROFIT CHANGES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.12.1 Spares in Stock or War Reserve Materiel (WRM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.12.2 WRM Assets . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.12.3 Nuclear Weapons Retrofit Orders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.13 TCTO FORMAT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
2.13.1 TCTO Markings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
3 TCTO DEVELOPMENT, IMPLEMENTATION, PUBLISHING, UPDATING, COORDINATION, AND
DOCUMENTATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.1 MODIFICATION NEED DETERMINATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.2 CONFIGURATION CONTROL BOARD (CCB) REVIEW (ECP or TCTO) . . . . . . . . . . . . . 3-1
3.2.1 Contractor Driven ECPs or MAJCOM PMDs Modifications . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.2.2 AFTO Form 872 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
3.3 TCTO DEVELOPMENT PROCESS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-19
3.3.1 TCTO Development Process Flow . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20
3.3.2 Modification Path . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-20
3.4 TCTO NUMBER ASSIGNMENT FROM ENHANCED TECHNICAL INFORMATION MAN-
AGEMENT SYSTEM (ETIMS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
TO 00-5-15
TABLE OF CONTENTS - CONTINUED
ii
3.4.1 TCTO Series Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
3.5 FORMAL OR INTERIM TCTO REQUIREMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
3.6 CONTRACTOR-PREPARED TCTOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
3.6.1 Data Calls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
3.6.2 Development of TO Data Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-22
3.6.3 AFTO Form 874 (Kits/Special Tools Required). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.6.4 Recommended Changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.6.5 Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7 ORGANICALLY-PREPARED TCTOS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7.1 AFTO Form 874 Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7.2 Recommended Changes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7.3 TCTO Format . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7.4 TCTO History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.7.5 Pre-Release Review Group Meeting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-23
3.8 PRODUCTION SYSTEMS OR COMMODITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24
3.9 TCTO DOCUMENTATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24
3.10 AFTO FORM 873 AND COMPLETION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . 3-24
3.11 AFTO FORM 874 AND COMPLETION INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . 3-34
3.11.1 TCM Responsibilities for Contractor-Prepared AFTO Forms 874 . . . . . . . . . . . . . . . . . . . . . 3-34
3.11.2 TCM Responsibilities for Organically-Prepared AFTO Forms 874 . . . . . . . . . . . . . . . . . . . . 3-35
3.11.3 Program Manager (PM) Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35
3.11.4 IM and DLA Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-35
3.11.5 Cataloging Activity Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36
3.11.6 Production Management Activities Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36
3.11.7 AFTO Form 874 and Completion Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36
3.11.7.1 Responsibilities . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-36
3.12 AFTO FORM 875, TIME COMPLIANCE TECHNICAL ORDER PROGRAMMING
DOCUMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-48
3.12.1 General. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-48
3.12.2 AFTO Form 875 Retention . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-48
3.12.3 AFTO Form 875, Time Compliance Technical Order Programming . . . . . . . . . . . . . . . . . . . 3-54
3.13 COORDINATION OF TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-59
3.13.1 PM Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-59
3.13.2 Additional Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-59
3.13.3 Immediate and Urgent Action TCTOs Coordination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.13.4 Aerospace Emergency Rescue Data. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.13.5 Quality Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.14 PUBLISHING TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.14.1 AFTO Form 82, TCTO Verification Certificate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.14.2 Pre-Release Review Group (PRRG) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-60
3.14.3 Illustrations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
3.14.4 Post-Publication Reviews. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
3.15 UPDATING AFFECTED TECHNICAL ORDERS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
3.15.1 Changes to TO and Flight Manual Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
3.16 DEPOT FIELD TEAM SUPPORT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-61
3.17 TCTO CONTROL RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.17.1 Materiel Improvement Project (MIP) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.17.2 Schedules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18 TCTO DOCUMENTATION AND TRACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.1 TCTO Master Record in REMIS and Follow-up . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.2 TCTO Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.3 TCTO Routing. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.4 Master Record . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.5 Compliance Period or Rescission Date Extensions Reporting . . . . . . . . . . . . . . . . . . . . . . . 3-62
3.18.6 Pass/Fail Documentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-62
TO 00-5-15
iii
3.19 TCTO POSTING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63
3.20 TCTO COMPLIANCE PERIODS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63
3.20.1 Inspection, Modification, and Safety TCTO Compliance Period Start Dates and
Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63
3.20.2 Multiple Compliance Periods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-63
3.21 TCTO IMPLEMENTATION PROCESS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-66
4 TCTO, KIT, AND DATA CODE NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1 TCTO NUMBERING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1.1 TCTO Series Headers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1.2 Numbering and Indexing eTCTOs and eTCTO Supplements . . . . . . . . . . . . . . . . . . . . . . . . 4-1
4.1.3 Mission Design Series. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.4 General Series . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.5 Missile, Aircraft or C-E. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.6 System and Training Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.7 Training Equipment Only . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.8 TCTOs Involving Computer Programs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.9 Immediate and Urgent TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
4.1.10 Supplements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4.2 NUMBERING KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4.2.1 TCTO Kit Identification Number Data Fields . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4.3 TCTO DATA CODE NUMBERS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4.3.1 Data Code Numbers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4.3.2 Data Code Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4.3.3 IMDS Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4.3.4 TCTO Supplements Requiring Additional Work . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
5 TCTO KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.1 GENERAL TCTO KIT METHODS AND PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.1.1 TCTO Kit Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.2 COMPLETE KIT CONCEPT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.2.1 Exceptions to Complete Kit Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
5.3 TCTO KIT MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.1 Assembly, Storage, and Distribution of Kits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.2 Local Manufacture/Purchase Items . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.3 Simulators, Mobile Training Units, Trainers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.4 Time/Storage-Limited Material . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.5 Depot-Level Parts and Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5.3.6 Containers. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.7 Substitute Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.8 Procured Kits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.9 Computer Software. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.10 Special Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.11 Training Equipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.3.12 Expendability, Recoverability, Reparability, Code (ERRCD) Designator . . . . . . . . . . . . . . . . 5-3
5.4 TCTO KIT ACCOUNTABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.4.1 Kit Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.4.2 Kit Procurement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.4.3 Inspection TCTOs and Condition Inspection TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5.4.4 Funding for Stock, Store, or Issue of Materiel not Authorized by Air Force. . . . . . . . . . . . . . 5-4
5.4.5 Re-identification and Stock List Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5.4.6 Item interchangeability and substitution (I&S) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5.4.7 MCR-1 Publication File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
TO 00-5-15
iv
5.4.8 Management Coding On Supply Records . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.9 Items/Spares Affected by TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.10 Inadvertent Reinstallation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.11 Safety of Flight Warning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.12 Shelf Life Item Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
5.4.13 AF Kits Procured by Sister Services . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.4.14 Locally Manufacture Parts Required for Technical Order Compliance. . . . . . . . . . . . . . . . . . 5-6
5.5 ASSEMBLY OF TCTO KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.5.1 Depot Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.5.2 Contractor Assembly. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.6 DEPOT-LEVEL KITS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-6
5.7 DEPOT STORAGE OF KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.7.1 Storage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.7.2 Parts Required . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.7.3 Repair . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.7.4 Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.8 REPORTING OF TCTO KITS IN SUPPLY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.8.1 Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.8.2 Initial Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9 DISTRIBUTION OF TCTO KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.1 Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.2 Receipt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.3 TCTO Kit Shipment . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.4 TCTO Kits Not Received . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.5 TCTO Kits Issued But Not Installed . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-7
5.9.6 Transfer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.9.7 Retrofit Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.9.8 TCTO Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.10 RELEASE OF KITS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.10.1 Requisitioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.10.2 Delayed Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.10.3 Failure Receipt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.11 DISPOSITION OF TCTO KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-8
5.11.1 Disassembly/Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.11.2 Completion Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.11.3 Requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.12 SUBSTITUTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.12.1 Non-Kitted Materials . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.12.2 Field-Level TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.13 DEPOT-LEVEL TCTO KIT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.13.1 Non-Kit Type TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.13.2 Required Computer Programs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-10
5.13.3 Waivers to Complete Kit Concept . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11
5.14 EXCESS KITS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11
5.15 TCTO Kit Reconciliation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-11
6 TCTO VERIFICATION, RELEASE OF TCTOS, KITS AND TECHNICAL DATA . . . . . . . . . . . . . . . 6-1
6.1 TCTO VERIFICATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.1.1 Prototyping . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.1.2 Prototyping and Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.2 APPLICABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.2.1 Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.2.2 Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-1
6.2.3 TCTO Verification Waivers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
TO 00-5-15
v
6.3 REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.1 Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.2 Observation of Personnel. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.3 Organic Depot Skills. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.4 Contractor Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.5 Verification Requirement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.6 Government Verification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.3.7 Minimum Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-6
6.4 RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.4.1 Air Force Materiel Command. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.4.2 Lead and Using Commands . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-7
6.4.3 Depot Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.5 TOMA . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6 PROCEDURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6.1 General Verification Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6.2 Specific Verification Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6.4 Verification Execution Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-8
6.6.5 Verification Failure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.6.6 TCTO/Kit Disapproval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.6.7 Resolution of Deficiencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7 RELEASE OF TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7.1 Release of TCTO Kits and Technical Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7.2 Immediate Action TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7.3 Urgent Action TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7.4 Release of Immediate, Urgent Action TCTOs, or Rapid Action Changes (RAC). . . . . . . . . . . 6-9
6.7.5 Interim Operational or Safety Supplements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-9
6.7.6 Routine Action TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.7 Initial Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.8 Record TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.9 Requisitioning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.10 Delayed Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.11 Failure Receipt . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.7.12 Release. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.8 RELEASE OF TO UPDATES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.8.1 Concurrent Release of Existing TO Updates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.8.2 Release of Before and After TO Updates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.9 ELECTRONIC DISTRIBUTION OF TIME COMPLIANCE TECHNICAL ORDERS. . . . . . . 6-10
6.9.1 Electronic Distribution of eTCTOs Using ETIMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-10
6.10 OTHER ETCTO DISTRIBUTION SYSTEMS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-11
6.10.1 PDF eTCTOs with Paper Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-11
6.10.2 HTML/XML eTCTOs with Paper Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12
6.11 DISTRIBUTION USING EMAIL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12
6.11.1 Simple Mail Transfer Protocol (SMTP) Email (Microsoft Office Outlook) with CAC . . . . . . . 6-12
6.11.2 Secure Distribution via Email. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-12
6.11.3 Encrypting Email . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.11.4 Exchanging Emails with TODO Organizational Accounts . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.12 DISTRIBUTION USING THE INTERNET . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.12.1 Non-ETIMS Sites. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.12.2 AF SharePoint Folders . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.12.3 Other Distribution Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-13
6.13 AIR FORCE TECHNICAL ORDER FUNCTIONAL SUPPORT (TOFST) GROUP TRAINING
AND CONTACT INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
6.13.1 AFTOFST E-mail. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
6.13.2 AF Technical Order Field Support Team SharePoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
TO 00-5-15
vi
6.13.3 AF TO System Training SharePoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
6.13.4 AF Technical Order Managers SharePoint . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6-14
7 COMPLIANCE WITH TIME COMPLIANCE TECHNICAL ORDERS . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.1 TCTO COMPLIANCE MANAGEMENT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.1.1 Maintenance Information Systems. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.1.2 Required TCTO Management Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-1
7.2 PERFORMING ACTIVITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
7.2.1 Base Level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
7.2.2 Depot Maintenance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-3
7.2.3 Contractors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4
7.2.4 Deployed, Transient, SAP/FMS Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4
7.2.5 Systems or Commodities (RSP, WRM, Spares) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-4
7.2.6 Research and Development Missions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.3 SPECIAL CIRCUMSTANCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.3.1 Rescinded TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.3.2 Extending the Compliance Period . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.3.3 Documentation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-5
7.3.4 Extending the Rescission Date . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6
7.3.5 Cancellation of a TCTO . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-6
7.3.6 Waivers to TCTO Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-8
7.3.7 TCTO Suspension (Abeyance) and Demodification of Items . . . . . . . . . . . . . . . . . . . . . . . . 7-9
7.4 MANAGEMENT CODING OF SUPPLY RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
7.4.1 Procedures Affecting Safety or Hazardous Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
7.4.2 Materiel Control. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
7.4.3 Accounting Personnel . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
7.5 MAINTENANCE RECORDS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7-9
8 RESCISSION, EXTENSION, REINSTATEMENT AND REPLACEMENT OF TCTOS. . . . . . . . . . . . . 8-1
8.1 RESCISSION OF TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.1.1 TO Manager Procedures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.1.2 Production Management Activity (PMA) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-1
8.1.3 Rescission Dates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-2
8.2 REINSTATEMENT OF TCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-3
8.2.1 Reinstatement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8.2.2 Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8.2.3 Updating REMIS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8.3 REPLACEMENT OF TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8.3.1 Conditions of Replacement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
8.3.2 Replacement TCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8-4
9 INTERIM TCTOS (ITCTO) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
9.1 GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-1
9.2 PROVISIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2
9.2.1 Redistribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2
9.3 USES OF ITCTOS AND PRIORITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-2
9.3.1 Interim Time Compliance Technical Orders (ITCTO) and ITCTO Supplements . . . . . . . . . . . 9-2
9.3.2 Immediate Action, Urgent Action, and Routine Safety Inspection TCTOs . . . . . . . . . . . . . . . 9-3
9.3.3 Routine TCTOs for ICBM and Associated SE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
9.3.4 Record TCTOs for ICBMs and Associated SE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
9.3.5 Interim TCTO Supplements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-3
9.4 ITCTO APPLICABILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
TO 00-5-15
vii
9.5 AUTHORIZATION FOR ITCTOs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
9.6 SECURITY ASSISTANCE PROGRAM (SAP)/FOREIGN MILITARY SALES (FMS)
SUPPORT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
9.6.1 Approval. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-5
9.6.2 Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
9.7 RESPONSIBILITIES, NOTIFICATION, AND ISSUE OF ITCTOs . . . . . . . . . . . . . . . . . . . 9-6
9.7.1 Program Manager (PM). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-6
9.8 CHIEF ENGINEER . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.9 TO MANAGERS/FLIGHT MANUAL MANAGERS (FMMS) - AFI 11-215 . . . . . . . . . . . . . 9-11
9.10 TECHNICAL CONTENT MANAGERS (TCM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.11 HQ AFMC FLIGHT SAFETY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.12 TO-USING ORGANIZATIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.13 SUSPENSION AND RESCISSION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.14 INDEXING ITCTOs. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.15 ITCTO PROCEDURES TO REMOVE SYSTEMS OR COMMODITIES FROM
SERVICE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.15.1 Notification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.15.2 Alternate Courses of Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-11
9.16 ITCTO DISTRIBUTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12
9.16.1 ITCTO Distribution Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9-12
10 ADVANCE NOTIFICATION SYSTEM (ANS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.1 ANS GENERAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.2 ANS RESPONSIBILITIES, NOTIFICATION, AND ISSUE . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.3 ANS ACCESSIBILITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.4 ANS FEATURES. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.5 PM ANS RESPONSIBILITIES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.5.1 Program Manager (PM). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-1
10.6 SECURITY ASSISTANCE PROGRAM (SAP)/FOREIGN MILITARY SALES (FMS)
SUPPORT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2
10.7 FLEET GROUNDING PROCESS FLOW . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10-2
APPENDIX A MAINTENANCE INFORMATION MANAGEMENT SYSTEM (MIMS)
DESCRIPTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
A.1 RELIABILITY AND MAINTAINABILITY INFORMATION SYSTEM (REMIS) (G099) . . . . A-1 A.2 GENERIC CONFIGURATION STATUS ACCOUNTING SUBSYSTEM (GCSAS) . . . . . . . . A-1 A.3 COMPREHENSIVE ENGINE MANAGEMENT SYSTEM (CEMS) (D042) . . . . . . . . . . . . . A-2 A.4 CORE AUTOMATED MAINTENANCE SYSTEM (CAMS) (G054) . . . . . . . . . . . . . . . . . . A-3
A.5 CORE AUTOMATED MAINTENANCE SYSTEM FOR AIRLIFT (CAMAS) (G081) . . . . . . A-5
APPENDIX…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .